DCP WIDENING - Coba

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 456

ENGINEER

REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd


PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA : 65 + 000 L 3.30 M Y: 0287684 X: 0490104 Date : November 9, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0 0 0
1 1 1 4 2.5 25.0 25
1 2 1.5 7.5 4.5 45.0 20
1 3 5.5 10.5 8 80.0 55 19.5 9.59
1 4 8 12.5 10.25 102.5 77.5
1 5 10 14.5 12.25 122.5 97.5
1 6 12 16 14 140.0 115
1 7 13 17 15 150.0 125
1 8 14.5 18.5 16.5 165.0 140
17.95 10.65
1 9 16 20.5 18.25 182.5 157.5
1 10 18 23 20.5 205.0 180
1 11 19 25.5 22.25 222.5 197.5
1 12 20 28 24 240.0 215.0
1 13 21.5 30 25.75 257.5 232.5
18.67 10.13
1 14 22.5 33.5 28 280.0 255.0
1 15 24 37 30.5 305.0 280.0
1 16 25.5 40 32.75 327.5 302.5
1 17 27 42.5 34.75 347.5 322.5
1 18 30 45.5 37.75 377.5 352.5
1 19 31 48 39.5 395.0 370.0 20.57 8.96
1 20 32 51.5 41.75 417.5 392.5
1 21 34 55.5 44.75 447.5 422.5
1 22 35.5 60 47.75 477.5 452.5
1 23 37 64 50.5 505.0 480.0
1 24 39 67.5 53.25 532.5 507.5
21.73 8.35
1 25 40 71.5 55.75 557.5 532.5
1 26 42.5 75.5 59 590.0 565.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engine


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA: 65 + 100 R . 3.5 M Y : 0287759 X : 049033 Date : November 9, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 4 0 0
1 1 2 7 4.5 45 45
1 2 4 8 6 60 15
1 3 6 10 8 80 35
1 4 7.5 12 9.75 97.5 52.5
11.6 18.62
1 5 8 13 10.5 105 60
1 6 9 14.5 11.75 117.5 72.5
1 7 9.5 16 12.75 127.5 82.5
1 8 11 16.5 13.75 137.5 92.5
1 9 12 17.5 14.75 147.5 102.5
1 10 12.5 18 15.25 152.5 107.5
1 11 13 19 16 160 115.0
1 12 13.5 19.5 16.5 165 120.0
1 13 14 20 17 170 125.0
1 14 15 21 18 180 135.0 10.26 10.86
1 15 16 22 19 190 145.0
1 16 17 24 20.5 205 160.0
1 17 17.5 25.5 21.5 215 170.0
1 18 19 27 23 230 185.0
1 19 19.5 28.5 24 240 195.0
1 20 20.5 30.5 25.5 255 210.0
1 21 21.5 32 26.75 267.5 222.5
10.65 20.66
1 22 22.5 34 28.25 282.5 237.5
1 23 23 35 29 290 245.00

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA: 65 + 200 L. 3.50 M Y : 0287856 X : 0489995 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 3 0 0
1 1 3 4 3.5 35 35
1 2 5 5.5 5.25 52.5 17.5
1 3 7 6.5 6.75 67.5 32.5
11.25 19.28
1 4 9 7 8 80 45
1 5 11 8 9.5 95 60
1 6 12 8.5 10.25 102.5 67.5
1 7 13.5 9.5 11.5 115 80
1 8 14.5 10 12.25 122.5 87.5
10.0 22.39
1 9 15 10.5 12.75 127.5 92.5
1 10 16 11 13.5 135 100
1 11 17 11.5 14.25 142.5 107.5
1 12 18 12 15 150 115.0
1 13 19 12.5 15.75 157.5 122.5
1 14 20 13 16.5 165 130.0
1 15 21 13.5 17.25 172.5 137.5
1 16 22 14 18 180 145.0
9.09 25.27
1 17 23.5 14.5 19 190 155.0
1 18 25 15 20 200 165.0
1 19 26.5 15.5 21 210 175.0
1 20 28 16 22 220 185.0
1 21 29.5 16.5 23 230 195.0
1 22 30 17 23.5 235 200.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA: 65 + 300 R. 3.47 M Y : 0287848 X : 0489929 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 6 0 0
1 1 4 9.5 6.75 67.5 67.5
1 2 7 12 9.5 95.0 27.5
1 3 10 14.5 12.25 122.5 55.0
1 4 13 17.5 15.25 152.5 85.0 26.43 6.52
1 5 15 21 18 180 112.5
1 6 19 25 22 220 152.5
1 7 22 28.5 25.25 252.5 185.0
1 8 24.5 33 28.75 287.5 220.0
1 9 27 36 31.5 315 247.5
1 10 29.5 39 34.25 342.5 275.0
1 11 33 42.5 37.75 377.5 310.0 27.5 6.20
1 12 35.5 42.5 39 390 322.5
1 13 39 45.5 42.25 422.5 355.0
1 14 41.5 49 45.25 452.5 385.0
1 15 42.5 51 46.75 467.5 400.0
1 16 43 53 48 480 412.5
1 17 44 55.5 49.75 497.5 430.0
1 18 44.5 57.5 51 510 442.5 23.2 7.68
1 19 45.5 59.5 52.5 525 457.5
1 20 46 61.5 53.75 537.5 470.0
1 21 47.5 63.5 55.5 555 487.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engine


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA: 65 + 400 L. 3.48 M Y : 0287843 X : 0489840 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0
1 1 8 17 12.5 125 125
1 2 15 19 17 170 45.0
1 3 20 25 22.5 225 100.0
1 4 27 31 29 290 165.0
1 5 33 37 35 350 225.0 44.17 3.39
1 6 39 40 39.5 395 270.0
1 7 46 41.5 43.75 437.5 312.5
1 8 53 42.5 47.75 477.5 352.5
1 9 61 43.5 52.25 522.5 397.5
1 10 65 44 54.5 545 420.0
1 11 70 45 57.5 575 450.0
1 12 72 46 59 590 465.0 44.55 3.36
1 13 75 46.5 60.75 607.5 482.5
1 14 76 47 61.5 615 490.0
1 15 78 48 63 630 505.0
1 16 79 48.5 63.75 637.5 512.5
1 17 80 49 64.5 645 520.0
1 18 82 50 66 660 535.0
1 19 84 51 67.5 675 550.0
1 20 85 52 68.5 685 560.0 24.7 7.10
1 21 87 52 69.5 695 570.0
1 22 89 54 71.5 715 590.0
1 23 90 55 72.5 725 600.0
1 24 91 55.5 73.25 732.5 607.5
1 25 92 56.5 74.25 742.5 617.5
26
27
28
29
30
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA: 65 + 500 R. 3.49 M Y : 0287778 X : 048763 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0
1 1 5 3 4 40.0 40.0
1 2 7.5 6.5 7 70.0 30.0
1 3 8.5 11 9.75 97.5 57.5
17.1 11.33
1 4 9 14.5 11.75 117.5 77.5
1 5 10 15 12.5 125.0 85.0
1 6 10.5 18 14.25 142.5 102.5
1 7 11 20 15.5 155.0 115.0
1 8 13.5 21 17.25 172.5 132.5
1 9 14.5 22 18.25 182.5 142.5
1 10 16 23 19.5 195.0 155.0
1 11 17 24 20.5 205.0 165.0
1 12 18 25 21.5 215.0 175.0 12.79 16.41
1 13 19 25.5 22.25 222.5 182.5
1 14 20 26 23 230.0 190.0
1 15 21 27 24 240.0 200.0
1 16 22 28 25 250.0 210.0
1 17 22.5 29 25.75 257.5 217.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA: 65 + 600 L. 3.45 M Y : 0287799 X : 0489673 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0
1 1 3 3 3 30.0 30.0
1 2 4 4 4 40.0 10.0
1 3 6 5 5.5 55.0 25.0
1 4 7 6 6.5 65.0 35.0
1 5 8 7 7.5 75.0 45.0 10.56 20.90
1 6 10 8 9 90.0 60.0
1 7 10.5 9 9.75 97.5 67.5
1 8 11.5 10 10.75 107.5 77.5
1 9 14 11 12.5 125.0 95.0
1 10 18 13 15.5 155.0 125.0
1 11 20 14 17 170.0 140.0
1 12 21 15.5 18.25 182.5 152.5
1 13 22 17 19.5 195.0 165.0
1 14 23 19 21 210.0 180.0 15 13.38
1 15 27 20 23.5 235.0 205.0
1 16 30 22 26 260.0 230.0
1 17 32 24 28 280.0 250.0
1 18 35 25 30 300.0 270.0
1 19 39.5 27 33.25 332.5 302.5
1 20 46 28 37 370.0 340.0
1 21 50 30 40 400.0 370.0
1 22 51 35 43 430.0 400.0 18.80 10.04
1 23 58 36 47 470.0 440.0
1 24 59 37 48 480.0 450.0
1 25 60 40 50 500.0 470.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA: 65 + 700 R. 3.50 M Y : 0287868 X : 0489604 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0.00 0 0 0 0 0 0 0
1 1 4 1 2.5 25.0 25.0
1 2 6 2 4 40.0 15.0
1 3 9 3 6 60.0 35.0
1 4 10.5 5.5 8 80.0 55.0 14.29 14.23
1 5 12 7 9.5 95.0 70.0
1 6 13.5 8.5 11 110.0 85.0
1 7 15 10 12.5 125.0 100.0
1 8 16 12 14 140.0 115.0
1 9 16.5 12.5 14.5 145.0 120.0
1 10 17 13.5 15.25 152.5 127.5
1 11 18 14 16 160.0 135.0
1 12 18.5 15 16.75 167.5 142.5 12.19 17.41
1 13 20 15.5 17.75 177.5 152.5
1 14 21 17 19 190.0 165.0
1 15 23 18 20.5 205.0 180.0
1 16 24 20 22 220.0 195.0
1 17 25 22 23.5 235.0 210.0
1 18 26 22.5 24.25 242.5 217.5
1 19 27 23 25 250.0 225.0
1 20 28 23.5 25.75 257.5 232.5 11.09 19.64
1 21 29 24 26.5 265.0 240.0
1 22 30 24.5 27.25 272.5 247.5
1 23 31 25 28 280.0 255.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA: 65 + 800 R. 3.50 M Y : 0287954 X : 0489552 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 2 0 0 0 0 0.00
1 1 2 5 3.5 35.0 35.0
1 2 4 7 5.5 55.0 20.0
1 3 5.5 9 7.25 72.5 37.5
1 4 7 11 9 90.0 55.0
12.50 16.86
1 5 8 12 10 100.0 65.0
1 6 9 14 11.5 115.0 80.0
1 7 9.5 16 12.75 127.5 92.5
1 8 10 17 13.5 135.0 100.0
1 9 11 18 14.5 145.0 110.0
1 10 11.5 19 15.25 152.5 117.5
1 11 12 20 16 160.0 125.0
1 12 12.5 20.5 16.5 165.0 130.0
1 13 13.5 21 17.25 172.5 137.5
1 14 14 21.5 17.75 177.5 142.5
1 15 14.5 22 18.25 182.5 147.5
1 16 15 23 19 190.0 155.0 8.48 27.61
1 17 16 23.5 19.75 197.5 162.5
1 18 16.5 24 20.25 202.5 167.5
