GENERAL NOTES:

1.ALL DIMENSIONS ARE IN MILLIMETER AND LEVELS IN METERS UNLESS OTHERWISE SPECIFIED.
2.THE PLANT ZERO LEVEL (±0.00) OF (AWEER PHASE IV) CORRESPONDS TO SITE ELEVATION (+43.20) DMD.
3.ALL LEVELS ARE WITH RESPECT TO PLANT ZERO LEVEL (±0.00) .
4.PLANT LOCAL REFERENCE COORDINATE AT CENTER OF SOUTH-WEST CORNER STEEL COLUMN OF UMB
BUILDING WHICH IS E=5000.000m,N=10000.000m OF PLANT COORDINATE CORRESPONDS TO
E=509011.189,N=2782628.967 OF DLTM..
5.ALL COORDINATES ARE BASED ON LOCAL COORDINATES SYSTEM.
6.CONCRETE WORKS SHALL BE IN ACCORDANCE WITH PROJECT VOL.ll G05.4/SECTION 7 FOR CONCRETE
WORKS.
7.THE MINIMUM CUBE COMPRESSIVE STRENGTH OF CONCRETE FOR SUBSTRUCTURES SHALL BE GRADE
C 32/40 Mpa WITH MAXIMUM FREE WATER CEMENT RATION 0.4 AND MINIMUM CEMENT CONTENT
400 Kg/m3 , AS PER PROJECT SPECIFICATION VOL.ll G05.4/CLAUSE 7.8.7 .
8.REINFORCEMENT STEEL SHALL CONFORM TO BS4449 GRADE 460 AS PER PROJECT SPECIFICATION VOL.ll
G05.4/CLAUSE 7.6 & 7.8.6.
9.REINFORCING BARS FOR SUBSTRUCTURES SHALL BE EPOXY COATED AS PER ASTM A775 AND THE
AVERAGE THICKNESS OF THE COATING SHALL BE 250 μm AS PER PROJECT SPECIFICATION VOL.ll
G05.4/CLAUSE 7.8.6.
10.COVER OF CONCRETE EXPOSED TO UNDERGROUND AND GROUND WATER SHALL BE 75 mm AS PER
PROJECT SPECIFICATION VOL.ll G05.4 /CLAUSE 7.8.9.7.
X X X 11.REINFORCING LAP SPLICE, DEVELOPMENT LENGTH AND STANDARD HOOK REQUIREMENTS SHALL BE
AS PER ACI318-11/CHAPTER12.
048 049 050 12.ALL EXPOSED EDGES SHALL BE CHAMFERED 25/25mm BY USING CHAMFER STRIPS.
13.WATERPROOFING SHALL BE APPLIED IN ACCORDANCE WITH THE PROJECT SPECIFICATION VOL.
ll/CLAUSE 13

11520 10470 LEGEND:

PART PART
T.O.S TOP OF STEEL
B.O.S TOP OF STEEL

PART 12

11 11
00 F.G.L FINISH GRADE LEVEL
26 2600 2600 T.O.P TOP OF PEDESTAL
0

min. 300mm

min. 300mm
80 50
0
50
0 800 800 500 500 800 800 500 500 800 T.O.F TOP OF FOUNDATION
B.O.F BOTTOM OF FOUNDATION
mm MILLIMETERS
+2.245 +2.232 +2.217
LEVEL IN ELEVATIONS
TOC TOC TOC
C3 C5 C5 PLAIN CONCRETE

