Road Base One Layer: Typical Details of Encasement AROUND H.V Cable
Road Base One Layer: Typical Details of Encasement AROUND H.V Cable
1.ALL DIMENSIONS ARE IN MILLIMETER AND LEVELS IN METERS UNLESS OTHERWISE SPECIFIED.
2.THE PLANT ZERO LEVEL (±0.00) OF (AWEER PHASE IV) CORRESPONDS TO SITE ELEVATION (+43.20) DMD.
3.ALL LEVELS ARE WITH RESPECT TO PLANT ZERO LEVEL (±0.00) .
4.PLANT LOCAL REFERENCE COORDINATE AT CENTER OF SOUTH-WEST CORNER STEEL COLUMN OF UMB
BUILDING WHICH IS E=5000.000m,N=10000.000m OF PLANT COORDINATE CORRESPONDS TO
E=509011.189,N=2782628.967 OF DLTM..
5.ALL COORDINATES ARE BASED ON LOCAL COORDINATES SYSTEM.
6.CONCRETE WORKS SHALL BE IN ACCORDANCE WITH PROJECT VOL.ll G05.4/SECTION 7 FOR CONCRETE
WORKS.
7.THE MINIMUM CUBE COMPRESSIVE STRENGTH OF CONCRETE FOR SUBSTRUCTURES SHALL BE GRADE
C 32/40 Mpa WITH MAXIMUM FREE WATER CEMENT RATION 0.4 AND MINIMUM CEMENT CONTENT
400 Kg/m3 , AS PER PROJECT SPECIFICATION VOL.ll G05.4/CLAUSE 7.8.7 .
8.REINFORCEMENT STEEL SHALL CONFORM TO BS4449 GRADE 460 AS PER PROJECT SPECIFICATION VOL.ll
G05.4/CLAUSE 7.6 & 7.8.6.
9.REINFORCING BARS FOR SUBSTRUCTURES SHALL BE EPOXY COATED AS PER ASTM A775 AND THE
AVERAGE THICKNESS OF THE COATING SHALL BE 250 μm AS PER PROJECT SPECIFICATION VOL.ll
G05.4/CLAUSE 7.8.6.
10.COVER OF CONCRETE EXPOSED TO UNDERGROUND AND GROUND WATER SHALL BE 75 mm AS PER
PROJECT SPECIFICATION VOL.ll G05.4 /CLAUSE 7.8.9.7.
X X X 11.REINFORCING LAP SPLICE, DEVELOPMENT LENGTH AND STANDARD HOOK REQUIREMENTS SHALL BE
AS PER ACI318-11/CHAPTER12.
048 049 050 12.ALL EXPOSED EDGES SHALL BE CHAMFERED 25/25mm BY USING CHAMFER STRIPS.
13.WATERPROOFING SHALL BE APPLIED IN ACCORDANCE WITH THE PROJECT SPECIFICATION VOL.
ll/CLAUSE 13
PART PART
T.O.S TOP OF STEEL
B.O.S TOP OF STEEL
PART 12
11 11
00 F.G.L FINISH GRADE LEVEL
26 2600 2600 T.O.P TOP OF PEDESTAL
0
min. 300mm
min. 300mm
80 50
0
50
0 800 800 500 500 800 800 500 500 800 T.O.F TOP OF FOUNDATION
B.O.F BOTTOM OF FOUNDATION
mm MILLIMETERS
+2.245 +2.232 +2.217
LEVEL IN ELEVATIONS
TOC TOC TOC
C3 C5 C5 PLAIN CONCRETE
F F F REINFORCED CONCRETE
700
700
700
(+1.85)/45.05 DMD TOC F19 (+1.85)/45.05 DMD TOC (+1.85)/45.05 DMD TOC F19
930
F19 SERVICE WATER LINE DN40
600
600
600
SERVICE AIR LINE DN40
500
515
515
515
FORMATION LEVEL OF FOUNDATION COMPACTED UP TO 98% COMPACTED UP TO 98%
COMPACTED UP TO 98%
575
575
575
PROPOSED PRECAST PROPOSED PRECAST PROPOSED PRECAST
100
100
100
PROTECTION COVER PROTECTION COVER PROTECTION COVER
400 600 400 400 600 400 400 600 400
00 00 00 0 0 00 00
Road base one layer 18 1 8 PCC 18 18 PCC 18 18 PCC
Road base one layer Road base one layer Road base one layer
1800
1800
Ø16@150mm
200
KEEY PLAN
LOCATION OF FOUNDATION
COMPR.0.S
PH.1 ODSE
BSDG
PHASE.1
GAS PRESSURE REDUCING STATION BUSHINGS
(NGPRS) SRSWH
GNIDLIUB LORTNOC
ROSSERPMOC SAG
F5080
F5070
PH.1
EDG 400 KV H STATION GIS BUILDING
36'' NG PIPE LINE FROM DUSUP
F5050
NOITATS ROSSERPMOC SAG LEUF
LARENEG POHSKROW
TIP NOITAROPAVE
LACIRTCELE
GEN. TRANSFORMERS GEN.C.W GEN.C.W GEN.C.W GEN.C.W GEN.C.W GEN.C.W
GNIDLIUB
X'FMR
SW.GEAR &
GEN.
