5.70
B A STRUCTURAL GENERAL NOTES:

3.95

1.00

A A
0.15
C1-F1 C1-F1

0.30
1.00

H
J
EXHAUST PIPE

0.53
EXHAUST

1.85
WF-1

WF-1
4.00

4.00
SILENCER

0.30
FLEXIBLE PIPE

1.20
AIR OUTLET SHUTTER

WF-1
TRANSFORMER

B B CONCRETE PAD

0.40
0.12
C1-F1 C1-F1

0.82
0.70
GENERATOR FOUNDATION

1.20

1.20
5.70

FOUNDATION PLAN

1.50
ST

0.30
1 01

0.30
1 2

400
5.70

200
f

500
ST FOUNDATION DETAIL
3 01

A A
TRUSS 1

TRUSS 1

TRUSS 1
4.00

4.00

0.39
0.60

B B 4.99 0.60

0.25
0.60
1.00

0.60
0.60
0.15
0.15 0.60

1.00

0.80 2.55 2.55 0.80


TRUSS 1
0.30

0.30

0.15
7.29
1.03
ST SCHEDULE OF BEAMS 4.85

4 01
ST ROOF FRAMING PLAN ST SCHEDULE OF TRUSSES
2 01
5 01

ENGR. ROLANDO JAMES A. BAUTISTA ENGR. ROLANDO JAMES A. BAUTISTA


AS-BUILT BATCHING PLANT ENGR. NOEL C. CUYA ST
(GENSET ROOM) Assistant Vice President for Operation

AHNEX BUILDERS AND READYMIX 01


CORPORATION