S. NO. DATE ISSUE RAISED
Shackle bolt missing and Canopy RR logo missing issues found during
1
in-process Audit of packed 1 in 1 motors.
20.06.2020
7 Uncoverage issue after painting process in powder coating
14 Shaft is not available for New MH Classic fan as per Vindr top cover
24.06.2020
25
DAILY QUALITY MEETING
ACTION TRACKER
ACTION DECIDED RESPONSIBILITY
a) Tags of Lot decision to be procured and will be given to Production. a)Rajat Nirwal
B) Sampling Plan to be displayed at IQC and PDI area. b)Sapna Pahuja
100 % motors which are having RTS issue should be analysed Sawan Saini
Visual checking inspection stage to be introduced before Surge testing. Shubham Chaudhary
Daily data to be filled by shop owners and shared with Rajat and Mohit Ji
SP, SS,SC,
before 10:30 AM.
Shaft drawing to be finalized and will be send to Purchase department Nishant Singh
Follow up for angle checking fixtures with Purchase Department Sawan Saini
Trial of 500 blade sets to be taken with Foam flammer Shubham Panwar
23.06.2020
a) 26.06.2020
b) 23.06.2020
23.06.2020
Already in discussion
26.06.2020
with production
26.06.2020
Frequency decided
26.06.2020 with Ankur
Cover = 50 k set
blade = 2000 set
01.07.2020
24.06.2020
30.06.2020
25.06.2020
30.06.2020
26.06.2020
28.06.2020
10.07.2020
30.06.2020
05.07.2020
02.07.2020
05.07.2020
02.07.2020
10.07.2020