RADIATORS RADIATORS RADIATORS RADIATORS RADIATORS RADIATORS AREA TO KEEP FREE
CONTROL BLDG
X'FMR FOR PHASE IPCCG
GEN. GEN. GEN. GEN. UTBRADE
X'FMR X'FMR X'FMR X'FMR AUX.
CAR PARKING
X'FMR
STORE AUX.
AUX.
X'FMR
X'FMR L.O CW L.O CW L.O CW L.O CW L.O CW L.O CW
AUX. AUX. AUX. AUX.
RADIATORS H30-GTR RADIATORS RADIATORS H20-GTR RADIATORS RADIATORS H10-GTR RADIATORS
X'FMR X'FMR X'FMR X'FMR
2.ESAHP
CCR BUILDING LIFE BASE)7O500Lm2
LOCAL CONTROL BUILDING LOCAL CONTROL BUILDING LOCAL CONTROL BUILDING
CCP 34
CCP 24
CCP 14
CCP 45
CCP 35
CCP 25
CCP 15
ERALF 2.HP
GAS TURBINE BUILDING
(4X204.60 MW)
KNAT SAG.NGI
GAS TURBINE BUILDING
ELOP .M4
25/15#
T.G-45H
T.G-35H
T.G-25H
T.G-15H
T.G-34H
T.G-24H
T.G-14H
G.T. GAS TURBINE BUILDING GAS TURBINE BUILDING GAS TURBINE BUILDING
)WM06.402(
)WM06.402(
)WM06.402(
)WM06.402(
)WM43.631(
)WM43.631(
)WM43.631(
WORKSHOP BLOCK-3 BLOCK-2 BLOCK-1
T.G-6H
T.G-5H
T.G-4H
T.G-3H
T.G-2H
T.G-1H
)WM41.101(
)WM41.101(
)WM41.101(
)WM41.101(
)WM41.101(
)WM41.101(
(NGPRS)
PHASE.2
KNAT SAG.NGI
GAS PRESSURE REDUCING STATION
45/35#
RELOOC RIA
RELOOC RIA
RELOOC RIA
RELOOC RIA
RELOOC RIA
RELOOC RIA
RELOOC NAF NIF
2OC
2OC
2OC
2OC
2OC
2OC
FIN FAN
COOLER
FIN FAN FIN FAN FIN FAN
FIN FAN FIN FAN COOLER COOLER FIN FAN COOLER
FIN FAN
COOLER COOLER COOLER COOLER
HTAB RETAW
PHASE.2
SRETAEH
MOOR.CELE
D.M.WATER
SAG/O.F
STORAGE TANK
PHASE.3
PH.3 AIR COMP. FUEL OIL FORWARDING
REFFUB GN
REFFUB GN
REFFUB GN
SAND BLDG. SUB STATION FOR PUMP HOUSE PH.2
BLASTING CHILLER YARD AIR COMP.
CH.WATER HVAC/F.O P/HOUSE
P/H
ESUOH/P GNIDRAWROF
LIO LEUF 2.ESAHP
IRRIGATION
PHASE.1
D.M.WATER
STORAGE TANK STORES
FUEL OIL UNLOADING STATION 62
PHASE.2 & 3
KNAT MAOF
(NGPRS)
PHASE.3
GAS PRESSURE REDUCING STATION (4x2.20 MIG)
PHASE.2 DFO STORAGE TANKS DFO STORAGE TANKS
(3x2.93 MIG) PHASE.1
NOITATS ECNALUBMA/ERIF
EGB-12 EGB-13 STORM WATER SOAKWAY
GUARD OFFICE
WATER USE
BATH HEATERS HO
OILY WATER E
PH.3 FLARE SEPARATOR CHECKER GAT
OFFICE
QUE
MOS
NEW ADMINISTRATION BUILDING AREA
BP5
200 200
Road base one layer REFRENCE DOCUMENTS:
DOCUMENT No REV DOCUMENT DESCRIPTION
100
400 400
Rev.
Employer:
Date Name
Project:
Note
Engineer: Contractor:
Consortium
06/07/2020
U/G Service Lines (Service Air – Instrument Air Sheet:
Checked: SHERIF SALMAN
-Service Water) Rerouting
Supersedes:
Origin. No.
3761800008-U-42-M-D-40050_B