MADHUCON PROJECTS LIMITED

Nizamabad _ Jagadalpur Section of NH-63 (EPC Mode) Project


Major Material Reconciliation Statement As on February-2019

Theoritical Qty As Qty As per


Description of the Difference
SL. No. Unit per Site Actuals Remarks
Material Qty
Measurement Consumption

A Highway
1 GSB (Aggregate) MT 112014 74147 37867
2 WMM (Aggregate) MT 79833 80072 -239
3 DBM (Aggregate) MT 30152 21664 8487
4 Bitumen (VG-30) MT 1293 1185 109

5 Emulsion
SS-1 MT 69.5 68.4 1.2
RS-1 MT 32.1 7.5 24.5

HSD / LDO Lts 268803 248804 19999


6
B Structures
1 Cement Bags 40286 36117 4168
2 Aggregates MT 7752.3 7466.1 286
3 Sand MT 4345.0 4185.4 160
4 Steel MT 509.68 494.56 15.12
5 Bindingwire Kgs 3575.69 3228.36 347.33
6 Admixture Lts 16484 6759 9726
Site Report_GSB
Chainage
Sl. Length
Date Side Work Done Details No's
No. (M)
From To

Package - 01 (From Km. 180+600 to 190+000)


Jun-18
1 6/10/2018 181500 181750 RHS Laying of GSB 1 250
2 6/10/2018 181800 182030 RHS Laying of GSB 1 230
3 6/13/2018 181800 182070 RHS Laying of GSB 1 270
4 6/14/2018 182070 182110 RHS Laying of GSB 1 40
5 6/14/2018 181500 181540 LHS Laying of GSB 1 40

6 183026 Box Culvert Back filling with GSB


Material
Total _ For the month of June-2018 _ Package - 01
Jul-18
1 7/2/2018 184470 185000 LHS Laying of GSB 1 530
Total _ For the month of July-2018 _ Package - 01
Aug-18
1 8/6/2018 181270 181370 LHS Laying of GSB 1 100
2 8/6/2018 181960 182100 LHS Laying of GSB 1 140
3 8/6/2018 185000 185300 LHS Laying of GSB 1 300
4 8/7/2018 181370 181500 LHS Laying of GSB 1 130
5 8/7/2018 181700 181740 LHS Laying of GSB 1 40
6 8/7/2018 181740 181940 LHS Laying of GSB 1 200
7 8/7/2018 181250 181500 RHS Laying of GSB 1 250
GSB DUMPING FOR PATCH WORK TO
8 8/14/2018 180750 180770 RHS REPAIR CAUSEWAY 1 20

GSB DUMPING FOR PATCH WORK TO


9 8/16/2018 180820 180830 RHS REPAIR CAUSEWAY 1 10

Total _ For the month of August-2018 _ Package - 01


Sep-18
1 3.09.2018 181670 181680 LHS Laying of GSB 1 10
2 3.09.2018 181690 181700 LHS Laying of GSB 1 10
3 8.09.2018 181750 181800 RHS Laying of GSB 1 50
4 18.09.2018 182100 182120 LHS Laying of GSB 1 20
5 18.09.2018 182100 182120 RHS Laying of GSB 1 20
Total _ For the month of September-2018 _ Package - 01
Nov-18
1 11/17/2018 184398 184408 BHS A1 Side approach GSB Dumping 1 10
2 11/17/2018 184398 184418 BHS A2 Side approach GSB Dumping 1 20
Total _ For the month of November-2018 _ Package - 01
Dec-18
12/15/2018 182140 182160 LHS Laying of GSB 1 20
12/16/2018 182160 182220 LHS Laying of GSB 1 60
12/18/2018 182290 182400 LHS Laying of GSB 1 110
12/19/2018 182400 182430 LHS Laying of GSB 1 30
Material dumping for diversion
12/24/2018 182500 182600 RHS 1 100
purpose

12/27/2018 182450 182550 RHS GSB Mixing Material dumping for 1 100
Diversion Purpose
12/28/2018 182520 182600 RHS GSB Dumping for Diversion Purpose 1 80
12/29/2018 181750 181940 LHS GSB Dumping for Drain gap 1 190
Total _ For the month of December-2018 _ Package - 01
Jan-19
04.01.2019 182130 182350 RHS Laying of GSB 1 220
05.01.2019 182350 182430 RHS Laying of GSB 1 80
06.01.2019 184430 184510 RHS Laying of GSB 1 80
07.01.2019 184510 184830 LHS Laying of GSB 1 320
10.01.2019 183930 184000 LHS Laying of GSB 1 70
11.01.2019 184000 184140 LHS Laying of GSB 1 140
12.01.2019 184140 184300 LHS Laying of GSB 1 160
Total _ For the month of January-2019 _ Package - 01
Feb-19
01.02.2019 183040 183080 LHS Laying of GSB 1 40
02.02.2019 183080 183200 LHS Laying of GSB 1 120
02.02.2019 181100 181150 LHS Laying of GSB 1 50
05.02.2019 183730 183770 LHS Laying of GSB 1 40
06.02.2019 183770 183810 LHS Laying of GSB 1 40
07.02.2019 183810 183820 LHS Laying of GSB 1 10
09.02.2019 184400 184450 LHS Laying of GSB 1 50
09.02.2019 184400 184450 RHS Laying of GSB 1 50
15.02.2019 183800 183810 LHS Laying of GSB 1 10
Total _ For the month of February-2019 _ Package - 01

Total _ As on February-2019 _ Package - 01


Package - 02 (From Km. 190+000 to 195+000)
Nov-18
Existing Road GSB Dumping Diversion
1 193750 RHS 1
purpose
2 194600 GSB shifting Stock for mixing 1
3 192350 GSB shifting Stock for mixing 1
Total _ For the month of Nov-2018 _ Package - 02
Dec-18
12/1/2018 193280 193340 RHS GSB Dumping Diversion purpose 1 60
12/17/2018 190620 190630 LHS Laying of GSB 1 10
12/18/2018 191000 193000 LHS Existing road maintenance with GSB 1 2000
12/19/2018 190620 190940 LHS Laying of GSB 1 320
Total _ For the month of Dec-2018 _ Package - 02
Total _ As on February-2019 _ Package - 02

Package - 03 (From Km. 195+000 to 213+000)


1 Upto May-2018 199170 200185 LHS Laying of GSB 1 1015
2 Upto May-2018 200220 200520 RHS Laying of GSB 1 300
3 Upto May-2018 200570 200940 LHS Laying of GSB 1 370
4 Upto May-2018 201500 201860 LHS Laying of GSB 1 360
5 Upto May-2018 201910 202280 RHS Laying of GSB 1 370
6 Upto May-2018 202320 202370 LHS Laying of GSB 1 50
7 Upto May-2018 202410 202770 LHS Laying of GSB 1 360
8 Upto May-2018 202800 202980 LHS Laying of GSB 1 180
9 Upto May-2018 202950 203300 RHS Laying of GSB 1 350
10 Upto May-2018 204200 204800 RHS Laying of GSB 1 600
11 Upto May-2018 210200 211850 LHS Laying of GSB 1 1650
12 Upto May-2018 210200 213080 RHS Laying of GSB 1 2880
13 Upto May-2018 211740 212100 RHS Laying of GSB 1 360
14 Upto May-2018 212220 212700 RHS Laying of GSB 1 480
15 Upto May-2018 212650 213080 LHS Laying of GSB 1 430
Total _ Upto May-2018 _ Package - 03 (From Km. 195+000 to 213+000)
Existing Road GSB Material Reused Locations
1 Upto May-2018 200220 200520 LHS Laying of GSB 1 300

2 Upto May-2018 200550 201200 RHS Laying of GSB 1 650

3 Upto May-2018 200850 202400 LHS Laying of GSB 1 1550


4 Upto May-2018 200940 201460 LHS Laying of GSB 1 520

5 Upto May-2018 202980 203300 LHS Laying of GSB 1 320

Total 3340
Jun-18
GSB Material Stocking nearest site
1 6/8/2018 200500
location
2 6/20/2018 201900 201940 LHS Laying of GSB 1 40
3 6/20/2018 202600 202700 RHS Laying of GSB 1 100
4 6/22/2018 202460 202580 RHS Laying of GSB 1 120
Road Damaged due to rain, Damaged
5 6/29/2018 208010 portion filling with GSB Material at
Slab Culvert approaches
Total _ June-2018 _ Package - 03
Jul-18
Laying of GSB (Material Received
1 7/1/2018 203950 204400 LHS 1 450
from Stock location)
GSB Material Stocking nearest site
2 7/1/2018 203500 location
GSB Material Stocking nearest site
3 7/2/2018 203500 location
Laying of GSB (Material Received
4 7/3/2018 202000 202360 LHS 1 360
from Stock location)
Laying of GSB (Material Received
5 7/3/2018 203800 203950 LHS 1 150
from Stock location)
GSB Material Stocking nearest site
6 7/4/2018 201780 201940 LHS 1 160
location
7 7/17/2018 202440 202780 LHS Diversion Road Preparation 1 340
Laying of GSB (Material Received
8 7/27/2018 212320 212400 LHS 1 80
from Stock location)

9 7/27/2018 212400 212500 LHS Laying of GSB (Material Received 1 100


from Stock location)
Laying of GSB (Material Received
10 7/28/2018 212320 212500 LHS 1 180
from Stock location)
11 7/29/2018 212320 212500 LHS Laying of GSB 1 180
12 7/30/2018 200220 200500 RHS Laying of GSB 1 280
Laying of GSB (Material Received
13 7/30/2018 199850 200180 RHS 1 330
from Stock location)
Total _ July-2018 _ Package - 03
Aug-18
1 8/1/2018 199220 199840 RHS GSB TOP CORRECTION 1 620
2 8/2/2018 199440 199860 RHS Laying of GSB 1 420
3 8/8/2018 199100 199200 RHS Laying of GSB 1 100
4 8/9/2018 201900 202360 LHS GSB TOP CORRECTION 1 460
5 8/13/2018 201200 201400 RHS Laying of GSB 1 200
6 8/23/2018 202760 202950 RHS GSB TOP CORRECTION 1 190
Total _ August-2018 _ Package - 03
Sep-18
1 14.09.2018 204460 204520 LHS Laying of GSB 1 60
2 15.09.2018 204100 204340 LHS Laying of GSB 1 240
3 16.09.2018 204680 204800 LHS Laying of GSB 1 120
4 19.9.2018 203950 204400 LHS Laying of GSB 1 450
Total _ September-2018 _ Package - 03
Oct-18
1 10/4/2018 199100 199200 LHS Laying of GSB 1 100
2 10/5/2018 204460 204500 LHS GSB correction 1 40
3 10/6/2018 204500 204720 LHS GSB correction 1 220
4 10/7/2018 201740 201900 RHS Existing GSB 1 160
5 10/15/2018 201680 201720 RHS Laying of GSB 1 40
Total _ October-2018 _ Package - 03
Nov-18
1 11/5/2018 202300 202430 RHS Laying of GSB 1 130
2 11/11/2018 190340 190360 LHS Laying of GSB 1 20
3 11/12/2018 192340 192360 LHS Laying of GSB 1 20
4 11/13/2018 202300 202430 RHS Laying of GSB 1 130
5 11/13/2018 202730 202980 RHS Laying of GSB 1 250
6 11/19/2018 208760 208970 RHS Laying of GSB 1 210
7 11/26/2018 204150 204200 RHS Laying of GSB 1 50
8 11/27/2018 204070 204170 RHS Laying of GSB 1 100
Total _ November-2018 _ Package - 03
Dec-18
12/2/2018 208600 208630 LHS Laying of GSB 1 30
12/3/2018 208640 208940 LHS Laying of GSB 1 300
12/4/2018 208600 208960 LHS Laying of GSB 1 360
12/9/2018 203250 203450 LHS Laying of GSB 1 200
12/16/2018 190440 190620 LHS Laying of GSB 1 180
Total _ December-2018 _ Package - 03
Jan-19
06.01.2019 201440 201500 RHS Laying of GSB 1 60
23.01.2019 203500 203640 LHS Laying of GSB 1 140
24.01.2019 203640 203680 LHS Laying of GSB 1 40
25.01.2019 203680 203720 LHS Laying of GSB 1 40
26.01.2019 203720 203840 LHS Laying of GSB 1 120
Total _ January-2019 _ Package - 03
Feb-19
03.02.2019 203500 203630 RHS Laying of GSB 1 130
04.02.2019 203630 203690 RHS Laying of GSB 1 60
05.02.2019 203840 203950 RHS Laying of GSB 1 110
Total _ February-2019 _ Package - 03

Total _ As on February-2019 _ Package - 03

Package - 04 (From Km. 213+000 to 223+000)


1 Upto May-2018 219000 219160 LHS Laying of GSB 1 160
2 Upto May-2018 219200 219440 LHS Laying of GSB 1 240
3 Upto May-2018 219530 219950 RHS Laying of GSB 1 420
4 Upto May-2018 219970 220180 LHS Laying of GSB 1 210
5 Upto May-2018 220225 220453 LHS Laying of GSB 1 228
6 Upto May-2018 220458 221082 LHS Laying of GSB 1 624
7 Upto May-2018 221086 221438 LHS Laying of GSB 1 352
8 Upto May-2018 221538 222278 LHS Laying of GSB 1 740

LHS &
9 Upto May-2018 222303 222542 Laying of GSB 2 239
RHS

LHS &
10 Upto May-2018 222547 222920 Laying of GSB 2 373
RHS

Total _ Upto May-2018 _ Package - 04


Jun-18
1 6/9/2018 220000 220220 LHS GSB Dumping 1 220
Total _ June-2018 _ Package - 04
Jul-18
1 7/3/2018 219700 219920 LHS Laying of GSB 1 220
2 7/10/2018 219500 219600 LHS Laying of GSB 1 100
3 7/18/2018 219440 219520 LHS Laying of GSB 1 80
4 7/19/2018 219700 219780 LHS Laying of GSB 1 80
5 7/20/2018 221560 221780 RHS Laying of GSB 1 220
6 7/29/2018 221780 222000 RHS Laying of GSB 1 220
7 7/29/2018 222000 222140 RHS Laying of GSB 1 140
8 7/30/2018 221100 221280 RHS Laying of GSB 1 180
Total _ July-2018 _ Package - 04
Aug-18
1 8/7/2018 222280 222303 LHS Laying of GSB 1 23
2 8/7/2018 222542 222547 LHS Laying of GSB 1 5
Total _ August-2018 _ Package - 04
Sep-18
1 3.09.2018 219000 219440 RHS Laying of GSB 1 440
2 3.09.2018 219960 220000 RHS Laying of GSB 1 40
3 4.09.2018 220000 220440 RHS Laying of GSB 1 440
4 5.09.2018 220760 220900 RHS Laying of GSB 1 140
5 5.09.2018 220440 220700 RHS Laying of GSB 1 260
6 6.09.2018 220900 221050 RHS Laying of GSB 1 150
7 6.09.2018 221050 221260 RHS Laying of GSB 1 210
8 6.09.2018 220700 220760 RHS Laying of GSB 1 60
9 7.09.2018 221260 221440 RHS Laying of GSB 1 180
10 7.09.2018 221100 221260 RHS Laying of GSB 1 160
11 7.09.2018 221260 221440 RHS Laying of GSB 1 180
12 19.09.2018 220700 220730 RHS Laying of GSB 1 30
13 22.09.2018 220720 220800 RHS Laying of GSB 1 80
14 23.09.2018 220700 221000 RHS Laying of GSB 1 300
15 24.9.2018 220900 220920 RHS Laying of GSB 1 20
Total _ August-2018 _ Package - 04
Oct-18
1 10/13/2018 214000 214080 RHS Laying of GSB 1 80
2 10/13/2018 213720 214000 RHS Laying of GSB 1 280
3 10/14/2018 214090 214340 RHS Laying of GSB 1 250
4 10/14/2018 214720 214800 RHS Laying of GSB 1 80
5 10/20/2018 214800 215390 RHS Laying of GSB 1 590
6 10/20/2018 214360 214380 RHS Laying of GSB 1 20
7 10/21/2018 215390 215820 RHS Laying of GSB 1 430
8 10/24/2018 214600 214700 RHS Existing GSB Stock at Site 1 100
9 10/24/2018 214780 214800 RHS Existing GSB Stock at Site 1 20
10 10/27/2018 214500 214700 LHS Laying of GSB 1 200
11 10/31/2018 214380 214500 RHS Laying of GSB 1 120
Total _October-2018 _ Package - 04
Nov-18
1 11/1/2018 215450 215600 RHS Laying of GSB 1 150
2 11/2/2018 215500 215600 RHS Laying of GSB 1 100
3 11/3/2018 215450 215600 RHS Laying of GSB 1 150
Total _ August-2018 _ Package - 04
Jan-19
05.01.2019 217140 217200 LHS Laying of GSB 1 60
06.01.2019 217200 217400 LHS Laying of GSB 1 200
07.01.2019 217400 217700 LHS Laying of GSB 1 300
11.01.2019 217700 217780 LHS Laying of GSB 1 80
12.01.2019 217780 217970 LHS Laying of GSB 1 190
16.01.2019 217970 218300 LHS Laying of GSB 1 330
17.01.2019 217200 217300 RHS Laying of GSB 1 100
20.01.2019 217300 217400 RHS Laying of GSB 1 100
21.01.2019 218000 218140 RHS Laying of GSB 1 140
22.01.2019 218140 218220 RHS Laying of GSB 1 80
Total _ January-2019 _ Package - 04
Feb-19
06.02.2019 218120 218300 RHS Laying of GSB 1 180
07.02.2019 217700 217940 RHS Laying of GSB 1 240
08.02.2019 217940 218000 RHS Laying of GSB 1 60
10.02.2019 218400 218440 RHS Laying of GSB 1 40
10.02.2019 218440 218500 RHS Laying of GSB 1 60
11.02.2019 218500 218540 RHS Laying of GSB 1 40
11.02.2019 218540 218620 RHS Laying of GSB 1 80
12.02.2019 217740 217800 RHS Laying of GSB 1 60
12.02.2019 218620 218700 RHS Laying of GSB 1 80
13.02.2019 218660 218700 RHS Laying of GSB 1 40
13.02.2019 218700 218760 RHS Laying of GSB 1 60
13.02.2019 217200 217600 LHS Laying of GSB 1 400
13.02.2019 217600 217800 LHS Laying of GSB 1 200
14.02.2019 217740 217800 RHS Laying of GSB 1 60
14.02.2019 217800 218300 LHS Laying of GSB 1 500
Total _ February-2019 _ Package - 04
Total _ As on February-2019 _ Package - 04

Total (PKG - 1, 2, 3 & 4) As on February-2019


Total Actual
Breadth Deapth Total Quantity
Quantity in Dispatched Remarks
(M) (M) in MT
Cum Qty in MT

6.050 0.200 302.500 695.75 695.00


6.050 0.200 278.300 640.090 605.000
5.850 0.050 78.975 181.643 180.000
5.850 0.050 11.700 26.910 111.660
5.850 0.050 11.700 26.910 113.480

37.741 86.804 86.804

720.916 1658.107 1791.944 7.5%

4.300 0.200 455.800 1048.340 801.480


455.800 1048.340 801.480 -30.8%

5.850 0.200 117.000 269.100 1394.920


5.850 0.200 163.800 376.740
4.640 0.200 278.400 640.320 677.810
5.850 0.200 152.100 349.830
5.850 0.200 46.800 107.640
5.850 0.200 234.000 538.200
5.850 0.200 292.500 672.750 559.450

5.850 1.800 210.600 484.380

5.000 0.300 15.000 34.500 351.950

1510.200 3473.460 2984.130 -16.4%

6.250 0.200 12.500 28.750


5.850 0.200 11.700 26.910
6.250 0.200 62.500 143.750 24.900
6.250 0.200 25.000 57.500
6.250 0.200 25.000 57.500 125.620
136.700 314.410 150.520 -108.9%
10.000 23.000
20.000 46.000 203.290
30.000 69.000 203.290 66.1%

6.250 0.200 25.000 57.500 62.270


6.250 0.200 75.000 172.500 169.970 6 Trips
6.250 0.114 78.375 180.263 179.880 7 Trips
6.250 0.200 37.500 86.250 80.530 6 Trips

6.500 0.150 97.500 224.250 225.000 9 Trips

5.100 0.100 51.000 117.300 117.000 12-Trips


9.000 0.050 36.000 82.800
0.600 0.700 79.800 183.540 185.360 6-Trips
480.175 1104.403 1020.010 -8.3%

6.250 0.170 233.750 537.625 530.000


6.250 0.170 85.000 195.500 173.640
4.200 0.200 67.200 154.560 164.390
4.200 0.200 268.800 618.240 612.810
4.200 0.200 58.800 135.240 133.000
6.000 0.200 168.000 386.400 266.000
6.000 0.200 192.000 441.600 412.130
1073.550 2469.165 2291.970 -7.7%

9.750 0.200 78.000 179.400 183.320


9.000 0.150 162.000 372.600
8.000 0.150 60.000 138.000
9.750 0.200 78.000 179.400 102.190
9.750 0.200 78.000 179.400 101.860
9.750 0.200 19.500 44.850 27.370
4.200 0.200 42.000 96.600 113.500
4.200 0.200 42.000 96.600 114.420
9.750 0.200 19.500 44.850 51.320
579.000 1331.700 693.980 -91.9%

4986.34 11468.58 9937.32 -15%


1.0 2.30 433.16
433.16
317.18
1.0 2.30 1183.500

5.00 0.11 33.0 75.900 74.580 3trips


4.50 0.20 9.0 20.700 225.860
9.7 22.280 22.280 1 Trip
4.20 0.13 174.7 401.856 384.630 15 Trips
226.4 520.7 707.4
227.4 523.0 1890.9 72%

7.740 0.200 1571.220 3613.806


7.740 0.200 464.400 1068.120
7.740 0.200 572.760 1317.348
7.740 0.200 557.280 1281.744
7.740 0.200 572.760 1317.348
7.740 0.200 77.400 178.020
7.740 0.200 557.280 1281.744
7.740 0.200 278.640 640.872
7.740 0.200 541.800 1246.140
7.740 0.200 928.800 2136.240
2.500 0.200 825.000 1897.500
2.500 0.200 1440.000 3312.000
7.740 0.200 557.280 1281.744
7.740 0.200 743.040 1708.992
2.500 0.200 215.000 494.500
9902.660 22776.118 17780.680 -28%

Existing Road GSB Material


7.720 0.200 463.200 1065.360 Reused in this location
Existing Road GSB Material
7.720 0.200 1003.600 2308.280
Reused in this location
Existing Road GSB Material
7.720 0.200 2393.200 5504.360
Reused in this location
Existing Road GSB Material
7.720 0.200 802.880 1846.624
Reused in this location
Existing Road GSB Material
7.720 0.200 494.080 1136.384
Reused in this location
5156.960 11861.008

110.435 254.000 254.000

7.740 0.200 61.920 142.416 142.416


7.740 0.200 154.800 356.040 356.040
7.740 0.200 185.760 427.248 427.248

178.838 411.328 360.829

691.753 1591.032 1540.533

7.700 0.200 693.000 0.000

340.260

207.870

7.700 0.200 554.400

7.700 0.200 231.000 27.960

7.740 0.200 247.680 53.500


8.000 0.200 544.000 137.620 Existing Road Material Reused
7.740 0.200 123.840

7.740 0.200 154.800 458.350

7.740 0.200 278.640

7.740 0.200 278.640 640.872


7.740 0.200 433.440 996.912

7.740 0.200 510.840 97.230

4050.280 1637.784 1322.790 -23.8%

7.740 0.200 959.760 2207.448 335.250


7.740 0.200 650.160 1495.368 654.710
7.700 0.200 154.000 354.200 277.260
7.740 0.070 249.228 573.224 356.220
7.740 0.200 309.600 712.080 1083.240
7.740 0.150 220.590 507.357 252.650
2543.338 5849.677 2959.330 -97.7%