F F F REINFORCED CONCRETE

+1.15 +1.15 +1.15

700
700

700
(+1.85)/45.05 DMD TOC F19 (+1.85)/45.05 DMD TOC (+1.85)/45.05 DMD TOC F19

930
F19 SERVICE WATER LINE DN40

INSTRUMENT AIR LINE DN25

600

600
600
SERVICE AIR LINE DN40

FORMATION LEVEL OF FOUNDATION FORMATION LEVEL OF FOUNDATION


500

500
515

515

515
FORMATION LEVEL OF FOUNDATION COMPACTED UP TO 98% COMPACTED UP TO 98%
COMPACTED UP TO 98%

575

575

575
PROPOSED PRECAST PROPOSED PRECAST PROPOSED PRECAST
100

100

100
PROTECTION COVER PROTECTION COVER PROTECTION COVER
400 600 400 400 600 400 400 600 400
00 00 00 0 0 00 00
Road base one layer 18 1 8 PCC 18 18 PCC 18 18 PCC
Road base one layer Road base one layer Road base one layer

1800

1800

Ø16@150mm
200

KEEY PLAN

LOCATION OF FOUNDATION

COMPR.0.S

PH.1 ODSE
BSDG
PHASE.1
GAS PRESSURE REDUCING STATION BUSHINGS
(NGPRS) SRSWH

24'' NG PIPE LINE FROM DUSUP

400 KV WARSAN GIS BUILDING 132 KV WARSAN GIS BUILDING

GNIDLIUB LORTNOC
ROSSERPMOC SAG

F5080

F5070
PH.1
EDG 400 KV H STATION GIS BUILDING
36'' NG PIPE LINE FROM DUSUP

F5050
NOITATS ROSSERPMOC SAG LEUF

SRELOOC SAG 1.ESAHP


SRELOOC LIO

LARENEG POHSKROW

TIP NOITAROPAVE
LACIRTCELE
GEN. TRANSFORMERS GEN.C.W GEN.C.W GEN.C.W GEN.C.W GEN.C.W GEN.C.W

GNIDLIUB
X'FMR
SW.GEAR &
GEN.
RADIATORS RADIATORS RADIATORS RADIATORS RADIATORS RADIATORS AREA TO KEEP FREE
CONTROL BLDG
X'FMR FOR PHASE IPCCG
GEN. GEN. GEN. GEN. UTBRADE
X'FMR X'FMR X'FMR X'FMR AUX.
CAR PARKING
X'FMR
STORE AUX.
AUX.
X'FMR
X'FMR L.O CW L.O CW L.O CW L.O CW L.O CW L.O CW
AUX. AUX. AUX. AUX.
RADIATORS H30-GTR RADIATORS RADIATORS H20-GTR RADIATORS RADIATORS H10-GTR RADIATORS
X'FMR X'FMR X'FMR X'FMR

GNIDLIUB .G.D.E 3.HP


NOITATS ROSSEPRMOC SAG LEUF
ERALF 1.HP

2.ESAHP
CCR BUILDING LIFE BASE)7O500Lm2
LOCAL CONTROL BUILDING LOCAL CONTROL BUILDING LOCAL CONTROL BUILDING

CCP 34

CCP 24

CCP 14
CCP 45

CCP 35

CCP 25

CCP 15
ERALF 2.HP
GAS TURBINE BUILDING
(4X204.60 MW)

KNAT SAG.NGI
GAS TURBINE BUILDING

ELOP .M4

25/15#
T.G-45H

T.G-35H

T.G-25H

T.G-15H

T.G-34H

T.G-24H

T.G-14H
G.T. GAS TURBINE BUILDING GAS TURBINE BUILDING GAS TURBINE BUILDING

)WM06.402(

)WM06.402(

)WM06.402(

)WM06.402(

)WM43.631(

)WM43.631(

)WM43.631(
WORKSHOP BLOCK-3 BLOCK-2 BLOCK-1

T.G-6H

T.G-5H

T.G-4H

T.G-3H

T.G-2H

T.G-1H
)WM41.101(

)WM41.101(

)WM41.101(

)WM41.101(

)WM41.101(

)WM41.101(
(NGPRS)
PHASE.2

KNAT SAG.NGI
GAS PRESSURE REDUCING STATION

45/35#

GNIRETEM & RETLIF SAG

GNIRETEM & RETLIF SAG

GNIRETEM & RETLIF SAG

RELOOC RIA

RELOOC RIA

RELOOC RIA

RELOOC RIA

RELOOC RIA

RELOOC RIA
RELOOC NAF NIF

RELOOC NAF NIF


RELOOC NAF NIF
PH.2
EDG

2OC

2OC

2OC

2OC

2OC

2OC
FIN FAN
COOLER
FIN FAN FIN FAN FIN FAN
FIN FAN FIN FAN COOLER COOLER FIN FAN COOLER
FIN FAN
COOLER COOLER COOLER COOLER

