Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

Project: Rehabilitation and Up-gradation of Repalle to Eeppurpalem Section from Km:129/927 to

Km:195/000 of NH-214A (New NH-216) to two lanes With Paved Shoulder in the State of Andhra
Pradesh under NHDP-IV through Engineering ,Procurement & Construction (EPC) basis.

Authority : Ministry of Road Transport & Highways


Authority Engineer : M/s WADIA TECHNO-ENGINEERING SERVICIES LIMITED.

EPC Contractor : M/s BSCPL InfraStrucure Limited

Measurement Of Texture Depth Of PQC Surface (As


per MORT&H & clause-602.12.2)

Location Grade of Concrete

Part of Structure Age in Days

Date of casting Date of Testing

RFI Number Specific Limit 3mm to 4mm

Dia(D) of Texture Depth


Offset From
S.NO Test Chainage sand patch (Dia)2 in mm Remarks
Center Line(m)
in mm (31000/D*D)

Average Texture Depth:……………………..mm

Remarks:
Contractor's Representative Consultant's Representative
Project: Rehabilitation and Up-gradation of Repalle to Eeppurpalem Section from Km:129/927 to Km:195/000 of NH-214A (New NH-216) to two lanes With Paved
Shoulder in the State of Andhra Pradesh under NHDP-IV through Engineering ,Procurement & Construction (EPC) basis.

Authority : Ministry of Road Transport & Highways

Authority Engineer : M/s WADIA TECHNO-ENGINEERING SERVICIES LIMITED.

EPC Contractor : M/s BSCPL InfraStrucure Limited


Chainage:-

Factor
Corrected
Core Core Compressive Compressive
S.No Date of Laying Core Location Side Offset from Core Length n=L/D Area(mm2) Weight(gm) Load (kN) Density(gm/cc) Strength (CCS) Strength Eq. Cube Comp Remarks
center line Dia(mm) (mm) (N/mm2) (N/mm2) str (CCS*1.25)
F=0.11n+0.78
(F*CCS)

Contractor's Representative Consultant's Representative


Project: Rehabilitation and Up-gradation of Repalle to Eeppurpalem Section from Km:129/927 to Km:195/000 of NH-214A (New NH-216) to two lanes With Paved
Shoulder in the State of Andhra Pradesh under NHDP-IV through Engineering ,Procurement & Construction (EPC) basis.

Authority : Ministry of Road Transport & Highways

Authority Engineer : M/s WADIA TECHNO-ENGINEERING SERVICIES LIMITED.

EPC Contractor : M/s BSCPL InfraStrucure Limited


Chainage:-

Factor
Corrected
Core Core Compressive Compressive
S.No Date of Laying Core Location Side Offset from Core Length n=L/D Area(mm2) Weight(gm) Load (kN) Density(gm/cc) Strength (CCS) Strength Eq. Cube Comp Remarks
center line Dia(mm) (mm) (N/mm2) (N/mm2) str (CCS*1.25)
F=0.11n+0.78
(F*CCS)

10

11

12

13

14

15

16

17
18

19

20

21

22

23

24

Contractor's Representative Consultant's Representative

You might also like