7.740 0.100 46.440 106.812 26.800


7.740 0.100 185.760 427.248
7.740 0.200 185.760 427.248
7.700 0.050 173.250 398.475 396.740
591.210 1359.783 423.540 -221.1%

7.740 0.060 46.440 106.812 194.170


7.740 0.070 21.672 49.846 69.430
7.740 0.070 119.196 274.151 316.580
8.140 0.250 325.600 748.880 Existing GSB
7.740 0.200 61.920 142.416 920.980
574.828 1322.104 1501.160 11.9%

7.740 0.100 100.620 231.426


4.000 0.250 20.000 46.000
4.240 0.130 11.024 25.355
7.740 0.100 100.620 231.426
7.740 0.100 193.500 445.050
7.740 0.200 325.080 747.684
7.740 0.200 77.400 178.020
7.740 0.200 154.800 356.040 2466.430
983.044 2261.001 2466.430 8.3%

7.740 0.200 46.440 106.812 115.450


7.740 0.150 348.300 801.090 606.050
7.740 0.200 557.280 1281.744 190.510
7.740 0.200 309.600 712.080 575.180
4.200 0.200 151.200 347.760 344.720
1412.820 3249.486 1831.910 -77.4%

7.740 0.200 92.880 213.624 213.624


10.000 0.150 210.000 483.000 484.040
10.000 0.150 60.000 138.000 138.000
10.000 0.150 60.000 138.000 124.200
10.000 0.150 180.000 414.000 408.915
602.880 1386.624 1368.779 -1.3%

10.800 0.150 210.600 484.380 482.910


14.000 0.150 126.000 289.800 280.900
14.000 0.150 231.000 531.300 102.870
567.600 1305.480 866.680 -50.6%

27077.37 54600.10 32061.83 -70%

7.740 0.200 247.680 569.664


7.740 0.200 371.520 854.496
7.740 0.200 650.160 1495.368
7.740 0.200 325.080 747.684
7.740 0.200 352.944 811.771
7.740 0.200 965.952 2221.690
7.740 0.200 544.896 1253.261
7.740 0.200 1145.520 2634.696

7.740 0.200 739.944 1701.871

7.740 0.200 1154.808 2656.058

6498.504 14946.559 13234.422 -12.9%

7.740 0.200 340.560 783.288 789.960


340.560 783.288 789.960 0.8%

3.870 0.200 170.280 391.644 897.000


3.870 0.200 77.400 178.020 178.020
3.870 0.200 61.920 142.416 309.000
3.870 0.200 61.920 142.416 123.000
3.870 0.200 170.280 391.644 900.781
3.870 0.200 170.280 391.644 320.000
3.870 0.200 108.360 249.228 378.000
3.870 0.200 139.320 320.436 488.830
959.760 2207.448 3594.631 38.6%

7.740 0.200 35.604 81.889 51.520


7.740 0.200 7.740 17.802 26.370
43.344 99.691 77.890 -28.0%

7.740 0.200 681.120 1566.576 1326.720


7.740 0.200 61.920 142.416 847.360
7.740 0.200 681.120 1566.576 490.710
7.740 0.200 216.720 498.456
7.740 0.200 402.480 925.704 637.460
7.740 0.200 232.200 534.060 484.000
7.740 0.200 325.080 747.684
7.740 0.200 92.880 213.624
7.740 0.200 278.640 640.872 406.660
7.740 0.200 247.680 569.664
7.740 0.200 278.640 640.872 403.770
7.740 0.200 46.440 106.812 36.190
7.740 0.200 123.840 284.832 113.970
7.740 0.200 464.400 1068.120 241.680
7.740 0.200 30.960 71.208 49.630
4164.120 9577.476 5038.150 -90.1%

3.000 0.200 48.000 110.400


3.000 0.110 92.400 212.520
3.000 0.200 150.000 345.000
3.000 0.200 48.000 110.400
2.500 0.100 147.500 339.250 245.690
2.500 0.200 10.000 23.000
2.500 0.200 215.000 494.500 661.220
5.000 0.100 50.000 Exiating GSB
5.000 0.100 10.000 Exiating GSB
2.300 0.200 92.000 211.600
5.000 0.200 120.000 276.000 96.570
982.900 2122.670 1003.480 -111.5%
7.100 0.100 106.500 244.950
7.140 0.100 71.400 164.220
7.140 0.100 107.100 246.330 23.780
285.000 655.500 23.780 3.6%

7.100 0.120 51.120 117.576 115.960


7.100 0.120 170.400 391.920 431.620
7.100 0.120 255.600 587.880 526.000
7.100 0.120 68.160 156.768 160.000
7.100 0.120 161.880 372.324 269.191
7.100 0.120 281.160 646.668 448.000
7.100 0.120 85.200 195.960 160.000
7.100 0.120 85.200 195.960 140.000
7.100 0.120 119.280 274.344 232.000
7.100 0.120 68.160 156.768 130.000
1346.160 3096.168 2612.771 -18.5%

7.100 0.120 153.360 352.728 470.000


7.100 0.120 204.480 470.304 430.000
7.100 0.120 51.120 117.576 112.000
7.100 0.120 34.080 78.384 110.000
7.100 0.120 51.120 117.576 158.000
7.100 0.120 34.080 78.384 100.000
7.100 0.120 68.160 156.768 220.000
7.100 0.120 51.120 117.576 150.000
7.100 0.120 68.160 156.768 220.000
7.100 0.120 34.080 78.384 72.000
7.100 0.120 51.120 117.576 150.000
3.500 0.200 280.000 644.000 644.000
4.800 0.200 192.000 441.600 441.000
4.800 0.200 57.600 132.480 145.000
4.600 0.200 460.000 1058.000 460.000
1790.480 4118.104 3882.000 -6.1%
16410.83 37606.90 30257.08 -24%

0 0 48701.95 104198.62 74147.09 -41%


Dec-18
Dec-18
Dec-18
Dec-18

Dec-18

Dec-18
Dec-18
Dec-18

Jan-19 Jan-19
Jan-19 Jan-19 289.6 289.600 0.000
Jan-19 Jan-19 760.104 809.634 596.010 213.624
Jan-19 Jan-19 1206.120
Jan-19 Jan-19 1115.2 1138.8 23.60
Jan-19 Jan-19
Jan-19 Jan-19

Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
Dec-18
Dec-18
Dec-18
Dec-18 465.16 0.000
Dec-18
Dec-18
Dec-18
Dec-18
Dec-18 3492.45 3559.270 66.820 33.41

Jan-19 Jan-19
Jan-19 Jan-19
Jan-19 Jan-19 6273520
Jan-19 Jan-19 6273.52 6202.329 71.191
Jan-19 Jan-19

Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
213720 214000 RHS
214000 214080 RHS 0
214090 214340 RHS 10
214360 214380 RHS 20
214380 214500 RHS 0
214500 214700 LHS 0
214600 214700 RHS
214720 214800 RHS 20
214780 214800 RHS -20
214800 215390 RHS 0
215390 215820 RHS 0
Jan-19 Jan-19
Jan-19 Jan-19
Jan-19 Jan-19
Jan-19 Jan-19
Jan-19 Jan-19
Jan-19 Jan-19
Jan-19 Jan-19
Jan-19 Jan-19
Jan-19 Jan-19
Jan-19 Jan-19

Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
Feb-19 Feb-19
0 0 0 0 0 0 0 0
Site Report_WMM
Chainage
Sl. Length
Date Side Work Done Details No's
No. (M)
From To

Package - 01 (From Km. 180+600 to 190+000)


1 9/1/2018 181320 181670 LHS Laying of WMM-1st Layer 1 350
2 9/2/2018 181280 181320 RHS Laying of WMM-1st Layer 1 40
3 9/2/2018 181260 181740 RHS Laying of WMM-1st Layer 1 480
4 9/2/2018 181700 182940 LHS Laying of WMM-1st Layer 1 1240
5 9/2/2018 181960 182080 LHS Laying of WMM-1st Layer 1 120
6 9/6/2018 181800 182100 RHS Laying of WMM-1st Layer 1 300
7 9/7/2018 181740 181750 RHS Laying of WMM-1st Layer 1 10
8 9/7/2018 181690 181700 LHS Laying of WMM-1st Layer 1 10
9 9/19/2018 182080 182120 LHS Laying of WMM-1st Layer 1 40
10 9/19/2018 182100 182120 RHS Laying of WMM-1st Layer 1 20

11 12.9.2018 181280 181720 LHS Laying of WMM top Layer 1 440


12 14.9.2018 181740 182100 LHS Laying of WMM top Layer 1 360
13 15.9.2018 181250 181760 RHS Laying of WMM top Layer 1 510
14 15.9.2018 181800 182100 RHS Laying of WMM top Layer 1 300
15 19.9.2018 181380 181560 RHS Laying of WMM top Layer 1 180
16 19.9.2018 181960 182020 LHS Laying of WMM top Layer 1 60
Total _ September-2018 _ Package - 01 (From Km. 180+600 to 190+000)
Jan-19
27.01.2019 182130 182430 LHS Laying of WMM-1st Layer 1 300
30.01.2019 182200 182310 RHS Laying of WMM-1st Layer 1 110
30.01.2019 182130 182430 RHS Laying of WMM-2nd Layer 1 300
Total _ January-2019 _ Package - 01 (From Km. 180+600 to 190+000)
Feb-19

08.02.2019 184450 184650 LHS Laying of WMM 1 200

09.02.2019 184450 184850 LHS Laying of WMM 1 400

10.02.2019 182130 182300 LHS Laying of WMM top layer 1 170

10.02.2019 182130 182280 RHS Laying of WMM top layer 1 150


11.02.2019 184450 184600 LHS Laying of WMM top layer 1 150
12.02.2019 184500 184750 LHS Laying of WMM 1 250
13.02.2019 184550 184800 LHS Laying of WMM top layer 1 250
14.02.2019 184400 184820 LHS Laying of WMM top layer 1 420
Total _ February-2019 _ Package - 01 (From Km. 180+600 to 190+000)

Total _ As on February-2019 _ Package - 01

Package - 03 (From Km. 195+000 to 213+000)


1 Upto May-2018 199180 200185 LHS Laying of WMM 1 1005
2 Upto May-2018 205950 207220 RHS Laying of WMM 1 1270
3 Upto May-2018 211740 212100 RHS Laying of WMM 1 360
4 Upto May-2018 212220 212700 RHS Laying of WMM 1 480
Total _ Upto May-2018 _ Package - 03 (From Km. 195+000 to 213+000)
Jun-18
1 6/3/2018 200220 200460 LHS Laying of WMM-1st Layer 1 240
2 6/4/2018 200460 200550 LHS Laying of WMM-1st Layer 1 90
3 6/4/2018 200550 200860 LHS Laying of WMM-1st Layer 1 310
4 6/10/2018 201220 201460 LHS Laying of WMM-1st Layer 1 240
5 6/12/2018 200880 200980 LHS Laying of WMM-1st Layer 1 100
6 6/16/2018 200980 201080 LHS Laying of WMM-1st Layer 1 100
7 6/17/2018 201180 201240 LHS Laying of WMM-1st Layer 1 60
8 6/19/2018 202960 203050 RHS Laying of WMM-1st Layer 1 90
9 6/19/2018 203050 203160 RHS Laying of WMM-1st Layer 1 110
10 6/20/2018 203160 203280 RHS Laying of WMM-1st Layer 1 120
11 6/20/2018 201450 201500 LHS Laying of WMM-1st Layer 1 50

12 6/21/2018 199400 199600 LHS Laying of WMM top Layer 1 200


13 6/21/2018 199600 199920 LHS Laying of WMM top Layer 1 320
14 6/22/2018 199920 200500 LHS Laying of WMM top Layer 1 580
15 6/23/2018 200920 201240 LHS Laying of WMM top Layer 1 320
16 6/24/2018 201240 201460 LHS Laying of WMM top Layer 1 220
17 6/24/2018 202980 203060 LHS Laying of WMM top Layer 1 80
18 6/25/2018 203040 203140 RHS Laying of WMM top Layer 1 100
19 6/25/2018 201500 201600 LHS Laying of WMM top Layer 1 100
20 6/26/2018 203140 203250 RHS Laying of WMM top Layer 1 110
21 6/27/2018 201050 201450 LHS Laying of WMM top Layer 1 400
22 6/28/2018 203000 203280 RHS Laying of WMM top Layer 1 280
23 6/29/2018 203260 203280 RHS Laying of WMM top Layer 1 20
Total _ June-2018 _ Package - 03
Jul-18
1 7/20/2018 201600 201620 LHS Laying of WMM-1st Layer 1 20
2 7/24/2018 211800 212020 LHS Laying of WMM-1st Layer 1 220
3 7/24/2018 211740 211800 LHS Laying of WMM-1st Layer 1 60

4 7/25/2018 211740 212020 LHS Laying of WMM top Layer 1 280


5 7/27/2018 200520 200560 LHS Laying of WMM top Layer 1 40
6 7/28/2018 211740 212020 LHS Laying of WMM top Layer 1 280
7 7/29/2018 211740 212020 LHS Laying of WMM top Layer 1 280
Total _ July-2018 _ Package - 03
Aug-18
1 8/2/2018 200560 201070 RHS Laying of WMM-1st Layer 1 510
2 8/5/2018 212300 212520 LHS Laying of WMM-1st Layer 1 220
3 8/5/2018 200560 200800 RHS Laying of WMM-1st Layer 1 240
4 8/5/2018 200440 200500 RHS Laying of WMM-1st Layer 1 60
5 8/5/2018 199200 199620 RHS Laying of WMM-1st Layer 1 420
6 8/3/2018 199620 199920 RHS Laying of WMM-1st Layer 1 300
7 8/5/2018 199910 200130 RHS Laying of WMM-1st Layer 1 220
8 8/6/2018 200140 200180 RHS Laying of WMM-1st Layer 1 40
9 8/6/2018 201070 201200 RHS Laying of WMM-1st Layer 1 130
10 8/6/2018 201650 201750 LHS Laying of WMM-1st Layer 1 100
11 8/7/2018 201750 201850 LHS Laying of WMM-1st Layer 1 100
12 8/7/2018 202800 202950 LHS Laying of WMM-1st Layer 1 150
13 8/9/2018 201840 202140 LHS Laying of WMM-1st Layer 1 300
14 8/10/2018 202120 202360 LHS Laying of WMM-1st Layer 1 240
15 8/12/2018 199100 199200 RHS Laying of WMM-1st Layer 1 100
16 8/12/2018 202840 202900 RHS Laying of WMM-1st Layer 1 60
17 8/14/2018 201200 201350 RHS Laying of WMM-1st Layer 1 150
18 8/15/2018 201350 201400 RHS Laying of WMM-1st Layer 1 50
19 8/31/2018 202430 202640 RHS Laying of WMM-1st Layer 1 210
20 8/31/2018 202640 202740 RHS Laying of WMM-1st Layer 1 100

1 8/5/2018 212500 212680 LHS Laying of WMM top Layer 1 180


2 8/5/2018 200230 200500 RHS Laying of WMM top Layer 1 270
3 8/7/2018 212300 212500 LHS Laying of WMM top Layer 1 200
4 8/7/2018 200800 201020 RHS Laying of WMM top Layer 1 220
5 8/7/2018 199200 199320 RHS Laying of WMM top Layer 1 120
6 8/8/2018 199380 199640 RHS Laying of WMM top Layer 1 260
7 8/8/2018 199640 199920 RHS Laying of WMM top Layer 1 280
8 8/9/2018 199920 200180 RHS Laying of WMM top Layer 1 260
9 8/9/2018 201740 201840 LHS Laying of WMM top Layer 1 100
10 8/9/2018 202800 202940 LHS Laying of WMM top Layer 1 140
11 8/12/2018 201060 201200 RHS Laying of WMM top Layer 1 140
12 8/13/2018 202000 202360 LHS Laying of WMM top Layer 1 360
13 8/13/2018 201020 201060 RHS Laying of WMM top Layer 1 40
14 8/14/2018 201600 201740 LHS Laying of WMM top Layer 1 140
15 8/17/2018 201840 202000 LHS Laying of WMM top Layer 1 160
16 8/18/2018 201200 201400 RHS Laying of WMM top Layer 1 200
17 8/24/2018 202180 202360 LHS Laying of WMM top Layer 1 180
18 8/25/2018 202800 202940 LHS Laying of WMM top Layer 1 140
19 8/26/2018 199100 199200 RHS Laying of WMM top Layer 1 100
Total _ August-2018 _ Package - 03
Sep-18
1 18.9.2018 202340 202380 LHS Laying of WMM-1st Layer 1 40
2 18.9.2018 202740 202780 LHS Laying of WMM-1st Layer 1 40
3 23.9.2018 201900 202300 RHS Laying of WMM-1st Layer 1 400
4 23.9.2018 203950 204320 LHS Laying of WMM-1st Layer 1 370
5 24.9.2018 204320 204400 LHS Laying of WMM-1st Layer 1 80
6 28.9.2018 202420 202480 LHS Laying of WMM-1st Layer 1 60
7 29.9.2018 203100 203280 LHS Laying of WMM-1st Layer 1 180
8 1 0
9 24.9.2018 201300 201900 RHS Laying of WMM top Layer 1 600
10 25.9.2018 201900 202300 RHS Laying of WMM top Layer 1 400
11 27.9.2018 203950 204400 LHS Laying of WMM top Layer 1 450
Total _ September-2018 _ Package - 03
Oct-18

1 10/4/2018 202980 203040 LHS Laying of WMM top Correction 1 60

2 10/6/2018 202380 202580 LHS WMM correction 1 200


3 10/7/2018 202600 202780 LHS WMM correction 1 180
4 10/9/2018 203000 203300 LHS Laying of WMM-1st Layer 1 300
5 10/10/2018 202950 203300 RHS WMM top Correction 1 350
6 10/10/2018 204450 204800 LHS WMM 1st Layer Preparation 1 350
7 10/11/2018 204440 204600 LHS WMM top Correction 1 160
8 10/12/2018 204440 204800 LHS WMM top Correction 1 360
9 10/19/2018 201620 201900 RHS Laying of WMM-1st Layer 1 280
10 10/20/2018 201540 201600 RHS Laying of WMM-1st Layer 1 60
11 10/22/2018 201580 201620 RHS WMM Correction 1 40
12 10/23/2018 201520 201900 RHS WMM Correction 1 380
13 10/26/2018 201540 201600 RHS WMM Correction 1 60
14 10/27/2018 201740 201900 RHS WMM Correction 1 160
15 10/27/2018 204400 204440 LHS WMM Correction 1 40

16 10/8/2018 202600 202780 LHS Laying of WMM top Layer 1 180


17 10/10/2018 202950 203300 RHS Laying of WMM top Layer 1 350
18 10/28/2018 199100 199200 LHS Laying of WMM top Layer 1 100
Total _ October-2018 _ Package - 03
Nov-18
1 11/5/2018 204200 204245 RHS Laying of WMM-1st Layer 1 45
2 11/9/2018 204245 204275 RHS Laying of WMM-1st Layer 1 30
3 11/10/2018 204275 204400 RHS Laying of WMM-1st Layer 1 125
4 11/11/2018 204440 204530 RHS Laying of WMM-1st Layer 1 90
5 11/12/2018 204530 204600 RHS Laying of WMM-1st Layer 1 70
6 11/13/2018 204600 204730 RHS Laying of WMM-1st Layer 1 130
7 11/14/2018 204730 204800 RHS Laying of WMM-1st Layer 1 70
8 11/19/2018 202300 202400 RHS Laying of WMM-1st Layer 1 100
9 11/20/2018 202400 202430 RHS Laying of WMM-1st Layer 1 30
10 11/23/2018 202730 202980 RHS Laying of WMM-1st Layer 1 250
11 11/23/2018 208600 208640 RHS Laying of WMM-1st Layer 1 40
12 11/26/2018 208780 208960 RHS Laying of WMM-1st Layer 1 180

13 11/14/2018 204200 204350 RHS Laying of WMM top Layer 1 150


14 11/25/2018 208700 208780 RHS Laying of WMM top Layer 1 80
15 11/25/2018 202720 202980 RHS Laying of WMM top Layer 1 260
16 11/29/2018 208900 208960 RHS Laying of WMM top Layer 1 60
Total _ November-2018 _ Package - 03
Dec-18
12/1/2018 203950 204020 RHS Laying of WMM-1st Layer 1 70
12/2/2018 202950 203200 RHS Laying of WMM-1st Layer 1 250
12/3/2018 204000 204020 RHS Laying of WMM top Layer 1 20
12/3/2018 203960 204200 LHS Laying of WMM top Layer 1 240
12/4/2018 208600 208700 LHS Laying of WMM-1st Layer 1 100
12/4/2018 203960 204200 RHS Laying of WMM top Layer 1 240
12/5/2018 208600 208800 LHS Laying of WMM-1st Layer 1 200
12/6/2018 208700 208960 LHS Laying of WMM-1st Layer 1 260
12/11/2018 203280 203300 LHS Laying of WMM-1st Layer 1 20
12/12/2018 203280 203420 LHS Laying of WMM-1st Layer 1 140
12/13/2018 203420 203450 LHS Laying of WMM-1st Layer 1 30
12/13/2018 203280 203450 LHS Laying of WMM top Layer 1 170
Total _ December-2018 _ Package - 03
Jan-19
06.01.2019 203300 203450 RHS Laying of WMM top Layer 1 150
30.01.2019 201400 201530 RHS Laying of WMM top Layer 1 130
31.01.2019 201400 201530 RHS Laying of WMM top Layer 1 130
Total _ January-2019 _ Package - 03
Feb-19
06.02.2019 201400 201500 LHS Laying of WMM top Layer 1 100

09.02.2019 200460 200520 RHS Laying of WMM 1 60

Total _ February-2019 _ Package - 03

Total _ As on February-2019 _ Package - 03

Package - 04 (From Km. 213+000 to 223+000)


1 Upto May-2018 219970 220000 LHS Laying of WMM 1 30
2 Upto May-2018 220225 220453 LHS Laying of WMM 1 228
3 Upto May-2018 220458 221082 LHS Laying of WMM 1 624
4 Upto May-2018 221086 221438 LHS Laying of WMM 1 352
5 Upto May-2018 221538 222278 LHS Laying of WMM 1 740

LHS &
6 Upto May-2018 222303 222542 Laying of WMM 2 239
RHS

LHS &
7 Upto May-2018 222547 222920 Laying of WMM 2 373
RHS

8 Upto May-2018 222547 222920 LHS Laying of WMM 1 373


9 Upto May-2018 222560 222580 RHS Laying of WMM 1 20
Total _ Upto May-2018 _ Package - 04
Jun-18
1 6/1/2018 222220 222440 LHS Laying of WMM-1st Layer 1 220
2 6/2/2018 220460 221080 LHS Laying of WMM-1st Layer 1 620
3 6/2/2018 221100 221440 LHS Laying of WMM-1st Layer 1 340
4 6/3/2018 221540 222270 LHS Laying of WMM-1st Layer 1 730

