INSPECTION TEST
FOGLIO DI
PLAN SHEET 2 OF 13
N°DI FABBRICA- SERIAL 2604/ 2605 / 2606 / 2607 SIGLA-ITEM 5-210D-HA-01 A/B/C/D
NUMBER
TYPE (TEMA) CONDENSATE STABILISER
N°DI DISEGNO-DRAWING N° 1427 SUPPLEMENTARY REBOILER
GOST DESIGN
GRAOUP CAT. 1
REFERENCE :
ALLEGATI / ATTACHMENTS:
INSPECTION CLASS : PIC.1
NOTE:
OFMECO MT 010- H R A /
ASME VIII Div.1 ed.2004
ASME VIII DIV.1 OFMECO PT 009
REVIEW NDE PROCEDURES Add.05 QUALITY
5 Ed.2004 Add.05 OFMECO RT 008
MT-PT-RT-UT-VT ASME V ed 2004 Add.05 CONTROL
OFMECO UT 011
OFMECO VT 012
H R R /
ASME VIII Div.1 Ed.2004 SNT – TC – 1 A OFMECO
NDE OPERATORS QUALITY
6 Add.05 Ed.2001 WRITTEN
REVIEW OF CERTIFICATION CONTROL
ASME V Ed.2004 ADD.05 PRACTICE
ASME II A H R R /
3.1 PRESSURE
APPROCED DATA
MATERIAL CERTIFICATES PARTS MATERIAL TEST QUALITY
7 SHEET
CHECK 2.2 NON REPORT CONTROL
4TPFC-00C-3PS-W000-
PRESSURE PARTS
0003
MATERIAL ARRIVAL AT THE H R R /
LOW STRESS
WORKSHOP PROCEDURE OFMECO MATERIAL TEST QUALITY
8 STAMPING MAY BE
IDENTIFICATION CHECK, MARKING MI 019 REPORT CONTROL
USED
TRANSFERING
SHELL
9
HEAT N° H / R /
SHELL BARREL MATERIAL TEST QUALITY
10 ASME VIII DIV.1 PLATE N°
CUTTING AND MARKING TRANSFER REPORT CONTROL
TEST N°
H / R /
ACCORDING TO
SHELL BARREL
ASME V ART.7 AND QUALITY
11 MT EXAMIN. LONGITUDINAL AND OFMECO MT 010 MT REPORT
ASME VIII DIV.1 CONTROL
CIRCUMFERENTIAL BEVELS
APPENDIX 6
H / / /
SHELL BARREL
12 / / / /
FORMING AND ROLLING
QUALITY H / M /
SHELL BARREL
OFMECO VT 012 AND ASME VIII DIV.1 CONTROL
13 LONGITUDINAL VISUAL FIT-UP AND WPS
WPS APPLICABLE AND WELDING
TACK WELDS
TECHNOLOGY
QUALITY H / R /
SHELL BARREL
CONTROL
LONGITUDINALS WELDING
14 WPS APPLICABLE WPS WPS AND
WELD TEST COUPON INCLUDED
WELDING
FOR CATEGORY A & B
TECHNOLOGY
H / / /
SHELL BARREL DIMENSIONAL QUALITY
15 DWG DGW
RE-ROLLING IF NECESSARY REPORT CONTROL
ACCORDING TO H / R /
SHELL BARREL ASME ASME V
QUALITY
16 MT EXAMINATION LONGITUDINAL OFMECO MT 010 ART.7 AND ASME MT REPORT
CONTROL
WELDS VIII DIV.1
APPENDIX 6
ACCORDING TO H R R /
SHELL
ASME V ART.2 QUALITY
17 RT EXAMINATION LONGITUDINAL OFMECO RT 008 RT REPORT
AND ASME VIII CONTROL
WELDS
DIV.1 UW-51
H / / /
SHELL BARREL
18 DWG DWG / /
ASSEMBLING
QUALITY H H M /
SHELL CONTROL
OFMECO VT 012 AND ASME VIII DIV.1
19 CIRCUMFERENTIAL VISUAL FIT-UP WPS AND
WPS APPLICABLE
AND TACK WELDS WELDING
TECHNOLOGY
QUALITY H / M /
CONTROL
SHELL
20 WPS APPLICABLE DWG WPS AND
CIRCUMFERENTIAL WELDS
WELDING
TECHNOLOGY
ACCORDING TO H R R /
SHELL ASME ASME V
QUALITY
21 MT EXAMINATION OFMECO MT 010 ART.7 AND ASME MT REPORT
CONTROL
CIRCUMFERENTIAL WELDS VIII DIV.1
APPENDIX 6
ACCORDING TO H R R /
SHELL
ASME V ART.2 QUALITY
22 RT EXAMINATION OFMECO RT 008 RT REPORT
AND ASME VIII CONTROL
CIRCUMFERENTIAL WELDS
DIV.1 UW-51
H / SW /
ACCORDING TO
NOZZLES TO SHELL
ASME V ART.7 AND MT REPORT QUALITY
23 MT EXAMINATION OF OPENINGS
OFMECO MT 010 ASME VIII DIV.1 CONTROL
AND BEVELS
APPENDIX 6
QUALITY H / M /
NOZZLES TO FLANGE CONTROL
OFMECO VT 012 AND ASME VIII DIV.1
24 VISUAL FIT-UP AND TACK WELD WPS AND
WPS APPLICABLE
WELDING
TECHNOLOGY
QUALITY H / M /
CONTROL
NOZZLES TO FLANGE
25 WPS APPLICABLE WPS WPS AND
CIRCUMFERENTIAL WELD
WELDING
TECHNOLOGY
ACCORDING TO H R R /
NOZZLES TO FLANGE ASME V ART.7 AND QUALITY
26 OFMECO MT 010 REV.4 MT REPORT
MT EXAMINATION OF WELDS ASME VIII DIV.1 CONTROL
APPENDIX 6
QUALITY H H SW /
NOZZLES TO SHELL CONTROL
OFMECO VT 012 AND ASME VIII DIV.1
27 VISUAL FIT-UP AND TACK WELD WPS AND
WPS APPLICABLE
WELDING
TECHNOLOGY
ACCORDING TO H R R /
NOZZLES TO SHELL ASME V ART.7 AND QUALITY
28 OFMECO MT 010 MT REPORT
MT EXAMINATION OF WELDS ASME VIII DIV.1 CONTROL
APPENDIX 6
ACCORDING TO H / R /
NOZZLES TO SHELL ASME V ART.4 AND QUALITY
29 OFMECO UT 011 UT REPORT
UT EXAMINATION OF WELDS ASME VIII DIV.1 CONTROL
APPENDIX 12
QUALITY H / R /
NOZZLES TO SHELL CONTROL
30 WELDING REINFORCING PADS WPS APPLICABLE WPS WPS AND
WELDING
TECHNOLOGY
NOZZLES TO SHELL H / R /
ASME V ART.10 APP.1 AIR PRESSURE 0.7 AIR TEST QUALITY
31 AIR TEST REINFORCING PADS
OFMECO AT 16 BAR REPORT CONTROL
QUALITY H / R /
SHELL CONTROL
32 WELD OF SADDLES AND EXTERNAL WPS APPLICABLE WPS WPS AND
ATTACHMENTS WELDING
TECHNOLOGY
ACCORDING TO H R R /
SHELL ASME V ART.7 AND QUALITY
33 OFMECO MT 010 MT REPORT
MT EXAMINATION OF WELDS ASME VIII DIV.1 CONTROL
APPENDIX 6
SHELL H / SW /
QUALITY
34 CHECK OF ROUNDNESS BY DWG DWG REPORT
CONTROL
TEMPLATE INSERCTION
HEAT N° H / / /
FLOATING HEADS: MATERIAL TEST QUALITY
35 DWG PLATE N°
CUTTING AND MARKING TRANSFER REPORT CONTROL
TEST N°
FLOATING HEAD: H R R /
ASME VIII DIV.1 DIMENSIONAL QUALITY
36 DIMENSIONAL CHECK AFTER COLD DWG
REPORT CONTROL
FORMING
ACCORDING TO H R R /
FLOATING HEAD
ASME V ART.7 AND QUALITY
