A= 0.1500
1/A = 6.6667
Utama
dia 19 12 = 178.4000 kg
dia 12 2 = 11.8267 kg
= 190.2267 kg
sengkang
dia 10
0.1250
54.0000 1.6 = 53.5680 kg
= 53.5680 kg
= 243.7947 kg
2 Balok 30/40 6
A= 0.1200
1/A = 8.3333
Utama
dia 19 7 = 130.0833 kg
dia 14 2 = 20.1500 kg
= 150.2333 kg
sengkang
dia 10
0.1250
67.0000 1.4 = 58.1560 kg
= 58.1560 kg
= 208.3893 kg
9 kolom 20/20
A= 0.0400
1/A = 25.0000
Utama
dia 12 8 = 177.4000 kg
= 177.4000 kg
sengkang
dia 10
0.1250
201.0000 0.8 = 99.6960 kg
= 99.6960 kg
= 277.0960 kg
Balok 15/20
A= 0.0300
1/A = 33.3333
Utama
dia 12 5 = 147.8333 kg
dia 10 0 = 0.0000 kg
= 147.8333 kg
sengkang
dia 8
0.1250
267.0000 0.7 = 73.4517 kg
= 73.4517 kg
= 221.2850 kg
= 157.6889 kg
sengkang
dia 8
0.1500
297.0000 0.6 = 70.0326 kg
= 70.0326 kg
= 227.7215 kg
Kolom 40/40
A= 0.1600
1/A = 6.2500
Utama
dia 16 8 = 79.0000 kg
= 79.0000 kg
sengkang
dia 10
0.1200
53.0000 1.6 = 52.5760 kg
= 52.5760 kg
= 131.5760 kg
Kolom 20/340
A= 0.0800
1/A = 12.5000
Utama
dia 16 4 = 79.0000 kg
dia 12 2 = 22.1750 kg
= 101.1750 kg
sengkang
dia 10
0.1200
105.0000 1.2 = 78.1200 kg
= 78.1200 kg
= 179.2950 kg
A= 0.0800
1/A = 12.5000
Utama
dia 16 0 = 0.0000 kg
dia 12 0 = 0.0000 kg
= 0.0000 kg
sengkang
dia 10
0.1200
105.0000 0 = 0.0000 kg
= 0.0000 kg
= 0.0000 kg
DAFTAR HARGA SATUAN
Proyek :
UPAH
1 Mandor hari Rp. 70,000.00
2 Kepala tukang hari Rp. 70,000.00
3 Tukang (batu, kayu, besi, cat) hari Rp. 65,000.00
4 Pekerja hari Rp. 45,000.00
BAHAN
1 Air ltr Rp. 65.00
2 Ampelas lbr Rp. 3,780.00
3 Balok bekisting (kayu kelas III) m3 Rp. 1,825,200.00
4 Balok lanan (kayu kelas II) m3 Rp. 2,430,100.00
5 Balok ulin (kayu kelas I) m3 Rp. 4,738,900.00
6 Batu bata bj Rp. 400.00
7 Batu cor/kerikil m3 Rp. 79,400.00
8 Batu kali/batu gunung m3 Rp. 106,900.00
9 Bendrat/kawat besi beton kg Rp. 18,000.00
10 Beugel kg Rp. 17,000.00
11 Besi beton polos kg Rp. 14,500.00
12 Besi beton ulir kg Rp. 16,000.00
13 Cat dasar kg Rp. 16,400.00
14 Cat kilap setara "Danalac" kg Rp. 34,700.00
15 Cat tembok setara "Danabrite" (interior) kg Rp. 29,400.00
16 Cat meni kg Rp. 18,900.00
17 Ceiling panel/gypsum bertekstur type byhua 9 mm m2 Rp. 95,000.00
+ exposed grid ceiling systems
18 Closed jongkok warna bh Rp. 227,100.00
19 Closed duduk warna (lengkap) bh Rp. 2,271,900.00
20 Dempul kg Rp. 16,400.00
21 Engsel Nylon 3" kualitas Baik psg Rp. 9,460.00
22 Engsel Nylon 4" kualitas Baik psg Rp. 11,300.00
23 Espagnolet tanam (SES) psg Rp. 50,400.00
24 Formtie bh Rp. 2,800.00
25 Floor drain bh Rp. 15,000.00
26 Handle jendela bh Rp. 6,000.00
27 Galam sedang dia 3,5 - 5 cm bh Rp. 3,750.00
28 Genteng Metal 3.5 mm dua susun lbr Rp. 34,000.00
29 Grendel kualitas baik bj Rp. 7,570.00
30 Kaca polos tebal 5 mm m2 Rp. 63,100.00