1 19 17 25 21 210.0 175.0
1 20 17.5 25.5 21.5 215.0 180.0
1 21 18 26 22 220.0 185.0
1 22 18.5 26.5 22.5 225.0 190.0
1 23 19 27 23 230.0 195.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engine


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA: 65 + 900 R. 3.65 M Y : 0287944 X : 0489453 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.28*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 4 0 0 0
1 1 2 7 4.5 45.0 45.0
1 2 4 7.5 5.75 57.5 12.5
1 3 7 9 8 80.0 35.0
1 4 10 10 10 100.0 55.0 13.57 15.19
1 5 12 11.5 11.75 117.5 72.5
1 6 14 12.5 13.25 132.5 87.5
1 7 15 13 14 140.0 95.0
1 8 16.5 14 15.25 152.5 107.5
1 9 17 15 16 160.0 115.0
1 10 18 15.5 16.75 167.5 122.5
1 11 18.5 16 17.25 172.5 127.5
1 12 19 16.5 17.75 177.5 132.5
1 13 19.5 17.5 18.5 185.0 140.0 9.44 24.07
1 14 20 18 19 190.0 145.0
1 15 20.5 19 19.75 197.5 152.5
1 16 21 19.5 20.25 202.5 157.5
1 17 21.5 20 20.75 207.5 162.5
1 18 22 21 21.5 215.0 170.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA: 66 + 000 CL Y : 0287899 X : 0489364 Date : 41,588.00


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.28*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0
1 1 3 6 4.5 45.0 45.0
1 2 6 9 7.5 75.0 30.0
1 3 8.5 10.5 9.5 95.0 50.0
15.00 13.38
1 4 10.5 11.5 11 110.0 65.0
1 5 12.5 12 12.25 122.5 77.5
1 6 14.5 12.5 13.5 135.0 90.0
1 7 16 13.5 14.75 147.5 102.5
1 8 17 14 15.5 155.0 110.0
1 9 17.5 14.5 16 160.0 115.0
1 10 18 15 16.5 165.0 120.0 10.38 21.34
1 11 18.5 15.5 17 170.0 125.0
1 12 19 16 17.5 175.0 130.0
1 13 19.5 16.5 18 180.0 135.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA: 66 + 100 CL Y : 0287847 X : 0489282 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.28*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0.0
1 1 3.5 2.5 3 30.0 30.0
1 2 7 5 6 60.0 30.0
1 3 10 8.5 9.25 92.5 62.50
1 4 15 12 13.5 135.0 105.0
25.00 6.99
1 5 15.5 17 16.25 162.5 132.5
1 6 16 24 20 200.0 170.0
1 7 16.5 26 21.25 212.5 182.5
1 8 17 29 23 230.0 200.0
1 9 18 30.5 24.25 242.5 212.5
1 10 18.5 34 26.25 262.5 232.5
1 11 19.5 36 27.75 277.5 247.5
1 12 20 37 28.5 285.0 255.0
18.75 10.08
1 13 21 37.5 29.25 292.5 262.5
1 14 22 38 30 300.0 270.0
1 15 24 38.5 31.25 312.5 282.5
1 16 27 39 33 330.0 300.0
1 17 31 40 35.5 355.0 325.0
1 18 33 40.5 36.75 367.5 337.5
1 19 34.5 41 37.75 377.5 347.5
1 20 36 41.5 38.75 387.5 357.5
1 21 37.5 42 39.75 397.5 367.5
15.67 12.65
1 22 38.5 43 40.75 407.5 377.5
1 23 39 44 41.5 415.0 385.0
1 24 40 45 42.5 425.0 395.0
1 25 41 45.5 43.25 432.5 402.5
1 26 41.5 46 43.75 437.5 407.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA: 66 + 200 L. 3.12 M Y : 0287866 X : 0489186 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.28*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1
1 1 4 3 3.5 35.0 35.0
1 2 6 5 5.5 55.0 20.0
1 3 7 7 7 70.0 35.0
1 4 8 8 8 80.0 45.0
1 5 10 10 10 100.0 65.0 10.83 20.22
1 6 11 11 11 110.0 75.0
1 7 11.5 12.5 12 120.0 85.0
1 8 12.5 13 12.75 127.5 92.5
1 9 13 13.5 13.25 132.5 97.5
1 10 13.5 14.5 14 140.0 105.0
1 11 14 16 15 150.0 115.0
1 12 14.5 16.5 15.5 155.0 120.0
1 13 15 17 16 160.0 125.0
1 14 16 18 17 170.0 135.0 10.97 19.9
1 15 19 19 19 190.0 155.0
1 16 20 20 20 200.0 165.0
1 17 22 21 21.5 215.0 180.0
1 18 24 22.5 23.25 232.5 197.5
1 19 26.5 24 25.25 252.5 217.5
1 20 30 25.5 27.75 277.5 242.5
1 21 34.5 27 30.75 307.5 272.5
1 22 39 29 34 340.0 305.0 12.125 17.53
1 23 44 31 37.5 375.0 340.0
1 24 50.5 32 41.25 412.5 377.5
1 25 57 33 45 450.0 415.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA: 66 + 300 R. 3,61 M Y : 0287941 X : 0489143 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.28*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0
1 1 3 3 3 30.0 30.0
1 2 5 3 4 40.0 10.0
1 3 5 7 6 60.0 30.0
1 4 7 9 8 80.0 50.0
1 5 8 13 10.5 105.0 75.0 18.89 9.98
1 6 9 14 11.5 115.0 85.0
1 7 10 20 15 150.0 120.0
1 8 11 22 16.5 165.0 135.0
1 9 12 28 20 200.0 170.0
1 10 14 34 24 240.0 210.0
1 11 15 35.5 25.25 252.5 222.5
1 12 16.5 36.5 26.5 265.0 235.0
1 13 18.5 38 28.25 282.5 252.5
1 14 19 39.5 29.25 292.5 262.5 16.67 11.70
1 15 20 40.5 30.25 302.5 272.5
1 16 20.5 41.5 31 310.0 280.0
1 17 21.5 42.5 32 320.0 290.0
1 18 22 44 33 330.0 300.0
1 19 23 45.5 34.25 342.5 312.5
1 20 26 47.5 36.75 367.5 337.5
1 21 27 49 38 380.0 350.0
1 22 28.5 51 39.75 397.5 367.5 16 12.32
1 23 29.5 53 41.25 412.5 382.5
1 24 30 54 42 420.0 390.0
1 25 31 55 43 430.0 400.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA: 66 + 400 R. 3.80 M Y : 0288020 X : 0489113 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.28*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0
1 1 2.5 3 2.75 27.5 27.5
1 2 6 6 6 60 32.5
1 3 9 8 8.5 85 57.5 18.5 10.25
1 4 11.5 9 10.25 102.5 75.0
1 5 14 10 12 120 92.5
1 6 16 11 13.5 135 107.5
1 7 19 12 15.5 155 127.5
1 8 22 12.5 17.25 172.5 145.0
17.5 11.00
1 9 24 14 19 190 162.5
1 10 25 15 20 200 172.5
1 11 28 16 22 220 192.5
1 12 30.5 20 25.25 252.5 225.0
1 13 32 23 27.5 275 247.5
1 14 33 24 28.5 285 257.5
17.5 11.00
1 15 34 25 29.5 295 267.5
1 16 35 26 30.5 305 277.5
1 17 36 29 32.5 325 297.5
1 18 38 30 34 340 312.5
1 19 39 31 35 350 322.5
1 20 39.5 32 35.75 357.5 330.0 15.68 12.64
1 21 40 33 36.5 365 337.5
1 22 40.5 34 37.25 372.5 345.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA: 66 + 500 R. 3.70 M Y : 0288045 X : 0489015 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.28*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 0 0 0
1 1 11 4 7.5 75 75.0
1 2 13 6 9.5 95 67.5
1 3 16 7 11.5 115 87.5
1 4 17 8 12.5 125 97.5
1 5 18 9 13.5 135 107.5
17.25 11.20
1 6 19 11 15 150 122.5
1 7 20 12 16 160 132.5
1 8 22 13 17.5 175 147.5
1 9 23 14 18.5 185 157.5
1 10 24 16 20 200 172.5
1 11 27 19 23 230 202.5
1 12 29 20 24.5 245 217.5
1 13 30 27 28.5 285 257.5 20.17 9.19
1 14 31.5 31 31.25 312.5 285.0
1 15 32 34 33 330 302.5
1 16 33 35 34 340 312.5
1 17 34 37 35.5 355 327.5
1 18 35 38 36.5 365 337.5
17.5 11.00
1 19 36 39 37.5 375 347.5
1 20 37 40 38.5 385 357.5
1 21 38 41 39.5 395 367.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA: 66 + 600 R. 3.35 M Y : 0288096 X : 0488919 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.28*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0
1 1 7 9 8.0 80.0 80.0
1 2 17 17 17.0 170.0 90.0
1 3 18 26 22.0 220.0 140.0
53.33 2.67
1 4 27 30 28.5 285.0 205.0
1 5 34 36 35.0 350.0 270.0
1 6 40 40 40.0 400.0 320.0
1 7 44 45 44.5 445.0 365.0
1 8 49 46 47.5 475.0 395.0
1 9 51.5 51 51.3 512.5 432.5 41.36 3.69
1 10 53 51.5 52.3 522.5 442.5
1 11 55 52 53.5 535.0 455.0
1 12 57 53 55.0 550.0 470.0
1 13 60 53.5 56.8 567.5 487.5
1 14 60.5 54 57.3 572.5 492.5
1 15 61 54.5 57.8 577.5 497.5
1 16 62 55 58.5 585.0 505.0
1 17 62.5 55.5 59.0 590.0 510.0
23.48 7.57
1 18 63 56 59.5 595.0 515.0
1 19 63.5 56.5 60.0 600.0 520.0
1 20 64 57 60.5 605.0 525.0
1 21 64.5 57.5 61.0 610.0 530.0
1 22 65 58 61.5 615.0 535.0
1 23 65.5 58.5 62.0 620.0 540.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA: 66 + 700 L. 3.50 M Y : 0288010 X : 0488828 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.28*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0
1 1 3 3 3.0 30.0 30.0
1 2 6 5.5 5.8 57.5 30.0
1 3 7 7.5 7.3 72.5 45.0
1 4 9 9 9.0 90.0 62.5
22.8 7.85
1 5 12 11 11.5 115.0 87.5
1 6 15 14 14.5 145.0 117.5
1 7 18 17 17.5 175.0 147.5
1 8 22 20 21.0 210.0 182.5
1 9 26 24.5 25.25 252.5 225.0
1 10 30 28.5 29.25 292.5 265.0
1 11 33 32.5 32.75 327.5 300.0
1 12 36 36.5 36.25 362.5 335.0
34.4 4.67
