VW/AUDI/SKODA/SEAT-
Formula Q concrete
Formula Q capability
Formula Q new parts
Formula Q ready to go into mass production (2-day
production)
Renault/Nissan -
ANPQP - (Alliance new Product Quality Procedure)
PSA (Peugeot und Citroen) – AQP
Land Rover - FGTC (Ford Global Terms and Conditions)
Porsche - Quality Guideline for Suppliers
Contd….
Contd….
Input Output
Customer Product
(E.g. Customer Company’s Internal Activities (E.g. Customer
with needs) ( PLG, MFG, QA, PUR, whose needs have
MAINT ,TRG, QC & MGMT ) been met)
PROCESS
TÜV SÜD South Asia 29 April 2015
Terms & definitions
PROCESS:
Any Activity or Group of Activities that takes an Input, adds Value to it, and
provides an Output to an Internal or External Customer. Processes use an
Organization’s Resources to provide Definitive Results.
PROCESS:
Is a chain of value added activities
delivering a product or a service to a customer (internal or external) of the
process
INPUT OUTPUT
Customer who has a need Customer who has a need met
Key Question
How does an organization develop effective and efficient COPs?
Answer
Support processes
Analysis of a COP
O DEPARTMENT “A”
ACTIVITY 1
ACTIVITY 2
ACTIVITY 3
ACTIVITY 4
All Service Processes and Processes that support COPs. E.g.- Internal
and external communication process, operation of library, admission
process
Examples
Management Process (MP):
All such processes which establish the quality policy, objectives and
goals, provide necessary and adequate resources and actions to
achieve the same.
Examples
AND PARTICULARLY
• PROCESS APPROACH
• SYSTEMATIC IDENTIFICATION AND MANAGEMENT OF
THE VARIOUS PROCESSES EMPLOYED WITHIN AN
ORGANIZATION,
AND PARTICULARLY
Elements 4 to 8
1.1 General
1.1 General
1.2 Application
1.2 Application
2 NORMATIVE REFERNCES
The reference standard is ISO 9000
Note:
Here terms & definitions for the automotive industry are listed
to round off general terms & definitions in line with ISO
9000:2008
Note :
Requirements based on ISO 9001:2008 – process model
Comment :
Note :
The specific requirement of “ Documented procedure” not
used for all clauses.
ISO9000:2008 DEFINITION OF “Procedure” states “.. Specified
way to carry out an activity or a process” which may be
documented or not.
Note:
Scope statement to be specifically added matching the scope
of certification
Description of the processes, their interaction ( e.g.- activity
flow charts )
Any reduction in scope of the standard to be specifically
mentioned along with JUSTIFICATION FOR EXCLUSION
Permissible exclusions are limited to Section 7.3,
if the organization is not responsible for product design.
Exclusions do not cover the design of manufacturing
processes.
Note:
No modification except for “legibility” as such, although—
word “ data” no longer exists due to definition of the
document under ISO9000:2008 as “ information and its
support medium”
Phrase “master list or its equivalent”, has been removed
Note:
An organization's awareness of the importance to
meet customer requirements as well as regulatory
and legal requirements.
Note:
Determination of customer needs and expectations and
conversion into requirements
Note:
Commitment to meeting requirements and continual
improvement.
Act as a framework for determining and reviewing the quality
objectives (see 5.4.1)
The quality policy shall be reviewed for continuing suitability
Note:
Quality objectives shall be established at relevant functions
and levels
Quality objectives shall be measurable and consistent with
the Quality Policy
Note:
To ensure communication between the various levels and
functions regarding the processes of the quality
management system and its effectiveness.
5.6.1 General
The outputs from the management review shall include actions related
to
a) improvement of the quality management system and its
processes;
b) improvement of product related to customer requirements;
c) resource needs.
6.2.1 General
Note:
More focus on the competency (see 6.2.2)
Note:
Competency needs shall be identified.
Effectiveness of provided training shall be evaluated with
relevance to the organization.
Employees awareness of the relevance and importance of their
activities and their contribution to achieve the quality
objectives shall be ensured.
6.2.2.2 Training
Note:
Formal consideration required to identify, provide the
infrastructure needed to support activities.
Maintenance to cover all such facilities
Note:
Identify and manage those human and physical factors of the
work environment needed to achieve conformity of product
and/ or services
Examples of Human factors - Personal protective
equipment( safety), hygiene, ergonomics, interpersonal
relations, welfare etc.
Physical Factors - Lighting, temperature, noise, air quality,
vibration, etc.
7.1.3 Confidentiality
Note:
Identifying customer requirements stated and implied
(completeness, fitness for purpose, obligations and legal
requirements, availability, delivery, support)
Note :
Consideration of cost elements or prices not included.
Note :
Clearer, Specific requirement for review and amendment of
existing documentation, where product requirements are
changed.
Note:
Consideration in planning for the review, verification and
validation activities/ stages also added.
Note:
Need for Information gathering from previous similar designs.
The responsibility of gathering data is specified
Example: Product reliability data, performance history,
warranty record, etc.
Note :
Wherever applicable, validation shall be defined, planned and
completed prior to the delivery or implementation of the
product and/or service.
Where it is impossible to undertake full validation prior to
delivery or implementation, partial validation of the design or
development outputs shall be undertaken to the maximum
extent practical.
Need to record results of validation and necessary action
specified
Note :
The type and extent of control these processes shall be
dependent upon the effect on product realization or the final
product
The establishment of selection and evaluation criteria
becomes a specific requirement.
Records of such evaluations to be maintained.
The organization shall plan and carry out production and service
provision under controlled conditions. Controlled conditions shall
include, as applicable:
a) the availability of information that describes the characteristics of
the product;
b) the availability of work instructions,as necessary
c) the use of suitable equipment
d) the availability and use of measuring and monitoring devices;
The organization shall provide resources for tool & gauge design,
fabrication & verification activities.
The organization shall establish & implement a system for
production tooling management including:
Maintenance & repair facilities & personnel;
Storage & recovery;
Set-up;
Tool change programme for perishable tools;
Tool design modification documentation, including
engineering change level;
Note :
All manufacturing Processes shall be validated .
Method / arrangements used needs to be defined shall
include, as applicable:
Qualification of processes
Qualification of equipment and/or personnel
Use of specific procedures
Requirements of records
Re-validation
8.1General
4.17
Note :
More clarity on subject of independence
Note:
Measurement and monitoring methods to be applied shall
confirm the continuing ability of each process. ( e.g.-
accuracy, timeliness, dependability, reaction time, cycle time,
efficiency etc…-)
Note:
Product release before completing all specified activities shall
be approved by the customer,where applicable.
Though the steps in inspection are not specified the intent is
to meet specified Quality requirements during product
realization or in quality plans.
Note :
The organization shall take appropriate action,when
nonconforming products are detected after delivery or during
use.
When nonconforming product is corrected it shall be subject to re-
verification to demonstrate conformity to the requirements.
Responsibility for action by organization extended to post
delivery.
Note :
Trends analysis made a specific requirement.
Selection of data relevant to determining continual
improvement efforts becomes incumbent upon an
organization.e.g.- external audit results, complaints and
feedback from customer, surveys, marketing and/or field
inputs.
Note:
Selective and priority approach for selection of continual
improvement activities which are in the state of
conformance. Example - Employee participation (idea)
scheme, Quality improvement projects, Innovation teams etc.
Note:
Clarity in approach
Step by step activities are defined
Clear cut guidelines and step by step working procedures defined for :
Management Review
Design Input and Output
Purchasing Information
Analyzing of Data
Preparation of Work Instructions
Preparation of Quality System Documentation