riser systems
CONSISTENT AND RELIABLE DELIVERY OF CRITICAL INFRASTRUCTURE
Who we are Contents
07
Globally capable 09
Rigid flowline and riser systems
industry’s partner and employer of choice
in delivering the efficient offshore solutions
Rigid flowlines and risers are the veins of offshore oil and gas Solution-focussed products
developments. Some of these pipelines transport high pressure Subsea 7 offers an extensive portfolio of specification insulation or a double wall
Safety Integrity Sustainability Performance Collaboration Innovation Culture Creativity Relationships Reliability Solutions
1 PIPELINE BUNDLE 2 PIGGY-BACK PIPELINE 3 WET INSULATED PIPE 4 PIPE-IN-PIPE (PIP) 5 DIRECT ELECTRICAL HEATING (DEH) 6 ELECTRICALLY HEAT TRACED 7 SINGLE PIPE 8 MECHANICALLY LINED PIPE (MLP)
A solution that integrates multiple flowline and A solution to improve the efficiency of offshore A solution to improve the thermal performance A solution to improve thermal performance A solution which enables the development
FLOWLINE (EHTF) A solution for simple field developments A more cost-effective corrosion resistant
control systems within a single steel carrier pipe installation by allowing two products to be of a single pipe by applying high performance of a flowline by sleeving the production of subsea fields through enhanced A solution which offers significantly enhanced and where flow assurance is not a concern. pipeline solution as an alternative to
with manifold structures at each end. Subsea installed simultaneously and also minimising insulation coatings. pipeline within an outer pipe, with high thermal performance avoiding hydrates and flow assurance properties. EHTF technology Typically, the single pipe is fabricated more expensive options such as solid
processing functions can also be incorporated. seabed preparation. performance insulation material contained wax formation. allows the carried fluid to be maintained above from carbon steel with an external corrosion-resistant alloys or metallurgical
We have worked with a variety of suppliers
within the dry annulus. wax or hydrate appearance temperature anti-corrosion coating. clad pipe.
Following full function testing onshore, the Subsea 7 developed and patented an and coating systems, qualifying up to 100mm The pipeline heating system, for wet insulated
along its journey from the wellhead to the host
Pipeline Bundle (up to 7km in length) is then automated piggy-back machine thick injection moulded polypropylene, and Subsea 7’s high-performance PIP solution pipelines, creates an electrical loop from For flowlines transporting aggressive fluids Subsea 7 qualified MLP for use in the
facility. This enables simplification of field
launched and transported to its offshore allowing piggy-back pipeline installation high performance Ultra and NEMO field joint uses insulation in combination with reduced a current generator located on the topsides the single pipe can be fabricated from solid challenging, deepwater Sapinhoá-Lula
architecture by removing the second leg of
location using the Controlled Depth Tow rate to be increased from 350m/hr to over coating products. internal pressure, offering unrivaled directly connected to both ends of the pipeline. or metallurgically clad corrosion resistant NE field development, Brazil. MLP offers cost
the production loop often required to enable
Method (CDTM). We have installed over 80 1,000m/hr and reducing operator fatigue performance. Subsea 7 has developed the alloys (CRA). Subsea 7 is a world leader in savings over alternative clad pipe systems
We work with clients to optimise repair Subsea 7 has been successfully installing pigging with dead oil for preservation.
Pipeline Bundles to date. and improving safety. next generation of PIP systems with a variable the fabrication of CRA pipelines having and Subsea 7 has since deployed MLP in
procedures where needed, to allow cost electrical heating systems since 2007
u-value, Dynamic ARrival Temperature The system can operate either in a passive welded and installed over 500km of pipelines, both fatigue and non-fatigue sensitive zones
Subsea 7 has developed a Pipeline Bundle efficient remedial work, if required, to avoid including the world’s deepest open loop
(DART). This technology is specifically suited or active functionality. The heat-traced with sizes varying from 2" to 48" in diameter. for pipelines and risers.
refloat concept allowing temporary or permanent costly schedule issues. (DEH) system.
to high pressure high temperature fields technology can be applied with all pipe
recovery and repositioning of a Pipeline Subsea 7 offers unrivalled experience and
where operators will benefit from operational metallurgies, at high temperatures and in
Bundle, enabling risk mitigation from iceberg know-how for the installation and application
flexibility by adjusting the production fluid permanent operation. It offers significantly
strikes in polar regions or assisting pipeline of MLP.
arrival temperature at the host facility. lower power requirements and lower costs
reuse for marginal field developments.
than DEH systems.
