VHTS Shop Drawing Log: Design & Build Package 4 - Green Line Underground
VHTS Shop Drawing Log: Design & Build Package 4 - Green Line Underground
VHTS Shop Drawing Log: Design & Build Package 4 - Green Line Underground
Transmittal Details
Status Code : A=Approved; B=Approved with Comments; C=SONO; D=NOWC; E=Failed/Not Approved; F=Responded/Reviewed/Actioned; U= Under Review
REDCO To PSH PSH To REDCO
Planned Submission
Remarks
Status
Rev. #
# Location Code Doc.Type Station Name Dwg No. Shop Drawing Description. Transmittal Date Transmittal Date
1 General DWG All Stations M008-RGL-ELE-DWG-GD-00001 SHOP DRAWING STATION - Under Plate Form Earth Pit Connection Details 22/Aug/16 C1
(All Stations Typical)
2 General DWG All Tunnels M008-RGL-ELE-DWG-GD-00002 SHOP DRAWING TUNNEL - Tunnel Bonding Details 22/Aug/16 C1
(All Tunnels Typical)
Page No.1 of 2
VHTS Shop Drawing Progress Summary
Under Review
Total Rejected /
Sr.No. Description (No's) Submitted to PSH Balance to go with PSH Approved Resubmission's Remarks
450 120%
400
Submission No.--------->
100%
350
300 80%
250
60%
200
150 40%
100
20%
50
- 0%
Week 3
Week4
Week 1
Week 2
Week4
Week 1
Week 2
Week 3
Week4
Week 1
Week 2
Week 3
Week 3
Week4
Week 1
Week 2
Week 3
Week4
Week 1
Week 2
Week 3
Week4
Week 1
Dec-16Week 2
Week 3
Week 3
Week4
Week 1
Week 2
Week4
Week 1
Week 2
Week 3
Jun-16
Jul-16
Sep-16
Apr-16
May-16
Oct-16
Nov-16
Aug-16
Plan (Periodic) Plan Cumulative Actual (Periodic) Actual Cumulative Plan % (Cumulative) Actual % (Cumulative)