FIT UP REPORT

REPORT No. F.U- 01 DATE 22/08/2020


PROJECT NAME PROTECTION WORK FOR PIPELINE STRUCTURES
PROJECT No. 560-C37 TANK No. E4 IRRIGATION TANK
CLIENT ROYAL COMMISSION, JUBAIL
APPLICABLE CODE API 653 WPS No. WPS-RSCC-SMAW-01
DRAWING No. 560-802-20VS-AE-002 PLATE THICKNESS 6 (mm)

RESULT
JOINT NO. JOINT TYPE FIT UP DATE REMARKS
ACCEPT REJECT
AJ1 Butt Joint 22/08/2020 ACCEPT -------
AJ2 Butt Joint 22/08/2020 ACCEPT -------
AJ3 Butt Joint 22/08/2020 ACCEPT -------
AJ4 Butt Joint 22/08/2020 ACCEPT -------
AJ5 Butt Joint 22/08/2020 ACCEPT -------
AJ6 Butt Joint 22/08/2020 ACCEPT -------
AJ7 Butt Joint 22/08/2020 ACCEPT -------
AJ8 Butt Joint 22/08/2020 ACCEPT -------

COMPANY RAWABI SPECIALIZED CONTRACTING COMPANY ROYAL COMMISSION

JOB QA/QC Mechanical Engineer Senior Field Mechanical Engineer

NAME Gaber Mohamed Farghly Nabhan Said Kolathod

DATE 23/08/2020 23/08/2020

SIGNATURE