37 MT EXAMINATION ON THE KNUCKLE OFMECO MT 010 NT REPORT
ASME VIII DIV.1 CONTROL
REGION AFTER COLD FORMING
APPENDIX 6
ACCORDING TO H / SW /
FLOATING HEADS:
ASME V ART.7 AND QUALITY
38 MT EXAMINATION CIRC.BEVELS OFMECO MT 010 MT REPORT
ASME VIII DIV.1 CONTROL
APPENDIX 6
QUALITY H H / /
ASSEMBLING FLOATING HEADS CONTROL
OFMECO VT 012 AND ASME VIII DIV.1
39 CIRCUMFERENTIAL VISUAL FIT-UP WPS AND
WPS APPLICABLE
AND TACK WELDS WELDING
TECHNOLOGY
ACCORDING TO H R R /
ASSEMBLING FLOATING HEADS
ASME V ART.7 AND QUALITY
40 MT EXAMINATION OFMECO MT 010 MT REPORT
ASME VIII DIV.1 CONTROL
CIRCUMFERENTIAL WELD
APPENDIX 6
ACCORDING TO H R R
ASSEMBLING FLOATING HEADS:
ASME V ART.4 AND QUALITY
41 UT EXAMINATION ON THE OFMECO UT 011 UT REPORT
ASME VIII DIV.1 CONTROL
CIRCUMF.WELD
APPENDIX 12
SHELL H R R /
COVER HEAD: ASME VIII DIV1 DIMENSIONAL QUALITY
42 DWG
DIMENSIONAL CHECK AFTER COLD REPORT CONTROL
FORMING
SHELL ACCORDING TO H R R /
COVER HEAD ASME V ART.7 AND QUALITY
43 OFMECO MT 010 MT REPORT
MT EXAMINATION ON THE KNUCKLE ASME VIII DIV.1 CONTROL
REGION AFTER COLD FORMING APPENDIX 6
SHELL H / R /
HEAT N° MATERIAL TEST QUALITY
44 COVER HEAD: ASME VIII DIV 1
PLATE N° REPORT CONTROL
CUTTING AND MARKING TRANSFER
SHELL ACCORDING TO H / R /
COVER HEAD: ASME V ART.7 AND QUALITY
45 OFMECO MT 010 MT REPORT
MT EXAMINATION CIRC.BEVELS ASME VIII DIV.1 CONTROL
APPENDIX 6
QUALITY H H SW /
SHELL
CONTROL
COVER HEAD TO FLANGE: OFMECO VT 012 AND ASME VIII DIV.1
46 WPS AND
CIRCUMFERENTIAL VISUAL FIT-UP WPS APPLICABLE
WELDING
AND TACK WELDS
TECHNOLOGY
SHELL ACCORDING TO H R R /
ASSEMBLING COVER HEAD: ASME V ART.7 AND QUALITY
47 OFMECO MT 010 MT REPORT
MT EXAMINATION ASME VIII DIV.1 CONTROL
CIRCUMFERENTIAL WELD APPENDIX 6
SHELL ACCORDING TO H R R /
ASSEMBLING COVER HEAD: ASME V ART.2 QUALITY
48 OFMECO RT 008 RT REPORT
RT EXAMINATION OF WELDS AND ASME VIII CONTROL
DIV.1 UW 51
SHELL H H W /
DIMENSIONAL QUALITY
49 INTERNAL VISUAL AND DWG OFMECO VT 012
REPORT CONTROL
DIMENSIONAL EXAMINATION
ACCORDING TO H R R /
SHELL ASME V ART.4-7
OFMECO MT 010 MT REPORT QUALYTY
50 MT-UT EXAM.ON THE BASE METAL AND ASME VIII
OFMECO UT 011 UT REPORT CONTROL
BEFORE LIFTUNG LUG WELDING DIV.1
APPENDIX 6 - 12
ABREVIATION: OFM = Ofmeco
INSPECTION CODES: H = HOLD POINT SW = SPOT WITNESS W = WITNESS POINT C = CERTIFICATE REQUIRED M = MONITOR A = APPROVAL REQUIRED R = REVIEW OF DOCS.
Y:\ibassoli\COMMESSE\Commesse 2007\1021\5-210D-HA-01 A,B,C,D NF 2604-05-06-07\ITP Rev.3.doc
INSPECTION TEST PLAN PAGINA 9 DI 13
Client: PETROFAC E&C INTERNATIONAL LIMITED Item(s) 5-210D-HA-01 A/B/C/D NF 2604 / 2605 / 2606 / 2067
Final Client: / P.O. no.: JI-183-PPFM004 Dwg. N° 1427 QCP n° ITP – 1021 - 04
Ofmeco JOB
Project/Service: KPO B—KARACHAGANAK KHAZAKHSTAN n°.: 1021 Rev.: 3 Date: 21/01/2008
ACCORDING TO H R R /
SHELL CHECK OF QUALITY
51 HT 015 ASME VIII DIV:1
HEAT TREATMENT DIAGRAM CONTROL
UCS - 56
ACCORDING TO H R R /
OFMECO MT 010 MT REPORT
SHELL ASME VIII DIV.1 QUALITY
52 OFMECO UT 011 UT REPORT
NDT EXAMINATION P.W.H.T. APPENDIX 6 & 8 CONTROL
OFMECO RT 008 RT REPORT
AND UW-51
H / R /
BUNDLE INSERTION INTO SHELL QUALITY
53 / / /
CHECK OF OPERATION CONTROL
54 CHANNELL
H / / /
HEAT N°
CHANNEL BARREL MATERIAL TEST QUALITY
55 PLATE N°
CUTTING AND MARKING TRANSFER REPORT CONTROL
TEST N°
ACCORDING TO H / R /
CHANNEL BARREL
ASME V ART.7 AND QUALITY
59 MT EXAMINATION LOGITUDINAL OFMECO MT 010 MT REPORT
ASME VIII DIV.1 CONTROL
WELD
APPENDIX 6
H R R /
ACCORDING TO
CHANNEL BARREL
ASME V ART.2 QUALITY
60 RT EXAMINATION OF LONGITUDINAL OFMECO RT 008 RT REPORT
AND ASME VIII CONTROL
WELD
DIV.1 UW-51
QUALITY H H SW /
CHANNEL ASSEMBLING TO
CONTROL
FLANGES OFMECO VT 012 AND ASME VIII DIV.1
61 WPS AND
CIRCUMFERENTIAL VISUAL FIT-UP WPS APPLICABLE
WELDING
AND TACK WELD
TECHNOLOGY
CHANNEL ASSEMBLING TO ACCORDING TO H / R /
FLANGES ASME V ART.7 AND QUALITY
62 OFMECO MT 010 MT REPORT
MT EXAMINATION ASME VIII DIV.1 CONTROL
CIRCUMFERENTIAL WELDS APPENDIX 6
H R R /
CHANNEL ASSEMBLING TO ACCORDING TO
FLANGES ASME V ART.2 QUALITY
63 RT REPORT
RT EXAMINATION OF OFMECO RT 008 REV.4 AND ASME VIII CONTROL
CIRCUMFERENTIAL WELDS DIV.1 UW-51
QUALITY H / SW /
CHANNEL EXTERNAL CONTROL
OFMECO VT 012
67 ATTACHMENTS WPS WPS AND
WELDING BOOK
VISUAL FIT-UP AND TACK WELD WELDING
TECHNOLOGY
CHANNEL H H W /
DWG DWG DIMENSIONAL QUALITY
68 VISUAL AND DIMENSIONAL
REPORT CONTROL
EXAMINATION
ACCORDING TO H R R /
CHANNEL ASME V ART.4-7
OFMECO MT 010 MT REPORT QUALYTY
69 MT-UT EXAM.ON THE BASE METAL AND ASME VIII
OFMECO UT 011 UT REPORT CONTROL
BEFORE LIFTUNG LUG WELDING DIV.1
APPENDIX 6 - 12
ACCORDING TO H R R /
CHANNEL CHECK OF QUALITY
70 HT 015 ASME VIII DIV:1
HEAT TREATMENT DIAGRAM CONTROL
UCS - 56
ACCORDING TO H R R /
OFMECO MT 010 MT REPORT
CHANNEL ASME VIII DIV.1 QUALITY
71 OFMECO UT 011 UT REPORT
NDT EXAMINATION P.W.H.T. APPENDIX 6 & 8 CONTROL
OFMECO RT 008 RT REPORT
AND UW-51
72 TUBE BUNDLE
H / R /
TUBE SHEET QUALITY
73 ACCORDING TO ASTM SA 578 LEVEL S7 UT REPORT
UT EXAMINATION CONTROL
BUNDLE CAGE H / W /
DIMENSIONAL QUALITY
74 DIMENSIONAL CHECK BEFORE TUBE DWG DWG
REPORT CONTROL
INSERTION
TUBE BUNDLE H W / /
QUALITY
75 VISUAL EXAMINATION AFTER TUBE DWG DWG /
CONTROL
INSERTION
QUALITY H / / /
TUBE TO TUBESHEET JOINTS CONTROL
76 WPS APPLICABLE WPS /
STRENGTH WELD AND WELDING
TECHNOLOGY
ACCORDING TO H R R /
TUBE TO TUBESHEET JOINTS OFMECO PT 009 ASME V ART.6 AND QUALITY
77 PT REPORT
PT EXAMINATION ASME VIII DIV.1 CONTROL
APPENDIX 8
TUBE TO TUBESHEET JOINTS H / SW /
OFMECO TE 001 QUALITY
78 EXPANSION OF TUBE INTO DWG /
CONTROL
TUBESHEET
82 FINAL TEST
H H H W
ASME VIII DIV1 OFMECO HR 014
HYDROTEST QUALITY
83 SHELL SIDE HYDROTEST DWG DURATION :
REPORT CONTROL
OFMECO HR 014 1 HOUR
H / / /
ASSEMBLING CHANNEL TO
84 DWG / / /
TUBESHEET
OFMECO HR 014 H H H W
DWG HYDROTEST QUALITY
85 TUBE SIDE HYDROTEST DURATION :
OFMECO HR 014 REPORT CONTROL
1 HOUR
FINAL VISUAL AND DIMENSIONAL H H H W
CHECK DWG DIMENSIONAL QUALITY
86 DWG
INCLUDING BASELINE THICKNESS OFMECO VT 012 REPORT CONTROL
SURVEY
H / / /
NO WATER
87 DRAINING AFTER HYDROTEST / / /
CONTENT
ACCORDING TO SPEC. H / W /
PAINTING QUALITY
88 SANBLASTING AND PAINTING 4TPFC-00C-3PS-WX00- /
RECORD CONTROL
00002
H H H R
MANUFACTURE DOCUMENTATION MANUFACTURER QUALITY
89 / /
MRB REVIEW DATA BOOK CONTROL
H H R /
ASME CODE SYMBOL
90 ASME VIII DIV.1 / / /
STAMPING
R / H R
RELEASE NOTE
91 / / / RELEASE NOTE
INSPECTION RELEASE NOTE