START-UP CHECKLIST

UNIT : ........................ Document No. : SLK-KTG1-OPR-CL-TBN-006

SYSTEM : VACUUM PUMP SYSTEM START-UP PERIOD : ............... / ............... / .....................

NO EQUIPMENT RECOMMENDED Check ( √ ) REMARKS

VACUUM PUMP

1 Seal System Must be Normal


2 Level Separator Must be Normal
3 Manual Valve inlet from Condenser Must be Open
4 Vacuum Break Must be Close
Inlet valve make up water separator Must be open
selenoid valve make up water separator Must be Close
5 Filling start up, if level normal must be
Bypass inlet valve make up water separator Must be open
closed
Manual Valve for Venting Air Must be Open Close after water out
6 Manual Valve Inlet of HE Must be Open
7 Manual Valve Outlet of HE Must be Open
8 Pneumatic inlet valve vacuum pump Must be closed
Visual Inspection After Pump Running
- Abnormal Sound Normal sound
9
- Any Vibration to Line or Pump Normal vibration
-Abnormal ampere Normal ampere
GLAND SEAL STEAM SYSTEM
Motorized outlet valve aux front desuperheating Must be Open
Motorized outlet valve aux rear desuperheating Put in to operation
All Drain System from Auxiliary Header to Sealing System Must be Open After seal steam header normal, close
Valve drain front sealing HP cylinder Must be Open After seal steam header normal, close
10 Valve rear front sealing HP cylinder Must be Open After seal steam header normal, close
Valve front sealing LP cylinder Must be Open After seal steam header normal, close
Valve rear sealong LP cylinder Must be Open After seal steam header normal, close
11 Motorized Valve from Auxiliary Steam Header to Gland Steam Must be Open
12 Pneumaic Valve from Auxiliary Steam Header to Gland Steam Must be Close
13 Manual Valve inlet HP cylinder and LP Cyiinder Must be Open
14 Motorized Valve Over Flow to Condenser and LPH#8 Must be Open
15 Pneumatic Valve Over Flow to Condenser and LPH#8 Must be Closed
16 Manual Valve Over Flow to Condenser Must be Open
17 Manual Valve Over Flow to LPH #8 Must be Open
Manual Valve Drain from Gland Steam Condensate to
18 Must be Open
multistage
Visual Inspection After Fan Running
- Any Leakage No any leakage
19
- Abnormal Sound Normal sound
- Any Vibration to Line or Fan Normal vibration

Checked by : Approved by :
Turbine Operator DCS Operator Shift Leader