1 13 41 41.5 41.25 412.5 385.0
1 14 47 46 46.5 465.0 437.5
1 15 52.5 52 52.25 522.5 495.0
1 16 57.5 58 57.75 577.5 550.0
1 17 64 64 64.0 640.0 612.5
1 18 70 65 67.5 675.0 647.5
1 19 72.5 71 71.75 717.5 690.0
36.0 4.40
1 20 75 76.5 75.75 757.5 730.0
1 21 78 81 79.5 795.0 767.5
1 22 80 84 82.0 820.0 792.5
1 23 82 86.5 84.25 842.5 815.0
1 24 84.5 89 86.75 867.5 840.0
1 25 85 90 87.5 875.0 847.5
1 26 88 92 90.0 900.0 872.5
31.1 5.30
1 27 90 94 92.0 920.0 892.5
1 28 91 95 93.0 930.0 902.5
1 29 93 97 95.0 950.0 922.5
1 30 94 98 96.0 960.0 932.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA: 66 + 800 R. 3.50 M Y : 0288012 X : 0488733 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.28*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0
1 1 4 5.5 4.75 47.5 47.5
1 2 14.5 12.5 13.5 135 107.5
1 3 24 18 21 210 182.5
1 4 33 27 30 300 272.5
61.88 2.21
1 5 37 35 36 360 332.5
1 6 54 37 45.5 455 427.5
1 7 59 38.5 48.75 487.5 460.0
1 8 64 40.5 52.25 522.5 495.0
1 9 68 42 55 550 522.5
1 10 72 44.5 58.25 582.5 555.0
1 11 74.5 49.5 62 620 592.5
1 12 78.5 57 67.75 677.5 650.0
1 13 82 61.5 71.75 717.5 690.0
49.58 2.93
1 14 84 66 75 750 722.5
1 15 89 70 79.5 795 767.5
1 16 93 74 83.5 835 807.5
1 17 97 79 88 880 852.5
1 18 100 84 92 920 892.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA: 66 + 900 L. 3. 80 M Y : 0288053 X : 0488649 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.28*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0
1 1 3 4.5 3.75 37.5 37.5
1 2 7 9 8 80 52.5
1 3 10 17 13.5 135 107.5
1 4 15 25 20 200 172.5 50.36 2.87
1 5 23 32.5 27.75 277.5 250.0
1 6 28 40.5 34.25 342.5 315.0
1 7 29 47 38 380 352.5
1 8 36 55.5 45.75 457.5 430.0
1 9 42 62 52 520 492.5
1 10 50 68 59 590 562.5
1 11 56 74.5 65.25 652.5 625.0
1 12 61 80.5 70.75 707.5 680.0
48.97 2.87
1 13 61.5 85.5 73.5 735 707.5
1 14 70 89 79.5 795 767.5
1 15 71 93 82 820 792.5
1 16 71.5 98 84.75 847.5 820.0
1 17 72 100 86 860 832.5
1 18 72.5
1 19 73
1 20 73.5
1 21 74
1 22 75
1 23 76
1 24 76.5
1 25 77.5
1 26 78
1 27 79
1 28 80
1 29 81.5
1 30 83.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

STA: 67 + 000 R. 3. 50 M Y : 0288128 X : 0488592 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative
Point 1 Point 2 Average DCP (mm/Blow)
No Blow Penetration (h)
=10^(2.632-(1.28*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 0 0 0
1 1 5 4.5 4.75 47.5 47.5
1 2 9 10 9.5 95 67.5
1 3 17 18 17.5 175 147.5
1 4 20 25 22.5 225 197.5
1 5 21.5 29 25.25 252.5 225.0 33.33 4.85
1 6 23 33 28 280 252.5
1 7 24 36 30 300 272.5
1 8 26 37 31.5 315 287.5
1 9 27.5 38 32.75 327.5 300.0
1 10 28.5 39 33.75 337.5 310.0
1 11 29.5 40 34.75 347.5 320.0
1 12 30.5 41 35.75 357.5 330.0
1 13 31.5 42 36.75 367.5 340.0
22.50 7.99
1 14 32.5 43 37.75 377.5 350.0
1 15 33.5 44.5 39 390 362.5
1 16 34 46 40 400 372.5
1 17 35 47 41 410 382.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS
CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstr


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013

Date of Contract : January 31th, 2013

TESTED DINAMIX CONE PENETRATION


L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA: 67 + 100 L. 3.60 M Y : 0288191 X : 0488676 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 2.5 2 2.25 22.5 22.5
1 2 4 3 3.50 35.0 12.5
1 3 4.5 4 4.25 42.5 20.0
1 4 5 5 5.00 50.0 27.5
1 5 6 6 6.00 60.0 37.5 10.83 20.22
1 6 7 7.5 7.25 72.5 50.0
1 7 8 9 8.50 85.0 62.5
1 8 9 11 10.00 100.0 77.5
1 9 11 13 12.00 120.0 97.5
1 10 12 14.5 13.25 132.5 110.0
1 11 13.5 16 14.75 147.5 125.0
1 12 15 18 16.50 165.0 142.5 13.39 15.45
1 13 16.5 21 18.75 187.5 165.0
1 14 19 23 21.00 210.0 187.5
1 15 21.5 26 23.75 237.5 215.0
1 16 23.5 29 26.25 262.5 240.0
1 17 25.5 31.5 28.50 285.0 262.5
1 18 28.5 34.5 31.50 315.0 292.5 16.90 11.49
1 19 30.5 37 33.75 337.5 315.0
1 20 31.5 40 35.75 357.5 335.0
1 21 32.5 43 37.75 377.5 355.0
1 22 33.5 47 40.25 402.5 380.0
1 23 35.5 51.5 43.50 435.0 412.5
1 24 38 55 46.50 465.0 442.5
1 25 41 59.5 50.25 502.5 480.0
1 26 44 65 54.50 545.0 522.5 23.50 7.56
1 27 47 70.5 58.75 587.5 565.0
1 28 51 75 63.00 630.0 607.5
1 29 54 79.5 66.75 667.5 645.0
1 30 58.5 87 72.75 727.5 705.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA: 67 + 200 R. 3.60 M Y : 0288772 X : 0488670 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 2 3.5 2.75 27.5 27.5
1 2 3 5 4 40.0 12.5
1 3 4 6 5 50.0 22.5
1 4 5 7 6 60.0 32.5
9.0625 25.37
1 5 6 8 7 70.0 42.5
1 6 7 9 8 80.0 52.5
1 7 8 10.5 9.25 92.5 65.0
1 8 8.5 11.5 10 100.0 72.5
1 9 9 13 11 110.0 82.5
1 10 10 14.5 12.25 122.5 95.0
1 11 10.5 15.5 13 130.0 102.5
1 12 11.5 16.5 14 140.0 112.5
1 13 12 17 14.5 145.0 117.5
1 14 13 18 15.5 155.0 127.5
8.38 28.04
1 15 13.5 19 16.25 162.5 135.0
1 16 14 20 17 170.0 142.5
1 17 15 20.5 17.75 177.5 150.0
1 18 15.5 21 18.25 182.5 155.0
1 19 16 22 19 190.0 162.5
1 20 16.5 22.5 19.5 195.0 167.5
1 21 17 23.5 20.25 202.5 175.0
1 22 17.5 24 20.75 207.5 180.0
1 23 18 25 21.5 215.0 187.5 8.00 29.72
1 24 19 25.5 22.25 222.5 195.0
1 25 19.5 26 22.75 227.5 200.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA: 67 + 300 L . 3.40 M Y : 0288359 X : 0488615 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 4 6 5 50.0 50.0
1 2 6 10 8 80.0 30.0
1 3 9.5 11 10.25 102.5 52.5
1 4 13 16.5 14.75 147.5 97.5
33.4375 4.83
1 5 18 19 18.5 185.0 135.0
1 6 24.5 24.5 24.5 245.0 195.0
1 7 30 27 28.5 285.0 235.0
1 8 33.5 30 31.75 317.5 267.5
1 9 36 35 35.5 355.0 305.0
1 10 41 40 40.5 405.0 355.0
1 11 44.5 44 44.25 442.5 392.5
39.46 3.92
1 12 50 50 50 500.0 450.0
1 13 55.5 55 55.25 552.5 502.5
1 14 59.5 61 60.25 602.5 552.5
1 15 63 68 65.5 655.0 605.0
1 16 67.5 76 71.75 717.5 667.5
1 17 70.5 88 79.25 792.5 742.5
1 18 74 89 81.5 815.0 765.0 42.00 3.62
1 19 77 90 83.5 835.0 785.0
1 20 80 98 89 890.0 840.0
1 21 83 100 91.5 915.0 865.0
1 22 86
1 23 88
1 24 90.5
1 25 93.5
1 26 97
1 27 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA: 67 + 400 R. 3. 60 M Y : 0288413 X : 0488548 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 4 3.5 3.75 37.5 37.5
1 2 7 7 7 70.0 47.5
1 3 9.5 11 10.25 102.5 65.0
1 4 12.5 13.5 13 130.0 92.5
1 5 15 15 15 150.0 112.5
16.5 11.85
1 6 16.6 16.5 16.55 165.5 128.0
1 7 17.5 18 17.75 177.5 140.0
1 8 18 19 18.5 185.0 147.5
1 9 19 20 19.5 195.0 157.5
1 10 19.5 21 20.25 202.5 165.0
1 11 20.5 22.5 21.5 215.0 177.5
1 12 21.5 24 22.75 227.5 190.0
1 13 22.5 25.5 24 240.0 202.5
1 14 23.5 27 25.25 252.5 215.0
15.56 12.77
1 15 25 28.5 26.75 267.5 230.0
1 16 26 30 28 280.0 242.5
1 17 27 31 29 290.0 252.5
1 18 28.5 32 30.25 302.5 280.0
1 19 30 33 31.5 315.0 292.5
1 20 31 34 32.5 325.0 302.5
1 21 32.5 35.5 34 340.0 317.5
1 22 33.5 37 35.25 352.5 330.0
14.52 13.94
1 23 35 38 36.5 365.0 342.5
1 24 36 39.5 37.75 377.5 355.0
1 25 37 41 39 390.0 367.5
1 26 38 42 40 400.0 377.5
1 27 39 43.5 41.25 412.5 390.0
1 28 40 45 42.5 425.0 402.5
14.42 14.07
1 29 41 47 44 440.0 417.5
1 30 42 49 45.5 455.0 432.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA: 67 + 500 R. 3.28 M Y : 0288429 X : 0488460 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 4 5 4.5 45.0 45.0
1 2 7 9 8.0 80.0 57.5
1 3 9.5 12 10.75 107.5 62.5
1 4 11 12.5 11.75 117.5 72.5
1 5 12 14.5 13.25 132.5 87.5
1 6 13 15.5 14.25 142.5 97.5
13.33 15.54
1 7 14 16 15.0 150.0 105.0
1 8 15 17 16.0 160.0 115.0
1 9 16 18 17.0 170.0 125.0
1 10 17 19.5 18.25 182.5 137.5
1 11 18 21 19.5 195.0 150.0
1 12 19 22 20.5 205.0 160.0
1 13 19.5 23 21.25 212.5 167.5
1 14 20 24 22.0 220.0 175.0