5 6/1/2018 222860 222920 LHS Laying of WMM top Layer 1 60


6 6/1/2018 222560 222860 RHS Laying of WMM top Layer 1 300
7 6/27/2018 222560 222900 LHS Laying of WMM top Layer 1 340
8 6/27/2018 222020 222260 LHS Laying of WMM top Layer 1 240
9 6/27/2018 222560 222920 RHS Laying of WMM top Layer 1 360
10 6/27/2018 222000 222260 LHS Laying of WMM top Layer 1 260
11 6/28/2018 221840 222000 LHS Laying of WMM top Layer 1 160
12 6/29/2018 221840 221900 LHS Laying of WMM top Layer 1 60
Total _ June-2018 _ Package - 04
Jul-18
1 7/12/2018 219980 220180 LHS Laying of WMM-1st Layer 1 200
2 7/13/2018 219540 219740 LHS Laying of WMM-1st Layer 1 200
3 7/14/2018 219000 219070 LHS Laying of WMM-1st Layer 1 70
4 7/15/2018 219060 219200 LHS Laying of WMM-1st Layer 1 140
5 7/20/2018 219640 219820 LHS Laying of WMM-1st Layer 1 180
6 7/23/2018 219820 219960 LHS Laying of WMM-1st Layer 1 140
7 7/26/2018 219440 219540 LHS Laying of WMM-1st Layer 1 100
8 7/29/2018 220160 220220 LHS Laying of WMM-1st Layer 1 60

9 7/1/2018 220240 220440 LHS Laying of WMM top Layer 1 200


10 7/2/2018 222000 222280 LHS Laying of WMM top Layer 1 280
Laying of WMM top Layer
11 7/3/2018 221420 221480 LHS 1 60
Profile Correction
12 7/4/2018 221040 221420 LHS Laying of WMM top Layer 1 380
13 7/4/2018 221540 222280 LHS Laying of WMM top Layer 1 740
14 7/10/2018 220700 221100 LHS Laying of WMM top Layer 1 400
15 7/11/2018 219200 219440 LHS Laying of WMM top Layer 1 240
16 7/18/2018 219980 220020 LHS Laying of WMM top Layer 1 40
17 7/19/2018 220060 220180 LHS Laying of WMM top Layer 1 120
18 7/20/2018 219980 220160 LHS Laying of WMM top Layer 1 180
19 7/20/2018 219600 219960 LHS Laying of WMM top Layer 1 360
20 7/24/2018 219200 219300 LHS Laying of WMM top Layer 1 100
21 7/24/2018 219300 219350 LHS Laying of WMM top Layer 1 50
22 7/24/2018 219350 219460 LHS Laying of WMM top Layer 1 110
Laying of WMM top Layer
23 7/26/2018 219000 219200 LHS 1 200
Profile Correction
Laying of WMM top Layer
24 7/27/2018 219440 219600 LHS 1 160
Profile Correction
Laying of WMM top Layer
25 7/29/2018 219000 219300 LHS 1 300
Profile Correction
Laying of WMM top Layer
26 7/29/2018 219600 219800 LHS 1 200
Profile Correction
Laying of WMM top Layer
27 7/29/2018 219600 219800 LHS 1 200
Profile Correction
Laying of WMM top Layer
28 7/29/2018 219800 219960 LHS 1 160
Profile Correction
Total _ July-2018 _ Package - 04
Aug-18
1 8/31/2018 221540 221970 RHS Laying of WMM-1st Layer 1 430

2 8/7/2018 220180 220220 LHS Laying of WMM top Layer 1 40


3 8/7/2018 222280 222320 LHS Laying of WMM top Layer 1 40
Total _ August-2018 _ Package - 04
Sep-18
1 1.09.2018 221540 222280 RHS Laying of WMM-1st Layer 1 740
2 3.09.2018 219500 219700 RHS Laying of WMM-1st Layer 1 200
3 5.09.2018 219000 219440 RHS Laying of WMM-1st Layer 1 440
4 6.09.2018 219960 220200 RHS Laying of WMM-1st Layer 1 240
5 6.09.2018 219220 219440 RHS Laying of WMM-1st Layer 1 220
6 7.09.2018 220440 220760 RHS Laying of WMM-1st Layer 1 320
7 26.9.2018 220760 220850 RHS Laying of WMM-1st Layer 1 90
8 26.9.2018 220850 221060 RHS Laying of WMM-1st Layer 1 210
9 27.9.2018 221320 221360 RHS Laying of WMM-1st Layer 1 40
10 30.9.2018 221200 221300 RHS Laying of WMM-1st Layer 1 100

11 3.09.2018 221540 222280 RHS Laying of WMM top Layer 1 740


12 6.09.2018 219500 219960 RHS Laying of WMM top Layer 1 460
13 9.09.2018 219000 219300 RHS Laying of WMM top Layer 1 300
14 10.09.2018 219300 219500 RHS Laying of WMM top Layer 1 200
15 11.09.2018 220440 220700 RHS Laying of WMM top Layer 1 260
16 28.9.2018 220300 220440 RHS Laying of WMM top Layer 1 140
17 29.9.2018 220700 220900 RHS Laying of WMM top Layer 1 200
18 29.9.2018 219960 220300 RHS WMM top Correction 1 340
Total _ September-2018 _ Package - 04
Oct-18
1 10/4/2018 221400 221430 RHS WMM top Correction 1 30
2 10/5/2018 221100 221400 RHS WMM top Correction 1 300
3 10/23/2018 213900 213955 RHS Laying of WMM top Layer 1 55
4 10/31/2018 214960 215050 RHS Laying of WMM top Layer 1 90
Total _ October-2018 _ Package - 04
Nov-18
1 11/1/2018 215050 215150 RHS Laying of WMM-1st Layer 1 100
2 11/2/2018 215150 215160 RHS Laying of WMM-1st Layer 1 10
3 11/3/2018 215050 215200 RHS Laying of WMM-1st Layer 1 150
4 11/4/2018 213800 213900 RHS Laying of WMM-1st Layer 1 100
Total _ November-2018 _ Package - 04
Dec-18
12/20/2018 214240 214360 RHS Laying of WMM top Layer 1 120
12/21/2018 214500 214640 RHS Laying of WMM top Layer 1 140
12/23/2018 215500 215580 RHS Laying of WMM 1st Layer 1 80
12/26/2018 215400 215510 RHS Laying of WMM 1st Layer 1 110
12/27/2018 215510 215610 RHS Laying of WMM 1st Layer 1 100
12/27/2018 215300 215550 RHS Laying of WMM top Layer 1 250

12/28/2018 215550 215610 RHS Laying of WMM topCorrection 1 60

12/29/2018 215640 215680 RHS WMM top Correction 1 40


12/29/2018 215500 215600 RHS WMM top Correction 1 100
Total _ December-2018 _ Package - 04

Total _ As on February-2019 _ Package - 04

Total _ As on February-2019 _ Package - 01, 03 & 04


0 0 0 0 0 0 0

Total Actual
Breadth Deapth Total Quantity
Quantity in Dispatched Remarks
(M) (M) in MT
Cum Qty in MT

3.250 0.125 142.188 334.141


3.250 0.125 16.250 38.188
3.250 0.125 195.000 458.250
3.250 0.125 503.750 1183.813
3.250 0.125 48.750 114.563
3.250 0.150 146.250 343.688
6.250 0.200 12.500 29.375
6.250 0.200 12.500 29.375
3.300 0.200 26.400 62.040
3.300 0.125 8.250 19.388

3.400 0.090 134.640 316.404


3.500 0.106 133.560 313.866
3.500 0.110 196.350 461.423
3.500 0.100 105.000 246.750
3.300 0.080 47.520 111.672
3.300 0.080 15.840 37.224 3789.28
1744.748 4100.157 3592.237 -14.1%

3.500 0.200 210.000 493.50 555.50 Jan-19


3.500 0.125 48.125 113.09 173.11 Jan-19
3.500 0.125 131.250 308.44 122.07 Jan-19
389.375 915.031 850.688 -7.6%

1.750 0.250 87.500 205.625 164.307 Feb-19

1.750 0.250 175.000 411.25 285.955 Feb-19

3.500 0.125 74.375 174.781 165.521 Feb-19

3.500 0.125 65.625 154.219 438.592 Feb-19


5.200 0.250 195.000 458.250 494.221 Feb-19
3.500 0.150 131.250 308.4375 264.805 Feb-19
5.200 0.125 162.500 381.875 420.741 Feb-19
3.500 0.100 147.000 345.450 96.450 Feb-19
1038.250 2439.888 2330.592 -4.7%

3172.37 7455.08 6773.52 -10.1%

5.200 0.200 1045.200 2456.22


5.240 0.220 1464.056 3440.5316
5.240 0.220 415.008 975.2688
5.240 0.220 553.344 1300.3584 8376.54
3477.608 8172.379 7940.960 -2.9%

5.240 0.125 157.200 369.420 413.480


5.240 0.125 58.950 138.533
5.240 0.125 203.050 477.168 292.670
5.240 0.125 157.200 369.420
5.120 0.125 64.000 150.400 826.550
5.120 0.125 64.000 150.400 303.350
5.200 0.125 39.000 91.650 272.950
5.200 0.125 58.500 137.475
5.200 0.125 71.500 168.025 314.420
5.200 0.125 78.000 183.300
5.200 0.125 32.500 76.375 640.820

5.140 0.125 128.500 301.975


5.140 0.125 205.600 483.160 358.790
5.140 0.125 372.650 875.728 1325.540
5.140 0.125 205.600 483.160 1282.680
5.140 0.125 141.350 332.173
5.140 0.125 51.400 120.790 779.460
5.140 0.125 64.250 150.988
5.140 0.100 51.400 120.790 321.950
5.140 0.125 70.675 166.086 378.060
5.140 0.100 205.600 483.160 134.240
5.140 0.100 143.920 338.212 30.130
5.140 0.100 10.280 24.158 29.960
2635.125 6192.544 7304.387 15.2%
5.140 0.125 12.850 30.198
5.124 0.125 140.910 331.139
5.124 0.125 38.430 90.311 77.710

5.140 0.125 179.900 422.765 470.600


5.140 0.125 25.700 60.395 105.640
5.140 0.125 179.900 422.765
5.140 0.125 179.900 422.765 25.620
757.590 1780.337 644.232 -176.4%

5.250 0.125 334.688 786.516


5.250 0.125 144.375 339.281
5.250 0.125 157.500 370.125
5.250 0.125 39.375 92.531
5.250 0.125 275.625 647.719
5.250 0.125 196.875 462.656
5.250 0.125 144.375 339.281
5.250 0.125 26.250 61.688
5.250 0.125 85.313 200.484
5.250 0.125 65.625 154.219
5.250 0.125 65.625 154.219
5.250 0.125 98.438 231.328
5.250 0.125 196.875 462.656
5.250 0.125 157.500 370.125
5.250 0.125 65.625 154.219
5.250 0.125 39.375 92.531
5.250 0.125 98.438 231.328
5.250 0.125 32.813 77.109
5.250 0.125 137.813 323.859
5.250 0.170 89.250 209.738

5.125 0.125 115.313 270.984


5.125 0.125 172.969 406.477
5.125 0.125 128.125 301.094
5.125 0.125 140.938 331.203
5.125 0.125 76.875 180.656
5.125 0.125 166.563 391.422
5.125 0.125 179.375 421.531
5.125 0.125 166.563 391.422
5.125 0.125 64.063 150.547
5.125 0.125 89.688 210.766
5.125 0.125 89.688 210.766
5.125 0.125 230.625 541.969
5.125 0.125 25.625 60.219
5.125 0.055 39.463 92.737
5.125 0.125 102.500 240.875
5.125 0.125 128.125 301.094
5.125 0.040 36.900 86.715
5.125 0.040 28.700 67.445
5.125 0.125 64.063 150.547 13411.410
4497.906 10570.080 12714.017 16.9%

5.250 0.125 26.250 61.688


5.250 0.125 26.250 61.688
5.250 0.150 315.000 740.250
5.250 0.125 242.813 570.609
5.250 0.125 52.500 123.375
5.250 0.125 39.375 92.531
5.250 0.125 118.125 277.594
0.000 0.000
5.125 0.100 307.500 722.625
5.125 0.125 256.250 602.188
5.125 0.125 288.281 677.461 2387.060
1672.344 3930.008 2262.933 -73.7%

5.140 0.189 58.288 136.976

5.140 0.030 30.840 72.474


2.000 0.300 108.000 253.800
5.140 0.125 192.750 452.963
5.140 0.050 89.950 211.383
5.140 0.150 269.850 634.148
5.140 0.150 123.360 289.896
5.140 0.120 222.048 521.813
5.140 0.150 215.880 507.318
5.140 0.150 46.260 108.711
5.140 0.100 20.560 48.316
5.140 0.080 156.256 367.202
5.140 0.040 12.336 28.990
5.140 0.100 82.240 193.264
5.140 0.100 20.560 48.316

2.000 0.300 108.000 253.800


5.140 0.050 89.950 211.383
5.140 0.100 51.400 120.790 3736.080
1898.528 4461.540 3541.804 -26.0%

5.200 0.150 35.100 82.485


5.200 0.150 23.400 54.990
5.200 0.150 97.500 229.125
5.200 0.150 70.200 164.970
5.200 0.150 54.600 128.310
5.200 0.150 101.400 238.290
5.200 0.150 54.600 128.310
5.200 0.150 78.000 183.300
5.200 0.125 19.500 45.825
5.200 0.150 195.000 458.250
5.200 0.150 31.200 73.320
5.140 0.200 185.040 434.844

5.140 0.125 96.375 226.481


5.240 0.125 52.400 123.140
5.140 0.050 66.820 157.027
5.140 0.050 15.420 36.237 4643.490
1176.555 2764.904 4402.029 37.2%

5.200 0.125 45.500 106.925 72.020 Dec-18


5.200 0.150 195.000 458.250 456.453 Dec-18
5.200 0.125 13.000 30.550 28.345 Dec-18
5.200 0.250 312.000 733.200 687.054 Dec-18
2.450 0.200 49.000 115.150 Dec-18
2.450 0.200 117.600 276.360 Dec-18
5.200 0.125 130.000 305.500 378.252 Dec-18
5.200 0.125 169.000 397.150 251.002 Dec-18
5.200 0.125 13.000 30.550 26.279 Dec-18
5.200 0.200 145.600 342.160 321.372 Dec-18
5.200 0.200 31.200 73.320 279.543 Dec-18
5.200 0.125 110.500 259.675 167.796 Dec-18
1331.400 3128.790 2668.114 -17.3%

5.200 0.250 195.000 458.25 645.24 Jan-19


5.200 0.250 169.000 397.15 164.53 Jan-19
5.200 0.125 84.500 198.58 54.38 Jan-19
448.500 1053.975 864.140 -22.0%

5.200 0.200 104.000 244.400 196.596 Feb-19

5.200 0.250 78.000 183.300 168.915 Feb-19

182.000 427.700 365.511 -17.0%

18077.56 42482.26 42708.13 0.5%

5.200 0.125 19.500 45.825


5.200 0.125 148.200 348.270
5.200 0.125 405.600 953.160
5.200 0.125 228.800 537.680
5.200 0.125 481.000 1130.350

5.200 0.125 310.700 730.145

5.200 0.125 484.900 1139.515

5.200 0.125 242.450 569.758


5.200 0.125 13.000 30.550 6352.420
2334.150 5485.253 6022.094 8.9%

5.200 0.125 143.000 336.050 222.690


5.200 0.125 403.000 947.050
5.200 0.125 221.000 519.350
5.200 0.125 474.500 1115.075

5.120 0.125 38.400 90.240


5.120 0.125 192.000 451.200
5.120 0.125 217.600 511.360
5.120 0.125 153.600 360.960
5.120 0.125 230.400 541.440
5.120 0.125 166.400 391.040 829.250
5.120 0.125 102.400 240.640 954.770
5.120 0.125 38.400 90.240 1345.550
2380.700 5594.645 3177.942 -76.0%

5.200 0.125 130.000 305.500 522.690


5.200 0.125 130.000 305.500 451.770
5.200 0.125 45.500 106.925 174.790
5.200 0.125 91.000 213.850 252.070
5.200 0.125 117.000 274.950 101.360
5.200 0.125 91.000 213.850 681.470
5.200 0.125 65.000 152.750
5.200 0.125 39.000 91.650

5.100 0.125 127.500 299.625 574.830


5.100 0.125 178.500 419.475 177.510

5.100 0.125 38.250 89.888 240.900

5.100 0.125 242.250 569.288


5.100 0.125 471.750 1108.613 101.620
5.100 0.125 255.000 599.250 442.160
5.100 0.125 153.000 359.550 642.960
5.100 0.125 25.500 59.925 96.900
5.100 0.125 76.500 179.775 247.720
5.100 0.125 114.750 269.663
5.100 0.125 229.500 539.325
5.100 0.125 63.750 149.813
5.100 0.125 31.875 74.906
5.100 0.125 70.125 164.794 209.250
5.100 0.125 127.500 299.625 881.970

5.100 0.125 102.000 239.700 445.870

5.100 0.125 191.250 449.438

5.100 0.125 127.500 299.625

5.100 0.125 127.500 299.625

5.100 0.125 102.000 239.700 1074.460

3564.500 8376.575 6939.644 -20.7%

5.250 0.125 282.188 663.141

5.125 0.125 25.625 60.219


5.125 0.125 25.625 60.219 1575.660
333.438 783.578 1493.726 47.5%

5.250 0.125 485.625 1141.219


5.250 0.125 131.250 308.438
5.250 0.125 288.750 678.563
5.250 0.125 157.500 370.125
5.250 0.125 144.375 339.281
5.250 0.125 210.000 493.500
5.250 0.125 59.063 138.797
5.250 0.125 137.813 323.859
5.250 0.125 26.250 61.688
5.250 0.125 65.625 154.219

5.125 0.125 474.063 1114.047


5.125 0.125 294.688 692.516
5.125 0.125 192.188 451.641
5.125 0.125 128.125 301.094
5.125 0.125 166.563 391.422
5.125 0.125 89.688 210.766
5.125 0.030 30.750 72.263
5.125 0.014 24.395 57.328 6964.670
3106.708 7300.763 6602.507 -10.6%
5.125 0.150 23.063 54.197
5.140 0.036 54.741 128.641
5.125 0.125 35.234 82.801
5.125 0.125 57.656 135.492 2006.900
170.694 401.131 1902.541 78.9%

5.140 0.125 64.250 150.988


5.140 0.125 6.425 15.099
5.140 0.125 96.375 226.481
5.125 0.120 61.500 144.525 1121.730
228.550 537.093 1063.400 49.5%

5.200 0.125 78.000 183.300 474.749 Dec-18


5.200 0.125 91.000 213.850 160.648 Dec-18
5.200 0.125 52.000 122.200 222.543 Dec-18
5.200 0.125 71.500 168.025 245.826 Dec-18
5.200 0.125 65.000 152.750 Dec-18
5.200 0.125 162.500 381.875 525.713 Dec-18

5.200 0.125 39.000 91.650 134.189


Dec-18
5.200 0.060 12.480 29.328 272.958 Dec-18
5.200 0.060 31.200 73.320 1351.450 Dec-18
602.680 1416.298 3388.076 58.2%

12721.42 29895.33 30589.93 2.3%

33971.35 79832.67 80071.57 0.3%


0 0

10.25 7 3.25

Jan-19
Jan-19
Jan-19

Feb-19

Feb-19

Feb-19

Feb-19
Feb-19
Feb-19
Feb-19
Feb-19
Jan-19
Jan-19
Jan-19

Feb-19

Feb-19
6166.830
320.675

5846.155
0 0 0 0 0 0 0 0 0 0
Site Report_DBM
Chainage Total
Breadth Deapth
Sl. No. Date Side No's Length (M) Quantity
(M) (M)
From To in Cum

Package - 01 (180+600 to 190+000)


1 11.02.2019 180700 181000 LHS 1 300 5.000 0.040 60.00

Total February-2019 (Package-1) 300.000 60.000


Total As on February-2019 (Package-1) 300 60

Package - 03 (195+000 to 213+000)


