FACTORY INSPECTION TEST RECORD

Date Inspection : 04 Agustus 2020 Project Code : APAJ/VI.20/66


Customer : PT ABB Sakti Industri
Project Name : Steel Structure 150 KV GI PT.Indorama Synthetics, Tbk - West Java
Discription : Earthing Lighting Mas H=12,5M
Inspection Check Point

Material physical A N/A


Material Straightness A N/A
Hole to Hole A N/A
Visual Welding A N/A
Installation A N/A
Material Spesification A N/A
Marking A N/A
Dimensiaon Check
Inspection Inspection
Dimension in (mm) Dimension in (mm)
NO Result NO Result
Item Draw Tolerance Act Dev OK Rep Rej Item Draw Tolerance Act Dev OK Rep Rej
1 A 16000 ±3 7 G 544 ± 1,5
2 B 5000 ± 2,5 8 H 150 ±1
3 C 5000 ± 2,5 9 I 150 ±1
4 D 2500 ±2 10 J 544 ± 1,5
5 E 3500 ± 2,5 11 K 150 ±1
6 F 150 ±1 12 D1 Ø 30 − 0 + 0,2
Remark / Sketch / Photo attachment

A H
F
C G

B
D1
K

Checked By Review By

QC Inspector