1 15 21 25 23.0 230.0 185.0
1 16 22 26 24.0 240.0 195.0
1 17 22.5 27 24.75 247.5 202.5
1 18 23 28 25.5 255.0 232.5 11.74 18.26
1 19 24 28.5 26.25 262.5 240.0
1 20 24.5 29.5 27.0 270.0 247.5
1 21 25 30 27.5 275.0 252.5
1 22 26 31 28.5 285.0 262.5
1 23 26.5 32 29.25 292.5 270.0
1 24
1 25
1 26
1 27
1 28
1 29
1 30
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA: 67 + 600 L. 3.66 M Y : 0288529 X : 0488466 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 2 5.5 3.75 37.5 37.5
1 2 4 9 6.5 65.0 42.5
1 3 8 12 10 100.0 62.5
1 4 12 15 13.5 135.0 97.5
1 5 16 18 17 170.0 132.5
23 7.77
1 6 18 19.5 18.75 187.5 150.0
1 7 20 21 20.5 205.0 167.5
1 8 21 22 21.5 215.0 177.5
1 9 22.5 24.5 23.5 235.0 197.5
1 10 26 27.5 26.75 267.5 230.0
1 11 30 30.5 30.25 302.5 265.0
1 12 31.5 33.5 32.5 325.0 287.5
1 13 34 35 34.5 345.0 307.5
1 14 36.5 36 36.25 362.5 325.0 22.50 7.99
1 15 39 37.5 38.25 382.5 345.0
1 16 41 38.5 39.75 397.5 360.0
1 17 44 40 42 420.0 382.5
1 18 47.5 41.5 44.5 445.0 422.5
1 19 51.5 44 47.75 477.5 455.0
1 20 54 47 50.5 505.0 482.5
1 21 56 50.5 53.25 532.5 510.0
24.70 7.10
1 22 59 52.5 55.75 557.5 535.0
1 23 62.5 54 58.25 582.5 560.0
1 24 65.5 55 60.25 602.5 580.0
1 25 70 58 64 640.0 617.5
1 26 74.5 61 67.75 677.5 655.0
1 27 77 64 70.5 705.0 682.5
1 28 80 68 74 740.0 717.5 26.92 6.37
1 29 85 71 78 780.0 757.5
1 30 90.5 75.5 83 830.0 807.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA: 67 + 700 R. 3.52 M Y : 0288550 X : 0488418 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 6 4 5 50.0 50.0
1 2 11 10.5 10.75 107.5 85.0
1 3 14.5 19 16.75 167.5 117.5
1 4 15.5 25 20.25 202.5 152.5 31.43 5.23
1 5 17 27.5 22.25 222.5 172.5
1 6 20.5 29 24.75 247.5 197.5
1 7 24 30 27 270.0 220.0
1 8 26 32 29 290.0 240.0
1 9 27 34 30.5 305.0 255.0
1 10 28 37.5 32.75 327.5 277.5
27.50 6.20
1 11 29 41 35 350.0 300.0
1 12 30.5 46 38.25 382.5 332.5
1 13 32 49.5 40.75 407.5 357.5
1 14 33 53 43 430.0 380.0
1 15 34 56 45 450.0 400.0
1 16 35 59 47 470.0 420.0 26.81 6.40
1 17 35.5 61 48.25 482.5 432.5
1 18 36.5 64.5 50.5 505.0 482.5
1 19 37.5 67.5 52.5 525.0 502.5
1 20 39.5 69.5 54.5 545.0 522.5
1 21 41.5 71.5 56.5 565.0 542.5
24.58 7.14
1 22 43.5 72.5 58 580.0 557.5
1 23 45.5 73.5 59.5 595.0 572.5
1 24 48 74.5 61.25 612.5 590.0
1 25 50 75 62.5 625.0 602.5
1 26 52 75.5 63.75 637.5 615.0
1 27 54.5 76 65.25 652.5 630.0
22.25 8.11
1 28 56.5 76.5 66.5 665.0 642.5
1 29 58.5 77 67.75 677.5 655.0
1 30 60.5 77.5 69 690.0 667.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA: 67 + 800 L. 3.36 M Y : 0288577 X : 0488325 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 2 1.5 15 0.0
1 1 3 6 4.5 45.0 45.0
1 2 5 11.5 8.25 82.5 60.0
1 3 6 13.5 9.75 97.5 52.5
1 4 10 15.5 12.75 127.5 82.5 24.29 7.25
1 5 12.5 18 15.25 152.5 107.5
1 6 16.5 20 18.25 182.5 137.5
1 7 21 22 21.5 215.0 170.0
1 8 22.5 24 23.25 232.5 187.5
1 9 26 25 25.5 255.0 210.0
1 10 27.5 27 27.25 272.5 227.5
1 11 29 28.5 28.75 287.5 242.5
1 12 31.5 29.5 30.5 305.0 260.0
21.32 8.56
1 13 34 31 32.5 325.0 280.0
1 14 36 32.5 34.25 342.5 297.5
1 15 38 34.5 36.25 362.5 317.5
1 16 41 35.5 38.25 382.5 337.5
1 17 44.5 37 40.75 407.5 362.5
1 18 48 40.5 44.25 442.5 420.0
1 19 50 44 47 470.0 447.5
1 20 52 47 49.5 495.0 472.5
1 21 54 51.5 52.75 527.5 505.0
1 22 55.5 57 56.25 562.5 540.0
1 23 57 61.5 59.25 592.5 570.0
1 24 59 64 61.5 615.0 592.5 21.25 8.60
1 25 60 65.5 62.75 627.5 605.0
1 26 61.5 67.5 64.5 645.0 622.5
1 27 63 69.5 66.25 662.5 640.0
1 28 64 70.5 67.25 672.5 650.0
1 29 65 72 68.5 685.0 662.5
1 30 66 73.5 66 660.0 637.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA: 67 + 900 R. 3.51 M Y : 0288627 X : 0488741 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 4 5.5 4.75 47.5 47.5
1 2 6 8 7 70.0 47.5
1 3 7 9.5 8.25 82.5 35.0 11.5 18.75
1 4 8 11 9.5 95.0 47.5
1 5 9 12 10.5 105.0 57.5
1 6 10 13 11.5 115.0 67.5
1 7 10.5 14 12.25 122.5 75.0
1 8 11 15 13 130.0 82.5
1 9 11.5 16 13.75 137.5 90.0
1 10 12.5 16.5 14.5 145.0 97.5
1 11 13.5 17.5 15.5 155.0 107.5
9.56 23.71
1 12 14 18.5 16.25 162.5 115.0
1 13 14.5 19 16.75 167.5 120.0
1 14 15.5 20.5 18 180.0 132.5
1 15 16 21.5 18.75 187.5 140.0
1 16 16.5 23 19.75 197.5 150.0
1 17 17 25 21 210.0 162.5
1 18 17.5 27.5 22.5 225.0 202.5
1 19 18 31.5 24.75 247.5 225.0
1 20 18.5 37 27.75 277.5 255.0
1 21 19 42 30.5 305.0 282.5 16.77 11.61
1 22 19.5 50.5 35 350.0 327.5
1 23 20 58 39 390.0 367.5
1 24 20.5 64.5 42.5 425.0 402.5
1 25 21 70.5 45.75 457.5 435.0
1 26 22 76.5 49.25 492.5 470.0
1 27 22.5 85.5 54 540.0 517.5 20.60 8.94
1 28 23 94.5 58.75 587.5 565.0
1 29 24 100 62 620.0 597.5
1 30 25
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA: 68 + 000 R. 3.26 M Y : 0288645 X : 0488154 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0.5 5 0.0
1 1 2 4.5 3.25 32.5 32.5
1 2 4 8 6 60.0 27.5
1 3 9 11.5 10.25 102.5 70.0 21.5 8.47
1 4 10.5 13.5 12 120.0 87.5
1 5 12 16 14 140.0 107.5
1 6 13 18.5 15.75 157.5 125.0
1 7 14 21 17.5 175.0 142.5
1 8 15 23 19 190.0 157.5
1 9 16.5 25 20.75 207.5 175.0
1 10 18 27 22.5 225.0 192.5
1 11 19.5 28 23.75 237.5 205.0
1 12 21 28.5 24.75 247.5 215.0 14.58 13.86
1 13 23 29 26 260.0 227.5
1 14 25 29.5 27.25 272.5 240.0
1 15 26 30 28 280.0 247.5
1 16 26.5 30.5 28.5 285.0 252.5
1 17 27 31 29 290.0 257.5
1 18 27.5 31.5 29.5 295.0 262.5
1 19 32
1 20 33
1 21 33.5
1 22 34
1 23 35
1 24 36
1 25 37
1 26 39
1 27 41
1 28 43.5
1 29 49
1 30 54
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA: 68 + 100 L. 3.94 M Y : 0288619 X : 0488064 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 5.5 2 3.75 37.5 37.5
1 2 9 6 7.5 75.0 52.5
1 3 12 10 11 110.0 72.5
1 4 15 12 13.5 135.0 97.5
1 5 18 14 16 160.0 122.5 26.39 6.53
1 6 24 15 19.5 195.0 157.5
1 7 27 16 21.5 215.0 177.5
1 8 31.5 17.5 24.5 245.0 207.5
1 9 36 19 27.5 275.0 237.5
1 10 41 20 30.5 305.0 267.5
1 11 47 22 34.5 345.0 307.5
1 12 52 24 38 380.0 342.5
1 13 56.5 26 41.25 412.5 375.0
1 14 59 27 43 430.0 392.5 26.81 6.40
1 15 61.5 28 44.75 447.5 410.0
1 16 63.5 29.5 46.5 465.0 427.5
1 17 66 31 48.5 485.0 447.5
1 18 68 33 50.5 505.0 482.5
1 19 72 37 37 370.0 347.5
1 20 77 42 42 420.0 397.5
1 21 82 51 51 510.0 487.5
1 22 84 57 57 570.0 547.5 27.50 6.20
1 23 85.5 62 62 620.0 597.5
1 24 87 67 67 670.0 647.5
1 25 88 71 71 710.0 687.5
1 26 89 76 76 760.0 737.5
1 27 91 81 81 810.0 787.5
1 28 92 87 87 870.0 847.5 31.58 5.20
1 29 93 92 92 920.0 897.5
1 30 94.5 97 97 970.0 947.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA: 68 + 200 R. 3.54 M Y : 0288643 X : 0487978 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 0 0.5 5 0.0
1 1 7 10 8.5 85.0 85.0
1 2 14 19 16.5 165.0 142.5
1 3 24 29.5 26.75 267.5 182.5
1 4 34 42.5 38.25 382.5 297.5
75.6 1.71
1 5 42 54 48 480.0 395.0
1 6 50 64 57 570.0 485.0
1 7 58 71 64.5 645.0 560.0
1 8 62 76 69 690.0 605.0
1 9 68 80 74 740.0 655.0
1 10 75 86 80.5 805.0 720.0
1 11 82 90 86 860.0 775.0
1 12 86 92 89 890.0 805.0
56.09 2.51
1 13 87 94 90.5 905.0 820.0
1 14 88 95 91.5 915.0 830.0
1 15 89 96 92.5 925.0 840.0
1 16 100 96.5 98.25 982.5 897.5
1 17 97
1 18 97.5
1 19 98
1 20 99
1 21 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA: 68 + 300 R. 3.25 M Y : 0288696 X : 0487944 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 0 0.5 5 0.0
1 1 3 4 3.5 35.0 35.0
1 2 4 7 5.5 55.0 32.5
1 3 6 10 8 80.0 45.0
1 4 7 12 9.5 95.0 60.0
1 5 9 14 11.5 115.0 80.0 26.67 6.44
1 6 11 20 15.5 155.0 120.0
1 7 13 26 19.5 195.0 160.0
1 8 16 30 23 230.0 195.0
1 9 21 34 27.5 275.0 240.0
