Organizational Chart For Fdas Installation

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

PROEFESSINAL MECHANICAL ENGINEER

PROFESSIONAL MECHANICAL ENGINEER


DUTIES & RESPONSIBILITIES:
 ATTEND TWO (2) TIMES A WEEK FOR TECHNICAL MEETING (TUESDAY-THURSDAY)
 RESOLVES ALL TECHNICAL ISSUE OCCUR DURING CONSTRUCTION
 SERVES AS PRPOJECT CONSULTANT
 APPROVE ALL CONSTRUCTION DRAWINGS
PROJECT ENGINEER
 VISIT THE SITE CONSTRUCTION TWO (2) TIMES A WEEK (TUESDAY-THURSDAY)

PROJECT ENGINEER

PROJECT
SUPERVISOR/FOREMAN
DUTIES & RESPONSIBILITIES:
 FULL TIME IN-CHARGRE ON PROJECT CONSTRUCTION
 CREATE DAILY ACTIVITY SCHEDULE
 REPORT THE DAILY MANPOWER AND PROGRESS
 CREATE SHOP DRAWINGS AND CONSTRUTION DRAWINGS
 RESPONSIBLE FOR SITE SAFETY PRECAUTION

PROEFESSINAL SUPERVISOR/FOREMAN
DUTIES & RESPONSIBILITIES:
 GROUP TEAM LEADER
 SUPERVISE AND MONITOR THE TECHNICIANS AND HELPERS
 REPORT ACTUAL DAILY PROGRESS
 RESPONSIBLE FOR THE TOOLS AND EQUIPMENT TO BE USED

TECHNICIAN / HELPER
DUTIES & RESPONSIBILITIES:
 INCHARGE OF ACTUAL INSTALLATION

PREPARED BY:
JERIC REYES

APPOROVED BY: