Project: RDMP-JO-Building PKG 1 Title: Bar Bending Schedule A B C D Dia. Length (M) QTY Unit Weight (KG/M) Total Length (M) Total Weight (KG)
Project: RDMP-JO-Building PKG 1 Title: Bar Bending Schedule A B C D Dia. Length (M) QTY Unit Weight (KG/M) Total Length (M) Total Weight (KG)
Project: RDMP-JO-Building PKG 1 Title: Bar Bending Schedule A B C D Dia. Length (M) QTY Unit Weight (KG/M) Total Length (M) Total Weight (KG)
COLUMN
B
1 C1 400 X 400 300 5700 0 0 D25 3.85 6.00 16 4 384 1478.94
A C
C
2 C1 400 X 400 A C 400 450 75 0 D10 0.62 1.85 27 4 199.8 123.28
C
3 C1 400 X 400 A 300 300 75 0 D10 0.62 1.35 7 4 37.8 23.32
C
B
4 C1 400 X 400 A 75 300 75 0 D10 0.62 0.45 27 4 48.6 29.99
C
B
5 C1 400 X 400 A 75 300 75 0 D10 0.62 0.45 7 4 12.6 7.77
C
B
6 C1 400 X 400 A 75 300 75 0 D10 0.62 0.45 34 4 61.2 37.76
C
QTY
REMARK
(PCS)
32 MAIN BAR
17 HOOP BAR S1
4 HOOP BAR S2
5 HOOP BAR S1
2 HOOP BAR S2
6 HOOP BAR