Professional Documents
Culture Documents
Structure Works
Structure Works
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 1 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 2 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level
during works.
Crane topple Fatality / 1 4 4 M 2 Crane is operated by SS
major injury competent Operator and
Signalman is engaged
during works.
Damage to 1 3 3 M 2 Crane is operated by SS
property competent Operator and
Signalman is engaged
during works.
Fire during Fatality / 1 4 4 M 2 Welding works is SHO, SC
welding works major injury inspected and hot work
for joining the permit possessed
steel bar cage
2 Welding machine SHO, SC
undergoes periodically
checking and fire
extinguisher is place
near the welder working
area.
Damage to 1 3 3 M 2 Welding machine SHO, SC
property undergoes periodically
checking and fire
extinguisher is place
near the welder working
area.
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 3 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 4 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 5 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 6 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 7 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 8 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 9 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level
relevant workers.
Damage to 1 3 3 M 2 Crane is operated by SHO, SS
property competent Operator and
Signalman is engaged
during works.
Noise Ill health 4 1 4 M 1 Use proper PPE SHO, SS
(helmet, harness, vest,
boots & ear muff)
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 10 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 11 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level
HEAD OFFICE / PROJECT: DESCRIPTION OF JOB: PREPARED BY: FARHAN MOHAMED JSHA NO 31
PPA1M – 17RM1 STRUCTURE WORKS - PILING PMJ/PPA1M17RM1/JSHA/
PW
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY:
PAGE 12 of 12
PRECINCT 17RM1 PUTRAJAYA CHUA KIM BIOW
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT HIERARCHY OPERATIONAL RESPONSIBILITY
OF CONTROL
Probability Severity Risk Ranking CONTROL
Hazard Effect
(A) (B) (GROUP)
Score Level
Note:
1. Legend for Responsibility: PM – Project Manager, PE – Project Engineer, SS- Site Supervisor, EO – Environmental Officer, SHO – Safety & Health Officer, SC
- Subcontractor , W – Worker, All – All personnel.
2. High risk – implement operational control(s) prior to commencement of work.
Probability (Assessing Likelihood) Rating Severity Rating Probability 1 2 3 4
Severity
Very Unlikely, Probably Will Not Happen, 1 First Aid Injury / Ill Health 1 1 L L M M
Yearly
Unlikely, Rarely, 6 months 2 Minor Injury / Minor Ill Health / No Lost Time Injury 2 2 L M M H
Likely, Occasionally, Monthly 3 Major Injury / Major Ill Health / Permanent 3 3 M M H H
Disability / Lost Time Injury / Occupational
Diseases / Dangerous Occurrence (Damage to
Property)
Very Likely, Frequently, Daily 4 Fatality 4 4 M H H H