1 20.03.2018 205160 205270 LHS 1 110.000 5.000 0.065 35.75
2 20.03.2018 205430 205470 LHS 1 40.000 5.000 0.065 13.00
3 21.03.2018 205160 205270 RHS 1 110.000 5.000 0.065 35.75
4 21.03.2018 205430 205640 RHS 1 210.000 5.000 0.065 68.25
5 21.03.2018 205470 205730 LHS 1 260.000 5.000 0.065 84.50
6 22.03.2018 205640 205740 RHS 1 100.000 5.000 0.065 32.50
7 22.03.2018 207220 207610 LHS 1 390.000 5.000 0.065 126.75
8 23.03.2018 207220 207770 RHS 1 550.000 5.000 0.065 178.75
9 25.03.2018 207770 208450 RHS 1 680.000 5.000 0.065 221.00
10 26.03.2018 207610 207990 LHS 1 380.000 5.000 0.065 123.50
11 27.03.2018 207990 208100 LHS 1 110.000 5.000 0.065 35.75
12 29.03.2018 208100 208180 LHS 1 80.000 5.000 0.065 26.00
13 30.03.2018 208180 208530 LHS 1 350.000 5.000 0.065 113.75
14 30.03.2018 209000 209100 LHS 1 100.000 5.000 0.065 32.50
15 01.04.2018 209100 209140 LHS 1 40.000 5.000 0.065 13.00
16 03.04.2018 209140 209440 LHS 1 300.000 5.000 0.065 97.50
17 04.04.2018 209000 209640 RHS 1 640.000 5.000 0.065 208.00
18 04.04.2018 209440 209680 LHS 1 240.000 5.000 0.065 78.00
19 06.04.2018 209640 209680 RHS 1 40.000 5.000 0.065 13.00
20 06.04.2018 210280 210870 LHS 1 590.000 5.000 0.065 191.75
21 09.04.2018 210280 210640 RHS 1 360.000 5.000 0.065 117.00
22 10.04.2018 210640 210870 RHS 1 230.000 5.000 0.065 74.75
23 10.04.2018 210950 211020 LHS 1 70.000 5.000 0.065 22.75
24 10.04.2018 211070 211180 LHS 1 110.000 5.000 0.065 35.75
25 11.04.2018 211180 211570 LHS 1 390.000 5.000 0.065 126.75
26 13.04.2018 210950 211020 RHS 1 70.000 5.000 0.065 22.75
27 13.04.2018 211070 211380 RHS 1 310.000 5.000 0.065 100.75
28 18.04.2018 205950 206470 RHS 1 520.000 5.000 0.080 208.00
29 19.04.2018 206470 206890 RHS 1 420.000 5.000 0.080 168.00
30 21.04.2018 206890 207220 RHS 1 330.000 5.000 0.080 132.00
31 23.04.2018 205950 206390 LHS 1 440.000 5.000 0.080 176.00
32 25.04.2018 206390 206720 LHS 1 330.000 5.000 0.080 132.00
33 29.04.2018 206720 206840 LHS 1 120.000 5.000 0.080 48.00
34 03.05.2018 206590 206790 LHS 1 200.000 5.000 0.080 80.00
35 06.05.2018 206790 207090 LHS 1 300.000 5.000 0.080 120.00
36 10.06.2018 211740 211760 RHS 1 20.000 5.000 0.080 8.00
37 14.06.2018 211760 211810 RHS 1 50.000 5.000 0.080 20.00
38 16.06.2018 211810 211830 RHS 1 20.000 5.000 0.080 8.00
39 17.06.2018 211830 211880 RHS 1 50.000 5.000 0.080 20.00
40 19.06.2018 211880 212020 RHS 1 140.000 5.000 0.080 56.00
41 20.06.2018 212020 212230 RHS 1 210.000 5.000 0.080 84.00
42 25.06.2018 212230 212430 RHS 1 200.000 5.000 0.080 80.00
Total As on June-2018 (Package-3) 10210.0 3569.500
43 05.07.2018 199200 199450 LHS 1 250.000 5.000 0.080 100.00
44 19.07.2018 199530 199580 LHS 1 50.000 5.000 0.080 20.00
45 20.07.2018 199450 199530 LHS 1 80.000 5.000 0.080 32.00
46 23.07.2018 199580 199840 LHS 1 260.000 5.000 0.080 104.00
47 24.07.2018 199840 200185 LHS 1 345.000 5.000 0.080 138.00
48 27.07.2018 200220 200240 LHS 1 20.000 5.000 0.080 8.00
49 28.07.2018 200240 200750 LHS 1 510.000 5.000 0.080 204.00
50 29.07.2018 200750 200870 LHS 1 120.000 5.000 0.080 48.00
51 30.07.2018 200870 201150 LHS 1 280.000 5.000 0.080 112.00
Total July-2018 (Package-3) 1915.000 766.000
52 9.08.2018 201200 201420 LHS 1 220 5.000 0.080 88.00
Total Aug-2018 (Package-3) 220 88.000
53 15.09.18 201780 202270 LHS 1 490 5.000 0.080 196.00
54 16.09.18 202270 202340 LHS 1 70 5.000 0.080 28.00
55 16.09.18 202440 202615 RHS 1 175 5.000 0.080 70.00
56 18.09.18 202620 202720 RHS 1 100 5.000 0.080 40.00
57 18.09.18 202805 202970 LHS 1 165 5.000 0.080 66.00
58 18.09.18 203000 203080 RHS 1 80 5.000 0.080 32.00
59 23.9.2018 203080 203280 RHS 1 200 5.000 0.080 80.00
60 24.9.2018 199100 199190 RHS 1 90 5.000 0.080 36.00
61 25.9.2018 199190 199370 RHS 1 180 5.000 0.080 72.00
62 26.9.2018 199370 199410 RHS 1 40 5.000 0.080 16.00
Total September-2018 (Package-3) 1590 636.000
63 2.10.2018 199410 199460 RHS 1 50 5.000 0.080 20.00
64 4.10.2018 199460 199730 RHS 1 270 5.000 0.080 108.00
65 6.10.2018 199730 200100 RHS 1 370 5.000 0.080 148.00
66 8.10.2018 200100 200195 RHS 1 95 5.000 0.080 38.00
67 8.10.2018 200220 200330 RHS 1 110 5.000 0.080 44.00
68 9.10.2018 200330 200460 RHS 1 130 5.000 0.080 52.00
69 11.10.2018 202355 202660 LHS 1 305 5.000 0.080 122.00
70 12.10.2018 202660 202805 LHS 1 145 5.000 0.080 58.00
71 12.10.2018 202970 203155 LHS 1 185 5.000 0.080 74.00
72 24.10.2018 203160 203280 LHS 1 120 5.000 0.080 48.00
73 24.10.2018 203950 204190 LHS 1 240 5.000 0.080 96.00
74 25.10.2018 204190 204400 LHS 1 210 5.000 0.080 84.00
75 25.10.2018 204445 204610 LHS 1 165 5.000 0.080 66.00
76 26.10.2018 204610 204825 LHS 1 215 5.000 0.080 86.00
77 27.10.2018 200460 200900 RHS 1 440 5.000 0.080 176.00
78 28.10.2018 200900 201320 RHS 1 420 5.000 0.080 168.00
79 29.10.2018 201320 201410 RHS 1 90 5.000 0.080 36.00
80 30.10.2018 201410 201450 RHS 1 40 5.000 0.080 16.00
81 30.10.2018 201550 201800 RHS 1 250 5.000 0.080 100.00
82 31.10.2018 201800 201980 RHS 1 180 5.000 0.080 72.00
Total October-2018 (Package-3) 4030 1612.000
83 01.11.2018 201980 202255 RHS 1 275 5.000 0.080 110.00
84 02.11.2018 211740 211890 LHS 1 150 5.000 0.080 60.00
85 03.11.2018 211890 212040 LHS 1 150 5.000 0.080 60.00
86 04.11.2018 212220 212250 LHS 1 30 5.000 0.080 12.00
87 14.11.2018 212280 212490 RHS 1 210 5.000 0.080 84.00
88 18.11.2018 212500 212700 LHS 1 200 5.000 0.080 80.00
89 20.11.2018 212490 212740 RHS 1 250 5.000 0.080 100.00
90 24.11.2018 204485 204800 RHS 1 315 5.000 0.080 126.00
91 25.11.2018 204220 204400 RHS 1 180 5.000 0.080 72.00
92 25.11.2018 204450 204485 RHS 1 35 5.000 0.080 14.00
93 27.11.2018 202720 202775 RHS 1 55 5.000 0.080 22.00
94 27.11.2018 202255 202440 RHS 1 185 5.000 0.080 74.00
95 29.11.2018 202775 202920 RHS 1 145 5.000 0.080 58.00
96 30.11.2018 208600 208775 RHS 1 175 5.000 0.080 70.00
Total November-2018 (Package-3) 2355 942.000
Dec-18
01.12.2018 208775 208970 RHS 1 195 5.000 0.080 78.00
03.12.2018 207085 207215 RHS 1 130 5.000 0.080 52.00
06.12.2018 203960 204225 RHS 1 265 5.000 0.080 106.00
06.12.2018 204800 204810 RHS 1 10 5.000 0.080 4.00
11.12.2018 208595 208675 LHS 1 80 5.000 0.080 32.00
12.12.2018 208675 208940 LHS 1 265 5.000 0.080 106.00
19.12.2018 208940 208967 LHS 1 27 5.000 0.080 10.80
21.12.2018 203280 203450 LHS 1 170 5.000 0.080 68.00
Total December-2018 (Package-3) 1142 456.800
Feb-19
05.02.2019 203280 203400 RHS 1 120 5.000 0.040 24.00
06.02.2019 203400 203500 LHS 1 100 5.000 0.080 40.00
06.02.2019 199110 199200 LHS 1 90 5.000 0.080 36.00
07.02.2019 201400 201500 LHS 1 100 5.000 0.080 40.00
10.02.2019 200460 200520 RHS 1 60 5.000 0.080 24.00
11.02.2019 201460 201520 LHS 1 60 10.06
Total February-2019 (Package-3) 2134 174.064

Total As on February-2019 (Package-3) 20320 8244

Package - 04 (213+000 to 223+000)


1 10.8.2018 222500 222680 LHS 1 180 5.000 0.080 72.00
2 23.8.2018 222680 222837 LHS 1 157 5.000 0.080 62.80
3 24.8.2018 222837 222910 LHS 1 73 5.000 0.080 29.20
4 24.8.2018 222500 222770 RHS 1 270 5.000 0.080 108.00
5 25.8.2018 222770 222910 RHS 1 140 5.000 0.080 56.00
6 25.8.2018 221535 222070 LHS 1 535 5.000 0.080 214.00
7 29.8.2018 219000 219660 LHS 1 660 5.000 0.080 264.00
8 30.8.2018 219660 219840 LHS 1 180 5.000 0.080 72.00
9 31.8.2018 219840 220050 LHS 1 210 5.000 0.080 84.00
Total August-2018 (Package-4) 2405 962.000
10 1.9.2018 220050 220290 LHS 1 240 5.000 0.080 96.00
11 2.9.2018 220290 220710 LHS 1 420 5.000 0.080 168.00
12 3.9.2018 220710 220790 LHS 1 80 5.000 0.080 32.00
13 09.09.18 220790 221440 LHS 1 650 5.000 0.080 260.00
14 09.09.18 221540 221580 RHS 1 40 5.000 0.080 16.00
Total September-2018 (Package-4) 1430 572.000
Dec-18
22.12.18 213730 213980 RHS 1 250 5.000 0.080 100.00
23.12.18 213980 214360 RHS 1 380 5.000 0.080 152.00
24.12.18 214395 214540 RHS 1 145 5.000 0.080 58.00
26.12.18 214520 214795 RHS 1 275 5.000 0.080 110.00
27.12.18 214795 214810 RHS 1 15 5.000 0.080 6.00
28.12.18 214810 215060 RHS 1 250 5.000 0.080 100.00
29.12.18 215060 215460 RHS 1 400 5.000 0.080 160.00
31.12.18 215280 215570 RHS 1 290 5.000 0.040 58.00
31.12.18 215570 215616 RHS 1 46 5.000 0.080 18.40
31.12.18 215634 215640 RHS 1 6 5.000 0.050 1.50
Total December-2018 (Package-4) 842 763.900
Jan-19
02.01.19 215640 215740 RHS 1 100 5.000 0.080 40.00
04.01.19 219000 219200 RHS 1 200 5.000 0.080 80.00
05.01.19 219200 219665 RHS 1 465 5.000 0.080 186.00
06.01.19 219665 219695 RHS 1 30 5.000 0.060 9.00
07.01.19 219695 219790 RHS 1 95 5.000 0.080 38.00
08.01.19 219790 220010 RHS 1 220 5.000 0.080 88.00
09.01.2019 220010 220115 RHS 1 105 5.000 0.080 42.00
16.01.2019 220115 220300 RHS 1 185 5.000 0.080 74.00
18.01.2019 220300 220440 RHS 1 140 5.000 0.080 56.00
18.01.2019 220480 220600 RHS 1 120 5.000 0.080 48.00
19.01.2019 220600 220840 RHS 1 240 5.000 0.080 96.00
20.01.2019 220840 221000 RHS 1 160 5.000 0.080 64.00
20.01.2019 221000 221075 RHS 1 75 5.000 0.080 30.00
21.01.2019 221095 221270 RHS 1 175 5.000 0.080 70.00
22.01.2019 221270 221440 RHS 1 170 5.000 0.080 68.00
22.01.2019 221580 221760 RHS 1 180 5.000 0.080 72.00
23.01.2019 221760 222070 RHS 1 310 5.000 0.080 124.00
24.01.2019 222060 222370 RHS 1 310 5.000 0.080 124.00
29.01.2019 222370 222490 RHS 1 120 5.000 0.080 48.00
29.01.2019 222405 222490 LHS 1 85 5.000 0.080 34.00
30.01.2019 222280 222405 LHS 1 125 5.000 0.080 50.00
Total January-2018 (Package-4) 3610 1441.000
Feb-19
01.02.2019 222080 222280 LHS 1 200 5.000 0.080 80.00
Total February-2018 (Package-4) 200 80.000

Total As on February-2019 (Package-4) 3835 3818.900

Total _ As on February-2019 _ Package -


01, 03 & 04 24455 12123

Theoritical Actual
Qty in Cum Qty in MT

Total DBM_Grade - II 3630 3251.077


Total DBM_Grade - I 8494 8279.894

Feb-19 Actual 905.500


Macherial Patchwaork DBM 2110 8/9/2018
0 0 0 0 0 0

Total HM Plant
Quantity Production Remarks
(MT) (MT)

148.680 29.060 DBM_Grade-II Feb-19 Feb-19

148.680 29.060 -411.6%


148.68 29.06 -412%

88.589 DBM_Grade-II
32.214 115.780 DBM_Grade-II
88.589 DBM_Grade-II
169.124 DBM_Grade-II
209.391 376.510 DBM_Grade-II
80.535 DBM_Grade-II
314.087 365.920 DBM_Grade-II
442.943 389.280 DBM_Grade-II
547.638 504.900 DBM_Grade-II
306.033 303.250 DBM_Grade-II
88.589 96.150 DBM_Grade-II
64.428 56.520 DBM_Grade-II
281.873 DBM_Grade-II
80.535 298.200 DBM_Grade-II
32.214 28.260 DBM_Grade-II
241.605 188.220 DBM_Grade-II
515.424 DBM_Grade-II
193.284 589.830 DBM_Grade-II
32.214 DBM_Grade-II
475.157 480.830 DBM_Grade-II
289.926 268.690 DBM_Grade-II
185.231 DBM_Grade-II
56.375 DBM_Grade-II
88.589 304.240 DBM_Grade-II
314.087 247.020 DBM_Grade-II
56.375 DBM_Grade-II
249.659 273.200 DBM_Grade-II
515.424 507.420 DBM_Grade-II
416.304 446.000 DBM_Grade-II
327.096 345.770 DBM_Grade-II
436.128 376.180 DBM_Grade-II
327.096 225.260 DBM_Grade-II
118.944 120.660 DBM_Grade-II
198.240 145.030 DBM_Grade-II
297.360 270.000 DBM_Grade-II
19.824 28.320 DBM_Grade-II
49.560 41.560 DBM_Grade-II
19.824 23.260 DBM_Grade-II
49.560 46.380 DBM_Grade-II
138.768 167.500 DBM_Grade-II
208.152 184.100 DBM_Grade-II
198.240 212.870 DBM_Grade-II
8845.221 8027.110 -10.2%
249.100 225.150 DBM_Grade-I
49.820 44.740 DBM_Grade-I
79.712 65.920 DBM_Grade-I
259.064 231.170 DBM_Grade-I
343.758 351.000 DBM_Grade-I
19.928 27.900 DBM_Grade-I
508.164 424.510 DBM_Grade-I
119.568 106.770 DBM_Grade-I
278.992 227.070 DBM_Grade-I
1908.106 1704.230 -12.0% 13565.996
219.208 211.200 DBM_Grade-I
219.208 211.200 -3.8%
488.236 498.720 DBM_Grade-I
69.748 272.890 DBM_Grade-I
174.370 DBM_Grade-I
99.640 343.410 DBM_Grade-I
164.406 DBM_Grade-I
79.712 DBM_Grade-I
199.280 180.650 DBM_Grade-I
89.676 76.260 DBM_Grade-I
179.352 187.120 DBM_Grade-I
39.856 37.650 DBM_Grade-I
1584.276 1596.700 0.8%
49.820 46.860 DBM_Grade-I
269.028 258.070 DBM_Grade-I
368.668 286.150 DBM_Grade-I
94.658 205.910 DBM_Grade-I
109.604 100.810 DBM_Grade-I
129.532 141.390 DBM_Grade-I
303.902 277.420 DBM_Grade-I
144.478 341.650 DBM_Grade-I
184.334 DBM_Grade-I
119.568 338.310 DBM_Grade-I
239.136 DBM_Grade-I
209.244 365.110 DBM_Grade-I
164.406 DBM_Grade-I
214.226 225.690 DBM_Grade-I
438.416 394.130 DBM_Grade-I
418.488 385.940 DBM_Grade-I
89.676 103.200 DBM_Grade-I
39.856 261.190 DBM_Grade-I
249.100 DBM_Grade-I
179.352 176.310 DBM_Grade-I
4015.492 3908.140 -2.7%
274.010 275.470 DBM_Grade-I
149.460 151.780 DBM_Grade-I
149.460 187.080 DBM_Grade-I
29.892 20.540 DBM_Grade-I
209.244 225.360 DBM_Grade-I
199.280 192.060 DBM_Grade-I
249.100 267.660 DBM_Grade-I
313.866 264.530 DBM_Grade-I
179.352 202.610 DBM_Grade-I
34.874 DBM_Grade-I
54.802 259.120 DBM_Grade-I
184.334 DBM_Grade-I
144.478 194.600 DBM_Grade-I
174.370 167.550 DBM_Grade-I
2346.522 2408.360 2.6%

194.298 207.62 DBM_Grade-I Dec-18


129.532 64.360 DBM_Grade-I Dec-18
264.046 245.920 DBM_Grade-I Dec-18
9.964 DBM_Grade-I Dec-18
79.712 81.080 DBM_Grade-I Dec-18
264.046 239.180 DBM_Grade-I Dec-18
26.903 30.700 DBM_Grade-I Dec-18
169.388 143.250 DBM_Grade-I Dec-18
1137.889 1012.110 -12.4%
59.784 300.460 DBM_Grade-I Feb-19 Feb-19
99.640 DBM_Grade-I Feb-19 Feb-19
89.676 197.400 DBM_Grade-I Feb-19 Feb-19
99.640 68.020 DBM_Grade-I Feb-19 Feb-19
59.784 87.430 DBM_Grade-I Feb-19 Feb-19
25.070 27.270 1-Trip Patch work Feb-19 Feb-19
433.594 680.580 36.3%

20490 19548 -4.8%

179.352 178.416 DBM_Grade-I


156.435 155.420 DBM_Grade-I
72.737 79.240 DBM_Grade-I
269.028 176.230 DBM_Grade-I
139.496 DBM_Grade-I
533.074 632.040 DBM_Grade-I
657.624 649.950 DBM_Grade-I
179.352 160.680 DBM_Grade-I
209.244 213.660 DBM_Grade-I
2396.342 2245.636 -6.7%
239.136 237.860 DBM_Grade-I
418.488 319.730 DBM_Grade-I
79.712 63.410 DBM_Grade-I
647.660 619.190 DBM_Grade-I
39.856 251.540 DBM_Grade-I
1424.852 1491.730 4.5%

249.100 159.850 DBM_Grade-I Dec-18


378.632 459.820 DBM_Grade-I Dec-18
144.478 133.560 DBM_Grade-I Dec-18
274.010 285.800 DBM_Grade-I Dec-18
14.946 43.050 DBM_Grade-I Dec-18
249.100 262.130 DBM_Grade-I Dec-18
398.560 333.210 DBM_Grade-I Dec-18
144.478 DBM_Grade-I Dec-18
45.834 DBM_Grade-I Dec-18
3.737 186.030 DBM_Grade-I Dec-18
1902.875 1863.450 -2.1%

99.640 106.340 DBM_Grade-I Jan-19 Jan-19


199.280 170.760 DBM_Grade-I Jan-19 Jan-19
463.326 401.890 DBM_Grade-I Jan-19 Jan-19
22.419 19.850 DBM_Grade-I Jan-19 Jan-19
94.658 81.990 DBM_Grade-I Jan-19 Jan-19
219.208 214.300 DBM_Grade-I Jan-19 Jan-19
104.622 94.370 DBM_Grade-I Jan-19 Jan-19
184.334 181.470 DBM_Grade-I Jan-19 Jan-19
139.496 DBM_Grade-I Jan-19 Jan-19
119.568 246.310 DBM_Grade-I Jan-19 Jan-19
239.136 233.110 DBM_Grade-I Jan-19 Jan-19
159.424 217.180 DBM_Grade-I Jan-19 Jan-19
74.730 DBM_Grade-I Jan-19 Jan-19
174.370 156.170 DBM_Grade-I Jan-19 Jan-19
169.388 146.820 DBM_Grade-I Jan-19 Jan-19
179.352 170.000 DBM_Grade-I Jan-19 Jan-19
308.884 258.290 DBM_Grade-I Jan-19 Jan-19
308.884 204.140 DBM_Grade-I Jan-19 Jan-19
119.568 DBM_Grade-I Jan-19 Jan-19
84.694 292.070 DBM_Grade-I Jan-19 Jan-19
124.550 112.160 DBM_Grade-I Jan-19 Jan-19
3589.531 3307.220 -8.5%

199.280 195.860 DBM_Grade-I Feb-19 Feb-19


199.280 195.860 -1.7%

9512.880 9103.896 -4%

30152 28681 -5%

2875.56
Site Report_DLC

Chainage Total
Length Breadth Deapth
Sl. No. Date Side No's Quantity
(M) (M) (M)
From To in Cum

Package - 03 (195+000 to 213+000)


1 10.02.2019 203720 203747 RHS 1 27.000 9.000 0.15 36.45

Total As on February-2019 (Package-3) 27.0 36.450


Batching Plant
Production Remarks
(Cum)

36.000 3-Trips

36.000 -1.2%
Prime coat over Granular Surface
Chainage Total
Length Breadth
Sl. No. Date Side No's Quantity in
(M) (M)
From To Sqm

Package - 01 (From Km. 180+600 to 190+000)


1 11.02.2019 180700 181000 LHS 1 300.000 5.000 1500
Total As on February-2019 (Package-1) 1500

Total As on February-2019 (Package-1) 1500

Package - 03 (From Km. 195+000 to 213+000)


2 18.04.2018 205950 206470 RHS 1 520.000 6.000 3120
3 19.04.2018 206470 206890 RHS 1 420.000 6.000 2520
4 21.04.2018 206890 207220 RHS 1 330.000 6.000 1980
5 10.06.2018 211740 211760 RHS 1 20.000 5.000 100
6 14.06.2018 211760 211810 RHS 1 50.000 5.000 250
7 16.06.2018 211810 211830 RHS 1 20.000 5.000 100
8 17.06.2018 211830 211880 RHS 1 50.000 5.000 250
9 19.06.2018 211880 212020 RHS 1 140.000 5.000 700
10 25.06.2018 212230 212430 RHS 1 200.000 5.000 1000
11 05.07.2018 199200 199450 LHS 1 250.000 5.000 1250
12 19.07.2018 199450 199530 LHS 1 80.000 5.000 400
13 20.07.2018 199530 199580 LHS 1 50.000 5.000 250
14 23.07.2018 199580 199840 LHS 1 260.000 5.000 1300
15 24.07.2018 199840 200185 LHS 1 345.000 5.000 1725
16 27.07.2018 200220 200240 LHS 1 20.000 5.000 100
17 28.07.2018 200240 200750 LHS 1 510.000 5.000 2550
18 29.07.2018 200750 200870 LHS 1 120.000 5.000 600
19 30.07.2018 200870 201150 LHS 1 280.000 5.000 1400
Total As on July-2018 (Package-3) 19595
20 15.09.18 201780 202270 LHS 1 490.000 5.000 2450
21 16.09.18 202270 202340 LHS 1 70.000 5.000 350
22 16.09.18 202440 202615 RHS 1 175.000 5.000 875
23 18.09.18 202620 202720 RHS 1 100.000 5.000 500
24 18.09.18 202805 202970 LHS 1 165.000 5.000 825
25 18.09.18 203000 203080 RHS 1 80.000 5.000 400
26 23.9.2018 203080 203280 RHS 1 200.000 5.000 1000
27 24.9.2018 199100 199190 RHS 1 90.000 5.000 450
28 25.9.2018 199190 199370 RHS 1 180.000 5.000 900
29 26.9.2018 199370 199410 RHS 1 40.000 5.000 200
Total_September-2018 (Package-3) 7950
30 2.10.2018 199410 199460 RHS 1 50.000 5.000 250
31 4.10.2018 199460 199730 RHS 1 270.000 5.000 1350
32 6.10.2018 199730 200100 RHS 1 370.000 5.000 1850
33 8.10.2018 200100 200195 RHS 1 95.000 5.000 475
34 8.10.2018 200220 200330 RHS 1 110.000 5.000 550
35 9.10.2018 200330 200460 RHS 1 130.000 5.000 650
36 11.10.2018 202355 202660 LHS 1 305.000 5.000 1525
37 12.10.2018 202660 202805 LHS 1 145.000 5.000 725
38 12.10.2018 202970 203155 LHS 1 185.000 5.000 925
39 24.10.2018 203160 203280 LHS 1 120.000 5.000 600
40 24.10.2018 203950 204190 LHS 1 240.000 5.000 1200
41 25.10.2018 204190 204400 LHS 1 210.000 5.000 1050
42 25.10.2018 204445 204610 LHS 1 165.000 5.000 825
43 26.10.2018 204610 204825 LHS 1 215.000 5.000 1075
44 27.10.2018 200460 200900 RHS 1 440.000 5.000 2200
45 28.10.2018 200900 201320 RHS 1 420.000 5.000 2100
46 29.10.2018 201320 201410 RHS 1 90.000 5.000 450
47 30.10.2018 201410 201450 RHS 1 40.000 5.000 200
48 30.10.2018 201550 201800 RHS 1 250.000 5.000 1250
49 31.10.2018 201800 201980 RHS 1 180.000 5.000 900
Total_October-2018 (Package-3) 20150
50 01.11.2018 201980 202255 RHS 1 275.000 5.000 1375
51 02.11.2018 211740 211890 LHS 1 150.000 5.000 750
52 03.11.2018 211890 212040 LHS 1 150.000 5.000 750
53 04.11.2018 212220 212250 LHS 1 30.000 5.000 150
54 14.11.2018 212280 212490 RHS 1 210.000 5.000 1050
55 18.11.2018 212500 212700 LHS 1 200.000 5.000 1000
56 20.11.2018 212490 212740 RHS 1 250.000 5.000 1250
57 24.11.2018 204485 204800 RHS 1 315.000 5.000 1575
58 25.11.2018 204220 204400 RHS 1 180.000 5.000 900
59 25.11.2018 204450 204485 RHS 1 35.000 5.000 175
60 27.11.2018 202720 202775 RHS 1 55.000 5.000 275
61 27.11.2018 202255 202440 RHS 1 185.000 5.000 925
62 29.11.2018 202775 202920 RHS 1 145.000 5.000 725
63 30.11.2018 208600 208775 RHS 1 175.000 5.000 875
Total_November-2018 (Package-3) 11775
64 01.12.2018 208775 208970 RHS 1 195.000 5.000 975
65 03.12.2018 207085 207215 RHS 1 130.000 5.000 650
66 06.12.2018 203960 204225 RHS 1 265.000 5.000 1325
67 06.12.2018 204800 204810 RHS 1 10.000 5.000 50
68 11.12.2018 208595 208675 LHS 1 80.000 5.000 400
69 12.12.2018 208675 208940 LHS 1 265.000 5.000 1325
70 19.12.2018 208940 208967 LHS 1 27.000 5.000 135
71 21.12.2018 203280 203450 LHS 1 170.000 5.000 850
Total_December-2018 (Package-3) 5710
72 05.02.2019 203280 203400 RHS 1 120.000 5.000 600
73 06.02.2019 203400 203500 LHS 1 100.000 5.000 500
74 06.02.2019 199110 199200 LHS 1 90.000 5.000 450
75 07.02.2019 201400 201500 LHS 1 100.000 5.000 500
76 10.02.2019 200460 200520 RHS 1 60.000 5.000 300
Total_February-2019 (Package-3) 2350

