DATE: 09/07/2020 Clarifications On Pre-Bid Queries For Civil S.No Clause No Description Queries by Bidder PDIL Reply
DATE: 09/07/2020 Clarifications On Pre-Bid Queries For Civil S.No Clause No Description Queries by Bidder PDIL Reply
Clause Queries By
S.No Description PDIL Reply
No Bidder
The Grade slab for the entire workshop building shall be VDC.
The flooring for workshop building is mentioned as VDC.
However, in case of vitrified tiles /other floor finishing have been
1 The finishing of office area is with Vitrified Tiles but the Kindly clarify
shown in a given area,, VDF flooring underneath shall be
grade slab of office area is not mentioned.
sufficiently lowered to achieve uniform top level
Clause 7.0 of the Technical Specification covers various parts of
Please confirm Civil construction and are general in nature.
The brick wall as per clause no 7.0 Page 26 of 483 is
2 Clay brick can Scope of work and the tender drawings clearly mentions Brick
mentioned as Concrete Block .
be used Wall construction. All brick work shall be with Brick class
designation 7.5, in cement mortar 1: 6.
Thickness of brick wall for outer / inner / partition is not
Kindly clarify 230 thk Brick wall
mentioned
The height of brick wall is 4.0 mtr and hence Lintel Beam
Structural requirements for Brickwork construction , wrt height
3 is to be considered. Similarly for length wise there should Kindly clarify.
and length, shall be provided by the bidder in all respect
be column at every 3.0 mtr C/C
4 Specification of floor / grade slab in workshop between Kindly clarify. The Grade slab for the entire workshop building shall be VDC.
Grid 11 – 12 is not mentioned However, in case of vitrified tiles /other floor finishing have been
shown in a given area,, VDF flooring underneath shall be
sufficiently lowered to achieve uniform top level
5 As per page 5 of 483 clause V, water supply – bidder to Please mention Nearest Source of water supply : 1 KM
source water nearest water source . Please mentioned the distance
the distance between the nearest source and the Disposal Point at nearest sewage drain : 1 KM
building. Similarly the peripheral drain has to be
connected to the nearest storm water drain . Disposal point at nearest storm water drain .: 1 KM
6 Requirement of MS grating in the workshop building. MS grating shall be of MS flats with minimum weight of 40kg/sq
m
.
CLARIFICATIONS ON PRE-BID QUERIES FOR ELECTRICAL
2. Outgoing Feeders for PDBs will be ACB, MDO Thermal All ACB shall be EDO type with protection & metering
Magnatic protection requirement as per NIT.
3. Outgoing Feeders for L T Motor ( ACB Protection ) will be All ACB shall be EDO type with protection & metering
ACB, MDO Thermal Magnatic protection requirement as per NIT.
4. Outgoing Feeders for other equipments will be suitable As per NIT.
ratings of MCCB with Thermal Magnatic protection
5. All Ougoing Feeder other than below 250A MCCB will have Metering and protection requirement of respective feeders
Volt, Amp and Multifuctioning Maters with all protective shall be as per NIT.
accessories.
4. Outgoing Feeders for Motor Starter Fed Feeder consider Motor rated below 75KW rating shall be contactor controlled
but Starter not consider and 75KW and above shall be ACB controlled with combined
microprocessor based motor protection relay
2. Outgoing Feeders above 63A will be MCCB with Thermal Outgoing feeders rated 63A and above shall be MCCB feeders
Magnatic protection with metering and protection requirement as per NIT.
3. Outgoing Feeders 63A & below will be MCB 10 KA with Outgoing feeders below 63A shall be MCCB feeders with
Thermal Magnatic protection metering and protection requirement as per NIT.
2. UPS Power Supply to be provided for all the Cabin, Office Noted, UPS supply shall be provided to all UPS loads within
Rooms, Testing Rooms and Labs workshop and warehouse building.
3. Emergency Light all the cabins and rooms One third lighting load shall be connected as emergency
lighting.
4 Power Cables 1. Power Connection of PMCC for Workshop and PDB for Cable from Substation shall be supplied and laid by other
Warehouse will be Client Scope however; termination of cable at Switchboards (under the
supply of bidder) incomers shall be in bidder’s scope
Further distribution to equipment at 415V, 240 V, 115 V (UPS)
AC, 240 V (UPS) AC etc. through proper type and size of
cables, their supply, erection, testing and
commissioning etc. shall be in Bidder’s scope.
3. Cable for Motor Connection not Consider In the bidder scope as per NIT.
6
2. All the office rooms, Cabin , lab, test room, store and toilets Office room, cabins shall be provided with decorative lighting
will be commercial lights. fixtures, For remaining area type of lighting fixtures shall be as
per NIT.
3. Consider Periphery Lights and gate light will be Street Light Type of lighting fixtures in respective areas shall be as per
NIT.
2. Roof Ventilator to be consider Workshop and Warehouse It is in Contractor’s scope, Requirement/specification as per
High Bay area ( Not Electrical Scope ) NIT.
2. Fire Alarm System for Warehouse to be Hooked up with Existing fire alarm make is Honeywell make with Notifier
Owner Centralised Systems. So need spec, make & model of Model 3030,vendor shall consider high speed network card
Centralised System. single mode fiber.
While make of fire alarm systems is Tyco zetler in HURL Sindri
& Barauni.
3. Smoke or Heat Dedector to be used for Warehouse area In heighted ceiling closed area vendor shall consider UV and
office, Stores, Pantry area but for Highbay area Smoke IR based beam detector.