04
6 © Subsea 7, 2019 © Subsea 7, 2019 05
7
Rising from the deep Driving
We have one of the largest portfolios of deepwater advances in
riser systems in the world.
Subsea 7 provides deepwater and ultra-deepwater riser technology welding
and materials
best suited to the field characteristics including extreme water depths,
harsh environments, host constraints or hydrocarbon composition.
• Weight-Distributed SCRs • First application of mechanically lined pipe (MLP) in Subsea 7’s Global Pipeline Welding Development
• Steel Lazy-Wave Risers dynamic risers for the Sapinhoá-Lula NE Project. Centre serves as a technical authority for welding and
• In progress qualification of first polymer lined SCR to materials enhancements to all Subsea 7 fabrication
offer a corrosion-resistant light-weight riser using our bases globally, greatly reducing client uncertainty
De-coupled Risers Swagelining technology. and risk. The centre incorporates 19 welding bays
Advantages: low hang-off load, and allows us to perform realistic pre-production
• 24 CRA SCRs installed using the reel-lay installation method. welding trials, operator training and research and
pre-installation before FPSO Global Pipeline Welding Development Centre
arrival, maximise local content, • Industry-leading in-house welding solution has enabled development activity.
fatigue and dynamic performance multiple SCRs installed with zero automated ultrasonic
testing (AUT) rejects.
• Single Hybrid Riser
A digital future High pressure, high temperature Leading the industry in corrosion resistant pipelines
• Hybrid Riser Tower • In-house design expertise offering complete SCR
design optimisation including strakes for vortex induced With the adoption of automation, artificial Riser designs for high pressure and high Subsea 7 led the industry by qualifying Mechanically Lined Pipe (MLP) in
• Buoy-Supported Risers
vibration (VIV) and buoyancy modules. intelligence and machine learning we plan to temperature (HPHT) field developments, are 2010 for use in the challenging, deep water Sapinhoá-Lula NE project in
• Gimbal Joint Riser
improve quality and productivity. We will have driving a need for heavier wall pipe welding Brazil. Furthermore, in 2016 Subsea 7 acquired Swagelining, the world’s
• Robust design for long term SCR wet storage
the ability to remotely review operations and capability or high strength steels. Subsea 7 offers leading polymer lining specialist for subsea pipelines and has since
requirements disconnecting FPSO schedule.
processes allowing us to improve availability of a fully qualified reel-able linepipe and welding completed qualification of the LinerBridge ® connector system and is
• Installation of first end SCR on reel-lay vessel skilled resources, improve training techniques, solution for X80 pipe and up to 45mm wall conducting research and development into expanding the application of
without anchor to control the SCR touchdown point aid familiarisation, increase equipment uptime thickness X60 pipe. Feasibility work has also been non-metallic pipeline solutions to dynamic riser service, S-lay installation
offering significant schedule optimisation. and reduce safety risks. completed for X80 mechanically lined pipe. and multi-phase sour service hydrocarbons.
06
8 © Subsea 7, 2019 © Subsea 7, 2019 07
9
The installation experts Globally capable
Pipeline installation fleet
Subsea 7 installation experts have delivered many world firsts, reducing the cost Subsea 7 has an extensive track record of safe
of field developments, improving predictability and enabling the world’s most and successful installation of rigid pipelines in SEVEN BOREALIS SEVEN CHAMPION SEVEN ANTARES SEVEN VEGA SEVEN OCEANS SEVEN NAVICA
Pioneering Residual Curvature Method Cost optimisation enabled through 1 BP Mad Dog 2 6 Wintershall Dea Nova
The project is the first substantial project Two 16km Pipe-in-Pipe production
(RCM) for pipeline lateral buckle control expert knowledge in the US to use Subsea 7’s Swagelining flowlines, a 17.5km water injection line
polymer lining technology. First project and a 12.7km 6" gas line was installed,
Subsea 7 pioneered this lay method in 2012 using the pipe Subsea 7 can install pipelines using more cost-effective to install in-house designed steel lazy wave all flowlines were layer polypropylene
straightener on the reel-lay vessel to create local curvature vessels whilst maintaining safety factors through industry- riser systems which will be initially wet coated. Largest diameter Pipe-in-Pipe
stored on the seabed. First application at 16.1-inch x 12-inch. First reeled
zones in the pipeline to lay engineered pipe curves on the leading installation expertise. of mechanised welding processes for installation of Swagelining Linerbridge ®
seabed. This method offers a low-cost solution to manage offshore riser tie-in. Design of an ROV technology in water injection line.
