Leve of Service Analysis: Transportation Planning
Leve of Service Analysis: Transportation Planning
ABSTRACT
I. INTRODUCTION
Traffic conflicts between vehicular movements are created when two or more roads
crossed each other. Such conflicts may cause delay and traffic congestion with the possibility of
road accidents. Thus, each intersection requires traffic control. It is regulated with stop signs,
traffic lights, and roundabout. The common type of intersection is the unsignalized intersection,
which is used to regulate low volume of traffic flow between the major and minor streets.
Batangas City comprises major intersections that plays a vital role in the continuous
development of its transportation system. And one of those intersections is the Ferry Rd. And
Herrera Road intersection located near the City Engineers Office and LPU-Batangas. This
intersection is one of the main passages to the city proper. It is an unsignalized and is usually
used by PUJs.
II. OBJECTIVES
This study aims to know the flow of traffic at the intersection between the Civil Engineers
Office and Lyceum of the Philippines University of Batangas.
III. METHODOLOGY
A. STUDY AREA
We had gathered our data from and at the intersection between the Civil Engineers
Office located at Ferry Rd. and Lyceum of the Philippines University of Batangas, at P. Herrera
Rd.
B. DATA COLLECTION
1. We manually counted every vehicles that passed through the designated road.
A. DATA ANALYSIS
1. VOLUME
3 156
4 0
5 279
6 187
7 0
8 136
2
B. DISCUSSION
There’s no problem in the traffic congestion in the area of our observation. No risk of
having heavy traffic. Speed limits traffic signals are unnecessary.
The results of the traffic between the P. Herrera road and Ferry Rd. Has proven very
short traffic delay. In conclusion, there are no traffic congestion in the area and it’s probably the
more convenient route to travel if one would like to reach their destination with little amount of
disruptions.
3
4
APPENDIX C.
COMPUTATION :
I. M h=0.5 M 1 + M 2
M 1=0
M 2=243
M h=0
M h=0.5 (0)+ 243
veh
M h=243
hr
pcu
III. M no=560
hr
I. M h=M 1 + M 2
M 1=0
M 2=243
M h=0
M h=243
Veh
M h=243
hr
5
pcu
III. M no=560
hr
V. RESERVE=560−0
pcu
RESERVE=560
hr
I. M h=0.5 M 1 + M 2+ M 3 + M 4 + M 5 + M 6
M h=0.5 ( 0 )+243+ 156+0+279+136
veh
M h=834
hr
pcu
III. M no=340
hr
V. RESERVE=340−0
6
pcu
RESERVE=340
hr
M 1=0
M 2=243
M 3=156
M 4 =0
M 5=279
M 7=0
M 8=136
M n=0
I. M h=0.5 M 1 + M 2+ M 3 + M 4 + M 5 + M 7 + M 8
M h=0.5 ( 0 )+243+ 156+0+279+ 0+0+136
M h=814 veh /hr
pcu
III. M no=360
hr
V. RESERVE=360−0
pcu
RESERVE=360
hr
7
8
APPENDIX D.
PHOTO DOCUMENTATION