PROJECT BOQ
Original Issue
RCC Septic Tank and other Site Works related to AFOH Offices
Kabul, Afghanistan
Project Components:
1. New RCC Septic plus some extra site works
This BOQ is part of the complete project documents and must be read together with these documents.
Complete project documents include the drawings, BOQ, schedules and specifications. Any
discrepancies between these documents are to be brought to the immediate attention of UNOPS
Engineer. Prices given by the contractor on this BOQ are to cover any and all additional materials, labor
or associated costs to complete the works as documented on the complete project documents.
Currency: US Dollars
Currency: US Dollars
Subtotal 1. General -
3/7
Original Issue
Currency: US Dollars
General Notes:
1 - The cost for all items below includes supplying of materials, making, installation, transportation, spare
parts, accessories, auxiliary materials, relocation of any existing items come under work to any new location
guided by the UNOPS Engineer , removal/salvage/disposal of any existing structure that needs to be
removed/salvaged/disposed , reinstating of all under work and their surrounding areas after the work to their
original states , all wilding works, hardware, glazing, all types of paintings including anti-rust paintings of all
non-galvanized steel surfaces followed by 2 other coats of oil-based painting and any other needed works
and materials to complete the job to the full satisfaction of UNOPS Engineer.
2 - Samples for all types of equipment, appliances, materials and accessories that need to be used in this
contract shall be brought to the approval of UNOPS engineer before using them in the job. All water sanitary
items to be Master Brand (or equivalent). All electrical equipment shall be original Italian. All ceramics to be
RAK Brand.
3 - Read sections in given specifications, and also read the drawings before pricing the job. Material
availability and changes of market prices for any material is to the responsibility of the Contractor without any
extra payment.
4 - In practical work, there may be a 5% variation in the design/size/quality/quantity of different parts of the
work itemized in their BOQ; all such changes till full satisfaction of UNOPS engineer are without any extra
payment. Only those vast changes in the design can be paid on the top of the BOQ sum subject to approval
of UNOPS Engineer. (In the case of big changes in the scope of work, there must be a written agreement
between Contractor and UNOPS Engineer on an agreed extra scope along with their prices prior to
resume/finish the work ).
1 Excavation of foundation: This item and its cost incudes excavation for any soil type
for the foundation and disposal of unwanted materials to outside UNAMA right away Cu.m
during the time of excavation. See drawings for more dimensions/details.
150.00 -
2 Earth backfilling: This item and its cost incudes any soil type backfill on/around the
new septic tank plus its compaction. The materials could be from the excavated
foundation subject to approval of UNOPS Engineer. Consult Engineer for location Cu.m
and sizes of backfilling. The work to be at full satisfaction of UNOPS Engineer. 40.00 -
3 PCC M-100 under the body of septic tank: This item and its cost incudes plinth
concrete under the tank as shown on the given drawings. The foundation ground
shall be compacted before PCC. The tasks includes provision of concrete, pouring, Cu.m
curing , and all needed works/materials at full satisfaction of UNOPS Engineer. 3.50 -
4 RCC M-200 for the body of septic tank: This item and its cost incudes all reinforced
concrete used for the whole tank structure including its accessing manholes/covers
as shown on the given drawings. The tasks includes provision of concrete, pouring,
curing , reinforcement, shuttering by using new smooth plywood boards, and all
needed works/materials to complete RCC body. The cost also includes PVC
embedded sleeves in the concrete for future piping connections, and the PVC
ventilation pipe shown on the drawings. The cost includes installation/embedding of Cu.m
PVC pipe, schedule-80, 10" on septic roof, having a operable metallic GI cover to
the instruction of UNOPS Engineer.
The work shall be at full satisfaction of UNOPS Engineer. The RCC shall be from a
certified concrete batch plant and shall carry its all testing documents as per our
Specs for concrete.
33.00 -
5 PCC M-150 on the ISOGAM layer for the sloppy floor of the septic tank: This item
and its cost incudes provision of concrete, pouring, curing , and all needed
works/materials at full satisfaction of UNOPS Engineer and to the given drawings. Cu.m
The concrete to be from a certified concrete batch plant along relevant test
documents. 3.50 -
6 Provision and installation of one layer of ISOGAM bituminous water-proofing sheets
for whole inside surfaces of the septic tank (floor and all walls) as per given
drawings. The cost includes all needed work/materials to the full satisfaction of Sq.m
UNOPS Engineer.
130.00 -
4/7
Original Issue
Currency: US Dollars
5/7
Original Issue
Currency: US Dollars
TOTAL FOR 1. New RCC Septic plus some extra site works -
Zero
6/7
PROJECT SUMMARY BOQ
Project No: 1314
Project Title: RCC Septic Tank and other Site Works related to AFOH Offices
Location: Kabul, Afghanistan
Currency: US Dollars
Original Issue
Total for General Project Costs -
Total for 1. New RCC Septic plus some extra site works -
-
-
-
-
-
-
-
-
-
-
Signature:
7/7