Total As on February-2019 (Package-3) 67530

Package - 04 (From Km. 213+000 to 223+000)


77 10.8.2018 222500 222680 LHS 1 180.000 5.000 900
78 23.8.2018 222680 222837 LHS 1 157.000 5.000 785
79 24.8.2018 222837 222910 LHS 1 73.000 5.000 365
80 24.8.2018 222500 222770 RHS 1 270.000 5.000 1350
81 25.8.2018 222770 222910 RHS 1 140.000 5.000 700
82 25.8.2018 221535 222070 LHS 1 535.000 5.000 2675
83 29.8.2018 219000 219660 LHS 1 660.000 5.000 3300
84 30.8.2018 219660 219840 LHS 1 180.000 5.000 900
85 31.8.2018 219840 220050 LHS 1 210.000 5.000 1050
Total_August-2018 (Package-4) 12025
86 1.9.2018 220050 220290 LHS 1 240.000 5.000 1200
87 2.9.2018 220290 220710 LHS 1 420.000 5.000 2100
88 3.9.2018 220710 220790 LHS 1 80.000 5.000 400
89 09.09.18 220790 221440 LHS 1 650.000 5.000 3250
90 09.09.18 221540 221580 RHS 1 40.000 5.000 200
Total_September-2018 (Package-4) 7150
91 22.12.18 213730 213980 RHS 1 250.000 5.000 1250
92 23.12.18 213980 214360 RHS 1 380.000 5.000 1900
93 24.12.18 214395 214540 RHS 1 145.000 5.000 725
94 26.12.18 214520 214795 RHS 1 275.000 5.000 1375
95 27.12.18 214795 214810 RHS 1 15.000 5.000 75
96 28.12.18 214810 215060 RHS 1 250.000 5.000 1250
97 29.12.18 215060 215460 RHS 1 400.000 5.000 2000
98 31.12.18 215570 215616 RHS 1 46.000 5.000 230
Total_December-2018 (Package-4) 8805
99 02.01.2019 215640 215740 RHS 1 100.000 5.000 500
100 04.01.2019 219000 219200 RHS 1 200.000 5.000 1000
101 05.01.2019 219200 219665 RHS 1 465.000 5.000 2325
102 07.01.2019 219695 219790 RHS 1 95.000 5.000 475
103 08.01.2019 219790 220010 RHS 1 220.000 5.000 1100
104 09.01.2019 220010 220115 RHS 1 105.000 5.000 525
105 16.01.2019 220115 220300 RHS 1 185.000 5.000 925
106 18.01.2019 220300 220440 RHS 1 140.000 5.000 700
107 18.01.2019 220480 220600 RHS 1 120.000 5.000 600
108 19.01.2019 220600 220840 RHS 1 240.000 5.000 1200
109 20.01.2019 220840 221000 RHS 1 160.000 5.000 800
110 20.01.2019 221000 221075 RHS 1 75.000 5.000 375
111 21.01.2019 221095 221270 RHS 1 175.000 5.000 875
112 22.01.2019 221270 221440 RHS 1 170.000 5.000 850
113 22.01.2019 221580 221760 RHS 1 180.000 5.000 900
114 23.01.2019 221760 222070 RHS 1 310.000 5.000 1550
115 24.01.2019 222060 222370 RHS 1 310.000 5.000 1550
116 29.01.2019 222370 222490 RHS 1 120.000 5.000 600
117 29.01.2019 222405 222490 LHS 1 85.000 5.000 425
118 30.01.2019 222280 222405 LHS 1 125.000 5.000 625
Total_January-2019 (Package-4) 17900
119 01.02.2019 222080 222280 LHS 1 200.000 5.000 1000
Total_February-2019 (Package-4) 1000

Total As on February-2019 (Package-4) 46880

Total _ As on February-2019 _ Package - 01,


115910
03 & 04
Remarks
Tack coat On Primed surface
Chainage Total
Length Breadth
Sl. No. Date Side No's Quantity in
(M) (M) Sqm
From To
Package - 01 (From Km. 180+600 to 190+000)
1 11.02.2019 180700 181000 LHS 1 300.000 5.000 1500
Total_February-2019 (Package-1) 1500

Total As on February-2019 (Package-1) 1500

Package - 03 (From Km. 195+000 to 213+000)


1 18.04.2018 205950 206470 RHS 1 520.000 6.000 3120
2 19.04.2018 206470 206890 RHS 1 420.000 6.000 2520
3 21.04.2018 206890 207220 RHS 1 330.000 6.000 1980
4 10.06.2018 211740 211760 RHS 1 20.000 5.000 100
5 14.06.2018 211760 211810 RHS 1 50.000 5.000 250
6 16.06.2018 211810 211830 RHS 1 20.000 5.000 100
7 17.06.2018 211830 211880 RHS 1 50.000 5.000 250
8 19.06.2018 211880 212020 RHS 1 140.000 5.000 700
9 25.06.2018 212230 212430 RHS 1 200.000 5.000 1000
10 05.07.2018 199200 199450 LHS 1 250.000 5.000 1250
11 19.07.2018 199450 199530 LHS 1 80.000 5.000 400
12 20.07.2018 199530 199580 LHS 1 50.000 5.000 250
13 23.07.2018 199580 199840 LHS 1 260.000 5.000 1300
14 24.07.2018 199840 200185 LHS 1 345.000 5.000 1725
15 27.07.2018 200220 200240 LHS 1 20.000 5.000 100
16 28.07.2018 200240 200750 LHS 1 510.000 5.000 2550
17 29.07.2018 200750 200870 LHS 1 120.000 5.000 600
18 30.07.2018 200870 201150 LHS 1 280.000 5.000 1400
Total As on July-2018 (Package-3) 19595
19 15.09.18 201780 202270 LHS 1 490.000 5.000 2450
20 16.09.18 202270 202340 LHS 1 70.000 5.000 350
21 16.09.18 202440 202615 RHS 1 175.000 5.000 875
22 18.09.18 202620 202720 RHS 1 100.000 5.000 500
23 18.09.18 202805 202970 LHS 1 165.000 5.000 825
24 18.09.18 203000 203080 RHS 1 80.000 5.000 400
25 23.9.2018 203080 203280 RHS 1 200.000 5.000 1000
26 24.9.2018 199100 199190 RHS 1 90.000 5.000 450
27 25.9.2018 199190 199370 RHS 1 180.000 5.000 900
28 26.9.2018 199370 199410 RHS 1 40.000 5.000 200
Total_September-2018 (Package-3) 7950
29 2.10.2018 199410 199460 RHS 1 50.000 5.000 250
30 4.10.2018 199460 199730 RHS 1 270.000 5.000 1350
31 6.10.2018 199730 200100 RHS 1 370.000 5.000 1850
32 8.10.2018 200100 200195 RHS 1 95.000 5.000 475
33 8.10.2018 200220 200330 RHS 1 110.000 5.000 550
34 9.10.2018 200330 200460 RHS 1 130.000 5.000 650
35 11.10.2018 202355 202660 LHS 1 305.000 5.000 1525
36 12.10.2018 202660 202805 LHS 1 145.000 5.000 725
37 12.10.2018 202970 203155 LHS 1 185.000 5.000 925
38 24.10.2018 203160 203280 LHS 1 120.000 5.000 600
39 24.10.2018 203950 204190 LHS 1 240.000 5.000 1200
40 25.10.2018 204190 204400 LHS 1 210.000 5.000 1050
41 25.10.2018 204445 204610 LHS 1 165.000 5.000 825
42 26.10.2018 204610 204825 LHS 1 215.000 5.000 1075
43 27.10.2018 200460 200900 RHS 1 440.000 5.000 2200
44 28.10.2018 200900 201320 RHS 1 420.000 5.000 2100
45 29.10.2018 201320 201410 RHS 1 90.000 5.000 450
46 30.10.2018 201410 201450 RHS 1 40.000 5.000 200
47 30.10.2018 201550 201800 RHS 1 250.000 5.000 1250
48 31.10.2018 201800 201980 RHS 1 180.000 5.000 900
Total_October-2018 (Package-3) 20150
49 01.11.2018 201980 202255 RHS 1 275.000 5.000 1375
50 02.11.2018 211740 211890 LHS 1 150.000 5.000 750
51 03.11.2018 211890 212040 LHS 1 150.000 5.000 750
52 04.11.2018 212220 212250 LHS 1 30.000 5.000 150
53 14.11.2018 212280 212490 RHS 1 210.000 5.000 1050
54 18.11.2018 212500 212700 LHS 1 200.000 5.000 1000
55 20.11.2018 212490 212740 RHS 1 250.000 5.000 1250
56 24.11.2018 204485 204800 RHS 1 315.000 5.000 1575
57 25.11.2018 204220 204400 RHS 1 180.000 5.000 900
58 25.11.2018 204450 204485 RHS 1 35.000 5.000 175
59 27.11.2018 202720 202775 RHS 1 55.000 5.000 275
60 27.11.2018 202255 202440 RHS 1 185.000 5.000 925
61 29.11.2018 202775 202920 RHS 1 145.000 5.000 725
62 30.11.2018 208600 208775 RHS 1 175.000 5.000 875
Total_November-2018 (Package-3) 11775
63 01.12.2018 208775 208970 RHS 1 195.000 5.000 975
64 03.12.2018 207085 207215 RHS 1 130.000 5.000 650
65 06.12.2018 203960 204225 RHS 1 265.000 5.000 1325
66 06.12.2018 204800 204810 RHS 1 10.000 5.000 50
67 11.12.2018 208595 208675 LHS 1 80.000 5.000 400
68 12.12.2018 208675 208940 LHS 1 265.000 5.000 1325
69 19.12.2018 208940 208967 LHS 1 27.000 5.000 135
70 21.12.2018 203280 203450 LHS 1 170.000 5.000 850
Total_December-2018 (Package-3) 5710
71 05.02.2019 203280 203400 RHS 1 120.000 5.000 600
72 06.02.2019 203400 203500 LHS 1 100.000 5.000 500
73 06.02.2019 199110 199200 LHS 1 90.000 5.000 450
74 07.02.2019 201400 201500 LHS 1 100.000 5.000 500
75 10.02.2019 200460 200520 RHS 1 60.000 5.000 300
Total_February-2019 (Package-3) 2350

Total As on February-2019 (Package-3) 67530

Package - 04 (From Km. 213+000 to 223+000)


10.8.2018 222500 222680 LHS 1 180.000 5.000 900
23.8.2018 222680 222837 LHS 1 157.000 5.000 785
24.8.2018 222837 222910 LHS 1 73.000 5.000 365
24.8.2018 222500 222770 RHS 1 270.000 5.000 1350
25.8.2018 222770 222910 RHS 1 140.000 5.000 700
25.8.2018 221535 222070 LHS 1 535.000 5.000 2675
29.8.2018 219000 219660 LHS 1 660.000 5.000 3300
30.8.2018 219660 219840 LHS 1 180.000 5.000 900
31.8.2018 219840 220050 LHS 1 210.000 5.000 1050
Total_August-2018 (Package-4) 12025
1.9.2018 220050 220290 LHS 1 240.000 5.000 1200
2.9.2018 220290 220710 LHS 1 420.000 5.000 2100
3.9.2018 220710 220790 LHS 1 80.000 5.000 400
09.09.18 220790 221440 LHS 1 650.000 5.000 3250
09.09.18 221540 221580 RHS 1 40.000 5.000 200
Total_September-2018 (Package-4) 7150
22.12.18 213730 213980 RHS 1 250.000 5.000 1250
23.12.18 213980 214360 RHS 1 380.000 5.000 1900
24.12.18 214395 214540 RHS 1 145.000 5.000 725
26.12.18 214520 214795 RHS 1 275.000 5.000 1375
27.12.18 214795 214810 RHS 1 15.000 5.000 75
28.12.18 214810 215060 RHS 1 250.000 5.000 1250
29.12.18 215060 215460 RHS 1 400.000 5.000 2000
31.12.18 215280 215570 RHS 1 290.000 5.000 1450
31.12.18 215570 215616 RHS 1 46.000 5.000 230
31.12.18 215634 215640 RHS 1 6.000 5.000 30
Total_December-2018 (Package-4) 10285
02.01.2019 215640 215740 RHS 1 100.000 5.000 500
04.01.2019 219000 219200 RHS 1 200.000 5.000 1000
05.01.2019 219200 219665 RHS 1 465.000 5.000 2325
07.01.2019 219695 219790 RHS 1 95.000 5.000 475
08.01.2019 219790 220010 RHS 1 220.000 5.000 1100
09.01.2019 220010 220115 RHS 1 105.000 5.000 525
16.01.2019 220115 220300 RHS 1 185.000 5.000 925
18.01.2019 220300 220440 RHS 1 140.000 5.000 700
18.01.2019 220480 220600 RHS 1 120.000 5.000 600
19.01.2019 220600 220840 RHS 1 240.000 5.000 1200
20.01.2019 220840 221000 RHS 1 160.000 5.000 800
20.01.2019 221000 221075 RHS 1 75.000 5.000 375
21.01.2019 221095 221270 RHS 1 175.000 5.000 875
22.01.2019 221270 221440 RHS 1 170.000 5.000 850
22.01.2019 221580 221760 RHS 1 180.000 5.000 900
23.01.2019 221760 222070 RHS 1 310.000 5.000 1550
24.01.2019 222060 222370 RHS 1 310.000 5.000 1550
29.01.2019 222370 222490 RHS 1 120.000 5.000 600
29.01.2019 222405 222490 LHS 1 85.000 5.000 425
30.01.2019 222280 222405 LHS 1 125.000 5.000 625
Total_December-2018 (Package-4) 17900
01.02.2019 222080 222280 LHS 1 200.000 200
Total_February-2019 (Package-4) 200

Total As on February-2019 (Package-4) 47560

Total _ As on February-2019 _ Package - 01, 116590


03 & 04
Remarks
Tack coat On Bituminous surface
Chainage Total
Length Breadth
Sl. No. Date Side No's Quantity in
(M) (M)
From To Sqm

Package - 01
1 20.03.2018 205160 205270 LHS 1 110.000 5.000 550
Total _ February-2019 550
Package - 01 - Total As on February-2019 550

Package - 03
1 20.03.2018 205160 205270 LHS 1 110.000 5.000 550
2 20.03.2018 205430 205470 LHS 1 40.000 5.000 200
3 21.03.2018 205160 205270 RHS 1 110.000 5.000 550
4 21.03.2018 205430 205640 RHS 1 210.000 5.000 1050
5 21.03.2018 205470 205730 LHS 1 260.000 5.000 1300
6 22.03.2018 205640 205740 RHS 1 100.000 5.000 500
7 22.03.2018 207220 207610 LHS 1 390.000 5.000 1950
8 23.03.2018 207220 207770 RHS 1 550.000 5.000 2750
9 25.03.2018 207770 208450 RHS 1 680.000 5.000 3400
10 26.03.2018 207610 207990 LHS 1 380.000 5.000 1900
11 27.03.2018 207990 208100 LHS 1 110.000 5.000 550
12 29.03.2018 208100 208180 LHS 1 80.000 5.000 400
13 30.03.2018 208180 208530 LHS 1 350.000 5.000 1750
14 30.03.2018 209000 209100 LHS 1 100.000 5.000 500
15 01.04.2018 209100 209140 LHS 1 40.000 5.000 200
16 03.04.2018 209140 209440 LHS 1 300.000 5.000 1500
17 04.04.2018 209000 209640 RHS 1 640.000 5.000 3200
18 04.04.2018 209440 209680 LHS 1 240.000 5.000 1200
19 06.04.2018 209640 209680 RHS 1 40.000 5.000 200
20 06.04.2018 210280 210870 LHS 1 590.000 5.000 2950
21 09.04.2018 210280 210640 RHS 1 360.000 5.000 1800
22 10.04.2018 210640 210870 RHS 1 230.000 5.000 1150
23 10.04.2018 210950 211020 LHS 1 70.000 5.000 350
24 10.04.2018 211070 211180 LHS 1 110.000 5.000 550
25 11.04.2018 211180 211570 LHS 1 390.000 5.000 1950
26 13.04.2018 210950 211020 RHS 1 70.000 5.000 350
27 13.04.2018 211070 211380 RHS 1 310.000 5.000 1550
28 23.04.2018 205950 206390 LHS 1 440.000 4.000 1760
29 25.04.2018 206390 206720 LHS 1 330.000 4.000 1320
30 29.04.2018 206720 206840 LHS 1 120.000 4.000 480
31 03.05.2018 206590 206790 LHS 1 200.000 4.000 800
32 06.05.2018 206790 207090 LHS 1 300.000 4.000 1200
33 20.06.2018 212020 212230 RHS 1 210.000 5.000 1050
Total _ July-2018 40910
06.01.19 219665 219695 RHS 30.000 5.000 150
Total _ January-2019 150
05.02.2019 203280 203400 RHS 120.000 5.000 600
Total _ February-2019 600
Package - 03 - Total As on February-2019 41660

Package - 04
31.12.18 215280 215570 RHS 1 290.000 5.000 1450
31.12.18 215634 215640 RHS 1 6.000 5.000 30
Total _ February-2019 1480

Package - 04 - Total As on February-2019 1480

Total As on February-2019 43690


Remarks
Concrete Mix design Summary
Source of Materials
Cement Orient (Birla A1) 53 Grade OPC
Water Base Camp
Admixture SIKAMENT 2071 NS
Coarse Aggregates Jagadevpet village, Velagatoor crusher
Fine Aggregates Godavari River (214+800) RHS

Mix Design Weights in SSD Condition


Slump (After 60
Grade Cement (kgs) W/C Water (kgs) 20MM (kgs) 10MM (kgs) R.Sand (kgs) Admixture (kgs) Slump (Initial) Density (gm/cc) Cement-Bags Agreegate-MT Sand-MT Admixture-Kgs
Min)
M-15 PCC 300 0.50 150.0 699.99 699.99 700.02 1.95 100 mm 40 mm 2.477 6.00 1.400 0.700 1.950
M-20 PCC 340 0.45 153.0 638.57 638.57 729.28 2.72 85 mm 35 mm 2.537 6.80 1.277 0.729 2.720
M-25 350 0.43 150.5 637.71 637.71 728.29 2.98 150 mm 55 mm 2.550 7.00 1.275 0.728 2.980
M-30 360 0.42 151.2 636.06 632.20 724.33 3.24 110mm 70mm 2.534 7.20 1.268 0.724 3.240
M-35 PILE 420 0.40 168.0 602.18 602.18 687.72 4.20 210 mm 155 mm 2.538 8.40 1.204 0.688 4.200
M-35 RCC 390 0.40 156.0 623.02 619.24 709.48 3.12 140 mm 110 mm 2.510 7.80 1.242 0.709 3.120
M-40 410 0.38 156.0 598 594.00 741 4.10 105 60 2.550 8.20 1.192 0.741 4.100
DLC 160 628.47 656.26 938.98 2.72 3.20 0.939 2.720

MIX Details
Ingredients Specific Gravity Water Absorption

Cement 3.150 -
Water 1.000 -
20MM 2.803 0.260
10MM 2.786 0.350
R.Sand 2.604 1.692
Admixture 1.210 -

AS per Actual
Slump (After 60
Grade Cement (kgs) W/C Water (kgs) 20MM (kgs) 10MM (kgs) R.Sand (kgs) Admixture (kgs) Slump (Initial) Density (gm/cc) Cement-Bags Agreegate-MT Sand-MT Admixture-Kgs
Min)
M-15 PCC 295 0.50 150.0 699.99 699.99 700.02 1.92 100 mm 40 mm 2.477 5.90 1.400 0.700 1.920
M-20 PCC 310 0.45 153.0 638.57 638.57 729.28 2.71 85 mm 35 mm 2.537 6.20 1.277 0.729 2.710
M-25 320 0.43 150.5 637.71 637.71 728.29 2.97 150 mm 55 mm 2.550 6.40 1.275 0.728 2.970
M-30 340 0.42 151.2 636.06 632.20 724.33 3.22 110mm 70mm 2.534 6.80 1.268 0.724 3.220
M-35 PILE 420 0.40 168.0 602.18 602.18 687.72 4.15 210 mm 155 mm 2.538 8.40 1.204 0.688 4.150
M-35 RCC 360 0.40 156.0 623.02 619.24 709.48 3.10 140 mm 110 mm 2.510 7.20 1.242 0.709 3.100
M-40 410 0.38 156.0 598 594.00 741 4.05 105 60 2.550 8.20 1.192 0.741 4.050
DBM-Grading-I
DBM-Grading-II
Material WMM (75mm to
(50mm to 75mm)
100mm)

40mm 30% 20% 0%


20mm 17% 18% 20.60%
10mm 21% 16% 30.20%
Dust 32% 46% 49.20%
Waste 0% 0% 0%
Sand
Lab Density 2.350 2.491 2.478
Bitumen 4.20% 4.50%

