SPECIFICATION NO.: SR-I/C&M/I-1101/2008 Schedule - 5 Page 1 of 1
SPECIFICATION NO.: SR-I/C&M/I-1101/2008 Schedule - 5 Page 1 of 1
: SR-I/C&M/I-1101/2008 SCHEDULE - 5
Page 1 of 1
Supply, testing, installation and commissioning of fully automatic capacitance and tan delta with
variable frequency test signal test kits FOR SOUTHERN REGION - I
(COMMERCIAL DEVIATIONS)
The following are the Commercial Deviations and variations from and exceptions to the
specifications and documents for the subject package. These deviations and variations are
exhaustive. Except for these deviations, the entire work shall be performed as per your
specifications and documents.
(Designation).............................................
(Common Seal)...........................................
Note: Continuation sheets of like size and format may be used as per Bidder's
requirements and annexed to this Schedule.
SPECIFICATION NO. : SR-I/C&M/I-1101/2008 SCHEDULE - 6
Page 1 of 1
Supply, testing, installation and commissioning of fully automatic capacitance and tan delta with variable
frequency test signal test kits FOR SOUTHERN REGION - I
(Designation).............................................
(Common Seal)...........................................
Note: Continuation sheets of like size and format may be used as per Bidder's
requirements and annexed to this Schedule.
SPECIFICATION NO. : SR-I/C&M/I-1101/2008 SCHEDULE - 7
Page 1 of 1
Supply, testing, installation and commissioning of fully automatic capacitance and tan delta with
variable frequency test signal test kits FOR SOUTHERN REGION - I
(TECHNICAL DEVIATIONS)
The following are the Technical Deviations and variations from and exceptions to the specifications
and documents for the subject package. These deviations and variations are exhaustive. Except for
these deviations, the entire work shall be performed as per your specifications and documents.
Note: Continuation sheets of like size and format may be used as per Bidder's
requirements and annexed to this Schedule.
SPECIFICATION NO. : SR-I/C&M/I-1101/2008 SCHEDULE - 8
Page 1 of 1
Supply, testing, installation and commissioning of fully automatic capacitance and tan delta with
variable frequency test signal test kits FOR SOUTHERN REGION - I
(ADDITIONAL INFORMATION)
We have enclosed with our proposal the following additional information for
Supply,testing,installation and commissioning of fully automatic capacitance and tan delta with
variable frequency test signal test kits for Southern Region-I.
——————————————————————————————————————
Sl. No. Brief description of Information Ref. & Page No.
——————————————————————————————————————
——————————————————————————————————————
(Designation).............................................
(Common Seal)...........................................
Note: Continuation sheets of like size and format may be used as per Bidder's
requirements and annexed to this Schedule.
SPECIFICATION NO. : SR-I/C&M/I-1101 /2008 SCHEDULE - 11
Page 1 of 1
Supply, testing, installation and commissioning of fully automatic capacitance and tan delta with
variable frequency test signal test kits FOR SOUTHERN REGION - I
We hereby furnish the details of the items/sub-assemblies, we propose to buy for the
purpose of subject package.
——————————————————————————————————————
Sl. No. Item Description Qty. Proposed Source of Supply
be bought/
Sub-contracted
——————————————————————————————————————
1. ....................................... ........................................... ..................................
(Designation)...............................................
(Common Seal)............................................
SPECIFICATION NO. : SR-I/C&M/I-1101/2008 SCHEDULE - 10
Page 1 of 1
Supply, testing, installation and commissioning of fully automatic capacitance and tan delta with
variable frequency test signal test kits FOR SOUTHERN REGION - I
We hereby declare that the following Work Completion Schedule shall be followed by us
for the subject package.
————————————————————————————————————————
Sl. No. Description of Work Period in Months
(from the date of LOA)
————————————————————————————————————————
4. Commencement of shipment
5. Completion of shipment
————————————————————————————————————————
(Designation)...............................................
(Common Seal)............................................
SPECIFICATION NO. : SR-I/C&M/I-1101/2008 SCHEDULE - 12
Page 1 of 1
Supply, testing, installation and commissioning of fully automatic capacitance and tan delta with
variable frequency test signal test kits FOR SOUTHERN REGION - I
——————————————————————————————————————
Sl. No. Name of Person Date of Retirement/ Date of joining
with designation in resignation from and designation
POWERGRID POWERGRID in our Organisation
——————————————————————————————————————
——————————————————————————————————————
Date: (Signature)...................................................
(Designation)...............................................
(Common Seal)............................................
SPECIFICATION NO. : SR-I/C&M/I-1101/2008 SCHEDULE - 13
Page 1 of 2
Supply, testing, installation and commissioning of fully automatic capacitance and tan delta with
variable frequency test signal test kits FOR SOUTHERN REGION - I
Supply, testing, installation and commissioning of fully automatic capacitance and tan delta with
variable frequency test signal test kits FOR SOUTHERN REGION - I
Date: (Signature)...................................................
(Designation)...............................................
(Common Seal)............................................
BID PROPOSAL SHEETS
(VOLUME – IB)
FOR
Supply, testing, installation and commissioning of fully automatic capacitance and tan delta with
variable frequency test signal test kits FOR SOUTHERN REGION - I
CONTENTS:
***