EQUIPMENT AND TOOL MAINTENANCE SCHEDULE

EQUIPMENT TYPE Masonry One-bagger Mixer


EQUIPMENT CODE Masonry 01 to 10
LOCATION Practical Work Area

Schedule for the Month of April 2020


ACTIVITIE MANPOWER
S
Daily Every Weekly Every Month Remarks
other 15th ly
day Day

1.Clean x Activity is
and check done
the parts Trainer/Trai before and
and engine nee’s after
of 1 bagger working
mixer
2.Clean and x Activity is
check all done
tools and before and
equipment after
for CHB working
Trainer/Trai
laying and
nee’s
Plastering
work – dust
and
unnecessar
y materials
3. Remove x Activity is
and replace done
all tools Trainer/Trai before and
that are nee’s after
destroyed working
or damaged

TRAINERS Date Developed: Document No.


METHODOLOGY September 2020 Issued by:
1 NTTA
Developed by: Page 207
KARL JUMA M. Revision #
MASONRY NC II JACLA
4. Turn off x Activity is
the unit done
Trainer/Trai
and lights before and
nee’s
when not in after
use working
5. Run the x Activity is
equipment done
for 5 before and
minutes after
and observe working
unusual
Trainer/Trai
noise or
nee’s
abnormal
operation; if
repair is
necessary
bring to the
technician
Special Instruction:
Maintain one bagger mixer according to maintenance schedule, follow user’s
manual

Trainer : Karl Juma M. Jacla

TRAINERS Date Developed: Document No.


METHODOLOGY September 2020 Issued by:
1 NTTA
Developed by: Page 208
KARL JUMA M. Revision #
MASONRY NC II JACLA