SL NO.

DESCRIPTION OF WORK OFFER SENT PO RECEIVED WORK PROGRESS BILL RAISED PAYMENT RECEIVED
1 PRECLEANING BUILDING ü ü DONE ü ü
2 SPENT EARTH STORAGE YARD ü ü DONE ü ü
3 FOUNDATION FOR HCL TANK ü ü DONE ü ü
MONORAIL FOR EXPANDER
4
SECTION ü ü DONE ü ü
5 COMPOUND WALL ü ü DONE ü ü
SAFE WORKING LOAD FOR
6
EXISTING JIB CRANE ü ü DONE ü ü
190 KG MONORAIL TO LIFT GEAR
7
BOX OVER COT TANK ü ü DONE ü ü
COOLING TOWER WATER LINE
8
SUPPORT ü ü DONE ü ü
DYKE WALL FOR CAUSTIC
9
UNLOADING ü ü DONE ü ü
DYKE WALL FOR H2SO4
10
UNLOADING ü ü

STRUCTURAL DESIGNING ABOVE


11 DECANTER FOR GEARED TROLLEY ü ü DONE ü ü
OR JIB CRANE DESIGN.

STRUCTURAL DESIGN &


PLATFORM FOR CRACKER ROLLS
12
[330 KGS ACTUAL WEIGHT] ü ü IN PROGRESS
HANDLING.

SLOT CUTTING ON THE RCC SLAB


13
FOR MAINTENANCE. ü ü YET TO START

SEP COOLING TOWER WATER


14
LINE SUPPORT. ü ü YET TO START

STRUCTURAL SUPPORT FOR


15
BOILER FLUE GAS DUCT. ü ü YET TO START

M.S RACK DESIGN FOR CABLE


16
LAYING. ü
STABILITY CERTIFICATION OF ALL
17 STRUCTURAL/CIVIL BUILDINGS. ü ü YET TO START

 ROOM EXTENSION INFRONT


18
OF LAB. ü
19 INTERNAL CABINET EXTENSION. ü ü DONE û
20 ROAD WORK ü ü DONE ü ü
REPAIR WORK FOR FLOORING AT
21
FLAKER AREA ü ü DONE û
Solution for Vibrating Existing
22
column ü
23 Deputing civil engineer ü
24 Meal Bagging Machine ü ü DONE û
SUPERVISION OF PRECLEANNG
25 BLDG ü ü DONE û