The method statement for low voltage cables and wires at the Al Ain Data Center project was approved with comments. The comments requested that the method statement be updated to reflect the latest shop drawings, material submittals, and compliance with all relevant IEC, BS, and AADC standards and regulations. Additionally, all materials must be verified by the engineer before installation and all workmanship shall follow local authority standards.
The method statement for low voltage cables and wires at the Al Ain Data Center project was approved with comments. The comments requested that the method statement be updated to reflect the latest shop drawings, material submittals, and compliance with all relevant IEC, BS, and AADC standards and regulations. Additionally, all materials must be verified by the engineer before installation and all workmanship shall follow local authority standards.
The method statement for low voltage cables and wires at the Al Ain Data Center project was approved with comments. The comments requested that the method statement be updated to reflect the latest shop drawings, material submittals, and compliance with all relevant IEC, BS, and AADC standards and regulations. Additionally, all materials must be verified by the engineer before installation and all workmanship shall follow local authority standards.
Subject : METHOD STATEMENT FOR LV CABLES AND WIRES Company Name : AL HASOUN SEJON ELECTROMECHANICAL LLC Contractor Sub. No : HW-ADC-MSS-EL-0005 Date received : December 16, 2018 Date reviewed : December 17, 2018 Status : Approved with comments SALFO COMMENTS:
1. Findings
Shall be incorporated with latest approved shop drawings.
Shall be incorporated with updated material submittals. Shall be incorporated with IEC, BS and AADC standards & regulations all the time. All material shall be verified/inspected by the ENGINEER prior to installation. All workmanship shall be incorporated with the local authority’s standards and regulations.