Pembinaan Mitrajaya SDN BHD Pmj/Jsha: Jsha No 28 PMJ/PPA1M-17RM1 /Jsha/Cc PAGE 1 of 5
Pembinaan Mitrajaya SDN BHD Pmj/Jsha: Jsha No 28 PMJ/PPA1M-17RM1 /Jsha/Cc PAGE 1 of 5
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 28
PPA1M – 17RM1 CRAWLER CRANE PMJ/PPA1M-17RM1
/JSHA/CC
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 1 of 5
PRECINCT 17RM1 PUTRAJAYA OSHA 1994 – Act 514 CHUA KIM BIOW
FMA 1967 – Act 139, (BOWEC) Reg. 86 – Part XIV
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level
1. Preparation of Crawler Integrity of the Major 2 3 6 H 5 Forward crane SSS
crane machine Injury and operator SS
document.
Crawler crane
below 10 years to
undergo Third
Party Visual
Inspection.
Crawler crane
above 10 years
to undergo Third
Party NDT test
inspection.
Undergo DOSH
inspection
Obtain In House
Permit To Work
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 28
PPA1M – 17RM1 CRAWLER CRANE PMJ/PPA1M-17RM1
/JSHA/CC
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 2 of 5
PRECINCT 17RM1 PUTRAJAYA OSHA 1994 – Act 514 CHUA KIM BIOW
FMA 1967 – Act 139, (BOWEC) Reg. 86 – Part XIV
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level
Wire rope Major 2 4 8 H 5 Schedule SS
snap Injury / maintenance,
Fatality color coding,
Sling and rigging
by competent
person
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 28
PPA1M – 17RM1 CRAWLER CRANE PMJ/PPA1M-17RM1
/JSHA/CC
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 3 of 5
PRECINCT 17RM1 PUTRAJAYA OSHA 1994 – Act 514 CHUA KIM BIOW
FMA 1967 – Act 139, (BOWEC) Reg. 86 – Part XIV
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level
3 Bad Weather Lighting Strike Fatal / 2 4 8 H 5 Temporary stop SS
Major working.
Injury SSS
Find a safe place
under the
building
Resume working
after rain stop
and no lightning
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 28
PPA1M – 17RM1 CRAWLER CRANE PMJ/PPA1M-17RM1
/JSHA/CC
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 4 of 5
PRECINCT 17RM1 PUTRAJAYA OSHA 1994 – Act 514 CHUA KIM BIOW
FMA 1967 – Act 139, (BOWEC) Reg. 86 – Part XIV
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level
Note:
1. Legend for Responsibility: PM – Project Manager, PSE – Project Engineer, SS- Site Supervisor, EO – Environmental Officer, SHO – Safety & Health Officer,
SC - Subcontractor , W – Worker, All – All personnel.
2. High risk – implement operational control(s) prior to commencement of work.
Probability (Assessing Likelihood) Rating Severity Rating Probability 1 2 3 4
Severity
Very Unlikely, Probably Will Not Happen, 1 First Aid Injury / Ill Health 1 1 L L M M
Yearly
Unlikely, Rarely, 6 months 2 Minor Injury / Minor Ill Health / No Lost Time Injury 2 2 L M M H
Likely, Occasionally, Monthly 3 Major Injury / Major Ill Health / Permanent 3 3 M M H H
Disability / Lost Time Injury / Occupational
Diseases / Dangerous Occurrence (Damage to
Property)
Very Likely, Frequently, Daily 4 Fatality 4 4 M H H H
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 28
PPA1M – 17RM1 CRAWLER CRANE PMJ/PPA1M-17RM1
/JSHA/CC
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 5 of 5
PRECINCT 17RM1 PUTRAJAYA OSHA 1994 – Act 514 CHUA KIM BIOW
FMA 1967 – Act 139, (BOWEC) Reg. 86 – Part XIV
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level