VHTS Shop Drawing Log

Design & Build Package 4 - Green Line Underground


Updated As of 21 Jun 2016,Rev 2

Transmittal Details
Status Code : A=Approved; B=Approved with Comments; C=SONO; D=NOWC; E=Failed/Not Approved; F=Responded/Reviewed/Actioned; U= Under Review
REDCO To PSH PSH To REDCO

Planned Submission
Remarks

Status
Rev. #
# Location Code Doc.Type Station Name Dwg No. Shop Drawing Description. Transmittal Date Transmittal Date

1 General DWG All Stations M008-RGL-ELE-DWG-GD-00001 SHOP DRAWING STATION - Under Plate Form Earth Pit Connection Details 22/Aug/16 C1
(All Stations Typical)

2 General DWG All Tunnels M008-RGL-ELE-DWG-GD-00002 SHOP DRAWING TUNNEL - Tunnel Bonding Details 22/Aug/16 C1
(All Tunnels Typical)

Page No.1 of 2
VHTS Shop Drawing Progress Summary

Updated As of 21 Jun 2016

Under Review
Total Rejected /
Sr.No. Description (No's) Submitted to PSH Balance to go with PSH Approved Resubmission's Remarks

1 VHTS Shop Dwg's/Models 0 0 0 0 0 0

450 120%

400
Submission No.--------->

100%

350

300 80%

250

60%

200

150 40%

100

20%

50

- 0%
Week 3

Week4

Week 1

Week 2

Week4

Week 1

Week 2

Week 3

Week4

Week 1

Week 2

Week 3

Week 3

Week4

Week 1

Week 2

Week 3

Week4

Week 1

Week 2

Week 3

Week4

Week 1

Dec-16Week 2

Week 3
Week 3

Week4

Week 1

Week 2

Week4

Week 1

Week 2

Week 3
Jun-16

Jul-16

Sep-16
Apr-16

May-16

Oct-16

Nov-16
Aug-16

Plan (Periodic) Plan Cumulative Actual (Periodic) Actual Cumulative Plan % (Cumulative) Actual % (Cumulative)