Our offer is in accordance with the intent of the above listed specifications. Where deviation has occurred or clarification is deemed necessary, correspondent comment is made on below table.
Comment to
Msknan's reply
above document Section Clause Page no. Specification requirement Deviation / Clarification Maknan's reply dtd 18.05..2020 Siemens Reply dtd 21.05.2020
dtd 26.05.2020
- item no.
Tech Spec 2.3 Voltage and Frequency variation Frequency & Voltage variation will be as per IEC. Ok Point closed
Tech Spec 5.5 PT on withdrawable chesis We have considered fixed type line PT. Ok Point closed
No of man days
Erection,testing,commissioing will not be in our
Erection supervison on chargable basis will be finalize
scope. We can do supervision on man-day basis. Please inform number of man-days to be
Tech Spec 10.2 Commissioning assistance may be during
Please inform number of man-days to be considered. considered for supervision
recommended finlization of
Testing Kits to be arranged by Rungta Mines Ltd.
order
General
Painting procedure Painting procedure will be as per Siemens standard. Ok Point closed
Comment
.
Only fully assembled switchboard shall be offered for
inspection of routine tests. We shall submit test
certificates of bought out items and no separate tests
shall be conducted on these equipments at our works.
General
Inspection and Testing C Inspection shall be carried out as per our standard Ok Point closed
Comment
quality assurance plan(attached for your ref). Any type
test is not considered in our scope. However, we shall
submit type test reports for type tests carried out on
similar product. Any stage inspection is not envisaged.
We have not considered any tests at site.