Hydrology for Engineering

Example-2

The data of the table below can be used to adjusted the upper portion
of the double mass curve station D was relocated from 1984 to 1986

Annual catchment (In) at gauge

years A B C D T-ABC C.F C.F


1977 30 31 27 29 88 88 29
1978 33 36 32 32 101 189 61
1979 26 27 24 28 77 266 89
1980 27 26 27 24.9 80 346 113.9
1981 34 34 30 25.8 98 444 139.7
1982 31 33 31 24.9 95 539 164.6
1983 28 30 24 24.1 82 621 188.7
1984 35 34 33 33.5 102 723 222.2
1985 37 39 36 35.3 112 835 257.5
1986 34 35 35 25.8 104 939 283.3

double mass cuve


1000
900
800
700
600 double mass cuve
500
400
300
200
100
0
0 50 100 150 200 250 300

Prepared by: M.M.M.hirad