31 Kaca polos tebal 8 mm m2 Rp. 105,000.00
32 Kait angin kualitas baik bh Rp. 4,410.00
33 Kalsiborad Lbr Rp. 165,000.00
34 Kran ledeng stainless bh Rp. 9,000.00
35 Keramik uk. 20x20 warna m2 Rp. 57,000.00
36 Keramik uk. 30 x 30 warna m2 Rp. 63,000.00
37 Keramik uk. 40 x 40 warna m2 Rp. 80,000.00
NO. URAIAN UPAH / BAHAN SATUAN HARGA SATUAN
I PEKERJAAN PERSIAPAN
5 Urugan Pasir 1 M3
JUMLAH
60,133.10
8,000.00
35,500.00
43,650.00
11,833.33
26,000.00
42,040.00
JUMLAH
41,700.00
40,840.00
565,646.50
508,982.00
204,212.40
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
8 Acian 1 M2
7 Pasang Gerendel 1 Bh
1.05000 M2 Vinyl type Mipolam Troplan 100 + Rp. 285,000.00 Rp. 299,250.00
welding rod ( Gerflor )
0.35000 Kg Lem Vinyl Rp. 30,000.00 Rp. 10,500.00
0.15000 Oh Pekerja Rp. 45,000.00 Rp. 6,750.00
0.00800 Oh Mandor Rp. 70,000.00 Rp. 560.00
0.15000 Oh Tukang Rp. 65,000.00 Rp. 9,750.00
0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00
Rp. 18,110.00 Rp. 309,750.00 Rp. 327,860.00
1.05000 M2 Vinyl type Mipolam 180 + welding rod Rp. 260,000.00 Rp. 273,000.00
( Gerflor )
0.35000 Kg Lem Vinyl Rp. 30,000.00 Rp. 10,500.00
0.15000 Oh Pekerja Rp. 45,000.00 Rp. 6,750.00
0.00800 Oh Mandor Rp. 70,000.00 Rp. 560.00
0.15000 Oh Tukang Rp. 65,000.00 Rp. 9,750.00
0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00
Rp. 18,110.00 Rp. 283,500.00 Rp. 301,610.00
0.11000 M2 Vinyl type Mipolam Troplan 100 + Rp. 275,000.00 Rp. 30,250.00
capping strip ( Gerflor )
0.08000 Kg Lem Vinyl Rp. 30,000.00 Rp. 2,400.00
0.08000 Oh Pekerja Rp. 45,000.00 Rp. 3,600.00
0.00400 Oh Mandor Rp. 70,000.00 Rp. 280.00
0.08000 Oh Tukang Rp. 65,000.00 Rp. 5,200.00
0.00800 Oh Kepala Tukang Rp. 70,000.00 Rp. 560.00
Rp. 9,640.00 Rp. 32,650.00 Rp. 42,290.00
0.11000 M2 Vinyl type Mipolam 180 + capping Rp. 250,000.00 Rp. 27,500.00
strip ( Gerflor )
0.08000 Kg Lem Vinyl Rp. 30,000.00 Rp. 2,400.00
0.08000 Oh Pekerja Rp. 45,000.00 Rp. 3,600.00
0.00400 Oh Mandor Rp. 70,000.00 Rp. 280.00
0.08000 Oh Tukang Rp. 65,000.00 Rp. 5,200.00
0.00800 Oh Kepala Tukang Rp. 70,000.00 Rp. 560.00
Rp. 9,640.00 Rp. 29,900.00 Rp. 39,540.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
I PEKERJAAN PERSIAPAN
5 Urugan Pasir 1 M3
8 Acian 1 M2
NO. URAIAN
NO. URAIAN
NO. URAIAN
NO. URAIAN
NO. URAIAN
NO. URAIAN
NO. URAIAN
7 Pasang Gerendel 1 Bh
1.05000 M2 Vinyl type Mipolam Troplan 100 + Rp. 285,000.00 Rp. 299,250.00
welding rod ( Gerflor )
0.35000 Kg Lem Vinyl Rp. 30,000.00 Rp. 10,500.00
0.15000 Oh Pekerja Rp. 45,000.00 Rp. 6,750.00
0.00800 Oh Mandor Rp. 70,000.00 Rp. 560.00
0.15000 Oh Tukang Rp. 65,000.00 Rp. 9,750.00
0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00
Rp. 18,110.00 Rp. 309,750.00 Rp.
