Konark Virtue: JCB Work SR - No. Date Description Time in Hrs
Konark Virtue: JCB Work SR - No. Date Description Time in Hrs
JCB Work
Time in
Sr.No. Date Description
Hrs
3 11/29/2019 Club house -02 area footing pit excavation work 7.3
and loading to tractor shifting in amenity area
5 12/2/2019 Club house -02 area footing pit excavation work 7.3
and loading to tractor shifting in amenity area
Club House -02 Area foundation pit area loose
6 12/3/2019 material removing and shifting (Due to seepage 6.3
material continuously fall down)
a
Konark Virtue
Tractor Work
Time in
Sr.No. Date Description
Hrs
7 12/4/2019 8
Club house -02 area 2 tractor shifting in amenity
area
8 12/5/2019 4
Club house -02 area 2 tractor shifting in amenity
area