Dedector will not be effective . So we consider only Mannual
Call Point to be consider.
Fire alarm system for
Bidder shall provide the Fire Detection and We understand that warehouse building comprising
Clause No‐8.0 (a) FIRE Alarm System in Warehouse which shall be an independent fire alarm system of individual break glass type
manual call points, automatic
DETECTION AND independent system comprising of individual is required only for warehouse
sensors e.g. smoke and heat
1 ALARM SYSTEM,Doc break glass type manual call points, automatic building and repeater panel at
detectors, UV & IR based Beam
No:EM 270‐TS‐0803 sensors e.g. smoke and heat detectors, main fire station. Fire alarm system in Detector, main panel, repeater
Rev‐01 Page 33 of 53 panel, repeater panel, hooter, battery, battery workshop building is not panel, hooter, battery, battery
charger and any other hardware. required .Kindly confirm. charger and any other
hardware. Refer NIT.
The Integrated Fire Alarm System shall be Specification for both
conventional or micro processor based analog conventional and
Clause No‐5.1.1 Input
addressable system comprising of MCP, Microprocessor based fire alarm The Integrated Fire Alarm
Power Supply ,Doc
2 detectors; conventional or microprocessor system is given in tender System shall be micro
No:EM 270‐TS‐0804
based Fire Alarm panels, CFAP and associated specification kindly clarify which processor based
Rev‐0 Page 4 of 26
equipments detailed hereunder and in type of system required for
Project data sheets/ drawings. warehouse building.
Clause No‐8.0 (d) FIRE
Electrical sirens shall be provided to cover Siren is required for warehouse
DETECTION AND Kindly clarify whether siren is
entire Steam Generation Plant. Hooters and building. Hooters and exit lights
3 ALARM SYSTEM,Doc required for warehouse house
exit lights shall be provided at required shall be provided at required
No:EM 270‐TS‐0803 building or not.
locations in the buildings. locations in the buildings.
Rev‐01 Page 33 of 53
Separate Centralized Fire Alarm & Detection Existing fire alarm make is
System of entire fertilizer complex shall be Honeywell make with Notifier
Clause No‐8.0 (i) FIRE
provided by Owner. Fire Alarm & Detection Model 3030, bidders shall
DETECTION AND Kindly provide the make of considered High speed network
System of Warehouse shall be hooked‐up with
4 ALARM SYSTEM,Doc existing fire alarm system for card single mode fiber
the Centralized Fire Alarm System on the
No:EM 270‐TS‐0803 interfacing .
same network and shall be in Bidder scope. All While make of fire alarm
Rev‐01 Page 34 of 53
interfacing equipment as well as cabling systems is Tyco zetler in HURL
required for hook‐up shall be in Bidder scope Sindri & Barauni
Existing PA system is Neumann
Separate Centralized PA System shall be
make Digital exchange based
Clause No‐9.1 PA provided by Owner. However hook‐up of PA decentralized system.
Kindly provide the make of
SYSTEM ,Doc No:EM System of Centralized PA System shall be in
5 existing Public address system PA system Make for HURL
270‐TS‐0803 Rev‐01 bidders scope. All interfacing equipment as
for interfacing. Sindri & Barauni shall be
Page 34 of 53 well as cabling required for hook‐up shall be in
conveyed during detail
bidders scope.
engineering.
Unless stated otherwise, purchaser shall
provide one point power supply to each fire We understand that Power
Clause No‐5.1.1 Input
alarm panel (ZFAP/DGFAP/CFAP/ repeater supply to each fire alarm panel
Power Supply ,Doc
6 panel), details of which are indicated in data at warehouse and repeater Shall be as per NIT.
No:EM 270‐TS‐0804
sheet. A suitable power distribution to various panel in fire station is provided
Rev‐0 Page 7 of 26
equipment and sub system shall be included by M/s PDIL.Kindly clarify.
in vendor's scope.
As per OEM Standard NI‐Cd
Clause No‐5.1.2 Input
Batteries shall be Ni‐Cd type. Suitable and battery is not supported by fire
Power Supply ,Doc
7 adequately rated battery charger shall be alarm panel .SMF lead acid As per NIT.
No:EM 270‐TS‐0804
supplied as a part of back up battery system. battery is provided with suitable
Rev‐0 Page 7 of 26
battery charger. Kindly clarify.
Fire station shall be provided with dual
redundant PC with monitor for operator's
workstation and for engineering station. Any
Clause No‐8.1.16
of the two should be possible to configure as Kindly clarify Operating work
MICROPROCESSOR For GUI, bidders shall
engineering station for programming off line. station and engineering work
BASED FIRE ALARM consider required software
8 After Programming, the engineering station station with Printer for graphics
SYSTEM ,Doc No:EM license of fire alarm OEM
will be connected to network as online at fire station is required for
270‐TS‐0804 Rev‐0 with required gateway cards.
operator's workstation.. Programming shall Warehouse building .
Page 13 of 26
also
allow activating Siren from the keyboard in
manual mode as per operator's choice.
we understand that fire
Clause No‐8.0 (f) FIRE
suppression system is not in
DETECTION AND
The fire detection system shall be interfaced scope of bidder hence Any required hardware shall
9 ALARM SYSTEM,Doc
with fire suppression system integration with fire suppression be considered.
No:EM 270‐TS‐0803
system will be done by others.
Rev‐01 Page 33 of 53
Kindly clarify.