AS PER DESIGN

GSB WMM DBM-G-I DBM-G-II BC

Density 2.300 2.350 2.491 2.478

OMC/OBC 5.20% 5.20% 4.20% 4.50%

40mm 30.00% 20.00% 0.00%

20mm 75.00% 17.00% 18.00% 20.60%

Dust 32.00% 46.00% 49.20%

10mm 25.00% 21.00% 16.00% 30.20%

Total 100.00% 100.00% 100.00% 100.00%


40mm 25.00%
20mm 25.00%
Dust 25.00%
MPL
Emulsion
SL. No. Month Bitumen (MT) HSD / LDO Consumption (Ltrs) Consumption (Kgs)
Received Consumption HSD LDO SS-1 RS-1
1 Jun-18 76.05 10.718 3007.50 2599.12
2 Jul-18 57.21 63.56 5732.50 14679.50
3 Aug-18 95.24 102.02 3060.00 20647.01 4930
4 Sep-18 94.78 130.05 2222.38 24546.75 4090 4040
5 Oct-18 169.17 164.85 2406.46 27474.58 11910
6 Nov-18 89.30 101.15 2012.72 15654.63 5600
7 Dec-18 115.15 115.91 3555.00 14488.50 12400
8 Jan-19 113.56 131.75 4200.00 16552.00 10270
9 Feb-19 45.60 36.22 3400.00 3548.20 3730
Sub_Total 856 856 29597 140190 4090 52880

Total 1262 1185 55841 192963 7510 68390


Name of the Project :- Nizamabad-Jagadalpur Road of NH-63 (E
Theoritical Material Requirement As on February-2019

Cement Sand
S.No Item Unit Quantity
(Bags) (MT)

A Highway

1 GSB Cu.m 48,702

2 WMM Cu.m 33,971

3 Prime Coat (0.6 Kg / Sqm) Sq.m 115,910


Tack Coat on Primed Surface (0.2
4 Sq.m 116,590
Kg / Sqm)
Tack Coat on bituminious Surface
5 Sq.m 43,690
(2.0 Kg / 10 Sqm)

6 DBM_Grade - II Cu.m 3,630

7 DBM_Grade - I Cu.m 8,494

8 BC Cu.m -

9 DLC Cu.m 36.45 117 34.23

Total Highway Qty 117 34

B Structures

1 Maa Vaishnavi Construction (Office, Lab, Cement Godown and Other Miscellenious work

a Brick work Cu.m 135.515 180 8.82

b Plastering Sq.m 282.736 38 3.47

c RR Masonry wall Cu.m 155.158 108

d PCC - 1:2:4 Cu.m 8.500 42.5 7.00

e PCC - 1:4:8 Cu.m 47.825 143 37.08

f PCC - M15 Cu.m 64.803 249 45.36

g PCC - M20 Cu.m 122.910 737 90

h RCC - M25 Cu.m 31.722 70 23

i Steel MT 3.97

Total Qty 275.76 1,566.81 214.47

2 Mr. B. Tirupathi (Hot mix, Batching Plants and Weigh Bridge Foundation works at Base
a Brick work Cu.m 60.277 48 3.00

b Plastering Sq.m 368.357 6 4.42

c PCC - 1:2:4 Cu.m -

d PCC - 1:4:8 Cu.m 23.343 30 18.09

e PCC - M15 Cu.m 1.296 5 0.91

f PCC - M20 Cu.m 9.221 54 7

g RCC - M25 Cu.m - -

h Steel MT 0.51

Total Qty 33.86 143 33

3 Mr. N. Krishna rao (Hot mix, Batching Plants and Weigh Bridge Foundation works at Base

a PCC - M15 Cu.m 26.847 97 18.79

b PCC - M20 Cu.m - -

c RCC - M25 Cu.m 89.024 455 65

d Steel MT 3.38

Total Qty 115.87 552 84

4 Mr. P. Pradeep
a PCC - M15 Cu.m 16.166 97 11.32

b PCC - M20 Cu.m 137.024 932 100

c RCC - M25 Cu.m - -

d RCC - M30 Cu.m - -

e Steel MT 0.386

Total Qty 153.190 1,029 111

5 M/s. Jay Enter Prises


a PCC - M15 Cu.m - - -

b PCC - M20 Cu.m - - -

c RCC - M25 Cu.m - - -

d RCC - M30 Cu.m - - -

e RCC - M35 (Pile) Cu.m 50.900 428 35

f Steel MT 3.581

Total Qty 50.90 428 35

6 Mr. Hemendra Mandal


a PCC - M15 Cu.m 18.336 110 12.84
b PCC - M20 Cu.m 180.437 1,227 132

c RCC - M25 Cu.m 16.986 118.9 12

d RCC - M30 Cu.m - - -

e Steel MT 3.970

Total Qty 215.759 1,456 157

7 Mr. Sunil Khokan Mandal


a PCC - M15 Cu.m 4.200 25 2.94

b PCC - M20 Cu.m 7.250 49 5

c RCC - M25 Cu.m 3.180 22.3 2

d RCC - M30 Cu.m 9.912 71 7

e Steel MT 5.227

Total Qty 24.542 168 18

8 Mr. Subrato Mandal


a PCC - M15 Cu.m 19.018 114 13.31

b PCC - M20 Cu.m - - -

c RCC - M25 Cu.m 160.856 1,126.0 117

d RCC - M30 Cu.m 4.177 30 3

e Steel MT 13.84

Total Qty 184.051 1,270 133

9 M/s. TNR Constructions


a PCC - M15 Cu.m 43.540 261 30.48

b PCC - M20 Cu.m 14.920 101 11

c RCC - M25 Cu.m 239.073 1,673.5 174

d RCC - M30 Cu.m 63.890 460 46

e Steel MT 27.54

Total Qty 361.423 2,496 262

10 M/s. Anuma Rajkumar

a PCC - M15 Cu.m 192.804 1,157 134.97

b PCC - M20 Cu.m 813.952 5,535 594

c RCC - M25 Cu.m 110.091 770.6 80

d RCC - M30 Cu.m 235.049 1,692 170

e RCC - M35 Cu.m 545.288 3,926 395


f Steel MT 103.60

Total Qty 1,897.18 13,081 1,374

11 Mr. Umesh Prasad

a PCC - M15 Cu.m 275.743 1,654 193.03

b PCC - M20 Cu.m - - -

c RCC - M25 Cu.m 672.535 4,707.7 490

d RCC - M30 Cu.m - - -

e Steel MT 94.858

Total Qty 948.278 6,362 683

12 Mr. Barunkumar

a PCC - M15 Cu.m - - -

b PCC - M20 Cu.m - - -

c RCC - M25 Cu.m - - -

d RCC - M30 Cu.m - - -

e RCC - M35 (Pile) Cu.m 62.130 522 43

e Steel MT 168.855

Total Qty 62.130 521.892 42.728

13 Mr. Patitpabon Joddar

a PCC - M15 Cu.m 357.986 2,148 250.60

b PCC - M20 Cu.m - - -

c RCC - M25 Cu.m 1,110.154 7,771.1 809

d RCC - M30 Cu.m - - -

e Steel MT 81.076

Total Qty 1,468.140 9,919 1,059

Test Pile Platform PCC M-15 grade


Cu.m 4.0 24 3
at Km. 180+812 - Major Bridge

Base Camp Diesel Tank Platform


Cu.m 3.0 18 2
purpose PCC M-15

Saileela Electrical Utility shifting


work (M-20 grade) As on July- Cu.m 184 1,251 134.19
2018

Total Others works 191 1,293 139


Grand Total 6,019 40,402 4,379
ad-Jagadalpur Road of NH-63 (EPC Mode) Project
quirement As on February-2019

Aggregate Admixture Steel


Aggregate (MT)
(MT) (Lts) (MT)

40mm 20mm 10mm Dust 8mm 10mm

28,004 28,004 28,004 28,004 112,014

23,950 13,572 16,765 25,546 79,833

- 1,853 2,716 4,425 8,994

4,232 3,808 3,385 9,733 21,158

23 24 47

56,185 47,259 50,894 67,708 222,046

own and Other Miscellenious works and Construction of Engineers Quarters and Store Shed Foundation Quantities at Base camp Km

11.00

65.38

45 45 90.72 126.37

78 78 156.97 334.32

20 20 40.46 94.53

0.33 0.97

- 144.08 144.08 - 364.54 555.21

h Bridge Foundation works at Base Camp at km.181+900)


31.51

1 1 1.81 -

6 6 11.78 -

- - - -

- 0.51

- 7 7 - 45 -

h Bridge Foundation works at Base Camp at km.181+900)

19 19 37.59 52.35

- - - -

57 57 113.54 265.29

1.21 0.07

- 76 76 - 151 318

11 11 22.63 31.52

87 87 175.00 372.71

- - - -

- - - -

0.35 -

- 99 99 - 198 404.23

- - - -

- - - -

- - - -

30.65 30.65 61 213.78

- 1.19

- 31 31 - 61 213.78

12.84 12.84 25.67 35.76


115.22 115.22 230.44 490.79

10.83 10.83 21.66 50.62

- - - -

0.39 0.87

- 139 139 - 278 577.16

3 3 5.88 8.19

5 5 9.26 19.72

2 2 4.06 9.48

6 6 12.57 32.11

- 2.40

- 16 16 - 32 69.5

13 13 26.62 37.09

- - - -

103 103 205.16 479.35

3 3 5.30 13.53

- 8.50

- 119 119 - 237 530.0

30 30 60.96 84.90

10 10 19.05 40.58

152 152 304.92 712.44

41 40 81.03 207.00

- 17.15

- 233 233 - 466 1,044.9

135 135 269.92 375.97

520 520 1,039.53 2,213.95

70 70 140.41 328.07

150 149 298.10 761.56

347 345 691.57 1,766.73


6.25 31.87

- 1,221 1,218 - 2,440 5,446.3

193 193 386.03 537.70

- - - -

429 429 857.76 2,004.15

- - - -

19.12 26.02

- 622 622 - 1,244 2,541.9

- - - -

- - - -

- - - -

- - - -

37.41 37.41 75 260.95

- 5.86

- 37.413 37.413 - 74.827 260.946

251 251 501.17 698.07

- - - -

708 708 1,415.91 3,308.26

- - - -

29.99 34.88

- 959 959 - 1,917 4,006.3

2.80 2.80 5.60 7.800

2.10 2.10 4.20 8.160

117.50 117.50 234.99 500.48

- 122 122 - 245 516 - -


56,185 51,083 54,714 67,708 229,798 16,484 58 130
Binding LDO /
Steel Steel Bitumen
Wire Diesel
(MT) (MT) (MT)
(Kg) (KL)

12mm 16mm 20mm 25mm 32mm

80 405

188 889

269 1,293

dation Quantities at Base camp Km 181+900)

1.38 1.30 - - - 3.97 28


- - - - - 0.51 3.59

1.85 0.25 3.38 24

- - 0.03 - - 0.386 3

- 0.27 2.12 - - 3.581 25


0.11 0.14 0.03 - - 1.544 28

0.86 1.97 - - - 5.227 37

1.49 3.85 - - - 13.84 97

2.91 7.48 - - - 27.54 193


18.61 40.90 5.97 - - 103.60 725

15.80 15.75 7.87 10.30 - 94.858 664

13.01 2.03 - - 147.95 168.855 1,182

16.20 - - - - 81.076 568

1.29 1.29

- - - 1.29 - 1.29 - - -
72 74 16 12 148 510 3,576 269 1,293
Prime Coat Tack Coat Stone /
Pipes (1200mm Pipes Stone Spalls
(SS-1 Emulsion) (RS-1 Emulsion) Boulder
dia) (1000mm dia) (Cum)
(MT) (MT) (Cum)

69.55

23.32

8.74

69.55 32.06
- -
70 32 - - -
Name of the Project :

Co
Name of
Sl. Working
the PRC / Chainage Type of Structure Description of work
No. Period
RA Bill No. M-15

I M/s. Maa Vaishnavi Constructions


Office, Lab, Cement Godown, WMM Plant Foundation and Other
1 Aug/17 13.636
Miscellenious Quantities at Base Camp Km 181+950-LHS
Office, Lab, Cement Godown, WMM Plant Foundation and Other
2 Sep/17 Miscellenious Quantities at Base Camp Km 181+950-LHS 19.356

Office, Lab, Cement Godown, WMM Plant Foundation and Other


3 Dec-17 18.938
Miscellenious Quantities at Base Camp Km 181+950-LHS

Office, Lab, Cement Godown and Other Miscellenious Quantities at Base


4 Jan-18 7.308
Camp Km 181+950-LHS & Site Slab/Box Culvert.

5 Dec-18 193281 Box Culvert PCC & Raft Concrete 5.565

6 193281 Box Culvert Steel (Laps & Chairs)

Steel_Work in
7 193281 Box Culvert
Progress_Stock at Site
I Dec-18 - M/s. Maa Vaishnavi Constructions "TOTAL QUANTITIES" 64.803

II Mr. B. Tirupathi
1 Aug/17 Weigh Bridge at Velgatur Crusher 1.296
Office Room, Store Room and Staff Quarter - Quantities at Madhucon
2 Apr/18 Crusher, Velagatur

II Apr-18 - M/s. Mr. B. Tirupathi "TOTAL QUANTITIES" 1.296

III Mr. N. KRISHNA RAO


Hot mix, Batching Plants and Weigh Bridge Foundation works at Base Camp at
1 Jul/17 17.213
km.181+900
Hot mix, Batching Plants and Weigh Bridge Foundation works at Base Camp at
2 Aug/17 km.181+900 8.909

Hot mix, Batching Plants and Weigh Bridge Foundation works at Base Camp at
3 Sep/17 km.181+900 0.725

III Sep-17 - M/s. Mr. N. KRISHNA RAO "TOTAL QUANTITIES" 26.847


IV Mr. P. Pradeep
1 Apr/17 1 200534 Slab Culvert 6.562
2 Aug/17 1 202381 Slab Culvert 4.805

3 Aug/17 1 202786 Slab Culvert 4.799


IV Aug-17 - Mr. P. Pradeep "TOTAL QUANTITIES" 16.166

V M/s. Jay Enterprises


1 Mar/18 1 180812 Major Bridge Concrete & Steel Qty

2 May/18 2 182539 Minor Bridge Concrete, Steel & Liners Qty

3 Jun/18 3 180812 Major Bridge Liners Qty

4 Steel (Chairs & Laps)

Steel_Work in
5
Progress_Stock at Site
V Jun-18 - M/s. Jay Enterprises "TOTAL QUANTITIES" 0.000

VI Mr. Hemendra Mandal


1 Mar/18 1 200534 Slab Culvert Concrete & Steel Qty

2 Mar/18 1 202381 Slab Culvert Concrete & Steel Qty

3 Mar/18 1 202786 Slab Culvert Concrete & Steel Qty

4 Mar/18 1 208017 Slab Culvert Concrete & Steel Qty 14.668

5 Apr/18 1 200534 Slab Culvert Concrete & Steel Qty

6 Apr/18 1 194284 Box Culvert Concrete & Steel Qty

7 May/18 2 194284 Box Culvert Concrete & Steel Qty

8 May/18 2 201470 Slab Culvert Concrete & Steel Qty 3.668

9 Jun/18 3 183026 Box Culvert Concrete & Steel Qty

10 Jun/18 3 194063 Box Culvert Concrete & Steel Qty

11 Steel (Chairs & Laps)

Steel_Work in
12
Progress_Stock at Site
VI Jun-18 - Mr. Hemendra Mandal "TOTAL QUANTITIES" 18.336

VII Mr. Sunil Khokan Mandal


1 Aug/18 1 202380 Slab Culvert Concrete & Steel Qty
2 Aug/18 1 202785 Slab Culvert Concrete & Steel Qty

3 Sep/18 2 202785 Slab Culvert Concrete & Steel Qty

4 Sep/18 2 193128 Slab Culvert Concrete & Steel Qty 4.20

5 Steel (Chairs & Laps)

Steel_Work in
6
Progress_Stock at Site
VII Sep-18 - Mr. Sunil Khokan Mandal "TOTAL QUANTITIES" 4.200

Satya: Satya:
VIII Mr. Subrato Mandal The works M/s. TNR The Free issu
Construction, Material,
Satya: Con
1 Aug/18 1 194063 Box CulvertMandal
Satya:
Mr. Subrato Concrete
Labour& Steel Qty 6.30 Steel M/s. TN
The Free issu
The works M/s. TNR
working under TNR Reconciliatio
Material, Con
Construction,
Construction.
2 Aug/18 1 194288 Box Culvert TheConcrete
Same & Steel Qty 6.30 applicable
Steel M/s. M
TN
Mr.
workSubrato Mandal
Debit to TNR. Labour Reconciliatio
working under TNR
applicable M
Construction. The Same work
3 Aug/18 1 194832 Box Culvert Concrete & Steel Qty 6.30
Debit to TNR.
Satya:
4 Sep/18 2 184392 The works
Minor M/s. Anuam
Bridge Raj& Steel Qty
Concrete
Kumar,
Mr. Subrato Mandal Labour
5 Sep/18 2 194832 working under Rajkumar.
Box Culvert ConcreteThe
& Steel Qty
Same work Debit to Rajkumar.

6 Sep/18 2 194695 Box Culvert Concrete & Steel Qty 6.30

7 Oct/18 3 194832 Box Culvert Concrete & Steel Qty

8 Oct/18 3 194695 Box Culvert Concrete & Steel Qty

9 Oct/18 3 194063 Box Culvert Concrete & Steel Qty

10 Oct/18 3 201469 Slab Culvert Concrete & Steel Qty

11 Nov/18 4 193128 Box Culvert Concrete & Steel Qty

12 Dec/18 5 193128 Box Culvert Concrete & Steel Qty 6.418

13 Steel (Chairs & Laps)

Steel_Work in
14
Progress_Stock at Site
VIII Dec-18 - Mr. Subrato Mandal "TOTAL QUANTITIES" 31.618

IX M/s. TNR Constructions


1 Jan/18 1 183026 Box Culvert Concrete & Steel Qty 14.14
2 Mar/18 2 183026 Box Culvert Concrete & Steel Qty

3 Apr/18 2 194063 Box Culvert Concrete & Steel Qty 6.30

4 Apr/18 2 194284 Box Culvert Concrete & Steel Qty 6.30

5 May/18 2 183026 Box Culvert Concrete & Steel Qty 4.20

6 May/18 2 194284 Box Culvert Concrete & Steel Qty

7 Jun/18 3 194063 Box Culvert Concrete & Steel Qty

8 Jun/18 3 183026 Box Culvert Concrete & Steel Qty

9 Aug/18 4 194063 Box Culvert Concrete & Steel Qty 6.30

10 Aug/18 4 194288 Box Culvert Concrete & Steel Qty 6.30

11 Steel (Chairs & Laps)

Steel_Work in
12
Progress_Stock at Site

13 Steel_Handover to Store

IX Aug-18 - M/s. TNR Constructions "TOTAL QUANTITIES" 43.540

X M/s. Anuma Rajkumar Engineers & Contractors


1 Mar/18 1 219506 Slab Culvert Concrete & Steel Qty 7.30

2 Mar/18 1 184392 Minor Bridge Concrete & Steel Qty 23.63

3 Apr/18 1 219169 Slab Culvert Concrete & Steel Qty 9.31

4 Apr/18 1 219506 Slab Culvert Concrete & Steel Qty

5 Apr/18 1 219962 Slab Culvert Concrete & Steel Qty 6.29

6 Apr/18 1 184392 Minor Bridge Concrete & Steel Qty 3.86

7 May/18 1 219169 Slab Culvert Concrete & Steel Qty

8 May/18 1 219506 Slab Culvert Concrete & Steel Qty


9 May/18 1 219962 Slab Culvert Concrete & Steel Qty

10 May/18 1 184392 Minor Bridge Concrete & Steel Qty 3.86

11 May/18 2 219169 Slab Culvert Concrete & Steel Qty

12 May/18 2 219506 Slab Culvert Concrete & Steel Qty

13 May/18 2 219962 Slab Culvert Concrete & Steel Qty

14 Sep/18 2 184392 Minor Bridge Concrete & Steel Qty

15 Nov/18 3 194284 Box Culvert Concrete & Steel Qty 2.87

16 Nov/18 3 219506 Slab Culvert Concrete & Steel Qty 6.03

17 Nov/18 3 219962 Slab Culvert Concrete & Steel Qty 7.04

18 Nov/18 3 193787 Minor Bridge Concrete & Steel Qty 24.75

19 Dec/18 4 219169 Slab Culvert Concrete & Steel Qty

20 Dec/18 4 219506 Slab Culvert Concrete & Steel Qty

21 Dec/18 4 219962 Slab Culvert Concrete & Steel Qty

22 Dec/18 4 220456 Slab Culvert Concrete & Steel Qty 9.41

23 Dec/18 4 194284 Box Culvert Concrete & Steel Qty 2.87

24 Dec/18 4 193128 Box Culvert Concrete & Steel Qty

25 Dec/18 4 194827 Box Culvert Concrete & Steel Qty 2.80

26 Dec/18 4 184392 Minor Bridge Concrete & Steel Qty 0.67

27 Dec/18 4 193787 Minor Bridge Concrete & Steel Qty 5.00

28 Jan/19 5 200534 Slab Culvert Concrete & Steel Qty

29 Jan/19 5 201470 Slab Culvert Concrete & Steel Qty

30 Jan/19 5 221088 Slab Culvert Concrete & Steel Qty 4.47


31 Jan/19 5 194063 Box Culvert Concrete & Steel Qty 2.79

32 Jan/19 5 193128 Box Culvert Concrete & Steel Qty

33 Jan/19 5 193281 Box Culvert Concrete & Steel Qty

34 Jan/19 5 194691 Box Culvert Concrete & Steel Qty 2.79

35 Jan/19 5 193787 Minor Bridge Concrete & Steel Qty 25.16

36 Feb/19 6 193787 Minor Bridge Concrete & Steel Qty

37 Feb/19 6 194691 Box Culvert Concrete & Steel Qty 6.34

38 Feb/19 6 194827 Box Culvert Concrete & Steel Qty 6.34

39 Feb/19 6 198839 Box Culvert Concrete & Steel Qty 4.73

40 Feb/19 6 199004 Box Culvert Concrete & Steel Qty 9.61

41 Feb/19 6 202023 Slab Culvert Concrete & Steel Qty

42 Feb/19 6 202381 Slab Culvert Concrete & Steel Qty

43 Feb/19 6 202786 Slab Culvert Concrete & Steel Qty

44 Feb/19 6 221088 Slab Culvert Concrete & Steel Qty

45 Feb/19 6 217671 Slab Culvert Concrete & Steel Qty 4.54

46 Feb/19 6 218051 Slab Culvert Concrete & Steel Qty 5.86

47 Feb/19 6 218402 Slab Culvert Concrete & Steel Qty 4.47

48 Feb/19 6 194063 Box Culvert Concrete & Steel Qty

49 Steel (Chairs & Laps)

Steel_Work in
50
Progress_Stock at Site

51 Steel_Handover to Store

X Feb-19 M/s. Anuma Rajkumar Engineers & Contractors "TOTAL QUANTITIES" 192.804
XI Mr. Umesh Prasad
183070 to
1 Nov/18 1 Drain Concrete & Steel Qty 21.85
183185

182140 to
2 Dec/18 2 Drain Concrete & Steel Qty 130.72
184160
182140 to
3 Jan/19 3 Drain Concrete & Steel Qty 73.53
184160
182230 to
4 Feb/19 4 Drain Concrete & Steel Qty
184125

