PEMBINAAN MITRAJAYA SDN BHD PMJ/JSHA

HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 1 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW

NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level

1. Piling works – Falling into Fatality / 2 4 8 H 2 Put up warning signages SHO, SS


A) Bored pile bored holes major injury and barricade the area.

- boring of bored pile 3 Provide edge SHO, SS


protection / cover for the
bored holes.
Hit by Fatality / 1 4 4 M 2 Machineries are only SHO, SS, SC
machineries major injury handled by experienced
Operator and working
area only accessible by
relevant workers.

2 Engage Traffic SHO, SS, SC


Controller / Signalman
during works.
Damage to 1 3 3 M 2 Engage Traffic SHO, SS, SC
property Controller / Signalman
during works.
Noise Ill health 1 1 1 L 1 Use proper PPE SHO, SS, W,
(helmet, harness, vest, SC
boots & ear muff)
B) Bored pile Hit by fallen Fatality / 2 4 8 H 2 Materials are secured SS
- Placement of rebar objects major injury tightly prior to hoisting.
Damage to 2 3 6 M 2 Crane is operated by SS
property competent Operator and
Signalman is engaged

Revision : 0 Effective Date : 01-05-2018


PEMBINAAN MITRAJAYA SDN BHD PMJ/JSHA

HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 2 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW

NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level

during works.
Crane topple Fatality / 1 4 4 M 2 Crane is operated by SS
major injury competent Operator and
Signalman is engaged
during works.
Damage to 1 3 3 M 2 Crane is operated by SS
property competent Operator and
Signalman is engaged
during works.
Fire during Fatality / 1 4 4 M 2 Welding works is SHO, SC
welding works major injury inspected and hot work
for joining the permit possessed
steel bar cage
2 Welding machine SHO, SC
undergoes periodically
checking and fire
extinguisher is place
near the welder working
area.
Damage to 1 3 3 M 2 Welding machine SHO, SC
property undergoes periodically
checking and fire
extinguisher is place
near the welder working
area.

Revision : 0 Effective Date : 01-05-2018


PEMBINAAN MITRAJAYA SDN BHD PMJ/JSHA

HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 3 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW

NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level

C) Bored pile Fallen into Fatality / 2 4 8 H 2 The area is barricaded SHO, SS


- Casting of bored pile holes major injury and only accessible by
relevant workers.
Hit by fallen Fatality / 2 4 8 H 2 The Signalman is SS,SC
objects major injury engaged for the lifting
works.

2 Concrete bucket is SS, SC


secured tightly prior to
hoisting.
Damage to 2 3 6 M 2 Crane is operated by SHO, SS
property competent Operator and
Signalman is engaged
during works.
Hit by Fatality / 1 4 M M 2 Signalman is engaged SS, SC
machineries / major injury for the works and the
concrete area is accessible only
trucks by relevant workers.
Damage to 1 3 3 M 2 Crane is operated by SHO, SC
property competent Operator and
Signalman is engaged
during works.
D) Bored pile Noise Ill health 1 2 L L 1 Use proper PPE SHO, W, SC
PDA test (helmet, vest, boots &
ear muff)

Revision : 0 Effective Date : 01-05-2018


PEMBINAAN MITRAJAYA SDN BHD PMJ/JSHA

HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 4 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW

NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level

Hit by fallen Fatality / 2 4 8 H 2 Signalman is engaged SHO, SS


objects major injury for the lifting works.

2 Material is secured SS, SC


tightly prior to hoisting.
Damage to 2 3 6 M 2 Crane is operated by SHO, SS
property competent Operator and
Signalman is engaged
during works.
Crane topple Fatality / 1 4 4 M 2 Crane is operated by SHO, SS
major injury competent Operator and
Signalman is engaged
during works.
Damage to 1 3 3 M 2 Crane is operated by SHO, SS
property competent Operator and
Signalman is engaged
during works.
E) Bored pile Fall from Fatality / 3 4 12 H 2 Use proper PPE SHO, SS
- Hacking of pile head height major injury (helmet, harness, vest,
boots & ear muff)
Noise Ill health 2 1 2 L 2 Use proper PPE SHO, SS, W,
(helmet, harness, vest, SC
boots & ear muff)

2. A) Caisson pile Working in Fatality 2 4 8 H 3 Ventilation hose is SHO, SS, W,


confined installed up to the SC

Revision : 0 Effective Date : 01-05-2018


PEMBINAAN MITRAJAYA SDN BHD PMJ/JSHA

HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 5 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW

NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level

- Digging of Caisson pit and space bottom of Caisson pit


concreting of Caisson ring and the pit is ventilated
prior of works.

