LG&CD Department

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

LG&CD DEPARTMENT

Name of Firm: ______________________________

Existing Enlistment in LG&CD: C-5 PEC Category _________ (Valid Till_____________)

Category Applied: C-5

TECHNICAL STAFF

REQUIRE AVAILABLE WITH


Sr. No STAFF REMARKS / RECOMMENDATION
D THE FIRM
HEAD OFFICE STAFF
1 Project Manager 1
2 Quantity Surveyors 1
3 Accountant 1
4 Draftsman 1
FIELD STAFF

REQUIRE AVAILABLE WITH


STAFF List of staff is attached
D FIRM
5 Project Engineer (Bsc Civil) 1
Surveyors (Diploma 1
6
Holders)
7 Technician 2
Operators (Matching to the 2
8
no of equipments)

Assistant Engineer, Executive Engineer


LG&CD, District LG&CD, Circle
2

LG&CD DEPARTMENT
Name of Firm: ______________________________

Existing Enlistment in LG&CD: C-5 PEC Category _________ (Valid Till_____________)

Category Applied: C-5

MACHINERY

AVAILABLE WITH
Sr. No Name of Machinery REQUIRED REMARKS / RECOMMENDATION
THE FIRM
1 Mixer 2 List of Machinery / Documents is attached
2 Vertical Lift 1
3 Shuttering and Scaffolding 1000 sft.
4 Pumps / Water Tank 2
5 Generator 1
6 Diesel Engine 1
7 ConcreteVibrators 2
8 Tractor Trolley 1

Assistant Engineer, Executive Engineer


LG&CD, District LG&CD, Circle
3

LG&CD DEPARTMENT
Name of Firm : ______________________________
Existing Enlistment in LG&CD: C-5 PEC Category _________ (Valid Till_____________)
Category Applied: C-5

FINANCIAL CAPACITY

Sr. AVAILABLE WITH


Criteria REQUIRED REMARKS
No THE FIRM
Balance sheet must indicate a circulation money
of minimum Rs. 1.500 M (minimum 50% of
1 circulation money always remain in reserve of
1.500 (M) Name of Bank / upto ______
total works allotted to a particular contractor)

2 PEC LICENSE PEC license C-5 for the year 2017 verified by the PEC site.

General Requirement Attached Yes No


Attested Photocopy of CNIC
Affidavit
Partnership Deed in case of Firm
Income Tax return for last year
Contact Nos. of Firm / Contractor’s Staff
Performance Certificate Report from concerned Assistant Engineer
Fee Receipt (Enlistment / Renewal)

Assistant Engineer, Executive Engineer


LG&CD, District LG&CD, Circle

You might also like