Project Impact Analysis For Flood Control/Drainage Program
Project Impact Analysis For Flood Control/Drainage Program
Project Impact Analysis For Flood Control/Drainage Program
Name of Project: OO2: Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Dike within
Bicol River Basin, Brgy. San Vicente, Libmanan Camarines Sur
Description: Construction of Concrete Dike on Steel Sheet Pile
Goals/Objectives: To mitigate flooding in the areas affected by the River Flow during Typhoon and Heavy Rains and protect the river banks from erosion.
Note: Hydrologic Analysis is based on the available data from Google Map (elevations) and PPA Manuals (Highest Water Level Elevations-Table A page 13. All data are subject
for verification and complete Hydrologic/Hydraulic design will be conducted during Detailed Engineering phase to include Geotechnical, Tidal Analysis, Slope and stability
Analysis and other required Design parameters.
3. Inundation Period 3 days 1 day considering the maximum experienced flood level and the site is situated within
the Bicol river basin
4. Affected/Protected Popuplation San Vicente 1,815 pop. San Vicente 1,200 pop. see attached population data based on 2015 Census of Population
(assumed 10% marginal error)
5. Flood damage a. Houses: 348 households @ P100, 000 10% x 34.8 M = 3.48 M (assumed 10% Data based on Libmanan MMDRRMC records
(type & number of structures, per hh = 34.8 Million per occurrence marginal error)
properties or corps, estimated
worth damages if Flood Control
Structure is not built b. Other Structures: may include
commercial and other establishments
a. River Wall
b. Revetments
c. Dikes 164.00 l.m. Proposed length is based on initial field validation and survey. Actual length
should be determined during preliminary detailed engineering once funding
is approved.
d. Channels
e. Spur Dikes
f. Others