SITE VISIT DATE: 18-7-2020

Comments For Ground Floor Block work

1. Concrete column must be chipped for bonding b/w blocks & concrete surface.

2. Must Check& conform in blockwork shop drawings the blockwall face of starting.

1. Suggest to make the joint hook in alternate position.


1. Better to start blockwork for all the side in same time.
2. Make line tore for straight alignment of blockwork.
3. Conform Per day block work layer not morethan five.

1.Check the Concrete and blockwork Surface level difference and plastering thickness.