Konark Virtue

JCB Work
Time in
Sr.No. Date Description
Hrs

1 11/27/2019 Club house -02 area footing pit excavation work 4


and loading to tractor shifting in amenity area
2 11/28/2019 Club house -02 area footing pit excavation work 8
Making of ramp for excavtion

3 11/29/2019 Club house -02 area footing pit excavation work 7.3
and loading to tractor shifting in amenity area

4 11/30/2019 Club house -02 area footing pit excavation work 8


and loading to tractor shifting in amenity area

5 12/2/2019 Club house -02 area footing pit excavation work 7.3
and loading to tractor shifting in amenity area
Club House -02 Area foundation pit area loose
6 12/3/2019 material removing and shifting (Due to seepage 6.3
material continuously fall down)

7 12/4/2019 Club House -02 Area foundation pit area loose 8


material removing and shifting (Due to seepage
material continuously fall down)

8 12/5/2019 Club House -02 Area foundation pit area loose 4


material removing and shifting (Due to seepage
material continuously fall down)
Debit to,

a
Konark Virtue
Tractor Work
Time in
Sr.No. Date Description
Hrs

1 11/27/2019 Club house -02 area 2 tractor shifting in amenity 4


area
2 11/28/2019 Club house -02 area 2 tractor shifting in amenity 8
area
3 11/29/2019 Club house -02 area 2 tractor shifting in amenity 7.3
area

4 11/30/2019 Club house -02 area 2 tractor shifting in amenity 8


area
5 12/2/2019 Club house -02 area 2 tractor shifting in amenity 7.3
area

6 12/3/2019 Club house -02 area 2 tractor shifting in amenity 6.3


area

7 12/4/2019 8
Club house -02 area 2 tractor shifting in amenity
area

8 12/5/2019 4
Club house -02 area 2 tractor shifting in amenity
area
Today Days 6
In Days

Half Day

Full Day

Day

Full Day
a
Day

Day

Full Day

Half Day

Full Day