Pile Test (Maintained Load Test - MLT)
Pile Test (Maintained Load Test - MLT)
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 35
PPA1M – 17RM1 PILE TEST (MAINTAINED LOAD TEST – MLT) PMJ/PPA1M-17RM1
JSHA/PT
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 1 of 4
PRECINCT 17RM1 PUTRAJAYA OSHA 1994 – Act 514 CHUA KIM BIOW
FMA 1967 – Act 139, (BOWEC)
FMA (Noise Exposure) Reg. 89
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL CONTROL
Probability Severity (B) Risk Ranking (GROUP)
Hazard Effect (A)
Score Level
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 35
PPA1M – 17RM1 PILE TEST (MAINTAINED LOAD TEST – MLT) PMJ/PPA1M-17RM1
JSHA/PT
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 2 of 4
PRECINCT 17RM1 PUTRAJAYA OSHA 1994 – Act 514 CHUA KIM BIOW
FMA 1967 – Act 139, (BOWEC)
FMA (Noise Exposure) Reg. 89
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL CONTROL
Probability Severity (B) Risk Ranking (GROUP)
Hazard Effect (A)
Score Level
3 Suspended hook block Failure of limit Major Injury 1 3 3 M 5 Thorough Inspection, SS, SSS
of tower crane / mobile switch, Daily testing,
crane Hook block travel at Operator crane shall
full speed, apply emergency
Damage wire rope, brake,
Failure of braking Weekly inspection
mechanism, lifting gear
4. Suspended load by Incorrect rigging Major injury 1 3 3 M 5 PTW, PMA SS, SSS
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 35
PPA1M – 17RM1 PILE TEST (MAINTAINED LOAD TEST – MLT) PMJ/PPA1M-17RM1
JSHA/PT
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 3 of 4
PRECINCT 17RM1 PUTRAJAYA OSHA 1994 – Act 514 CHUA KIM BIOW
FMA 1967 – Act 139, (BOWEC)
FMA (Noise Exposure) Reg. 89
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL CONTROL
Probability Severity (B) Risk Ranking (GROUP)
Hazard Effect (A)
Score Level
5. Stacking the concrete Wire rope snapped, Major Injury 1 3 3 M 5 Schedule SS, SSS
block / piles Strong wind, maintenance /
Failure of braking inspection,
mechanism, Temporary stop
Object fall from work,
height, Cordon area,
Tag line,
Fully Supervised
1. Legend for Responsibility: PM – Project Manager, PSE – Project Engineer, SS- Site Supervisor, EO – Environmental Officer, SHO – Safety & Health Officer, SC -
Subcontractor , W – Worker, All – All personnel. High risk – implement operational control(s) prior to commencement of work.
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 35
PPA1M – 17RM1 PILE TEST (MAINTAINED LOAD TEST – MLT) PMJ/PPA1M-17RM1
JSHA/PT
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 4 of 4
PRECINCT 17RM1 PUTRAJAYA OSHA 1994 – Act 514 CHUA KIM BIOW
FMA 1967 – Act 139, (BOWEC)
FMA (Noise Exposure) Reg. 89
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL CONTROL
Probability Severity (B) Risk Ranking (GROUP)
Hazard Effect (A)
Score Level