1.05000 M2 Vinyl type Mipolam 180 + welding rod Rp. 260,000.00 Rp. 273,000.00
( Gerflor )
0.35000 Kg Lem Vinyl Rp. 30,000.00 Rp. 10,500.00
0.15000 Oh Pekerja Rp. 45,000.00 Rp. 6,750.00
0.00800 Oh Mandor Rp. 70,000.00 Rp. 560.00
0.15000 Oh Tukang Rp. 65,000.00 Rp. 9,750.00
0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00
Rp. 18,110.00 Rp. 283,500.00 Rp.
0.11000 M2 Vinyl type Mipolam Troplan 100 + Rp. 275,000.00 Rp. 30,250.00
capping strip ( Gerflor )
0.08000 Kg Lem Vinyl Rp. 30,000.00 Rp. 2,400.00
0.08000 Oh Pekerja Rp. 45,000.00 Rp. 3,600.00
0.00400 Oh Mandor Rp. 70,000.00 Rp. 280.00
0.08000 Oh Tukang Rp. 65,000.00 Rp. 5,200.00
0.00800 Oh Kepala Tukang Rp. 70,000.00 Rp. 560.00
Rp. 9,640.00 Rp. 32,650.00 Rp.
0.11000 M2 Vinyl type Mipolam 180 + capping Rp. 250,000.00 Rp. 27,500.00
strip ( Gerflor )
0.08000 Kg Lem Vinyl Rp. 30,000.00 Rp. 2,400.00
0.08000 Oh Pekerja Rp. 45,000.00 Rp. 3,600.00
0.00400 Oh Mandor Rp. 70,000.00 Rp. 280.00
0.08000 Oh Tukang Rp. 65,000.00 Rp. 5,200.00
0.00800 Oh Kepala Tukang Rp. 70,000.00 Rp. 560.00
Rp. 9,640.00 Rp. 29,900.00 Rp.
JUMLAH
60,133.10
8,000.00
35,500.00
43,650.00
11,833.33
26,000.00
42,040.00
JUMLAH
41,700.00
40,840.00
565,646.50
508,982.00
204,212.40
JUMLAH
165,762.00
141,077.90
78,696.80
67,829.10
JUMLAH
40,954.62
37,418.48
35,177.04
17,332.41
35,016.24
JUMLAH
601,385.50
226,385.50
21,697.00
JUMLAH
7,115,790.00
4,548,245.00
76,632.00
110,767.80
161,527.80
JUMLAH
553,150.25
595,966.37
629,675.65
501,875.76
669,517.77
707,478.78
735,858.71
754,465.88
786,026.25
796,009.47
860,456.34
873,332.01
163,420.00
128,315.00
138,072.50
234,971.50
242,261.80
249,971.50
242,557.00
215,314.00
3,762,107.77
5,174,902.77
6,345,910.78
6,284,562.17
JUMLAH
5,903,252.46
4,162,463.77
JUMLAH
75,480.00
70,085.00
30,200.00
61,171.20
57,085.00
136,385.50
9,411.00
JUMLAH
2,639,484.00
400,413.00
1,078,122.00
1,230,911.00
367,258.00
361,499.00
17,212.50
23,000.00
JUMLAH
128,600.00
83,650.00
22,827.50
17,145.00
25,460.00
15,937.50
JUMLAH
19,097.50
80,937.50
JUMLAH
JUMLAH
146,869.40
165,030.50
140,936.90
156,479.40
JUMLAH
327,860.00
301,610.00
42,290.00
39,540.00
JUMLAH
7,237.00
27,075.00
31,033.00
5,917.50
16,155.00
DAFTAR HARGA SATUAN
UPAH
1 Mandor hari Rp. 70,000.00
2 Kepala tukang hari Rp. 70,000.00
3 Tukang (batu, kayu, besi, cat) hari Rp. 65,000.00
4 Pekerja hari Rp. 45,000.00
BAHAN
1 Air ltr Rp. 150.00
2 Ampelas lbr Rp. 5,000.00
3 Balok bekisting (kayu kelas III) m3 Rp. -
4 Balok lanan (kayu kelas II) m3 Rp. 2,430,100.00
