Once a control has been implemented, another hazard identification should be conducted to make

sure the control is effective, or its introduction has not caused a new hazard. If a hazard is found, a
fresh risk assessment should be made, and control measures implemented. If a hazard is not
eliminated, the risk merely reduced, the hazard should be included in the hazard register and subject
to a regular review.