HTAB RETAW
PHASE.2

SRETAEH
MOOR.CELE
D.M.WATER

SAG/O.F
STORAGE TANK
PHASE.3
PH.3 AIR COMP. FUEL OIL FORWARDING

REFFUB GN

REFFUB GN

REFFUB GN
SAND BLDG. SUB STATION FOR PUMP HOUSE PH.2
BLASTING CHILLER YARD AIR COMP.
CH.WATER HVAC/F.O P/HOUSE
P/H

PHASE.3 DFO STORAGE TANKS F/F P/HOUSE EL.BUILDING WATER P/HOUSE


(3x2.93 MIG)

ESUOH/P REFSNART LIO LEUF 1.HP


COMP.HOUSE F/F WATER TANKS

LUBE & RECYCLE COOLERS CAR PARKING

ESUOH/P GNIDRAWROF
LIO LEUF 2.ESAHP
IRRIGATION

ENIL EPIP OFD ''02


50EGB30 50EGB20 50EGB10 POT.WATER
EGB-11 EGB-10 WATER
RESERVOIR
RESERVOIR
WORKSHOP
FUEL GAS COMPRESSORS AREA

PHASE.1
D.M.WATER
STORAGE TANK STORES
FUEL OIL UNLOADING STATION 62
PHASE.2 & 3

KNAT MAOF
(NGPRS)
PHASE.3
GAS PRESSURE REDUCING STATION (4x2.20 MIG)
PHASE.2 DFO STORAGE TANKS DFO STORAGE TANKS
(3x2.93 MIG) PHASE.1

CO2 X'FMRS ESDV SKID


PHASE.1
FUEL OIL & DEMIN.WATER
UNLOADING BAYS

GNIDLIUB NTS/S SAG LEUF


PRESSURE
FILTER SEPARATOR REDUCING 50EGB01 50EGB02 50EGB03
STATION

NOITATS ECNALUBMA/ERIF
EGB-12 EGB-13 STORM WATER SOAKWAY
GUARD OFFICE

OILY WATER ICE


N2 LPG
TREATMENT OFF
E
SW.PLANT TIM

WATER USE
BATH HEATERS HO
OILY WATER E
PH.3 FLARE SEPARATOR CHECKER GAT
OFFICE

QUE
MOS
NEW ADMINISTRATION BUILDING AREA

BP5

200 200
Road base one layer REFRENCE DOCUMENTS:
DOCUMENT No REV DOCUMENT DESCRIPTION
100

29/07/2020 AHMED ALI INCORPORATE E\E COMMENTS


B
400 400 06/07/2020 AHMED ALI FIRST ISSUE
A

400 400
Rev.

Employer:
Date Name

Project:
Note

Aweer Power Station 'H' Phase IV


GOVERNMENT OF DUBAI Dubai Electricity & Water Authority

Engineer: Contractor:
Consortium

TYPICAL DETAILS OF ENCASEMENT


eDF
AROUND H.V cable Originator: Stamp:

Date Name Drawing Title: Scale:


Gas Line foundation arrangement – Elevations AS SHOWN
Drawn: 06/07/2020 AHMED ALI

06/07/2020
U/G Service Lines (Service Air – Instrument Air Sheet:
Checked: SHERIF SALMAN
-Service Water) Rerouting
Supersedes:

Superseded by: Size: A1 PO No: 3761800008 File: 3761800008-U-42-M-D-40050_B

System: Annex: Document no.:

Origin. No.
3761800008-U-42-M-D-40050_B