GOVERNMENT OF INDIA
रे ल म ं त्र ालय
MINISTRY OF RAILWAYS
Indian Railways
Unified Standard Schedule Of Rates
(Formation Works, Bridge Works and P.Way Works)
सीमट गु णां क
Cement Coefficients
इज
ं ीिनयिरंग िवभाग
Engineering Department
2019
IR Unified Standard Schedule of Rates 2019- Cement Coefficients
013101 With provision of one 50mm wide retro-reflective tape in horizontal Metre 0.019
direction, duly secured/tight with vertical posts
013102 With provision of painting verticals & horizontals with red luminous Metre 0.019
paints / strips of 30cm each with a gap of 30 cm
022030 Providing and laying in position Plain cement concrete of specified
Nominal Mix for miscellaneous works like side drains, foundation
for OHE masts and other miscellaneous structures excluding the
cost of Cement, centering and shuttering - All work up to plinth
level :
022031 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone Cum 4.00
aggregate 20 mm nominal size)
022032 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone Cum 3.20
aggregate 20 mm nominal size)
022033 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone Cum 3.20
aggregate 40 mm nominal size)
022034 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone Cum 2.20
aggregate 20 mm nominal size)
022035 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone Cum 2.20
aggregate 40 mm nominal size)
022036 1:4:8 (1 Cement : 4coarse sand (zone-III): 8 graded stone Cum 1.70
aggregate 40 mm nominal size)
022040 Providing and laying in position machine batched, machine mixed Cum As per approved
and machine vibrated Design Mix Cement Concrete of specified design mix
grade (Cast in-Situ) using 20mm graded crushed stone aggregate
and coarse sand of approved quality in RCC raft foundation & Pile
cap including finishing, using Admixtures in approved proportions
(as per IS:9103), to modify workability & other properties without
impairing strength and durability complete as per specifications
and direction of the Engineer in charge. Payment for cement,
reinforcement and shuttering shall be paid extra.
022050 Providing and laying in position machine batched, machine mixed As per approved
and machine vibrated Design Mix Cement Concrete of specified design mix
grade (Cast in-Situ) using 20mm graded crushed stone aggregate
and coarse sand of approved quality for the following Reinforced
cement concrete structural elements up to height of 10 m from
foundation top level, including finishing, using Admixtures in
approved proportions (as per IS:9103), to modify workability &
other properties without impairing strength and durability complete
as per specifications and direction of the Engineer in charge.
Payment for cement, reinforcement, shuttering shall be paid extra.
Page 1 of 9
IR Unified Standard Schedule of Rates 2019- Cement Coefficients
Page 2 of 9
IR Unified Standard Schedule of Rates 2019- Cement Coefficients
Page 3 of 9
IR Unified Standard Schedule of Rates 2019- Cement Coefficients
024020 Providing and laying in position machine batched, machine mixed Cum As per approved
and machine vibrated Design Mix Cement Concrete of specified design mix
grade (cast in-situ) using 20mm graded crushed stone aggregate
and coarse sand of approved quality in Drop and curtain wall and
alike structures below bed level, including centering, shuttering
and finishing complete as per drawings and technical specifications
as directed by Engineer. Payment for cement, reinforcement and
shuttering shall be made extra.
025040 Providing and laying in position machine batched, machine mixed Cum As per approved
and machine vibrated Design Mix Cement Concrete of specified design mix
grade (Cast in-Situ) using 20mm graded crushed stone aggregate
and coarse sand of approved quality in jacketing of piers and
abutments from bottom of foundation upto a height of 10m
including finishing for designed thickness of jacketing. Payment for
reinforcement, cement, wire mesh, shuttering, drilling of holes and
insertion of rods will be made extra.
