Professional Documents
Culture Documents
HT MT: Smartset Thermo-Setting Solutions Technology
HT MT: Smartset Thermo-Setting Solutions Technology
com
HT
MT
LT
I-SET
C-SET
M-SET
SmartSet® slurries are engineered for each application based on job placement time and temperature at depth.
The slurry will be a combination of either SmartSet® LT, MT or HT (low, medium or high-temperature products)
together with C-Set, M-Set and I-Set (inhibitor) if required.
Physical Properties
Excellent insulator.
Zero gel strength generation – thin fluid until reaches set point providing very low friction pressures in
tubulars including most BHA components including the bit (viscosity can be increased through additives).
Right angle set – thin fluid to immovable solid within 120 seconds at set point always - key to stopping
channeling from gas, water or oil (time to set point can be delayed with I-Set).
Withstands 30% contamination (organic or inorganic) with no effect on set time characteristics.
Rapid compressive strength development - average compressive strength is 2,500 psi to 4,000 psi.
(can increase to 8,000 psi if desired).
Near wellbore phenomenum – within its normal temperature range (35°C-144°C) it sets up faster in the
wellbore periphery than in the actual wellbore, unless a squeeze is required. For colder applications an
accelerator may be required.
Environmentally friendly – all materials are completely non-toxic (OCNS category D/E).
Immisible in oil
-2-
Comparison to Other Fluid Types
Removable by acid
Fast transition
Solids free
Application Areas
Typically small volumes of SmartSet® slurry are required to achieve the desired results – often less than 1m3 for
remedial applications. Slurries are mixed at the well site under supervision of a Pluto engineer and pumped
downhole using conventional techniques and equipment.
-3-
Lost Circulation
1 2 3
1 Problem 3
Result Benefits
Partial to total fluid losses encountered Circulation Ideal for carbonates
while drilling restored. Pumped through the bit and mud motors – no
need to pull BHA
Continue drilling to
2 Solution total depth
Liquid to solid in 120 seconds at set point
1) Ascertain temperature @ point of loss +/- 5°C Ready to drill out in 2 hours after placement
2) Pickup BHA Withstands 30% contamination without affect
3) Spot SmartSet below bit on setting characteristics
1 2 3
Enlarged wellbore
or unstable formation
washout
1
Problem 3
Result Benefits
Drilling problems from unstable formation A stable zone Pumped through the bit – no need to pull BHA
including sloughing and gauge hole Ready to drill out in 2 hours after placement
2
Solution Easy to drill
1) Ascertain temperature @ point of Withstands 30% contamination without affect
application +/- 5°C on setting
2) Spot SmartSet across zone Leaves gauge hole over treatment length
3) Pick up above plug
4) Wait then drill out
-4-
Water Flow Shut Off
1 2 Tubing 3
Oil zone
Retainer
1 2 3
Tubing
Bridge
Brine Polymerized Plug
1
Problem 3
Result Benefits
Heavy brine / polymers damage reservoir Pressure test and Can be set with coil tubing
during workover resume oil / gas (extremely low friction pressure)
No damage to formation
2 Solution production
Plug will hold formation pressure
after drill out
1) Cover production zone with SmartSet
Well returned quickly to production
2) Perform workover
Workover rig time minimised
3) Drill out SmartSet
No transition / channeling between fluid and
4) Re-perforate and / or acid wash to
set point
restore oil production
-5-
Surface Casing Vent Flow
1 2 3
Retainer
Gas zone
Shut off with
SmartSet
Bridge Plug
1 Problem 3
Result Benefits
Gas migration between production and Low-viscosity, thin slurry with small particle
Surface vent gas
size easy to place in micro annulus
surface casing flow eliminated.
Environmentally friendly - and nontoxic to
Drill out and
2 Solution ground water
pressure test if
1) Isolate zone to be perforated Right angle set stops gas
desired.
2) Perforate at top of gas zone Does not dehydrate during squeeze
Perforations shut displacement
3) Squeeze SmartSet through perforations
and up micro annulus off with SmartSet.
Benefits
Production can be restored by acidizing or
re-perforating after any up hole remedial work is
finished.
-6-
Laboratory & Engineering Support
120
Example of:
1.Linear temperature effect
The time to set point varies by 100
2.Effect of I-Set inhibitor
admix composition and final 80
temperature. The I-Set additive is 67 Min
-7-
Why SmartSet® ?
Our Locations