5 Feb/19 4 182539 Minor Bridge Concrete & Steel Qty 49.64

6 Steel (Chairs & Laps)

Steel_Work in
7
Progress_Stock at Site

8 Steel_Handover to Store

XI Feb-19 - Mr. Umesh Prasad "TOTAL QUANTITIES" 275.743

XII Mr. Barunkumar

1 Feb/19 1 180812 Major Bridge Concrete & Steel Qty

2 Steel (Chairs & Laps)

Steel_Cutting bending in
3 Progress_Stock at Base
Camp/Store

4 Steel_Handover to Store

XII Feb-19 - Mr. Barunkumar "TOTAL QUANTITIES" 0.000

XIII Mr. Patitpaban Joddar

1 Oct/18 1 181672 Pipe Culvert Concrete & Steel Qty 10.08

2 Oct/18 1 182442 Pipe Culvert Concrete & Steel Qty 10.08

181720 to
3 Oct/18 1 Drain Concrete & Steel Qty 117.23
182100

4 Nov/18 2 181672 Pipe Culvert Concrete & Steel Qty 7.78

5 Nov/18 2 182442 Pipe Culvert Concrete & Steel Qty 7.78

181840 to
6 Nov/18 2 Drain Concrete & Steel Qty
181950
Major Bridge
7 Nov/18 2 180812 Concrete & Steel Qty 17.68
Retaining wall

8 Dec/18 3 181672 Pipe Culvert Concrete & Steel Qty 3.23

9 Dec/18 3 182442 Pipe Culvert Concrete & Steel Qty 3.23

181540 to
10 Dec/18 3 Drain Concrete & Steel Qty 64.60
182105
181535 to
11 Jan/19 4 Drain Concrete & Steel Qty 76.01
184160
182225 to
12 Feb/19 4 Drain Concrete & Steel Qty 40.28
184160

13 Steel (Chairs & Laps)

Steel_Work in
14
Progress_Stock at Site

15 Steel_Handover to Store

XIII Nov-18 - Mr. Patitpaban Joddar "TOTAL QUANTITIES" 357.986

1) Mr. Hemendramandal Labour working under M/s. TNR Constructions @ 194+284 Box culvert -(Qty M-
2) Mr. Hemendramandal Labour working under M/s. TNR Constructions @ 194+284 Box culvert -(Qty M-
3) 202+380 Slab culvert works executed Mr. Sunil K. Mandal on NMR Basis in RA Bill No. 01 (Qty - 9.130
4) Mr. Subrato Mandal Labour working under M/s. TNR Construction at Km 194+063 & Km. 194+288, the
MADHUCON PROJECTS LTD
Name of the Project : NH-63 on Nizamabad - Jagadalpur road on EPC mode under NH(O) in the state of Telangana
QUANTITY RECONCILIATION STATEMENT AS ON 28th Feb-2019
WORK DONE QUANTITY 's AS PER BILLING / SITE

Concrete (Cum) Steel (MT)


Total
Concrete
M-20 M-25 M-30 M-35 M-40 Qty 8mm 10mm 12mm 16mm

1.5 15.136 0.330 0.289 0.576

16.674 36.030

122.91 141.848

7.308

13.548 19.113 0.669 0.516

0.009 0.043

0.800 0.740

122.910 31.722 0.000 0.000 0.000 219.435 0.330 0.967 1.376 1.299

9.221 10.517 0.513

0.000

9.221 0.000 0.000 0.000 0.000 10.517 0.000 0.513 0.000 0.000

54.41 71.623 0.626 0.069 1.262 0.253

25.566 34.475 0.381 0.386

9.048 9.773 0.202 0.205

0.000 89.024 0.000 0.000 0.000 115.871 1.209 0.069 1.853 0.253

43.086 49.648
45.095 49.900 0.163

48.843 53.642 0.189


137.024 0.000 0.000 0.000 0.000 153.190 0.352 0.000 0.000 0.000

25.450 25.450 0.293 0.107

25.45 25.450 0.293 0.107

0.000

0.008 0.055

0.600

0.000 0.000 0.000 50.900 0.000 50.900 0.000 1.194 0.000 0.269

9.563 9.563 0.260

19.421 19.421

20.928 20.928

56.716 71.384

26.341 26.341
Satya:
The Qty Reconciliation
15.30 applicable to M/s. TNR 15.300 Satya:
Satya:
Constructions Satya:
The Qty Reconciliation
The Qty Reconciliation The Qty Reco
applicable to M/s. TNR
13.387 applicable to M/s. TNR13.387 1.129 0.108 applicable to
Constructions
Constructions Construction
Satya: Satya: Satya: Sa
47.468 The Qty Reconciliation 51.136 0.111 The Qty Reconciliation
The Qty Reco
Th
applicable to M/s. TNR applicable applicable
to M/s. TNRap
to
22.725 Constructions 22.725 0.676 0.270 0.242
Constructions
Construction
Co

16.986 16.986 0.874 0.108

0.020 0.138

180.437 68.398 0.000 0.000 0.000 267.171 0.391 0.874 0.108 0.138

2.750 2.320 3.200 8.270 0.195 0.315


0.860 0.860

4.500 6.712 11.212

4.200

0.027

2.400 0.660 1.630

7.250 3.180 9.912 0.000 0.000 24.542 0.000 2.400 0.855 1.972

Satya: Satya: Satya: Satya: Satya:


The Free issued The Free issued The Free issued
The Free issued
The Free
Material, Concrete &
Satya: 14.920 Material,
Satya: Concrete & Material, Concrete
Material,
Satya: 1.164
Satya: & Concrete
Material,
Satya: &
Steel M/s. TNR, Steel M/s. TNR, 21.220 0.966 0.051
Steel M/s. Steel
TNR, M/s. Steel
TNR,Free
M/s
The Free issued The Free issued The Free issued
The Free issued
The
Reconciliation
Material, Concrete & Reconciliation
Material, Concrete & Reconciliation
Material, Reconciliation
Concrete
Material, Reconcili&
&Concrete
Material,
applicable
Steel M/s. M/s.
TNR, TNR
45.294 applicable
Steel M/s. M/s.
TNR, TNR 51.594 2.091 applicable
0.092 applicable
M/s.
TNR, TNR
1.164
Steel M/s. Steel M/s. applicabl
M/s.
TNR, TNR
Steel M/s
Reconciliation Reconciliation Reconciliation
Reconciliation
Reconcili
applicable M/s. TNR applicable M/s. TNR applicable applicable
M/s. TNR applicabl
M/s. TNR
16.607 22.907 0.966 0.051 1.164

Satya:
56.525 The Free56.525
issued
Material, Concrete &
Steel M/s. Rajkumar,
9.90 Reconciliation
9.900
applicable M/s.
Rajkumar
26.507 32.807 1.567 0.267 1.164

18.787 18.787 1.010

18.787 18.787 1.009

30.374 30.374 1.010


Satya: Satya:
The works The works executed
4.177 4.177 0.104 0.202
executed Mr. Mr. Subratomandal
Subratomandal Labour working on
Labour working NMR basis.
26.507 26.507 1.416 1.164
on NMR basis.

13.387 19.805 0.849

0.000 0.078 0.082 0.248

0.488 0.893 0.113

0.000 221.070 4.177 56.525 0.000 313.390 0.000 11.553 1.638 6.181

66.641 39.290 120.071 2.485 0.596 0.799


9.4 9.400 3.172 0.853 1.542

31.907 38.207 1.530 0.267 1.16

31.907 38.207 2.359 0.267 1.164

10.23 15.2 29.625

13.387 13.387

16.987 16.987 0.874 0.108

22.725 22.725 0.676 0.270 0.242

14.92 21.220 0.966 0.051 1.164

45.294 51.594 2.091 0.092 1.164

0.372 0.145

2.999 0.037 0.095

14.920 239.073 63.890 0.000 0.000 361.423 0.000 17.152 2.914 7.478

7.298

23.634

138.026 147.332

118.454 118.454

6.290

10.8 116.858 131.522 3.129 4.079 5.484

8.22 8.218 0.248

23.64 23.640 0.261


94.177 94.177 0.205

53.15 57.014

0.96 0.39 1.350 0.017 0.031

0.96 0.39 1.350 0.017 0.031

0.96 0.39 4.056 5.406 0.017 0.251

78.645 78.645 1.588 0.094 3.064

24.08 26.950 0.820 0.369

40.38 46.410

47.11 54.145

84.205 108.954 0.351 3.155 2.404 5.020

8.739 2.3 5.408 16.447 0.775 0.070 0.406

1.128 5.753 6.881 0.626 0.000 0.473

2.254 2.254 0.554 0.000 0.100

163.56 172.973 1.090

0 0 26.96 29.830 1.070 0.385 0.722

17.517 17.517 1.018 0.217 1.768

0 0 26.96 29.760 0.713 0.423 0.442

0 0 12.73 4.825 18.227 0.154 2.861 0.000 3.034

0 0 0 171.143 176.141 0.350 3.068 2.082 5.461

25.494 1.2 4.96 31.654 0.237 0.109 0.324 0.127

42.050 1.200 43.250 0.072 0.075 0.124 0.000

38.547 43.021 0.344


0 0 20.08 22.868 1.008 0.343 0.415

30.374 30.374 1.688 0.423 0.711

22.95 22.950 1.001 0.350 0.000

0 0 20.08 22.868 1.008 0.343 0.414

25.164

89.612 89.612 0.361 2.217 2.460 5.469

0 15.252 3.40 24.994 0.000 1.236 0.485 1.055

6.342 0.000 2.675 0.474 1.177

0 14.746 19.477 0.000 0.550 0.606 0.650

9.605 0.000 1.047 1.136 1.284

3.344 3.344 0.082 0.218

6.544 6.544 0.082 0.187 0.218

3.344 3.344 0.082 0.218

35.339 35.339

13.783 18.323

5.863

13.555 18.029

3.4 3.400

0.021 1.266 0.011 1.752

0.600 0.200 0.000 2.200

813.952 110.091 235.049 545.288 0.000 1897.184 6.249 31.872 18.610 40.903
28.000 49.850 1.201 1.880 0.930

0 332.090 462.810 11.382 17.096 8.172

0.000 288.75 362.280 5.364 7.043 3.394

23.695 23.695 0.546 0.000 0.000

49.643

0.626 0.000 3.300 15.754

0.000 672.535 0.000 0.000 0.000 948.278 19.119 26.019 15.796 15.754

62.130 62.130 5.864 13.011 2.033

0.000 0.000 0.000 62.130 0.000 62.130 0.000 5.864 13.011 2.033

10.082

10.082

0.000 133.7 250.930 3.147 6.541 3.045

7.777

7.777

74.10 74.095 1.576 2.467 1.221


17.679

3.234

3.234

0 473.45 538.049 13.747 14.694 6.858

0 288.35 364.361 7.513 5.303 2.558

0 140.56 180.840 3.604 5.230 2.522

0.000

0.400 0.650

0.000 1110.154 0.000 0.000 0.000 1468.140 29.988 34.884 16.204 0.000

94+284 Box culvert -(Qty M-25 - Cum 28.687 and Steel - 1.237 MT) in RA Bill No-02, The Same work Debited to M/s. TNR Construction
94+284 Box culvert -(Qty M-25 - Cum 22.725 and Steel - 1.188 MT) in RA Bill No-03, The Same work Debited to M/s. TNR Construction
RA Bill No. 01 (Qty - 9.130 Cum, Steel - 0.510 MT)
94+063 & Km. 194+288, the same work debited to PRC M/s. TNR Construction for the month of August-2018, in RA Bill No. 04.
e state of Telangana

Steel (MT) 1:4:8 1:2:4


Total Brick RR
Liner Qty Concrete Concrete Plastering
Steel work Masonry
(MT) Qty Qty Qty (Sqm)
20mm 25mm 32mm Qty (Cum) (Cum)
(Cum) (Cum)

1.195 29.345 8.5 48.135 66.576

0.000 18.48 24.397 27.166

0.000 62.983 188.994

0.000 155.158

1.185

0.052

1.540

0.000 0.000 0.000 3.972 47.825 8.500 135.515 282.736 155.158

0.513

0.000 23.343 60.277 368.357

0.000 0.000 0.000 0.513 23.343 0.000 60.277 368.357 0.000

2.210

0.768

0.407

0.000 0.000 0.000 3.384 0.000 0.000 0.000 0.000 0.000

0.000
0.017 0.180

0.017 0.206
0.034 0.000 0.000 0.386 0.000 0.000 0.000 0.000 0.000

1.013 1.413

1.013 1.413 5.176

0.000 2.264

0.092 0.155

0.600

2.118 0.000 0.000 3.581 7.440 0.000 0.000 0.000 0.000 0.000

0.023 0.283

0.000

0.000

0.000

0.000

0.000
Satya:
Satya:
The Qty Reconciliation
The Qty Reconciliation
applicable to M/s. TNR
applicable to M/s. TNR 1.238
Constructions
Constructions
Satya: Satya: Satya:
0.010
The Qty Reconciliation
The The Qty Reconciliation0.121
Qty Reconciliation
applicable applicable
to M/s. TNRapplicable
to M/s. TNRto M/s. TNR
Constructions
Constructions
Constructions 1.188

0.982

0.000

0.158

0.033 0.000 0.000 3.970 0.000 0.000 0.000 0.000 0.000 0.000

0.510
0.000

0.000

0.000

0.027

4.690

0.000 0.000 0.000 5.227 0.000 0.000 0.000 0.000 0.000 0.000

a: Satya: Satya:
Free issued
The Free issued
The Free issued
rial,
a: Concrete
Material,
Satya: & Concrete
Material,
Satya: &Concrete &
M/s. Steel
TNR, M/s. Steel
TNR,Free
M/s.issued
TNR, 2.180
Free issued
The Free issued
The
nciliation
Reconciliation
rial, Concrete
Material, Reconciliation
&Concrete
Material,
&Concrete &
cable
M/s. applicable
M/s.
TNR, TNR
Steel M/s. applicable
M/s.
TNR, TNR
Steel M/s. M/s.
TNR, TNR 3.347
nciliation
Reconciliation
Reconciliation
cable applicable
M/s. TNR applicable
M/s. TNR M/s. TNR
2.180

0.000

0.000

2.998

1.010

1.009

1.010
Satya:
0.306 The works executed
Mr. Subratomandal
Labour working on
NMR basis.
2.580

0.849

0.408

1.494

0.000 0.000 0.000 19.371 0.000 0.000 0.000 0.000 0.000 0.000

3.880
5.567

2.961

3.790

0.000

0.000

0.982

1.188

2.180

3.347

0.517

3.131

0.000 0.000 0.000 27.543 0.000 0.000 0.000 0.000 0.000 0.000

0.000

0.000

0.000

0.000

0.000

12.692

0.017 0.265

0.022 0.283
0.017 0.222

0.000

0.048

0.048

0.137 0.405

4.746

1.189

0.000

0.000

10.930

0.272 1.523

0.239 1.338

0.654

1.090

2.177

3.003

1.578

6.049

1.776692 12.739

0.147 0.944

0 0.271

0.344
1.766

2.822

1.350

1.765

0.000

0 10.508

0 2.776

0 4.326

0 1.806

0 3.467

0.300

0.141721 0.629

0.300

0.000

0.000

0.000

0.000

0.000

3.050

3.200 0 6.200

5.970 0.000 0.000 103.604 0.000 0.000 0.000 0.000 0.000 0.000
4.010

36.649

15.801

0.546

0.000

0.000

7.871 10.3 37.851

7.871 10.300 0.000 94.858 0.000 0.000 0.000 0.000 0.000 0.000

146.802 167.710

1.145 1.145

0.000

0.000 0.000 147.947 168.855 0.000 0.000 0.000 0.000 0.000 0.000

0.000

0.000

12.733

0.000

0.000

5.264
0.000

0.000

0.000

35.299

15.375

11.356

0.000

1.050

0.000 0.000 0.000 81.076 0.000 0.000 0.000 0.000 0.000 0.000

to M/s. TNR Construction


to M/s. TNR Construction

8, in RA Bill No. 04.


ACTUAL QUANTITY 's AS PER MIXTURE MAC

Concrete (Cum) Steel (MT


Total
Concrete
M-15 M-20 M-25 M-30 M-35 M-40 Qty 8mm 10mm

13.636 0 1.5 0 0 0 15.136 0.330 0.289

19.356 0 16.674 0 0 0 36.03 0.000 0.000

18.938 122.91 0 0 0 0 141.848 0.000 0.000

7 7

5 0 12 0 0 17 0.780

63.930 122.910 30.174 0.000 0.000 0.000 217.014 0.330 1.069

1.296 9.221 0 0 0 0 10.517 0 0.513

0 0 0 0 0 0 0 0 0

1.296 9.221 0.000 0.000 0.000 0.000 10.517 0.000 0.513

17.213 0 54.41 0 0 0 71.623 0.626 0.069

8.909 0 25.566 0 0 0 34.475 0.381 0.000

0.725 0 9.048 0 0 0 9.773 0.202 0.000

26.847 0.000 89.024 0.000 0.000 0.000 115.871 1.209 0.069

8 43.8 51.8
8 40.5 48.5 0.163 0.000

6.5 45.2 51.7 0.189 0.000


22.500 129.500 0.000 0.000 0.000 0.000 152.000 0.352 0.000

26.00 26.00 0.305

26.00 26.00 0.500

0.00

0.000 0.000 0.000 0.000 52.000 0.000 52.000 0.000 0.805

0.00 0.262

21 21.00

22.5 22.50

15 55 70.00

36.80 36.80

0.00

0.00

4.00 43.5 47.50 0.142

19.000 178.800 0.000 0.000 0.000 0.000 197.800 0.404 0.000

1.30 2.60 4.50 8.40


1.25 1.25

4.6 5.6 10.20

6.8 6.80

6.800 5.900 3.850 10.100 0.000 0.000 26.650 0.000 0.000

0.00

0.00

6.5 16.7 0 23.20 4.540

0.00

9.4 9.40 0.770

7.00 23.30 30.30

18 18.00

19 19.00

30.7 30.70 0.900

4.00 4.00

27 27.00 2.320

5.0 12 17.00

18.500 16.700 139.400 4.000 0.000 0.000 178.600 0.000 8.530

0.00
18.1 78.3 49.6 146.00 7.490

6.6 32 38.60 1.555

0.00

0.00

6.60 48.50 55.10 3.703

18.00 18.00

25.10 25.10

7.0 14.3 21.30 3.600

7.0 46 53.00

-2.88

45.300 0.000 262.200 49.600 0.000 0.000 357.100 0.000 13.468

6.0 6.00

24.0 24.00 6.161

11 141.5 152.50 0.95 0.600

127.00 127.00

7.5 7.50

4.0 10.00 114.50 128.50

9.0 9.00 0.824

30.00 30.00
98.50 98.50

4.0 48.00 52.00

1.5 0.5 2.00

1.50 0.5 2.00

2.00 0.50 4.50 7.00

78.50 78.50

2.5 25.60 28.10 0.3 2.660

6.0 42.00 48.00

8.5 49.00 57.50

24.0 85.00 109.00

9.0 2.0 6.00 17.00 0.35 2.550

1.00 6.00 7.00

2.00 2.00

6.0 160 166.00

2.5 27.60 30.10

21.0 21.00

3.0 25.00 28.00

0.5 8.50 5.20 14.20

5.0 175.80 180.80

22.7 1.5 5.00 29.20 0.040

39.5 1.5 41.00

6.5 40 46.50
3.0 26.50 29.50

33.0 33.00

24 24.00

5.0 17.00 22.00

25.0 25.00

70.50 70.50 0.131

6.0 12 3.00 21.00

0.00

5.0 12 17.00

6.0 6.00

6.00 6.00

5.00 5.00

4.50 4.50

36.50 36.50

6.0 12 18.00

6.0 6.00

6.0 12 18.00

6.00 6.00

0.00

-0.32

189.000 833.700 111.500 234.200 529.500 0.000 1897.900 1.600 12.646


27 0.00 19.20 46.20 1.3 3.97

105 0 260.8 365.80 10.56 12.676

63.5 0 321.65 385.15 4.094 5.882

50.5 50.50 0.044 0.016

60 60.00 3.12 2.170

255.500 0.000 652.150 0.000 0.000 0.000 907.650 19.118 24.714

50.50 50.50 3.183

0.00

0.00 2.681

0.000 0.000 0.000 0.000 50.500 0.000 50.500 0.000 5.864

8.00 8.00

7.20 7.20

115 127.5 242.50 4.05 5.670

12 12.00

3 3.00

52 52.00 2.34 3.820


18 18.00

3.5 3.50

3.5 3.50

65 440.7 505.70 13.736 11.360

62 241 303.00 3.56 10.240

36 132 168.00 5.85 2.620

0.00

333.200 0.000 993.200 0.000 0.000 0.000 1326.400 29.536 33.710


NTITY 's AS PER MIXTURE MACHENE / BATCHING PLANT / STORES

Steel (MT) 1:4:8 1:2:4


Total Liner Brick
Concrete Concrete
Steel Qty work
Qty Qty
12mm 16mm 20mm 25mm 32mm Qty (MT) (Cum)
(Cum) (Cum)

0.576 0.000 0.000 0.000 0.000 1.195 29.345 8.500 48.135

0.000 0.000 0.000 0.000 0.000 0.000 18.480 0.000 24.397

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 62.983

0.000 0.000 0.000

0.800 1.300 2.880 0.000 0.000 0.000

1.376 1.300 0.000 0.000 0.000 4.075 0.000 47.825 8.500 135.515

0 0 0 0 0 0.513 0 0 0

0 0 0 0 0 0.000 23.343 0.000 60.277

0.000 0.000 0.000 0.000 0.000 0.513 23.343 0.000 60.277

1.262 0.253 0.000 0.000 0.000 2.210

0.386 0.000 0.000 0.000 0.000 0.768

0.205 0.000 0.000 0.000 0.000 0.407

1.853 0.253 0.000 0.000 0.000 3.384 0.000 0.000 0.000


0.000 0.000 0.017 0.000 0.000 0.180

0.000 0.000 0.017 0.000 0.000 0.206


0.000 0.000 0.034 0.000 0.000 0.386 0.000 0.000 0.000

0.105 1.20 1.61 0.000

0.500 1.20 2.20 5.176

2.264

0.000

0.000 0.605 2.400 0.000 0.000 3.810 7.440 0.000 0.000 0.000

0.02 0.284

0.138 0.138

0.01 0.152

0.000 0.138 0.032 0.000 0.000 0.574 0.000 0.000 0.000 0.000

0.44 0.38 0.82


0

1.96 0.720 2.01 4.69

2.400 1.100 2.010 0.000 0.000 5.510 0.000 0.000 0.000 0.000

0.750 1.750 7.040

0.000

0 0.530 1.300

0.000

0.000

0.000

0.76 0.548 2.208

0.000

0.32 0.892 3.532

1.830 3.720 0.000 0.000 0.000 14.080 0.000 0.000 0.000 0.000

0
1.399 2.083 10.972

4.870 1.080 7.505

0.000

0.000

0.565 2.396 6.664

0.088 0.088

0.300 0.300

1.13 1.600 6.330

1.44 0.830 2.270

0.000

0.000

-1.91 -1.53 -6.320

7.494 6.847 0.000 0.000 0.000 27.809 0.000 0.000 0.000 0.000

3.086 4.430 13.677

1.100 8.800 0.046 11.496

0.000

0.000

0.000

0.959 1.832 0.49 4.109

0.000
0.000

0.000

0.000

0.000

0.000

0.000

2.13 6.140 1.59 12.820

0.000

0.000

0.000

2.98 6.750 12.630

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

14.81 7.200 22.050

0.000

0.000
0.000

0.000

0.000

0.000

0.000

14.77 4.24 19.141

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

-1.07 -1.75 -3.140

38.765 33.402 6.324 0.046 0.000 92.783 0.000 0.000 0.000 0.000
0.8 6.07

5.3 1.697 30.233

4.470 0.034 14.480

0.060

6.531 15.720 6.17 10.3 44.015

0.000

0.000

0.000

17.101 15.754 7.871 10.300 0.000 94.858 0.000 0.000 0.000 0.000

5.169 0.029 0.03 0.05 20.366 28.825

0.000

7.842 2.004 126.436 138.963

0.000

13.011 2.033 0.028 0.050 146.802 167.788 0.000 0.000 0.000 0.000

2.190 0.000 11.910

0.000

0.000

0.91 7.070
0.000

0.000

0.000

5.92 0.063 31.079

5.37 19.170

8.470

0.000

0.000

0.000

14.390 0.000 0.000 0.000 0.063 77.699 0.000 0.000 0.000 0.000
RR Aggregate Sand
Plastering Cement
Masonry Theoritical Theoritical Actual
Qty (Sqm) Theoritical
(Cum) Stock Qty in MT Qty in MT