1 10 26 36.5 31.25 312.5 277.5
1 11 28 40.5 34.25 342.5 307.5
1 12 28 46.5 37.25 372.5 337.5
1 13 30 51 40.5 405.0 370.0
1 14 32 56.5 44.25 442.5 407.5
34.61 4.63
1 15 36 62 49 490.0 455.0
1 16 40 67.5 53.75 537.5 502.5
1 17 44 73 58.5 585.0 550.0
1 18 48 78 63 630.0 607.5
1 19 53 83 68 680.0 657.5
1 20 58.5 86 72.25 722.5 700.0
1 21 64 87 75.5 755.0 732.5
1 22 70.5 89 79.75 797.5 775.0
1 23 77 90 83.5 835.0 812.5
1 24 82.5 92.5 87.5 875.0 852.5
1 25 84.5 93.5 89 890.0 867.5 31.08 5.30
1 26 87 94.5 90.75 907.5 885.0
1 27 88.5 95.5 92 920.0 897.5
1 28 89.5 97.5 93.5 935.0 912.5
1 29 90 99.5 94.75 947.5 925.0
1 30 91 100 95.5 955.0 932.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA: 68 + 400 L. 5.05 M Y : 0288805 X : 0487946 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 0 0 0 0.0
1 1 4 4 4 40.0 40.0
1 2 6.5 8 7.25 72.5 50.0
1 3 9.5 9.5 9.5 95.0 55.0
1 4 12.5 11 11.75 117.5 77.5
1 5 16 13 14.5 145.0 105.0
1 6 18.5 14 16.25 162.5 122.5 28.18 6.01
1 7 27 15 21 210.0 170.0
1 8 35 15.5 25.25 252.5 212.5
1 9 42 16 29 290.0 250.0
1 10 47 16.6 31.8 318.0 278.0
1 11 53 17 35 350.0 310.0
1 12 56 17.5 36.75 367.5 327.5
1 13 61 18 39.5 395.0 355.0
1 14 67 19 43 430.0 390.0
1 15 71 20 45.5 455.0 415.0
1 16 76 21.5 48.75 487.5 447.5
1 17 81 23 52 520.0 480.0 34.43 4.66
1 18 87 26.5 56.75 567.5 545.0
1 19 92 34.5 63.25 632.5 610.0
1 20 96 43 69.5 695.0 672.5
1 21 99.5 49 74.25 742.5 720.0
1 22 100 56 78 780.0 757.5
1 23 59.5
1 24 65.5
1 25 70
1 26 74
1 27 82
1 28 89
1 29 95
1 30 99
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA: 68 + 500 R. 2.76 M Y : 0288850 X : 0487883 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 5.5 4.5 5 50.0 50.0
1 2 8 7 7.5 75.0 52.5
1 3 10 8 9 90.0 40.0
1 4 11 9.5 10.25 102.5 52.5
1 5 13.5 11 12.25 122.5 72.5
1 6 14.5 11.5 13 130.0 80.0
12.92 16.17
1 7 17 12 14.5 145.0 95.0
1 8 19 13 16 160.0 110.0
1 9 20 13.5 16.75 167.5 117.5
1 10 23 14 18.5 185.0 135.0
1 11 24.5 15 19.75 197.5 147.5
1 12 25.5 15.5 20.5 205.0 155.0
1 13 27.5 16 21.75 217.5 167.5
1 14 29 16.5 22.75 227.5 177.5
1 15 31 17 24 240.0 190.0
1 16 31.5 17.5 24.5 245.0 195.0
1 17 32 18 25 250.0 200.0
1 18 33 18.5 25.75 257.5 235.0 12.50 16.86
1 19 33.5 19 26.25 262.5 240.0
1 20 34 20 27 270.0 247.5
1 21 34.5 21 27.75 277.5 255.0
1 22 36 22 29 290.0 267.5
1 23 39 23 31 310.0 287.5
1 24 42 23.5 32.75 327.5 305.0
1 25 45 24 34.5 345.0 322.5
1 26 48 24.5 36.25 362.5 340.0
1 27 51.5 25 38.25 382.5 360.0 13.83 14.83
1 28 54.5 25.5 40 400.0 377.5
1 29 57.5 26 41.75 417.5 395.0
1 30 60.5 27 43.75 437.5 415.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA: 68 + 600 L. 3.49 M Y : 0288943 X : 0487863 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 5 5.5 5.25 52.5 52.5
1 2 11 12 11.5 115.0 92.5
1 3 17 15 16.0 160.0 107.5
1 4 22 17.5 19.75 197.5 145.0
1 5 26 19 22.5 225.0 172.5
1 6 30 21 25.5 255.0 202.5 27.5 6.20
1 7 33 22.5 27.75 277.5 225.0
1 8 35.5 24 29.75 297.5 245.0
1 9 38 25.5 31.75 317.5 265.0
1 10 41 27 34.0 340.0 287.5
1 11 42.5 28.5 35.5 355.0 302.5
1 12 45 30 37.5 375.0 322.5
1 13 46.5 31.5 39.0 390.0 337.5
1 14 48 33 40.5 405.0 352.5
1 15 49.5 35 42.25 422.5 370.0
1 16 50.5 36.5 43.5 435.0 382.5
1 17 51.5 38 44.75 447.5 395.0 21.70 8.37
1 18 52.5 39 45.75 457.5 435.0
1 19 54 40 47.0 470.0 447.5
1 20 55.5 40.5 48.0 480.0 457.5
1 21 56.5 41 48.75 487.5 465.0
1 22 58 42 50.0 500.0 477.5
1 23 59 43 51.0 510.0 487.5
1 24 60.6 43.5 52.05 520.5 498.0
1 25 62 44.5 53.25 532.5 510.0
1 26 63 45.5 54.25 542.5 520.0
19.00 9.91
1 27 65 46.5 55.75 557.5 535.0
1 28 66 47.5 56.75 567.5 545.0
1 29 67.5 48.5 58 580.0 557.5
1 30 69 49.5 59.25 592.5 570.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA: 68 + 700 R. 3.32 M Y : 0289039 X : 0487841 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 9 7.5 8.25 82.5 82.5
1 2 14 9.5 11.75 117.5 95.0
1 3 18.5 14.5 16.5 165.0 82.5
1 4 21 17.5 19.25 192.5 110.0
27.2 6.29
1 5 23.5 20 21.75 217.5 135.0
1 6 26 22.5 24.25 242.5 160.0
1 7 29 25.5 27.25 272.5 190.0
1 8 31.5 28.5 30 300.0 217.5
1 9 33.5 31 32.25 322.5 240.0
1 10 36 32 34 340.0 257.5
1 11 38 33 35.5 355.0 272.5
1 12 39.5 34 36.75 367.5 285.0
1 13 40 35 37.5 375.0 292.5 18.68 10.13
1 14 41 35.5 38.25 382.5 300.0
1 15 41.5 36 38.75 387.5 305.0
1 16 42 37 39.5 395.0 312.5
1 17 42.5 37.5 40 400.0 317.5
1 18 43 38 40.5 405.0 382.5
1 19 43.5 38.5 41 410.0 387.5
1 20 44 39 41.5 415.0 392.5
16.63 11.73
1 21 44.5 39.5 42 420.0 397.5
1 22 45 40 42.5 425.0 402.5
1 23 40.5 40.5 405.0 382.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA: 68 + 800 L. 3.49 M Y : 0289072 X : 0487769 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 0 0.5 5 0.0
1 1 7 3 5 50.0 50.0
1 2 12 4.5 8.25 82.5 60.0
1 3 19 6 12.5 125.0 75.0
1 4 26.5 7.5 17 170.0 120.0
1 5 30.5 9.5 20 200.0 150.0 31.1 5.30
1 6 35 11 23 230.0 180.0
1 7 39 15 27 270.0 220.0
1 8 43 18 30.5 305.0 255.0
1 9 46 20 33 330.0 280.0
1 10 52 21.5 36.75 367.5 317.5
1 11 57 23 40 400.0 350.0
1 12 61 24 42.5 425.0 375.0
1 13 65 25 45 450.0 400.0
1 14 69 26 47.5 475.0 425.0 31.25 5.27
1 15 72 27.5 49.75 497.5 447.5
1 16 75 30 52.5 525.0 475.0
1 17 78 33 55.5 555.0 505.0
1 18 81 36 58.5 585.0 562.5
1 19 83 38.5 60.75 607.5 585.0
1 20 86 43 64.5 645.0 622.5
1 21 89 45 67 670.0 647.5
1 22 92 51 71.5 715.0 692.5
31.92 5.13
1 23 95 56 75.5 755.0 732.5
1 24 97 62 79.5 795.0 772.5
1 25 98.5 67 82.75 827.5 805.0
1 26 100 70.5 85.25 852.5 830.0
1 27 73
1 28 76
1 29 77.6
1 30 79.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA: 68 + 900 R. 3.85 M Y : 0289149 X : 0487692 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 4 4 4 40.0 40.0
1 2 6 5 5.5 55.0 32.5
1 3 7 10 8.5 85.0 45.0
1 4 9 14 11.5 115.0 75.0
32.5 5.01
1 5 10 18 14 140.0 100.0
1 6 13 27 20 200.0 160.0
1 7 19 34 26.5 265.0 225.0
1 8 22 38 30 300.0 260.0
1 9 25.5 43 34.25 342.5 302.5
1 10 29 46 37.5 375.0 335.0
1 11 36 49 42.5 425.0 385.0
34.64 4.62
1 12 41 51 46 460.0 420.0
1 13 45 54 49.5 495.0 455.0
1 14 49 56 52.5 525.0 485.0
1 15 53 58 55.5 555.0 515.0
1 16 56 60 58 580.0 540.0
1 17 57 62 59.5 595.0 555.0
1 18 61 64 62.5 625.0 602.5
31.70 5.17
1 19 63 67 65 650.0 627.5
1 20 66 69 67.5 675.0 652.5
1 21 68 71 69.5 695.0 672.5
1 22 70 74 72 720.0 697.5
1 23 72 76 74 740.0 717.5
1 24 75 78 76.5 765.0 742.5
1 25 76 80 78 780.0 757.5
1 26 78 82 80 800.0 777.5
28.92 5.81
1 27 81 84 82.5 825.0 802.5
1 28 84 86 85 850.0 827.5
1 29 86 88 87 870.0 847.5
1 30 88 90 89 890.0 867.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA: 69 + 000 L. 3.34 M Y : 0289240 X : 0487659 Date : November 10, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 4.5 10 7.25 72.5 72.5
1 2 6 16.5 11.25 112.5 40.0
26.875 6.38
1 3 7 22.5 14.75 147.5 75.0
1 4 8.5 27.5 18 180.0 107.5
1 5 10 34 22 220.0 147.5
1 6 13.5 39 26.25 262.5 190.0
1 7 19 44 31.5 315.0 242.5
1 8 21.5 48 34.75 347.5 275.0
1 9 23.3 52 37.65 376.5 304.0 38.65 4.02
1 10 29 56 42.5 425.0 352.5
1 11 35 60 47.5 475.0 402.5
1 12 40.5 65 52.75 527.5 455.0
1 13 45 70 57.5 575.0 502.5
1 14 49.5 74 61.75 617.5 545.0
1 15 53.5 79 66.25 662.5 590.0
1 16 56 81 68.5 685.0 612.5 37.36 4.20
1 17 58.5 83 70.75 707.5 635.0
1 18 63 86 74.5 745.0 672.5
1 19 70 88 79 790.0 717.5
1 20 76 90 83 830.0 757.5
1 21 80 91.5 85.75 857.5 785.0
1 22 83 93 88 880.0 807.5
36.70 4.29
1 23 89 94.5 91.75 917.5 845.0
1 24 95 96 95.5 955.0 882.5
1 25 99.5 97 98.25 982.5 910.0
1 26 100 98 99 990.0 917.5
1 27 99
1 28 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI.
JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 69 + 100 R. 3.55 M Y : 0289321 X: 0487597 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 2 2.4 2.20 22.0 22.0
1 2 3 3 3.00 30.0 8.0
1 3 4 4 4.00 40.0 18.0
1 4 5 4.9 4.95 49.5 27.5
1 5 6 5.5 5.75 57.5 35.5
1 6 8 6.5 7.25 72.5 50.5
9.08 25.32
1 7 8.5 7.6 8.05 80.5 58.5
1 8 9 8 8.50 85.0 63.0
1 9 10 9 9.50 95.0 73.0
1 10 11 10 10.50 105.0 83.0
1 11 12 11 11.50 115.0 93.0
1 12 13 15 14.00 140.0 118.0
1 13 14 18 16.00 160.0 138.0
1 14 16 22 19.00 190.0 168.0
1 15 18 24 21.00 210.0 188.0
14.61 13.83
1 16 21 25 23.00 230.0 208.0
1 17 26 27 26.50 265.0 243.0
1 18 28 29 28.50 285.0 263.0
1 19 31 31 31.00 310.0 288.0
1 20 32.1 32 32.05 320.5 298.5
1 21 35 33 34.00 340.0 318.0
1 22 36 33.6 34.80 348.0 326.0
1 23 37 34.6 35.80 358.0 336.0
1 24 38 35 36.50 365.0 343.0
13.43 15.39
1 25 39 36 37.50 375.0 353.0
1 26 40 37.4 38.70 387.0 365.0
1 27 41 38.4 39.70 397.0 375.0
1 28 42 38.9 40.45 404.5 382.5
1 29 43 40 41.50 415.0 393.0
1 30 44 41 42.50 425.0 403.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 69 + 200 R. 3.45 M Y : 0288772 X: 0488670 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 5 6 5.50 55.0 55.0
1 2 6 9 7.50 75.0 20.0
1 3 8 11 9.50 95.0 40.0
1 4 10 12.5 11.25 112.5 57.5
1 5 11.5 14 12.75 127.5 72.5
1 6 12.5 15.5 14.00 140.0 85.0
14.17 14.38
1 7 14 16.5 15.25 152.5 97.5
1 8 16 17.5 16.75 167.5 112.5
1 9 18 18.5 18.25 182.5 127.5
1 10 20 20 20.00 200.0 145.0
1 11 21 22 21.50 215.0 160.0
1 12 22 23 22.50 225.0 170.0
1 13 22.5 25 23.75 237.5 182.5
1 14 23 27 25.00 250.0 195.0
1 15 24 29 26.50 265.0 210.0
1 16 25 30.5 27.75 277.5 222.5 13.29 15.60
1 17 26 32 29.00 290.0 235.0
1 18 27 32.5 29.75 297.5 242.5
1 19 28 33.5 30.75 307.5 252.5
1 20 34.5
1 21 35
1 22 36
1 23 36.6
1 24 38
1 25 39
1 26 39.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 69 + 300 L. 3.48 M Y : 0289488 X: 0487638 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 5 5 5.00 50.0 50.0
1 2 8 7 7.50 75.0 25.0
1 3 11.5 9 10.25 102.5 52.5
1 4 14 12 13.00 130.0 80.0
1 5 15.5 15.5 15.50 155.0 105.0
1 6 17 18 17.50 175.0 125.0
22.50 7.99
1 7 18.5 20.5 19.50 195.0 145.0
1 8 20 23 21.50 215.0 165.0
1 9 22 25.5 23.75 237.5 187.5
1 10 24 28.5 26.25 262.5 212.5
1 11 27 31 29.00 290.0 240.0
1 12 29.5 34.5 32.00 320.0 270.0
1 13 31 37.5 34.25 342.5 292.5
1 14 33 40 36.50 365.0 315.0
1 15 34.5 42.5 38.50 385.0 335.0
1 16 36 45 40.50 405.0 355.0
20.48 9.01
1 17 37 47.5 42.25 422.5 372.5
1 18 38.5 49 43.75 437.5 387.5
1 19 39.5 50.5 45.00 450.0 400.0
1 20 41 52.5 46.75 467.5 417.5
1 21 42 54 48.00 480.0 430.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 69 + 400 R. 3.42 M Y : 0289490 X: 0487637 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 2 2.5 2.25 22.5 22.5
1 2 3 4.0 3.50 35.0 12.5
1 3 4 6.0 5.00 50.0 27.5
1 4 4.5 7.0 5.75 57.5 35.0
1 5 5 8.0 6.50 65.0 42.5
10.00 22.39
1 6 6 9.0 7.50 75.0 52.5
1 7 7 10.5 8.75 87.5 65.0
1 8 7.5 11.5 9.50 95.0 72.5
1 9 8 12.5 10.25 102.5 80.0
1 10 9 15.5 12.25 122.5 100.0
1 11 9.5 17.0 13.25 132.5 110.0
1 12 10 18.0 14.00 140.0 117.5
1 13 10.5 19.5 15.00 150.0 127.5
1 14 11.5 21.0 16.25 162.5 140.0
1 15 12 23.0 17.50 175.0 152.5 11.71 18.32
1 16 13 24.0 18.50 185.0 162.5
1 17 14 26.0 20.00 200.0 177.5
1 18 14.5 29.0 21.75 217.5 195.0
1 19 15 34.0 24.50 245.0 222.5
1 20 36.5
1 21 38.0
1 22 39.0
1 23 40.0
1 24 41.0
1 25 42.0
1 26 43.0
1 27 44.0
1 28 46.0
1 29 47.0
1 30 48.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 69 + 500 L. 3.49 M Y : 0289652 X: 0487560 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 4 4 4.00 40.0 40.0
1 2 6 5 5.50 55.0 15.0
1 3 8 7 7.50 75.0 35.0 17.50 11.00
1 4 10 9 9.50 95.0 55.0
1 5 12 11 11.50 115.0 75.0
1 6 14 13 13.50 135.0 95.0
1 7 16 15 15.50 155.0 115.0
1 8 17.5 17 17.25 172.5 132.5
1 9 19.5 19 19.25 192.5 152.5 18.96 9.94
1 10 21.5 22 21.75 217.5 177.5
1 11 23 24 23.50 235.0 195.0
1 12 26.5 27 26.75 267.5 227.5
1 13 33 30 31.50 315.0 275.0
1 14 39.5 34 36.75 367.5 327.5
1 15 45 38.5 41.75 417.5 377.5
1 16 50 43 46.50 465.0 425.0
1 17 56 48 52.00 520.0 480.0
1 18 62 52 57.00 570.0 530.0
1 19 67 56 61.50 615.0 575.0 32.80 4.95
1 20 72.5 60 66.25 662.5 622.5
1 21 78 63 70.50 705.0 665.0
1 22 84 67 75.50 755.0 715.0
1 23 91.5 70 80.75 807.5 767.5
1 24 99 71 85.00 850.0 810.0
1 25 100 72 86.00 860.0 820.0
1 26 72.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 69 + 600 R. 3.39 M Y : 0289743 X: 0487549 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 4 3 3.50 35.0 35.0
1 2 5 5 5.00 50.0 15.0
1 3 5.5 7 6.25 62.5 27.5
1 4 7 8 7.50 75.0 40.0
11.25 19.28
1 5 8 10 9.00 90.0 55.0
1 6 10 12 11.00 110.0 75.0
1 7 10.5 12.5 11.50 115.0 80.0
1 8 11 14 12.50 125.0 90.0
1 9 11.5 14.5 13.00 130.0 95.0
1 10 12.5 15 13.75 137.5 102.5
1 11 13 16 14.50 145.0 110.0
1 12 13.5 17 15.25 152.5 117.5
1 13 14 18 16.00 160.0 125.0 12.94 16.14
1 14 15 19 17.00 170.0 135.0
1 15 16 20.5 18.25 182.5 147.5
1 16 17 27 22.00 220.0 185.0
1 17 17.5 33.5 25.50 255.0 220.0
1 18 18 40 29.00 290.0 255.0
1 19 19 47 33.00 330.0 295.0
16.67 11.70
1 20 20.5 52 36.25 362.5 327.5
1 21 22 55 38.50 385.0 350.0
1 22 60
1 23 65.5
1 24 72
1 25 75.5
1 26 78
1 27 81
1 28 84
1 29 86.5
1 30 89
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 69 + 700 L. 3.44 M Y : 0289840 X: 0487549 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 5.5 7.5 6.50 65.0 65.0
1 2 9 20 14.50 145.0 80.0
1 3 13 27 20.00 200.0 135.0
1 4 21 31 26.00 260.0 195.0 45.36 3.28
1 5 26.5 34 30.25 302.5 237.5
1 6 30.5 37 33.75 337.5 272.5
1 7 33.5 43 38.25 382.5 317.5
1 8 39 48.5 43.75 437.5 372.5
1 9 44 52 48.00 480.0 415.0
1 10 49 55 52.00 520.0 455.0
1 11 50.5 57 53.75 537.5 472.5
35.33 4.51
1 12 52 58 55.00 550.0 485.0
1 13 54 59 56.50 565.0 500.0
1 14 56 60 58.00 580.0 515.0
1 15 58.5 60.5 59.50 595.0 530.0
1 16 60 70 65.00 650.0 585.0
1 17 62 80 71.00 710.0 645.0
1 18 64 80.5 72.25 722.5 657.5
37.14 4.23
1 19 66 90 78.00 780.0 715.0
1 20 67.5 90.5 79.00 790.0 725.0
1 21 69 100 84.50 845.0 780.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 69 + 800 R. 3.46 M Y : 0289933 X: 0487497 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 4 2 0 0 0.0
1 1 9 5 7.00 70.0 70.0
1 2 10.5 6 8.25 82.5 12.5
1 3 12 7.5 9.75 97.5 27.5
9.58 23.63
1 4 13 9 11.00 110.0 40.0
1 5 14 10 12.00 120.0 50.0
1 6 14.5 11 12.75 127.5 57.5
1 7 15 12 13.50 135.0 65.0
1 8 16.5 13.5 15.00 150.0 80.0
