6 4 10 10 4 14 14 3.5 17.5
1.4.1 – Systems 1.4.2 – Specialized 1.4.3 – Custom
changes design Customer order interface Management Reporting
#Equations 11.5 5.5 15.5 15.5 5.5 19.5 Interface
Total Slack = TS = LF - EF = LS – ES 19.5 5.5 23
EF = ES+Dur.
LS=LF-Dur.
14 18 0 18 4 18
1.2.3 – Legal Contract Milestone –
Negotiations Contract assigned 28 0 28
21 25 7 25 7 25 Finish
28 0 28
18 2 20
1.5.3 – Pharmacy 22 2 24 24 0 24 25 2 27 27 1 28
1.5.4 – Customization
manager drone operations procedures Milestone – End Flight 1.6.1 – Final 1.6.2 – Closing
of Flight Processing operations implementation out the project
21 23 1 25 25 31 25 25 0 27 23
27 0 28
22 3 25
1.3.4 – Drone 25 0 25
maintenance Milestone – End
procedures Adapted drones
22 25 0 25 0 25
17.5 0 17.5
Milestone – End IT
and App interfaces
23 5.5 23