KURVA S

PEMBANGUNAN GEDUNG ILMUSIPIL.COM


BADAN METEOROLOGI, KLIMATOLOGI DAN GEOFISIKA

13 14 = Rp 83.07
TAHUN 2009 cek cek start finish Pengurang LIBUR LEBARAN Jml Week Rumus Rumus adjust Harga Item Harga Total = Rp 9,419.00
BOBOT
NO. URAIAN PEKERJAAN JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DES KET bobot selisih Week ke Week ke Week Week efektif Bobot mguan kolom akhir Pekerjaan
(%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10.00 11
Foreman Lskilled labor labour
I
II
PEKERJAAN PERSIAPAN
PEKERJAAN PONDASI
2.88
6.84
0.13
0.86
0.13
0.86
0.13
0.86
0.13
0.86
0.13
0.86
0.13
0.86
0.13
0.86
0.13
0.86
0.13 0.13 0.13 0.13
L 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 2.8837
6.8443
-
-
1
1
24
8
1
-
1
-
22
8
0.1311
0.8555
0.1306
0.8558
2,553,736,842.87
6,061,099,208.79
88,556,574,164.50
88,556,574,164.50
III PEKERJAAN TANAH 5.11 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43
I 5.1075 - 1 12 - - 12 0.4256 0.4259 4,523,013,995.09 88,556,574,164.50
IV PEKERJAAN STRUKTUR TOWER B
4.1 Basement 2.08 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 2.0811 - 3 11 - - 9 0.2312 0.2315 1,842,946,943.82 88,556,574,164.50
4.2 Lantai 1 1.65 0.83 0.83 U 1.6501 - 6 7 - - 2 0.8250 0.8251 1,461,231,377.83 88,556,574,164.50
4.3
4.4
Lantai 2
Lantai 3
2.38
1.91
1.19 1.19
0.96 0.96
R 2.3769
1.9138
-
-
7
8
8
9
-
-
-
-
2
2
1.1884
0.9569
1.1885
0.9569
2,104,875,780.05
1,694,780,951.79
88,556,574,164.50
88,556,574,164.50
4.5 Lantai 4 1.71 0.85 0.85 1.7068 - 8 9 - - 2 0.8534 0.8534 1,511,505,245.60 88,556,574,164.50
4.6 Lantai 5 1.59 0.80 0.80 1.5925 - 9 10 - - 2 0.7962 0.7963 1,410,237,995.24 88,556,574,164.50
4.7 Lantai 6 1.56 1.56
0.78 0.78
I 1.5610 - 10
10
10
11
-
-
-
-
1
2
1.5610 1.5610 1,382,336,103.69 88,556,574,164.50
4.8 Lantai 7 1.56 1.5581 - 0.7791 0.7790 1,379,801,188.17 88,556,574,164.50
4.9 Lantai 8 1.51 0.76 0.76 D 1.5106 - 11 12 - - 2 0.7553 0.7553 1,337,739,342.17 88,556,574,164.50
4.10 Lantai 9 1.45 0.72 0.72 1.4464 - 11 12 - - 2 0.7232 0.7232 1,280,925,378.87 88,556,574,164.50
4.11 Lantai 10 1.43 0.72 U 0.72 1.4328 - 12 15 1 1 2 0.7164 0.7164 1,268,801,782.94 88,556,574,164.50
4.12
4.13
Lantai 11
Lantai 12
1.43
1.41
L 1.43
0.70 0.70
1.4262
1.4088
-
-
14
15
15
16
-
- -
1 1
2
1.4262
0.7044
1.4262
0.7044
1,263,020,651.95
1,247,627,051.88
88,556,574,164.50
88,556,574,164.50
4.14 Lantai 13 1.40 1.40 1.3993 - 16 16 - - 1 1.3993 1.3993 1,239,197,439.77 88,556,574,164.50
4.15 Lantai Atap 1.45 0.73 0.73 1.4526 - 16 17 - - 2 0.7263 0.7263 1,286,397,140.26 88,556,574,164.50
4.16 Lantai Executive Lounge 0.28 F 0.28 0.2846 - 17 17 - - 1 0.2846 0.2846 252,047,575.34 88,556,574,164.50
4.17 Lantai Instrument 0.25 0.13 0.13 0.2549 - 17 18 - - 2 0.1274 0.1275 225,690,620.68 88,556,574,164.50
4.18 Rangka Atap 0.30 I 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.3032 - 15 21 - - 7 0.0433 0.0434 268,479,830.78 88,556,574,164.50