1 9 17 14.5 15.75 157.5 87.5
1 10 17.5 16 16.75 167.5 97.5
1 11 18 17 17.50 175.0 105.0 9.00 25.59
1 12 18.5 18 18.25 182.5 112.5
1 13 19 19 19.00 190.0 120.0
1 14 19.5 20 19.75 197.5 127.5
1 15 20 21 20.50 205.0 135.0
1 16 22
1 17 24
1 18 26
1 19 29
1 20 31
1 21 32
1 22 33
1 23 34
1 24 35
1 25 35.5
1 26 36
1 27 38
1 28 39
1 29 39.5
1 30 40
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 69 + 900 L. 3.54 M Y : 0290028 X: 0487523 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 4 6 5.00 50.0 50.0
1 2 7.5 8.5 8.00 80.0 30.0
1 3 9 9.5 9.25 92.5 42.5
1 4 10 10.5 10.25 102.5 52.5 10.36 21.41
1 5 10.5 11 10.75 107.5 57.5
1 6 11 12 11.50 115.0 65.0
1 7 11.5 13 12.25 122.5 72.5
1 8 12 14 13.00 130.0 80.0
1 9 14 16 15.00 150.0 100.0
1 10 15 18 16.50 165.0 115.0
1 11 16 19.5 17.75 177.5 127.5 11.79 18.17
1 12 17 20.5 18.75 187.5 137.5
1 13 18 22 20.00 200.0 150.0
1 14 19 24 21.50 215.0 165.0
1 15 20 26 23.00 230.0 180.0
1 16 20.5 28.5 24.50 245.0 195.0
1 17 21 31 26.00 260.0 210.0
15.13 13.24
1 18 21.5 35 28.25 282.5 232.5
1 19 22 40 31.00 310.0 260.0
1 20 22.5 48 35.25 352.5 302.5
1 21 50
1 22 64.5
1 23 66
1 24 69
1 25 70
1 26 74
1 27 76
1 28 78
1 29 79
1 30 80
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 70 + 000 R. 3.55 M Y : 0290111 X: 0487570 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 7 5.5 6.25 62.5 62.5
1 2 10 9 9.50 95.0 32.5
15.63 12.70
1 3 12 10.5 11.25 112.5 50.0
1 4 13 12 12.50 125.0 62.5
1 5 14 13 13.50 135.0 72.5
1 6 15 14 14.50 145.0 82.5
1 7 16 15 15.50 155.0 92.5
1 8 16.5 16 16.25 162.5 100.0
1 9 17.5 17 17.25 172.5 110.0
1 10 18 17.5 17.75 177.5 115.0 10.67 20.63
1 11 19.5 18.5 19.00 190.0 127.5
1 12 21 19 20.00 200.0 137.5
1 13 22 20 21.00 210.0 147.5
1 14 22.5 21 21.75 217.5 155.0
1 15 23 21.5 22.25 222.5 160.0
1 16 24 22 23.00 230.00 167.5
1 17 24.5 23 23.75 237.50 175.0
1 18 25 24 24.50 245.00 182.5
9.52 23.82
1 19 26 24.5 25.25 252.50 190.0
1 20 26.5 25 25.75 257.50 195.0
1 21 27 25.5 26.25 262.50 200.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 70 + 100 L. 3.45 M Y : 0290201 X: 0487609 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 4.5 3 3.75 37.5 37.5
1 2 8 4 6.00 60.0 22.5
1 3 12 5 8.50 85.0 47.5 18.50 10.25
1 4 15 6 10.50 105.0 67.5
1 5 18 8 13.00 130.0 92.5
1 6 21.5 9 15.25 152.5 115.0
1 7 24 10 17.00 170.0 132.5
1 8 26 11 18.50 185.0 147.5
1 9 28 12 20.00 200.0 162.5
1 10 29.5 15 22.25 222.5 185.0
1 11 31 17 24.00 240.0 202.5 18.13 10.52
1 12 33 19 26.00 260.0 222.5
1 13 36 20 28.00 280.0 242.5
1 14 37 21.5 29.25 292.5 255.0
1 15 39 23 31.00 310.0 272.5
1 16 40 25.5 32.75 327.5 290.0
1 17 40.5 29 34.75 347.5 310.0
1 18 41 32 36.50 365.0 327.5
1 19 42 34 38.00 380.0 342.5
1 20 42.5 36 39.25 392.5 355.0
1 21 43 39.5 41.25 412.5 375.0
1 22 43.5 43 43.25 432.5 395.0
1 23 44 46 45.00 450.0 412.5
16.67 11.70
1 24 45 49 47.00 470.0 432.5
1 25 46 52 49.00 490.0 452.5
1 26 46.5 54 50.25 502.5 465.0
1 27 47 55.5 51.25 512.5 475.0
1 28 48 57 52.50 525.0 487.5
1 29 48.5 58 53.25 532.5 495.0
1 30 49 58.5 53.75 537.5 500.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 70 + 200 R. 3.50 M Y : 0290288 X: 0487671 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 1 5 3.00 30.0 30.0
1 2 1.5 8 4.75 47.5 17.5
1 3 3 9 6.00 60.0 30.0
1 4 4 11 7.50 75.0 45.0
14.38 14.12
1 5 6 11.5 8.75 87.5 57.5
1 6 7.3 14 10.65 106.5 76.5
1 7 9 14.5 11.75 117.5 87.5
1 8 12 17 14.50 145.0 115.0
1 9 14.5 18 16.25 162.5 132.5
1 10 18 19 18.50 185.0 155.0
1 11 20 21.6 20.80 208.0 178.0
1 12 21.4 22.5 21.95 219.5 189.5
1 13 24.4 25 24.70 247.0 217.0
22.33 8.07
1 14 30 28.5 29.25 292.5 262.5
1 15 35.4 31.4 33.40 334.0 304.0
1 16 39 35 37.00 370.0 340.0
1 17 42 38 40.00 400.0 370.0
1 18 44.4 42 43.20 432.0 402.0
1 19 47.5 45 46.25 462.5 432.5
1 20 51 47 49.00 490.0 460.0
1 21 53 49 51.00 510.0 480.0
1 22 54.4 51.5 52.95 529.5 499.5
1 23 56 54.5 55.25 552.5 522.5
1 24 58 57 57.50 575.0 545.0
22.83 7.85
1 25 60 60 60.00 600.0 570.0
1 26 62 62 62.00 620.0 590.0
1 27 63 64 63.50 635.0 605.0
1 28 65 65 65.00 650.0 620.0
1 29 68 70 69.00 690.0 660.0
1 30 70 73 71.50 715.0 685.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 70 + 300 L. 3.43 M Y : 0290367 X: 0487720 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 2 0 0 0 0.0
1 1 4.3 4 4.15 41.5 41.5
1 2 7 6.2 6.60 66.0 24.5
1 3 10 8 9.00 90.0 48.5
29.75 5.61
1 4 14 10 12.00 120.0 78.5
1 5 20.4 13 16.70 167.0 125.5
1 6 28 16 22.00 220.0 178.5
1 7 36 21 28.50 285.0 243.5
1 8 45 28.6 36.80 368.0 326.5
1 9 57.4 37 47.20 472.0 430.5
1 10 68.5 47 57.75 577.5 536.0
1 11 70 56 63.00 630.0 588.5
58.66 2.37
1 12 82.2 66 74.10 741.0 699.5
1 13 87.4 76 81.70 817.0 775.5
1 14 92.3 83 87.65 876.5 835.0
1 15 96 89 92.50 925.0 883.5
1 16 100 96 98.00 980.0 938.5
1 17 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 70 + 400 R. 3.39 M Y : 0290545 X: 0487636 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 3 5 4.00 40.0 40.0
1 2 5 9 7.00 70.0 30.0
1 3 7 12 9.50 95.0 55.0
1 4 7.4 15.4 11.40 114.0 74.0
1 5 8.2 17.1 12.65 126.5 86.5
1 6 9 18 13.50 135.0 95.0 18.18 10.48
1 7 10 19 14.50 145.0 105.0
1 8 11 20 15.50 155.0 115.0
1 9 12.5 22 17.25 172.5 132.5
1 10 14.3 25.6 19.95 199.5 159.5
1 11 16 32 24.00 240.0 200.0
1 12 17 40 28.50 285.0 245.0
1 13 19 44.1 31.55 315.5 275.5
1 14 21 47.1 34.05 340.5 300.5
1 15 23.4 49.4 36.40 364.0 324.0
21.58 8.43
1 16 26.1 51.2 38.65 386.5 346.5
1 17 30.2 53 41.60 416.0 376.0
1 18 31.5 54.5 43.00 430.0 390.0
1 19 34 56 45.00 450.0 410.0
1 20 35.2 57.5 46.35 463.5 423.5
1 21 38 58.1 48.05 480.5 440.5
1 22 39 60.5 49.75 497.5 457.5
1 23 39.5 62 50.75 507.5 467.5
1 24 40 63 51.50 515.0 475.0
1 25 41 65 53.00 530.0 490.0 18.17 10.49
1 26 43 66 54.50 545.0 505.0
1 27 43.5 67.5 55.50 555.0 515.0
1 28 44 69 56.50 565.0 525.0
1 29 45.5 70 57.75 577.5 537.5
1 30 46 71 58.50 585.0 545.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 70 + 500 L. 3.55 M Y : 0290560 X: 0487747 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 2 0 0 0.0
1 1 5 4.5 4.75 47.5 47.5
1 2 8 6 7.00 70.0 22.5
25.75 6.73
1 3 10.3 9 9.65 96.5 74.5
1 4 14 11 12.50 125.0 103.0
1 5 17.5 12.5 15.00 150.0 128.0
1 6 19.2 13.5 16.35 163.5 141.5
1 7 20.5 14 17.25 172.5 150.5
1 8 22 15 18.50 185.0 163.0
17.33 11.13
1 9 23 16 19.50 195.0 173.0
1 10 25 16.5 20.75 207.5 185.5
1 11 27 17.1 22.05 220.5 198.5
1 12 28 18 23.00 230.0 208.0
1 13 30 18.5 24.25 242.5 220.5
1 14 32 19 25.50 255.0 233.0