031011 With Soffit level upto 9m above Bed level Cum As per approved
design mix
031012 With Soffit level From 9m above Bed Level to12m above Bed Level Cum As per approved
design mix
031013 With Soffit level From 12m above Bed Level to 15m above Bed Cum As per approved
Level design mix
031014 Extra over USSOR Item no. 031013 for Soffit level beyond 15m Cum As per approved
above Bed Level for every 1m or part thereof design mix
Page 4 of 9
IR Unified Standard Schedule of Rates 2019- Cement Coefficients
031080 Supplying and laying in position specified grade precast Cum As per approved
prestressed cement concrete ballast retainers of size, as directed design mix
by Engineer In-charge. Payment for Shuttering, Cement,
reinforcement, HTS cables, anchorage cones, stressing of cables
and grouting of the ducts will be done extra.
Page 5 of 9
IR Unified Standard Schedule of Rates 2019- Cement Coefficients
041080 Providing and fixing various size HTS holding down bolts As per actual As per actual site
conforming to IS:1364 in concrete column or in other structures site consumption for
with proper nuts, bolts, washers/plates, grouting of holes with all consumption Grouting
material, labour, T&P as a complete job. for Grouting
Note: Cement used in grouting will be paid separately under
relevant item.
Page 6 of 9
IR Unified Standard Schedule of Rates 2019- Cement Coefficients
052050 Guniting concrete surface with cement mortar of average thickness Sqm 0.16
25mm along with wire mesh 50x50x3mm, applied with compressor
after cleaning surface and spraying complete including curing as
per procedure and technical specifications given under para 209.3
of IRBM. Rate is excluding the cost of cement which shall be paid
extra.
052070 Grouting of masonry/concrete by injection process duly Sealing of
cracks, through nipples complete as per Technical Specification
and procedure given in IRBM Para No 209 including necessary
admixutre. (Cement wil be paid extra)
052071 Neat Cement Grout with 20% anti shrinkage compound w.r.t. As per actual As per actual site
cement. site consumption
consumption
052072 Cement Sand Mortar (1:1) Grout with 20% anti-shrinkage As per actual As per actual site
compound w.r.t. cement site consumption
consumption
052100 Applying shotcrete mixture of average thickness 40mm over Sqm 0.16
masonry / concrete including removal of defective concrete,
raking the mortar in joints, cleaning the surface thoroughly, fixing
50x50x3mm wire mesh over the surface for application of grout
mixture comprising cement, sand,coarse aggregate, water, quick
setting compoud complete as per procedures and specifications
given in IRBM Para No 209(3) including curing. Rate is excluding
the cost of cement which shall be paid extra.
052150 Providing weep holes by making suitable opening or drilling in Metre 0.02
existing Brick Masonry / Plain / Reinforced Concrete abutment,
wing wall/return wall with 110 mm dia UPVC pipe (working
pressure 4kg/sqcm) extending through the full width of the structure
complete and repairing the same with cement mortar 1:2 (1 cement
: 2 coarse sand). Rate is excluding the cost of cement which shall
be paid extra.
Page 7 of 9
IR Unified Standard Schedule of Rates 2019- Cement Coefficients
053011 Piers, substructure, Box bridges and culverts in river bed Sqm 0.065
053030 Surface protection of Bridge Deck by cleaning and preparing the Sqm 0.065
surface by acid etching; treating the surface with a two-layer
plaster; first layer of 5mm thick with cement (OPC or slag), admixed
with an octadecanoic acid based cementitious waterproofing
compound (bulk density not greater than 0.5 gm/cc) in the weight
ratio of 50:3 for cement and waterproofing compound, further
enriched with specially fabricated deformed galvanized steel fibre
@ 150 gm/sqm of treated surface and second layer of 12mm thick
cement-sand (1:2.5) plaster, enriched with polyester fibre (to be
paid separately) and curing the plastered surface. Treatment shall
be impermeable under a water head of 20m complete as per
specifications. Rate is excluding cost of cement which shall be paid
extra.
Page 8 of 9
IR Unified Standard Schedule of Rates 2019- Cement Coefficients