2 Workers are briefed SHO, W, SC


about safety aspect and
workers are to work in
pairs.

1 Use PPE (helmet, SHO, SC


harness, vest & boots)

2 The working pit is SHO, SS, W,


checked accordingly SC
with gas detector to
make sure its safe.
Hit by fallen Fatality / 2 4 8 H 2 Earth bucket is secured SHO, SS, W,
materials major injury tightly, properly locked SC
and the excavated
material is not over-
filled.

1 Use proper PPE SHO, SS, W,


(helmet, harness, vest & SC
boots)

2 The working area is SHO, SS, W,


barricaded and all the SC
loose material on the

Revision : 0 Effective Date : 01-05-2018


PEMBINAAN MITRAJAYA SDN BHD PMJ/JSHA

HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 6 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW

NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level

caisson pit is removed.


Damage to 2 3 6 M 2 Crane is operated by SHO, SS
property competent Operator and
Signalman is engaged
during works.
B) Caisson pile Hit by fallen Fatality / 2 4 8 H 2 Signalman is engaged SHO, SS
- Placement of rebar cage objects major injury for the lifting works.

2 Material is secured SS, SC


tightly prior to hoisting.
Damage to 2 3 6 M 2 Crane is operated by SHO, SS
property competent Operator and
Signalman is engaged
during works.
Crane topple Fatality / 1 4 4 M 2 Crane is operated by SHO, SS
major injury competent Operator and
Signalman is engaged
during works.
Damage to 1 3 3 M 2 Crane is operated by SHO, SS
property competent Operator and
Signalman is engaged
during works.
Fire during Fatality / 1 4 4 M 2 Welding works is SHO, W, SC
welding works major injury inspected and hot work
for joining permit possessed

Revision : 0 Effective Date : 01-05-2018


PEMBINAAN MITRAJAYA SDN BHD PMJ/JSHA

HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 7 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW

NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level

rebar cage Welding machine SHO, SC


undergoes periodically
checking and fire
extinguisher is place
near the welder working
area.
Damage to 1 4 4 M 2 Welding machine SHO, SC
property undergoes periodically
checking and fire
extinguisher is place
near the welder working
area.
C) Caisson pile Fall into holes Fatality / 2 4 8 H 2 The area is barricaded SHO, SS, W,
- Casting of caisson pile major injury and only accessible by SC
relevant workers.
Hit by fallen Fatality / 2 4 8 H 2 Signalman is engaged SHO, SS
objects major injury for the lifting works.

2 Material is secured SS, SC


tightly prior to hoisting.
Damage to 2 3 6 H 2 Crane is operated by SHO, SS
property competent Operator and
Signalman is engaged
during works.
Hit by Fatality / 1 4 4 M 2 Signalman is engaged SHO, SS
machineries / major injury for the works and the
Revision : 0 Effective Date : 01-05-2018
PEMBINAAN MITRAJAYA SDN BHD PMJ/JSHA

HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 8 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW

NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level

concrete area is accessible by


trucks relevant workers.
Damage to 1 3 3 M 2 Crane is operated by SHO, SS
property competent Operator and
Signalman is engaged
during works.
D) Caisson pile Fall from Fatality / 3 4 12 H 1 Use proper PPE SHO, SS
- Hacking of pile head height major injury (helmet, harness, vest,
boots & ear muff).
Noise Ill health 2 1 2 L 1 Use proper PPE SHO, SS, W,
(helmet, harness, vest, SC
boots & ear muff).

3. Sheet pile – Hit by fallen Fatality / 2 4 8 H 2 Signalman is engaged SHO, SS


A) Installation of sheet pile objects major injury for the lifting works.
and extraction of sheet pile Material is secured SS, SC
2
tightly prior to hoisting.
Damage to 2 3 6 H 2 The heavy machinery is SHO, SS
property operated by
experienced Operator
and Signalman is
engaged during works.
Hit by Fatality / 1 4 4 M 2 Signalman is engaged SHO, SS
machineries major injury for the works and the
area is accessible by

Revision : 0 Effective Date : 01-05-2018


PEMBINAAN MITRAJAYA SDN BHD PMJ/JSHA

HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 9 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW

NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level

relevant workers.
Damage to 1 3 3 M 2 Crane is operated by SHO, SS
property competent Operator and
Signalman is engaged
during works.
Noise Ill health 4 1 4 M 1 Use proper PPE SHO, SS
(helmet, harness, vest,
boots & ear muff)

4. Micropile – Falling into Fatality / 2 4 8 H 2 Put up warning signages SHO, SS


A) Boring of micropile shaft bored holes major injury and barricade the area

3 Provide edge SHO, SS


protection / cover for the
bored holes
Hit by Fatality / 1 4 4 M 2 Machineries are only SHO, SS, SC
machineries major injury handled by experienced
Operator and working
area only accessible by
relevant workers.

