Brothers Contracting Company

Submittal Review Form


Instructions: Contractor shall complete all shaded fields as appropriate except area in sky blue reserved for Engineer.

Submit Date: Contract No. ISH/F4/2017 LOGID Ref NO. TO/PROJECT ID SEQ NO. REV.
01/7/2018
Electronic Delivery Method: EMAIL Delivery SUB 2017 SH-A21 A
ISH/F4

No. Items Attached:


To: Ibn Sena Specialist Hospital From: Brothers Contracting Company

Attention: Eng.Nael Nazzal Attention: Eng.Naser Hamdan


Description: Shower and toilet walls tile shop drawing
Specification No. ( second floor)

Supplier/Subcontractor Drawing No.


Subject Submittal has been reviewed and review action is as shown below:
Item No.ofP [For Engineer's use]
Contractor's Item Description QTY
No. ages Comments Action Reviewer

Shower and toilet walls CD 1


1 tile shop drawing
( second floor)

A = No Exceptions Noted, B = Make Corrections Noted, C = Amend - Resubmit, D = Rejected - Resubmit E = Review Not Required

Contractor's Verification: complete either (a) or (b)following:  Notice &from the Owner. Corrections or comments made
relative to submittals during this review do not relieve the
We have verified that the materials, shop drawing, M.O.S, contractor from compliance with the requirements of the
(a) equipment…etc. Contained in this submittal meets all the project drawings and specifications. This check is only for review
requirements specified or shown (no exceptions). of general conformance with the design concept of the
project and general compliance with the information given
We have verified that the material, shop drawing, M.O.S, equipment in the contract documents. The contractor is responsible for
(b) …etc. contained in this Submittal meets all the project requirements
confirming and correlating all qualifies and dimensions;
specific or shown, except for the following deviations (List
Deviations below or attach separate sheet). selecting fabrication processes and techniques of
construction/coordinating his work with that of other trades,
and performing his work in a safe and satisfactory manner.

Deviations: See attached file

Contractor Rep. Submit Date


Eng.Naser Hamdan 01,July, 2018

Contract No. ISH/F4/2017


SUB-2017-ISH/F4-SHA21-A
Brothers Contracting Company

Contract No. ISH/F4/2017


SUB-2017-ISH/F4-SHA21-A