Construction of Flyover at Km.

77+750(Hinganghat-Nandgaon Junction) on Nagpur-


Hyderabad Section of NH-44 in State of Maharashtra on Engineering, Procurement &
Construction (EPC) Mode

Client : National Highways Authority of India


Authority Engineer : M/s Consulting Engineer Group
EPC Contractor : M/s.Vidya Infra Built Pvt. Ltd
CALIBRATION OF AGGREGATE SCALE (BP @ Hinganghat )
Plant Make : Siemen ( Mobi mix750 ) Batching Plant No : 01
3
Capacity of Gauge : 30 m /hr DATE OF CALIBRATION 5-Feb-20
Trial 1 Trial 2 DUE DATE OF CALIBRATION 5-Aug-20
Average of
Actual Load Average
Load in Kg Unload in kg Load in Kg Unload in kg Loading & Remarks
Applied [Kgs] variations
unloading
0 0 0 0 0 0.0 0.0
50 50 50 50 50 50.0 0.0
100 100 100 100 100 100.0 0.0
150 150 150 150 150 150.0 0.0
200 200 200 200 200 200.0 0.0
250 250 250 250 250 250.0 0.0
300 299 299 300 300 300.0 0.0
350 349 349 350 350 350.0 0.0
400 399 399 399 399 399.0 -0.3
450 449 449 449 449 449.0 -0.2
500 499 499 499 499 499.0 -0.2
550 549 549 549 549 549.0 -0.2
600 599 599 599 599 599.0 -0.2
650 649 650 649 649 649.0 -0.2
700 699 700 699 699 699.0 -0.1
750 749 749 749 749 749.0 -0.1
800 799 799 799 799 799.0 -0.1
850 849 849 849 850 849.0 -0.1
900 899 899 899 899 899.0 -0.1
950 949 949 950 950 950.0 0.0
1000 999 999 998 999 999.0 -0.1
% variation -0.09

1000
AGGREGATE SCALE
950
900
850
800
750
700
650
600
Actual load in Kg

550
500
450
400
350
300
250
200
150
100
50
0
0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 600.0 650.0 700.0 750.0 800.0 850.0 900.0 950.0 1000.0

Avg. Of Loading/Unloadin (Kg)

Contractor's Rep. Auth. Engg. Rep.


Date Date
Construction of Flyover at Km.77+750(Hinganghat-Nandgaon Junction) on Nagpur-
Hyderabad Section of NH-44 in State of Maharashtra on Engineering, Procurement &
Construction (EPC) Mode
Client : National Highways Authority of India
Authority Engineer : M/s Consulting Engineer Group
EPC Contractor : M/s.Vidya Infra Built Pvt. Ltd
CALIBRATION OF CEMENT SCALE (BP @ Hingaghat)
Plant Make : Siemen ( Mobi mix750 ) Batching Plant No : 01
Capacity of Gauge : 30 Cum. DATE OF CALIBRATION 5-Feb-20
Trial 1 Trial 2 DUE DATE OF CALIBRATION 5-Aug-20
Average
Act.Load Average
Load in Kg Unload in kg Load in Kg Unload in kg Loading & Remarks
Applied (Kg) variations
unloading
0 0.0 0.0 0.0 0.0 0.0 0.0

20 20.0 20.0 20.0 20.0 20.0 0.0

40 40.0 40.0 40.0 40.0 40.0 0.0

60 60.0 60.0 60.0 60.0 60.0 0.0

80 80.0 80.0 80.0 80.0 80.0 0.0

100 99.0 100.0 100.0 100.0 99.8 -0.3

120 120.0 120.0 119.0 120.0 119.8 -0.2

140 140.0 140.0 139.0 140.0 139.8 -0.2

160 160.0 160.0 160.0 160.0 160.0 0.0

180 180.0 180.0 179.0 179.0 179.5 -0.3

200 200.0 199.0 199.0 200.0 199.5 -0.3

220 220.0 220.0 220.0 220.0 220.0 0.0

240 240.0 240.0 239.0 239.0 239.5 -0.2

260 260.0 259.0 260.0 259.0 259.5 -0.2

280 280.0 279.0 280.0 280.0 279.8 -0.1

300 299.0 299.0 299.0 299.0 299.0 -0.3


% variation -0.12

Calibration Of Cement scale of (BP 38 km)