66.576 0.000
51.43 41.09 222.1 212.0

27.166 0.000
24.95 14.38 2975.9 231

188.994 0.000
932.539588 914

0.000 155.158
292.1021 124
0.000 0.000 12mm 0.800

16mm 0.740

282.736 155.158

0 0 59 49

368.357 0.000
31.51 85.11 50
368.357 0.000

352 343

155.00 132

45.00 49
0.000 0.000
0.000 0.000

10mm 0.600

0.000 0.000

8mm 0.020

16mm 0.138

0.000 0.000
10mm 2.400

12mm 0.660

16mm
1.63

0.000 0.000 Stock at Site @ Km. 194+250 Box culvert

10mm

12mm

16mm

0.000 0.000
10mm

12mm

16mm

0.000 0.000

10mm

12mm
16mm

0.000 0.000
0.000 0.000

0.000 0.000
0.000 0.000
Name of the Project
Theoriti

Cement Sand
S.No Item Unit Quantity Aggrega
(Bags) (MT)

40mm
A Highway

1 GSB Cu.m 32,238 18,537

2 WMM Cu.m 34,073 24,021

3 Prime Coat (0.6 Kg / Sqm) Sq.m 115,910


Tack Coat on Primed Surface (0.2
4 Sq.m 116,590
Kg / Sqm)
Tack Coat on bituminious Surface
5 Sq.m 43,690
(2.0 Kg / 10 Sqm)

6 DBM_Grade - II Cu.m 3,251 1,620

7 DBM_Grade - I Cu.m 5,446 2,713

8 BC Cu.m -

9 DLC Cu.m 36.00 115 33.80

Total_Highway Qty 115 34 46,891

B Structures

1 Maa Vaishnavi Construction (Office, Lab, Cement Godown and Other Miscellenious work

a Brick work Cu.m 135.515 130 8.82

b Plastering Sq.m 282.736 40 3.47

c RR Masonry wall Cu.m 155.158 80

d PCC - 1:2:4 Cu.m 8.500 53 7.00

e PCC - 1:4:8 Cu.m 47.825 129 37.08

f PCC - M15 Cu.m 63.930 272 44.75

g PCC - M20 Cu.m 122.910 740 90

h RCC - M25 Cu.m 30.174 37 22

i Steel MT 4.08

Total Qty 273.34 1,481.00 212.73 -

2 Mr. B. Tirupathi (Hot mix, Batching Plants and Weigh Bridge Foundation works at Base
a Brick work Cu.m 60.277 48 3.00

b Plastering Sq.m 368.357 6 4.42

c PCC - 1:2:4 Cu.m -

d PCC - 1:4:8 Cu.m 23.343 30 18.09

e PCC - M15 Cu.m 1.296 5 0.91

f PCC - M20 Cu.m 9.221 44 7

g RCC - M25 Cu.m -

h Steel MT 0.51

Total Qty 33.86 133 33 -

3 Mr. N. Krishna rao (Hot mix, Batching Plants and Weigh Bridge Foundation works at Base

a PCC - M15 Cu.m 26.847 85 18.79

b PCC - M20 Cu.m - -

c RCC - M25 Cu.m 89.024 440 65

d Steel MT 3.38

Total Qty 115.87 524 84 -

4 Mr. P. Pradeep
a PCC - M15 Cu.m 22.500 133 15.75

b PCC - M20 Cu.m 129.500 803 94

c RCC - M25 Cu.m - - -

d RCC - M30 Cu.m - - -

e Steel MT 0.386

Total Qty 152.00 936 110 -

5 M/s. Jay Enter Prises


a PCC - M15 Cu.m - - -

b PCC - M20 Cu.m - - -

c RCC - M25 Cu.m - - -

d RCC - M30 Cu.m - - -

e RCC - M35 (Pile) Cu.m 52.000 437 36

f Steel MT 3.810

Total Qty 52.00 437 36 -

6 Mr. Hemendra Mandal


a PCC - M15 Cu.m 19.000 112 13.30
b PCC - M20 Cu.m 178.800 1,109 130

c RCC - M25 Cu.m - - -

d RCC - M30 Cu.m - - -

e Steel MT 0.574

Total Qty 197.80 1,221 144 -

7 Mr. Sunil Khokan Mandal


a PCC - M15 Cu.m 6.800 40 4.76

b PCC - M20 Cu.m 5.900 37 4

c RCC - M25 Cu.m 3.850 24.6 3

d RCC - M30 Cu.m 10.100 69 7

e Steel MT 5.510

Total Qty 26.650 170 19 -

8 Mr. Subrato Mandal


a PCC - M15 Cu.m 18.500 109 12.95

b PCC - M20 Cu.m 16.700 104 12

c RCC - M25 Cu.m 139.400 892.2 102

d RCC - M30 Cu.m 4.000 27 3

e Steel MT 14.080

Total Qty 178.60 1,132 130 -

9 M/s. TNR Constructions


a PCC - M15 Cu.m 45.300 267 31.71

b PCC - M20 Cu.m - - -

c RCC - M25 Cu.m 262.200 1,678.1 191

d RCC - M30 Cu.m 49.600 337 36

e Steel MT 27.81

Total Qty 357.100 2,283 259 -

10 M/s. Anuma Rajkumar

a PCC - M15 Cu.m 189.000 1,115 132.30

b PCC - M20 Cu.m 833.700 5,169 608

c RCC - M25 Cu.m 111.500 713.6 81

d RCC - M30 Cu.m 234.200 1,593 170

e RCC - M35 Cu.m 529.500 3,601 384


f Steel MT 92.78

Total Qty 1,897.900 12,191 1,375 -

11 Mr. Umesh Prasad

a PCC - M15 Cu.m 255.500 1,507 178.86

b PCC - M20 Cu.m - - -

c RCC - M25 Cu.m 652.150 4,173.8 475

d RCC - M30 Cu.m - - -

e Steel MT 94.858

Total Qty 907.650 5,681 654 -

12 Mr. Barunkumar

a PCC - M15 Cu.m - - -

b PCC - M20 Cu.m - - -

c RCC - M25 Cu.m - - -

d RCC - M30 Cu.m - - -

e RCC - M35 (Pile) Cu.m 50.500 424 35

e Steel MT 167.788

Total Qty 50.500 424.200 34.730 -

13 Mr. Patitpabon Joddar

a PCC - M15 Cu.m 333.200 1,966 233.25

b PCC - M20 Cu.m - - -

c RCC - M25 Cu.m 993.200 6,356.5 723

d RCC - M30 Cu.m - - -

e Steel MT 77.699

Total Qty 1,326.400 8,322 957 -

Test Pile Platform PCC M-15 grade


Cu.m 4.0 24 3
at Km. 180+812 - Major Bridge

Base Camp Diesel Tank Platform


Cu.m 3.0 18 2
purpose PCC M-15

Saileela Electrical Utility shifting


work (M-20 grade) As on July- Cu.m 184 1,141 134.19
2018

Total Others works 191 1,183 139 -


Grand Total 5,797 36,232 4,219 46,891
Name of the Project :- Nizamabad-Jagadalpur Road of NH-63 (EPC Mode) Project
Theoritical Material Requirement As on February-2019

Aggregate Admixture Steel


Aggregate (MT)
(MT) (Lts) (MT)

20mm 10mm Dust 8mm 10mm 12mm

18,537 18,537 18,537 74,147

13,612 16,815 25,623 80,072

1,458 1,296 3,725 8,098

2,442 2,171 6,240 13,566

23 24 46

36,071 38,842 54,125 175,929

her Miscellenious works and Construction of Engineers Quarters and Store Shed Foundation Quantities at Base camp Km 181+900)

11.00

65.38

45 45 89.50 63.93

78 78 156.97 147.49

19 19 38.48 36.21

0.33 1.07 1.38

142.48 142.48 - 361.34 247.63

ndation works at Base Camp at km.181+900)


31.51

1 1 1.81 -

6 6 11.78 -

- - - -

- 0.51 -

7 7 - 45 -

ndation works at Base Camp at km.181+900)

19 19 37.59 26.85

- - - -

57 57 113.54 106.83

1.21 0.07 1.85

76 76 - 151 134

16 16 31.50 22.50

83 83 165.39 155.40

- - - -

- - - -

0.35 - -

98 98 - 197 177.90

- - - -

- - - -

- - - -

- -

31.31 31.31 63 62.40

- 0.81 -

31 31 - 63 62.40

13.30 13.30 26.60 19.00


114.18 114.18 228.35 214.56

- - - -

- - - -

0.40 - -

127 127 - 255 233.56

4.76 4.76 9.52 6.80

4 4 7.54 7.08

2 2 4.91 4.62

6 6 12.81 12.12

- - 2.40

17 17 - 35 30.62

12.95 12.95 25.90 18.50

11 11 21.33 20.04

89 89 177.79 167.28

3 3 5.07 4.80

- 8.53 1.83

115 115 - 230 210.62

32 32 63.42 45.30

- - - -

167 167 334.42 314.64

32 31 62.91 59.52

- 13.47 7.49

230 230 - 461 419.5

132 132 264.60 189.00

532 532 1,064.75 1,000.44

71 71 142.21 133.80

149 148 297.03 281.04

337 335 671.54 635.40


1.60 12.65 38.77

1,222 1,219 - 2,440 2,240

178.85 178.85 357.69 255.50

- - - -

416 416 831.77 782.58

- - - -

19.12 24.71 17.10

595 595 - 1,189 1,038.08

- - - -

- - - -

- - - -

- - - -

30.41 30.41 61 212.10

- 5.86 13.01

30.410 30.410 - 60.820 212.100

233.24 233.24 466.47 333.20

- - - -

633 633 1,266.75 1,191.84

- - - -

29.54 33.71 14.39

867 867 - 1,733 1,525.04

2.80 2.80 5.60 4.000

2.10 2.10 4.20 3.000

117.50 117.50 234.99 220.80

122 122 - 245 228 - - -


39,752 42,519 54,125 183,395 6,759 53 101 98
Binding Aggregate
Steel Steel
Wire Theoritical Qty
(MT) (MT)
(Kg) in MT

16mm 20mm 25mm 32mm

Aug-17 51.43

Sep-17 24.95

Aug-17

Sep-17

Aug-17

Sep-17

Dec-17

Jan-18

Dec-17

Jan-18

ntities at Base camp Km 181+900) Dec-18

1.30 - - - 4.08 20
- - - - 0.51 3

0.25 - - - 3.38 17

- 0.03 - - 0.386 25

0.61 2.40 - - 3.81 27


0.14 0.03 - - 0.574 55

1.10 2.01 - - 5.510 25

3.72 - - - 14.080 200

6.85 - - - 27.81 167


33.40 6.32 0.05 - 92.78 650

15.75 7.87 10.30 - 94.858 464.9

2.03 0.03 0.05 146.80 167.788 1,175

- - - 0.06 77.699 400

1.29 1.29

- - 1.29 - 1.29 -
65 19 12 147 495 3,228
Sand Cement Cement Qty As
Steel
Theoritical Qty Theoritical Qty per Actuals Qty Laps
Stock
in MT in Kgs in Bags

41.09 181.08736 174

14.38 2772 59

33 32

131 120

8 6

72.9 52

851 833

248.252 80

82 81

44 44

0.052 1.54
MADHUCON PROJECTS LIMITED
Nizamabad _ Jagadalpur Section of NH-63 (EPC Mode) Project
Major Material Reconciliation Statement As on February-2019

Theoritical Qty As
SL. No. Description of the Material Unit Qty As per Difference Remarks
per Site
Actuals Qty
Measurement

1 GSB (Aggregate) MT 112014 74147 37867


2 WMM (Aggregate) MT 79833 80072 -239
3 DBM (Aggregate) MT 30152 21664 8487
4 Bitumen (VG-30) MT 1293 1185 109
5 Emulsion
SS-1 MT 69.55 68.39 1.16
RS-1 MT 32.06 7.51 24.55
6 HSD / LDO Lts 268803 248804 19999

7 Test Pile works at Major Bridge at


Km. 180+812
a Cement Bags 24 24 0
b Aggregates MT 5.6 5.6 0
c Sand MT 2.8 2.8 0
d Steel MT 1.29 1.29 0
e Admixture Lts 7.8 4.0 4

Supply of Concrete (M-20 grade) for


8 Electrical Utility Shifting on Deditable
Basis

a Cement Bags 1251 1141 110


b Aggregates MT 235 235 0
c Sand MT 134 134 0
d Admixture Lts 500 221 280

9 Other Concrete works (Diesel Bunk


platform etc.,)
a Cement Bags 18 18 0
b Aggregates MT 4 4 0
c Sand MT 2 2 0.00
d Admixture Lts 8 3 5.16

1 M/s. Maa Vaishnavi Constructions


a Cement Bags 1567 1481 85.81
b Aggregates MT 365 361 3.20
c Sand MT 214 213 1.74
d Steel MT 3.97 4.08 -0.10
e Bindingwire Kg 28 20 7.43
f Admixture Lts 555.2 247.6 307.58
Major Material Reconciliation Statement As on February-2019

Theoritical Qty As
Qty As per Difference
SL. No. Description of the Material Unit per Site Remarks
Actuals Qty
Measurement

2 Mr. B. Tirupathi
a Cement Bags 143 133 10.00
b Aggregates MT 45 45 0.00
c Sand MT 33 33 0.00
d Steel MT 0.51 0.51 0.00
e Bindingwire Kg 3.59 2.56 1.03
f Admixture Lts 0.0 0.0 0.00

3 Mr. N. Krishna Rao


a Cement Bags 552 524 28.00
b Aggregates MT 151 151 0.00
c Sand MT 84 84 0.00
d Steel MT 3.38 3.38 0.00
e Bindingwire Kg 23.69 16.92 6.77
f Admixture Lts 317.6 133.7 183.97

4 Mr. P. Pradeep
a Cement Bags 1029 936 93.11
b Aggregates MT 198 197 0.74
c Sand MT 111 110 1.05
d Steel MT 0.39 0.39 0.00
e Bindingwire Kg 3 25 -22.30
f Admixture Lts 404.2 177.9 226.33

5 M/s. Jay Enter Prises


a Cement Bags 428 437 -9.24
b Aggregates MT 61 63 -1.32
c Sand MT 35 36 -0.76
d Steel MT 3.58 3.81 -0.23
e Bindingwire Kg 25 27 -1.60
f Admixture Lts 213.78 62.40 151.38

6 Mr. Hemendra Mandal


a Cement Bags 1456 1221 235.23
b Aggregates MT 278 255 22.83
c Sand MT 157 144 13.10
d Steel MT 1.54 0.57 0.97
e Bindingwire Kg 28 55 -27.21
f Admixture Lts 577.2 233.6 343.60
Major Material Reconciliation Statement As on February-2019

Theoritical Qty As
Qty As per Difference
SL. No. Description of the Material Unit per Site Remarks
Actuals Qty
Measurement

7 Mr. Sunil Khokan Mandal


a Cement Bags 168 170 -1.89
b Aggregates MT 32 35 -3.01
c Sand MT 18 19 -1.46
d Steel MT 5.23 5.51 -0.28
e Bindingwire Kg 37 25 11.59
f Admixture Lts 69.50 30.62 38.88

8 Mr. Subrato Mandal


a Cement Bags 1270 1132 138.12
b Aggregates MT 237 230 6.99
c Sand MT 133 130 3.94
d Steel MT 13.84 14.08 -0.24
e Bindingwire Kg 97 200 -103.10
f Admixture Lts 529.97 210.62 319.35

9 M/s. TNR Constructions


a Cement Bags 2496 2283 213.59
b Aggregates MT 466 461 5.22
c Sand MT 262 259 3.16
d Steel MT 27.54 27.81 -0.27
e Bindingwire Kg 193 167 25.95
f Admixture Lts 1044.9 419.5 625.47

10 M/s. Anuma Rajkumar


a Cement Bags 13081 12191 889.96
b Aggregates MT 2440 2440 -0.59
c Sand MT 1374 1375 -0.71
d Steel MT 103.60 92.78 10.82
e Bindingwire Kg 725 650 74.82
f Admixture Lts 5446.3 2239.7 3206.60

11 Mr. Umesh Prasad


a Cement Bags 6362 5681 680.99
b Aggregates MT 1244 1189 54.34
c Sand MT 683 654 29.02
d Steel MT 94.86 94.86 0.00
e Bindingwire Kg 664 465 199.11
Major Material Reconciliation Statement As on February-2019

Theoritical Qty As
Qty As per Difference
SL. No. Description of the Material Unit per Site Remarks
Actuals Qty
Measurement

f Admixture Lts 2541.85 1038.08 1503.77

12 Mr. Barunkumar
a Cement Bags 522 424 97.69
b Aggregates MT 75 61 14.01
c Sand MT 43 35 8.00
d Steel MT 168.85 167.79 1.07
e Bindingwire Kg 1182 1175 7.47
f Admixture Lts 260.95 212.10 48.85

13 Mr. Patitpabon Joddar


a Cement Bags 9919 8322 1596.63
b Aggregates MT 1917 1733 183.87
c Sand MT 1059 957 102.53
d Steel MT 81.08 77.70 3.38
e Bindingwire Kg 568 400 167.38
f Admixture Lts 4006.33 1525.04 2481.29
MADHUCON PROJECTS LTD
Name of the Project : NH-63 on Nizamabad - Jagadalpur road on EPC mode under NH(O) in the state of Telangana
QUANTITY RECONCILIATION STATEMENT AS ON 28th Feb-2019
WORK DONE QUANTITY 's AS PER BILLING / SITE

Concrete (Cum) Steel (MT)


Sl. Working Name of the PRC / Total Total Steel
No. Period RA Bill No. Concrete Qty REMARKS
M-15 M-20 M-25 M-30 M-35 M-40 Qty 8mm 10mm 12mm 16mm 20mm 25mm 32mm

I Dec-18 - M/s. Maa Vaishnavi Constructions "TOTAL QUANTITIES 64.803 122.910 31.722 0.000 0.000 0.000 219.435 0.330 0.967 1.376 1.299 0.000 0.000 0.000 3.972 Quantities not tallied with bills

II Apr-18 - M/s. Mr. B. Tirupathi "TOTAL QUANTITIES" 1.296 9.221 0.000 0.000 0.000 0.000 10.517 0.000 0.513 0.000 0.000 0.000 0.000 0.000 0.513 RA bills not avaialable

III Sep-17 - M/s. Mr. N. KRISHNA RAO "TOTAL QUANTITIES" 26.847 0.000 89.024 0.000 0.000 0.000 115.871 1.209 0.069 1.853 0.253 0.000 0.000 0.000 3.384 Quantities correct as per bills

IV Aug-17 - Mr. P. Pradeep "TOTAL QUANTITIES" 16.166 137.024 0.000 0.000 0.000 0.000 153.190 0.352 0.000 0.000 0.000 0.034 0.000 0.000 0.386 Quantities correct as per bills

V Jun-18 - M/s. Jay Enterprises "TOTAL QUANTITIES" 0.000 0.000 0.000 0.000 50.900 0.000 50.900 0.000 1.194 0.000 0.269 2.118 0.000 0.000 3.581 Quantities correct as per bills

Jun-18 - Mr. Hemendra Mandal "TOTAL QUANTITIES" 18.336 180.437 68.398 0.000 0.000 0.000 267.171 0.391 0.874 0.108 0.138 0.033 0.000 0.000 3.970 M 25 and steel not correct as per bills work done

VII Sep-18 - Mr. Sunil Khokan Mandal "TOTAL QUANTITIES" 4.200 7.250 3.180 9.912 0.000 0.000 24.542 0.000 2.400 0.855 1.972 0.000 0.000 0.000 5.227 Quantities correct as per bills

VIII Dec-18 - Mr. Subrato Mandal "TOTAL QUANTITIES" 31.618 0.000 221.070 4.177 56.525 0.000 313.390 0.000 11.553 1.638 6.181 0.000 0.000 0.000 19.371 Quantities not tallied with bills

IX Aug-18 - M/s. TNR Constructions "TOTAL QUANTITIES" 43.540 14.920 239.073 63.890 0.000 0.000 361.423 0.000 17.152 2.914 7.478 0.000 0.000 0.000 27.543

Total steel Billing quantity is correct but, item wise


X Feb-19 M/s. Anuma Rajkumar Engineers & Contractors "TOTAL 192.804 813.952 110.091 235.049 545.288 0.000 1897.184 6.249 31.872 18.610 40.903 5.970 0.000 0.000 103.604
wrong

XI Feb-19 - Mr. Umesh Prasad "TOTAL QUANTITIES" 275.743 0.000 672.535 0.000 0.000 0.000 948.278 19.119 26.019 15.796 15.754 7.871 10.300 0.000 94.858 Total Steel receipts taken instead of work done

XII Feb-19 - Mr. Barunkumar "TOTAL QUANTITIES" 0.000 0.000 0.000 0.000 62.130 0.000 62.130 0.000 5.864 13.011 2.033 0.000 0.000 147.947 168.855 Quantities correct as per bills

Work period not Nov, 2018 it is Feb, 2019. In Concrete


XIII Nov-18 - Mr. Patitpaban Joddar "TOTAL QUANTITIES" 357.986 0.000 1110.154 0.000 0.000 0.000 1468.140 29.988 34.884 16.204 0.000 0.000 0.000 0.000 81.076 M 25 actual billing quantity is 1090.154 but, 20MT
excess taken
MADHUCON PROJECTS LIMITED
Nizamabad _ Jagadalpur Section of NH-63 (EPC Mode) Project
Major Material Reconciliation Statement As on February-2019

Theoritical Qty As Qty As per Materials


Description of the Difference
SL. No. Unit per Site Actuals Issued as per Remarks
Material Qty (5-6)
Measurement Consumption Store

1 2 3 4 5 6 7 8
A Highway
1 GSB (Aggregate) MT 112014.48 74147.09
2 WMM (Aggregate) MT 79832.67 80071.57
3 DBM (Aggregate) MT 30151.87 21664.43
4 Bitumen (VG-30) MT 1293.36 1184.53 1005.00 179.53

5 Emulsion
SS-1 MT 69.55 68.39
RS-1 MT 32.06 7.51

Lts 268803.08 248803.75 1220013.00 -971209.25


6 HSD / LDO
B Structures
1 Cement Bags 40285.59 36117.18 25862.00 10255.18
2 Aggregates MT 7752.32 7466.07
3 Sand MT 4344.97 4185.37
4 Steel MT 509.68 494.56 323.00 171.56
5 Bindingwire Kgs 3575.69 3228.36
6 Admixture Lts 16484.28 6758.57

You might also like