This expert knowledge and in-depth understanding has removeable flexjoint anti-rotation
lateral pipeline buckling caused by thermal expansion of
enabled an increase of weather operability, heavier pipelines collar in collaboration with BP. Equinor Askeladd
the pipeline when in operation. RCM has been used 7
6 7
and deeper water to all be realised from existing assets offering Vigra 42km of 20" concrete coated
successfully for three North Sea field developments with 2 Shell Bonga 8
lower-cost solutions to our clients.
Wick Mechanically Lined Pipe (MLP)
Leith
others planned globally. 38km of production flowlines, 24km of
Glasgow
installed with complex modified
polymer lined water injection flowlines, polyurethane (PU) and PU/gravel field
nine steel catenary risers (SCR) and joint coating systems. Subsea 7
an 88km 16" gas export pipeline. This in-house welding solution delivered
was the first time that SCRs have been almost zero AUT repairs resulting in
Safe and efficient Industry leading engineering criticality Solution providers for the suspended from an FPSO and the first
Ingleside
the vessel completing the scope
installation of complex assessment – offering optimised non-standard pipelay time that corrosion-resistant alloy clad 1 9 ahead of schedule.
pipes were used in a dynamic SCR
PLET and ILT structures schedules while maintaining safety application.
Subsea 7’s installation expertise means we are the partner 8 Equinor Snorre
of choice to ensure reliable and consistent delivery of Three Pipeline Bundles totaling 21km,
Industry-leading pipeline end Since 2008 Subsea 7’s approach to Engineering Criticality 3 Petrobras Sapinhoá-Lula NE Malaysia
all with significant intermediate
termination (PLET) installation Assessment (ECA)-by finite element analysis (FEA) to cover non-standard pipelay. Four submerged riser buoys, each structures. The west Pipeline Bundle,
2
partially under-matched welds has gone beyond commonly weighing 2,800t, were installed at 250m at 7,619m long, is one of the longest
experience and capabilities. Subsea 7 has installed offshore pipelines using spiral wound 4
below the sea level. 27 steel catenary executed from Wick Fabrication
Over 450 pipeline structures accepted industry boundaries. Our internal research and line pipe, pushing beyond the industry standard for submarine risers (includes a number of mechanically Ubu Site in Scotland. The east Pipeline Bundle
installed with PLETS up to development team has investigated aspects such as: the pipelines. To achieve this Subsea 7 has developed a full internal lined risers) installed using an innovative 3 with a diameter of 147cm, is the largest
400t tension capable Riser Installation Australia diameter to date, and at 12,400t,
150t and In-line templates (ILT) safety factor for fatigue crack growth, tearing limit through engineering method to successfully install such pipelines. Tool. Project technology was shortlisted 5 by far the heaviest installed to date.
up to 70t. multiple reel cycles, girth weld residual stress relaxation for the Best Mechanical Engineering First project to incorporate Swagelining
during reeling, biaxial stress adjustment etc. This helps to Achievement Award by ASME Linerbridge ® connection system for
Proven capability of installing Petroleum Division. polymer lined pipelines.
optimise post-weld allowable defect size and minimise weld Spoolbase Pipeline Bundle Site Global Welding Development Centre
multiple midline structures in a
repair rates, whilst providing clients with ensured reliability. 4 Total CLOV 9 Saudi Armaco Hasbah
single pipe catenary enabling
130km of pipes including 40km of Pipe-in-Pipe 5 Cooper Sole 393km of pipe laid from shore pull-in
optimised field layout for close production lines, 60km of water injection lines, to 60m water depth, ranging from 6"
65km of reel-lay 12" sour gas pipeline
proximity well tie-ins. 32km of gas export lines, two hybrid riser towers from directionally drilled landfall to 125m to 36". Included within scope was 21km
and a single hybrid riser at the end of the gas water depth. Temporary spoolbase of corrosion-resistant alloy pipelines.
export pipeline. established and local workforce First full dynamic positioning pipelay for
specifically trained for project to deliver Saudi Aramco.
fully localised solution.
08
10 © Subsea 7, 2019 © Subsea 7, 2019 09
www.subsea7.com
client.enquiry@subsea7.com