V
4.19 Lantai Atap / Lantai Antena
PEKERJAAN ARSITE PEKERJAAN DINDING
0.28
T 0.09 0.09 0.09 0.2767 - 18 20 - - 3 0.0922 0.0923 245,055,299.94 88,556,574,164.50
88,556,574,164.50 1.00 2.00 4
5.1 Eksterior 14.13 0.59 1.18 R 1.18 1.18 1.18 1.18 1.18 1.18 1.18 1.18 1.18 1.77 14.1298 0.0001 11 24 1 1 12 1.1775 1.1774 12,512,936,599.08 88,556,574,164.50
5.2 Interior 1.61 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 1.6104 - 10 23 1 1 12 0.1342 0.1342 1,426,097,511.13 88,556,574,164.50 1,426,097,511.13
VI PEKERJAAN STRUKTUR AUDITORIUM
I
6.1 Basement 8.47 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 8.4696 - 3 11 - - 9 0.9411 0.9408 7,500,378,104.92 88,556,574,164.50
6.2 Lantai 1 3.94 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 3.9439 - 5 16 1 1 10 0.3944 0.3943 3,492,564,621.36 88,556,574,164.50
6.3 Lantai 2 1.46 0.37 0.37 0.37 0.37 1.4628 - 11 16 1 1 4 0.3657 0.3657 1,295,395,400.83 88,556,574,164.50
6.4 Lantai 3 0.99 0.49 0.49 0.9883 - 15 16 - - 2 0.4941 0.4942 875,193,915.64 88,556,574,164.50
6.5 Rangka Atap 1.81 0.30 0.30 0.30 0.30 0.30 0.30 1.8105 - 11 18 1 1 6 0.3017 0.3020 1,603,276,200.00 88,556,574,164.50
VII PEKERJAAN ARSITEKTUR AUDITORIUM 1.97 0.28 0.28 0.28 0.28 0.28 0.28 0.28 1.9680 - 18 24 - - 7 0.2811 0.2814 1,742,788,384.02 88,556,574,164.50
VIII PEKERJAAN MEKANIKAL & ELEKTRIKAL 25.14 0.33 0.33 0.33 0.33 0.33 0.33 0.33 1.32 1.32 1.32 1.32 1.65 1.65 1.99 1.99 2.32 2.65 2.65 2.65 25.1448 0.0000 3 23 1 1 19 1.3234 1.3236 22,267,395,680.00 88,556,574,164.50

JUMLAH TOTAL 100.00 88,556,574,164.50


Rencana Mingguan 1.41 1.41 2.92 2.92 3.31 4.13 5.32 6.31 5.06 6.72 7.09 6.45 - - 7.21 7.53 4.58 4.27 3.84 4.18 4.41 4.37 4.37 2.18 0.000
Kumulatif Rencana - 1.41 2.82 5.74 8.66 11.96 16.10 21.42 27.73 32.79 39.51 46.60 53.05 53.05 53.05 60.27 67.79 72.37 76.65 80.49 84.67 89.08 93.45 97.82 100.0

16.292
30-Jul 13-Oct
75.00
9
8.33333

240

32.1429

4/1/2008
4/1/2008
###

34.28571

PEKERJAAN PERSIAPAN, PRASARANA & PENUNJANG

PEKERJAAN STRUKTUR BETON & BAJA

PEKERJAAN DINDING

PEKERJAAN PINTU & JENDELA

PEKERJAAN LANTAI

PEKERJAAN PLAFOND

PEKERJAAN SANITAIR

PEKERJAAN LUAR DAN LAIN-LAIN

PEKERJAAN PLUMBING