Professional Documents
Culture Documents
Revision History: General Metal Container Corporation of The Philippines
Revision History: General Metal Container Corporation of The Philippines
62 General Luis St., Bo. Kapre, Nagkaisang Nayon, Novaliches, Quezon City, Philippines
REVISION HISTORY
Rev. Eff. Date DCN No. Description of Change Requestor
0 3/15/18 18-020 Initial Release MJ Cordero
This specification and the information herein is the property of GEMECO and is issued in strict confidence.
It shall not be reproduced, copied or given to a third party without express permission from GEMECO.
1.0 PURPOSE
The purpose of this specification is to establish a tool for analyzing and organizing information for
Quality Control that is intended to;
1.1 Make data gathering easy.
1.2 Speed up the collection of data.
1.3 Makes an idea more adaptable to comparisons and analysis.
1.4 Be able to arrange data systematically.
2.0 SCOPE
The specification contained in this document is Stop and Go Checklist applied to Coil Cutting
Printing Line, Lidline and Bodyline Department.
p y
o
C
5.0 SAFETY
N/A
e d
l
6.0 REQUIREMENTS
l
6.1 Stop and Go Checklist under this spec revision shall be used in the Coil Cutting, Printing Line
o
Lidline and Bodyline.
r
6.2 Changes and update in the Stop and Go Checklist must follow the Document Change Notice
t
(DCN) procedure.
7.0 PROCEDURE
o n
7.1 Fill-up pertinent data as required in this document.
C
8.0 RESPONSIBILITY
8.1 It shall be the responsibility of the Foreman/Supervisor to utilize this document as required.
8.2 It is the responsibility of the Production Clerk to always furnish a copy of this document
available in the production line.
9.0 SHUTDOWN
N/A
p y
o
C
e d
ll
ro
n t
o
C