Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

WORK INSTRUCTION

REBUILD ATLAS

Customer Description PN
Atlas Copco Drillhead Rebuild 3719011191 Rebuild
Drawing Operation
3719011191 Rebuild
Date Issued by Approved
2014-12-05 MF

INSTRUCTION STEP 1

At disassembly the general procedure is to follow the Assembly instruction but in


the reverse order.

However, it is important to follow these instructions in order to not damage the Drill
head at disassembly.

1. Before splitting the Housing parts it is important to unthread the Set screw
0192124400 in the shift fork (enough to release the piston).

2. Remove the Piston assembly including the spring

Tillhör:Produktion Giltig från: 050629


WORK INSTRUCTION
REBUILD ATLAS

Customer Benämning Art nr


Atlas Copco Drillhead Rebuild 3719011191 Rebuild
Ritn. Nr Operation
3719011191 Rebuild
Datum Utf. Godkänd
MF

INSTRUCTION STEP 2

3. Rotate the Shift fork away from the Piston position (Turn the output or inut shaft
clockwise until the fork hits the Countershaft)

Shift fork

4. Remove the Screw in the Block 3719011121

Tillhör:Produktion Giltig från: 050629


WORK INSTRUCTION
REBUILD ATLAS

Customer Benämning Art nr


Atlas Copco Drillhead Rebuild 3719011191 Rebuild
Ritn. Nr Operation
3719011191 Rebuild
Datum Utf. Godkänd
MF

INSTRUCTION STEP 3

5. As the Housing separates the Input shaft must be pressed down. The input shaft
is a part of the lower housing assembly. Press with a hydraulic piston or with a
plastic mallet (Remove nut and washer)

Input shaft

Tillhör:Produktion Giltig från: 050629

You might also like