2 Engage Traffic SHO, SS, SC


Controller / Signalman
during works.
Damage to 1 3 3 M 2 Engage Traffic SHO, SS,SC
property Controller / Signalman
during works.

Revision : 0 Effective Date : 01-05-2018


PEMBINAAN MITRAJAYA SDN BHD PMJ/JSHA

HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 10 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW

NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level

Noise Ill health 1 2 2 L 1 Use proper PPE SHO, SS, W,


(helmet, harness, vest, SC
boots & ear muff)
B) Micropile – Hit by fallen Fatality / 2 4 8 H 2 Materials are secured SS
Placement of API pipes into objects major injury tightly prior to hoisting.
bored holes Damage to 2 3 6 M Crane is operated by SS
2
property competent Operator and
Signalman is engaged
during works.
Crane topple Fatality / 1 4 4 H 2 Crane is operated by SS
major injury competent Operator and
Signalman is engaged
during works.
Damage to 1 3 3 M 2 Crane is operated by SS
property competent Operator and
Signalman is engaged
during works.
C) Micropile – Falling into Fatality / 2 4 8 H 2 Put up warning signage SHO, SS
Grouting of micropile bored holes. major injury and barricade the area.

3 Provide edge SHO, SS


protection / cover for the
bored holes.
Inhalation of Ill health 2 1 2 L 1 Use proper PPE SHO, SS, W,
cement (helmet, vest, boots, ear SC

Revision : 0 Effective Date : 01-05-2018


PEMBINAAN MITRAJAYA SDN BHD PMJ/JSHA

HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 11 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW

NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level

particles muff & face mask).


during grouting
works
Noise Ill health 1 1 1 L 1 Use proper PPE SHO, SS, W,
(helmet, vest, boots & SC
ear muff).
D) Micropile – Fire during Fatality / 1 4 1 M 2 Welding works is SHO, W, SC
Cutting & welding of welding works major injury inspected and hot work
micropile head for joining the permit possessed
steel bar cage
2 Welding machine SHO, SC
undergoes periodically
checking and fire
extinguisher is placed
near the welder working
area.
Damage to 1 3 3 M 2 Welding machine SHO, SC
property undergoes periodically
checking and fire
extinguisher is placed
near the welder working
area.
Burnt and eye Ill health 1 1 1 L 1 Use proper PPE SHO, SC
swollen due to (helmet, vest, boots,
welding fire safety spectacles &
sparks gloves).

Revision : 0 Effective Date : 01-05-2018


PEMBINAAN MITRAJAYA SDN BHD PMJ/JSHA

HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 12 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW

NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level

Note:
1. Legend for Responsibility: PM – Project Manager, PE – Project Engineer, SS- Site Supervisor, EO – Environmental Officer, SHO – Safety & Health Officer, SC
- Subcontractor , W – Worker, All – All personnel.
2. High risk – implement operational control(s) prior to commencement of work.
Probability (Assessing Likelihood) Rating Severity Rating Probability 1 2 3 4
Severity
Very Unlikely, Probably Will Not Happen, 1 First Aid Injury / Ill Health 1 1 L L M M
Yearly
Unlikely, Rarely, 6 months 2 Minor Injury / Minor Ill Health / No Lost Time Injury 2 2 L M M H
Likely, Occasionally, Monthly 3 Major Injury / Major Ill Health / Permanent 3 3 M M H H
Disability / Lost Time Injury / Occupational
Diseases / Dangerous Occurrence (Damage to
Property)
Very Likely, Frequently, Daily 4 Fatality 4 4 M H H H

Risk Ranking Group Hierarchy of Control


LEVEL SCORE 5 Elimination
L LOW 4 Substitution
M MEDIUM 3 Engineering Controls
H HIGH 2 Administrative Controls
1 Personal Protective Equipment

Revision : 0 Effective Date : 01-05-2018