300

280

260

240

220

200
Actual load in KG

180

160

140

120

100

80

60

40

20

0
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0 180.0 200.0 220.0 240.0 260.0 280.0 300.0

Avg Of Loading/unloadin (KG)

Contractor's Rep. Authority Engineer


Date Date
Construction of Flyover at Km.77+750(Hinganghat-Nandgaon Junction) on Nagpur-Hyderabad
Section of NH-44 in State of Maharashtra on Engineering, Procurement & Construction (EPC)
Mode
Client : National Highways Authority of India
Authority Engineer : M/s Consulting Engineer Group
EPC Contractor : M/s.Vidya Infra Built Pvt. Ltd
CALIBRATION OF WATER SCALE (BP @ Hinganghat)
Plant Make Siemen ( Mobi mix750 ) Batching Plant No : 01
Capacity of Gauge 30 Cum. DATE OF CALIBRATION 5-Feb-20
Trial 1 Trial 2 DUE DATE OF CALIBRATION 5-Aug-20
Average
Act.Load Average
Load in Kg Unload in kg Load in Kg Unload in kg Loading & Remarks
Applied (Kg) variations
unloading
0 0.0 0.0 0.0 0.0 0.0 0.0

20 20.0 21.0 20.0 20.0 20.0 0.0

40 40.0 41.0 40.0 40.0 40.0 0.0

60 60.0 60.0 61.0 60.0 60.0 0.0

80 80.0 80.0 81.0 81.0 81.0 1.3

100 100.0 101.0 100.0 100.0 100.0 0.0

120 120.0 120.0 120.0 120.0 120.0 0.0

140 140.0 140.0 141.0 140.0 140.0 0.0

160 161.0 161.0 161.0 161.0 161.0 0.6

180 181.0 181.0 181.0 181.0 181.0 0.6


% variation 0.24

Calibration Of Cement & water scale of (BP 38km) y = 0.9954x + 0.1124


180

160

140

120
Actual load in KG

100

80

60

40

20

0
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0 180.0

Avg. of Loading/Unloading (Kg)

Contractor's Rep. Concessionaire's Rep. I.C. Rep.


Date Date Date
Construction of Flyover at Km.77+750(Hinganghat-Nandgaon Junction) on Nagpur-
Hyderabad Section of NH-44 in State of Maharashtra on Engineering, Procurement &
Construction (EPC) Mode

Client : National Highways Authority of India


Authority Engineer : M/s Consulting Engineer Group
EPC Contractor : M/s.Vidya Infra Built Pvt. Ltd
CALIBRATION OF ADMIXTURE SCALE (BP @ Hinganghat)
Plant Make : Siemen ( Mobi mix750 ) Batching Plant No : 01
Capacity of Gauge : 30 Cum. DATE OF CALIBRATION 5-Feb-20
Trial 1 Trial 2 DUE DATE OF CALIBRATION 05-Aug-20
Actual Load Average of
Unload in Average
Applied Load in gm Load in gm Unload in gm Loading & Remarks
gm variations
[gm] unloading
0 0 0 0 0 0.0 0.0

500 500 500 500 500 500.0 0.0

1000 996 996 998 999 997.3 -0.3

1500 1495 1496 1496 1496 1495.8 -0.3

2000 1993 1995 1999 1999 1996.5 -0.2

2500 2498 2497 2499 2499 2498.3 -0.1

3000 2996 2994 2995 2996 2995.3 -0.2

3500 3497 3497 3496 3496 3496.5 -0.1


% variation -0.13

Calibration Of Admixture scale of (BP Hinganghat)


4000.0
y = 0.9989x - 0.7083

3500.0

3000.0
Actual load in (gms)

2500.0

2000.0

1500.0

1000.0

500.0

0.0
0 500 1000 1500 2000 2500 3000 3500 4000

Avg of Loading/Unloading (Kg)

Contractor's Rep. Authority Engineer


Date Date

You might also like