5 Balok ulin (kayu kelas I) m3 Rp. 4,738,900.00
6 Batu bata bj Rp. 1,000.00
7 Batu cor/kerikil m3 Rp. 79,400.00
8 Batu kali/batu gunung m3 Rp. 106,900.00
9 Bendrat/kawat besi beton kg Rp. 18,000.00
10 Beugel kg Rp. 17,000.00
11 Besi beton polos kg Rp. 14,500.00
12 Besi beton ulir kg Rp. 16,000.00
13 Cat dasar kg Rp. 16,400.00
14 Cat kilap setara "Danalac" kg Rp. 34,700.00
15 Cat tembok setara "Danabrite" (interior) kg Rp. 29,400.00
16 Cat meni kg Rp. 18,900.00
17 Ceiling panel/gypsum bertekstur type byhua 9 mm m2 Rp. 95,000.00
+ exposed grid ceiling systems
18 Closed jongkok warna bh Rp. 227,100.00
19 Closed duduk warna (lengkap) bh Rp. 2,271,900.00
20 Dempul kg Rp. 16,400.00
21 Engsel Nylon 3" kualitas Baik psg Rp. 9,460.00
22 Engsel Nylon 4" kualitas Baik psg Rp. 11,300.00
23 Espagnolet tanam (SES) psg Rp. 50,400.00
24 Formtie bh Rp. 2,800.00
25 Floor drain bh Rp. 15,000.00
26 Handle jendela bh Rp. 6,000.00
27 Galam sedang dia 3,5 - 5 cm bh Rp. 3,750.00
28 Genteng Metal 3.5 mm dua susun lbr Rp. 34,000.00
29 Grendel kualitas baik bj Rp. 7,570.00
30 Kaca polos tebal 5 mm m2 Rp. 63,100.00
31 Kaca polos tebal 8 mm m2 Rp. 105,000.00
32 Kait angin kualitas baik bh Rp. 4,410.00
33 Kalsiborad Lbr Rp. 165,000.00
34 Kran ledeng stainless bh Rp. 9,000.00
35 Keramik uk. 20x20 warna m2 Rp. 57,000.00
36 Keramik uk. 30 x 30 warna m2 Rp. 63,000.00
37 Keramik uk. 40 x 40 warna m2 Rp. 80,000.00
NO. URAIAN UPAH / BAHAN SATUAN HARGA SATUAN
I PEKERJAAN PERSIAPAN
5 Urugan Pasir 1 M3
7 Pasang Gerendel 1 Bh
I PEKERJAAN PERSIAPAN
1 Pengukuran dan bowplank I 1 M' 60,133.10
2 IMB Ls M2 5,500.00
3 Papan nama pekerjaan Ls Unit 500,000.00
Sub Jumlah
II PEKERJAAN TANAH
1 Galian tanah pondasi II 1 M3 35,500.00
2 Urugan tanah merah bawah lantai II 6 M3 41,700.00
3 Urugan pasir tebal 10 cm bawah pondasi II 5 M3 42,040.00
4 Pemadatan tanah II 4 M3 26,000.00
5 Urugan pasir tebal 10 cm bawah lantai II 5 M3 42,040.00
6 Urugan pasir tebal 10 cm bawah rabat pada carport II 5 M3 42,040.00
7 Mengurug tanah kembali II 3 M3 11,833.33
Sub Jumlah
Sub Jumlah
IV PEKERJAAN BETON
1 Pek. Cor beton tumbuk u/ lantai dalam bangunan tebal 7 cm VII 1 M3 553,150.25
2 Pek. Cor beton tumbuk lantai tebal 7 cm pada luar bangunan VII 1 M3 553,150.25
3 Sloof beton bertulang 15/20 VII 22 M3 5,174,902.77
4 Kolom beton bertulang 15/15, 20/20 VII 23 M3 6,345,910.78
5 Ringbalk atas beton bertulang 15/20 VII 24 M3 6,284,562.17
6 Ringbalk bawah + konsol beton bertulang 15/20 VII 24 M3 6,284,562.17
7 Balok latai/balok gantung dan balok teras beton bertulang VII 24 M3 6,284,562.17
8 Balok beton bertulang 15/30 VII 24 M3 6,284,562.17
9 Pek. Plat beton bertulang tebal 10 cm VII 25 M3 5,903,252.46
10 Listplank,kanopi beton bertulang tebal 5 cm VII 26 M3 4,162,463.77
Sub Jumlah
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN ANALISA VOLUME (Rp) (Rp)
(a) (b) (c) (d) (e) (dxe)
V PEKERJAAN ATAP
1 Pek. Kuda-kuda kayu kelas II 6/12 -
2 Pek. Gording kayu kelas II 6/12
3 Pek. Nok dan Jurai
4 Pek.Kasau 5/7 reng 3/5 M2
5 Pek. Atap metal VIII 1 M2 75,480.00
6 Bubungan VIII 2 M' 70,085.00
7 List plank ulin 2/30 VI 3 M' 76,632.00
Sub Jumlah
VI PEKERJAAN PLAFOND
1 Pek. Rangka plafond M2 61,171.20
2 Plafond kalsiboard - M2 57,085.00
3 Pekerjaan Lis Gypsum M' 13,200.00
Sub Jumlah
Sub Jumlah
Sub Jumlah
Sub Jumlah
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN ANALISA VOLUME (Rp) (Rp)
(a) (b) (c) (d) (e) (dxe)
X PEKERJAAN SANITASI
1 Saluran air hujan / Riol keliling bangunan Ls - M' 107,000.00
2 Bak kontrol X 5 unit 367,258.00
3 Septictank Ls - unit 2,000,000.00
4 Resapan Ls - unit 1,250,000.00
5 Closet duduk putih (polos) unit 2,639,484.00
6 Closet jongkok putih (polos) X 2 bh 400,413.00
7 Bak mandi lapis keramik X 3 bh 1,078,122.00
8 Bathup Ls unit 5,000,000.00
9 Dop bak mandi Ls - bh 10,000.00
10 Floor drain X 8 bh 23,000.00
11 Kran air stainless steel X 7 bh 17,212.50
12 Shower Ls bh 250,000.00
13 Washtafel+cermin (standart) X 4 bh 1,230,911.00
14 Bak cuci piring stainlessteel 1 lubang Ls bh 1,500,000.00
15 Instalasi air bersih dan kotor Ls - unit 720,000.00
16 Instalasi air hujan Ls - unit 448,000.00
Sub Jumlah
XI PEKERJAAN PENGECATAN
1 Menggosok dan mendempul kayu XIV 1 M2 7,237.00
2 Cat tembok+plamir pada :
* Dinding XIV 5 M2 16,155.00
* Plafond M2 16,155.00
3 Cat minyak pada :
* Kusen+pintu+jendela XIV 3 M2 31,033.00
* Listplank ulin XIV 3 M2 31,033.00
7 Water proofing coating Ls - M2 43,000.00
Sub Jumlah
Sub Jumlah
REKAPITULASI BIAYA
Pekerjaan :
URAIAN JUMLAH
NO
JUMLAH Rp.
DIBULATKAN Rp.
Terbilang : …………………………………………………..
Banjarmasin,……………………
PT / CV……………….
Nama Terang
Jabatan
NO URAIAN UPAH / BAHAN
1 KONSUMSI
biaya makan
air minum
2 TRASPORT
penyebrangan feri untuk mobil bak terbuka
penyebrangan feri untuk kendaraan
3 BENSIN
Kendaraan
mobil bak terbuka
4 SEWA ALAT
tenda
mobil bak terbuka
5 KESEKRETARIATAN
penyediaan kertas
tinta printer
maintance printer
jilid
pembuatan tok
ID Card
Plakat / cinderamata
Amplop
6 SURVEY
uang lelah
7 YANG LAIN
SATUAN UPAH VOLUME JUMLAH