1 15 33 20 26.50 265.0 243.0
16.97 11.43
1 16 35 21.2 28.10 281.0 259.0
1 17 37.5 22 29.75 297.5 275.5
1 18 42 23.5 32.75 327.5 305.5
1 19 45 24 34.50 345.0 323.0
1 20 47 25.4 36.20 362.0 340.0
1 21 49.1 26.5 37.80 378.0 356.0
1 22 52.5 28.1 40.30 403.0 381.0
1 23 56 30 43.00 430.0 408.0
1 24 63 32 47.50 475.0 453.0
18.95 9.94
1 25 64.5 35 49.75 497.5 475.5
1 26 67 40 53.50 535.0 513.0
1 27 69 40.5 54.75 547.5 525.5
1 28 70 42.5 56.25 562.5 540.5
1 29 72 44.5 58.25 582.5 560.5
1 30 73 45.1 59.05 590.5 568.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 70 + 600 R. 3.49 M Y : 0290655 X: 0487723 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 5 3 4.00 40.0 40.0
1 2 7 5.5 6.25 62.5 22.5
1 3 8.1 8 8.05 80.5 40.5
14.58 13.86
1 4 10 9 9.50 95.0 55.0
1 5 11.5 11 11.25 112.5 72.5
1 6 13 12.5 12.75 127.5 87.5
1 7 17.5 15 16.25 162.5 122.5
1 8 20 24 22.00 220.0 180.0
1 9 22 36 29.00 290.0 250.0
1 10 24.5 43.1 33.80 338.0 298.0
1 11 27 49 38.00 380.0 340.0 34.33 4.67
1 12 33 52 42.50 425.0 385.0
1 13 39 55 47.00 470.0 430.0
1 14 45 57.5 51.25 512.5 472.5
1 15 51 60 55.50 555.0 515.0
1 16 55 64 59.50 595.0 555.0
1 17 58 67 62.50 625.0 585.0
1 18 61 69 65.00 650.0 610.0
1 19 63.5 70.1 66.80 668.0 628.0 31.59 5.19
1 20 66 72 69.00 690.0 650.0
1 21 68 74 71.00 710.0 670.0
1 22 71 76 73.50 735.0 695.0
1 23 73.5 78 75.75 757.5 717.5
1 24 76 79.5 77.75 777.5 737.5
1 25 79 83.5 81.25 812.5 772.5
1 26 81 85 83.00 830.0 790.0
29.17 5.75
1 27 83.5 87 85.25 852.5 812.5
1 28 86 89 87.50 875.0 835.0
1 29 89.5 91 90.25 902.5 862.5
1 30 90 93 91.50 915.0 875.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 70 + 700 L. 3.48 M Y : 0290703 X: 0487802 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 5 2 3.50 35.0 35.0
1 2 9 3 6.00 60.0 25.0
1 3 12.5 4 8.25 82.5 47.5 18.50 10.25
1 4 14.5 6.5 10.50 105.0 70.0
1 5 16.5 9 12.75 127.5 92.5
1 6 20 11.5 15.75 157.5 122.5
1 7 24 15 19.50 195.0 160.0
1 8 29 17.6 23.30 233.0 198.0
1 9 32.5 19 25.75 257.5 222.5
1 10 34 20 27.00 270.0 235.0 22.32 8.07
1 11 36 20.5 28.25 282.5 247.5
1 12 39 22 30.50 305.0 270.0
1 13 41 23.5 32.25 322.5 287.5
1 14 44.5 25 34.75 347.5 312.5
1 15 47 29 38.00 380.0 345.0
1 16 50 35 42.50 425.0 390.0
1 17 52 40.5 46.25 462.5 427.5
1 18 54 46 50.00 500.0 465.0
1 19 56 51 53.50 535.0 500.0 25.87 6.70
1 20 57.5 56 56.75 567.5 532.5
1 21 59 60.2 59.60 596.0 561.0
1 22 60 63 61.50 615.0 580.0
1 23 61 65 63.00 630.0 595.0
1 24 62.5 67 64.75 647.5 612.5
1 25 63.5 69 66.25 662.5 627.5
1 26 65 71 68.00 680.0 645.0
1 27 66 72.5 69.25 692.5 657.5 23.08 7.74
1 28 66.5 74 70.25 702.5 667.5
1 29 67.5 75.5 71.50 715.0 680.0
1 30 68.5 77 72.75 727.5 692.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 70 + 800 R. 3.51 M Y : 0290740 X: 0487895 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 1.5 3 2.25 22.5 22.5
1 2 2.5 5 3.75 37.5 15.0
1 3 3.5 6 4.75 47.5 25.0
1 4 4.5 7 5.75 57.5 35.0
1 5 6 8.2 7.10 71.0 48.5
11.50 18.75
1 6 7 9 8.00 80.0 57.5
1 7 8 10.5 9.25 92.5 70.0
1 8 9.5 12 10.75 107.5 85.0
1 9 11 13 12.00 120.0 97.5
1 10 12.5 15 13.75 137.5 115.0
1 11 15 19.5 17.25 172.5 150.0
1 12 17.5 22.5 20.00 200.0 177.5
1 13 19 25 22.00 220.0 197.5
1 14 20.5 28.2 24.35 243.5 221.0
1 15 22 32 27.00 270.0 247.5
1 16 23 36.5 29.75 297.5 275.0 19.40 9.65
1 17 24 40.5 32.25 322.5 300.0
1 18 25 44 34.50 345.0 322.5
1 19 26 47.5 36.75 367.5 345.0
1 20 27.5 51.5 39.50 395.0 372.5
1 21 30 56 43.00 430.0 407.5
1 22 34 61 47.50 475.0 452.5
1 23 38 68.5 53.25 532.5 510.0
1 24 41 74.5 57.75 577.5 555.0
1 25 44 80 62.00 620.0 597.5
1 26 47.5 84.5 66.00 660.0 637.5 25.42 6.85
1 27 50 88 69.00 690.0 667.5
1 28 53 92 72.50 725.0 702.5
1 29 56 95.5 75.75 757.5 735.0
1 30 59 98 78.50 785.0 762.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 70 + 900 L. 3.43 M Y : 0290762 X: 0487836 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 3.6 4.8 4.20 42.0 42.0
1 2 7.9 9.5 8.70 87.0 45.0
1 3 13.9 14 13.95 139.5 97.5
1 4 17.5 16.8 17.15 171.5 129.5 71.57 1.84
1 5 20.5 19.8 20.15 201.5 159.5
1 6 23.7 22.3 23.00 230.0 188.0
1 7 26.9 25.5 26.20 262.0 220.0
1 8 29.5 29 29.25 292.5 250.5
1 9 32.6 33 32.80 328.0 286.0
1 10 37.2 37.2 37.20 372.0 330.0
1 11 42.8 41.7 42.25 422.5 380.5 35.79 4.43
1 12 47 47.4 47.20 472.0 430.0
1 13 52.1 49.4 50.75 507.5 465.5
1 14 56.6 52 54.30 543.0 501.0
1 15 58.6 54 56.30 563.0 521.0
1 16 63 56 59.50 595.0 553.0
1 17 65.2 57.9 61.55 615.5 573.5 32.05 5.10
1 18 67.4 59.5 63.45 634.5 592.5
1 19 69.2 61 65.10 651.0 609.0
1 20 71.3 62.3 66.80 668.0 626.0
1 21 72.6 63.4 68.00 680.0 638.0
1 22 74.3 64.4 69.35 693.5 651.5
1 23 75 65.1 70.05 700.5 658.5
1 24 75.4 66 70.70 707.0 665.0
1 25 75.9 67.2 71.55 715.5 673.5 23.42 7.60
1 26 76 68.1 72.05 720.5 678.5
1 27 76.1 69 72.55 725.5 683.5
1 28 76.3 70 73.15 731.5 689.5
1 29 76.4 70.3 73.35 733.5 691.5
1 30 76.5 72.4 74.45 744.5 702.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 71 + 000 R. 3.32 M Y : 0290764 X: 0487738 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 3 3 3.00 30.0 30.0
1 2 5 4.9 4.95 49.5 19.5
1 3 6.2 6 6.10 61.0 31.0
1 4 7.2 7.2 7.20 72.0 42.0
1 5 8.1 8 8.05 80.5 50.5
1 6 8.4 8.8 8.60 86.0 56.0
8.63 27.01
1 7 9.6 9.5 9.55 95.5 65.5
1 8 10.4 10 10.20 102.0 72.0
1 9 11 10.5 10.75 107.5 77.5
1 10 11.5 12.3 11.90 119.0 89.0
1 11 12 13 12.50 125.0 95.0
1 12 12.9 13.8 13.35 133.5 103.5
1 13 13.8 14.4 14.10 141.0 111.0
1 14 14.4 15 14.70 147.0 117.0
1 15 15 15.5 15.25 152.5 122.5
1 16 15.8 16 15.90 159.0 129.0
1 17 16.4 16.5 16.45 164.5 134.5
1 18 17.2 17 17.10 171.0 141.0
1 19 17.8 17.5 17.65 176.5 146.5
1 20 18.6 17.9 18.25 182.5 152.5 7.43 32.67
1 21 19.4 18.4 18.90 189.0 159.0
1 22 20 19 19.50 195.0 165.0
1 23 20.6 19.6 20.10 201.0 171.0
1 24 21.4 20.4 20.90 209.0 179.0
1 25 22 21 21.50 215.0 185.0
1 26 22.5 21.8 22.15 221.5 191.5
1 27 23.6 22.5 23.05 230.5 200.5
1 28 23.8 23 23.40 234.0 204.0
1 29 24 23.5 23.75 237.5 207.5 7.13 34.38
1 30 24.8 24 24.40 244.0 214.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 71 + 100 L. 3.53 M Y : 0290788 X : 0487645 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0.9 0.1 0 0 0.0
1 1 8.5 5.6 7.05 70.5 70.5
1 2 15.4 8.7 12.05 120.5 50.0
1 3 19.6 9.7 14.65 146.5 76.0 27.50 5.99
1 4 25.3 10.6 17.95 179.5 109.0
1 5 29.4 12.2 20.80 208.0 137.5
1 6 32.7 14.3 23.50 235.0 164.5
1 7 35.6 16 25.80 258.0 187.5
1 8 38.7 22.4 30.55 305.5 235.0
1 9 42.4 26.8 34.60 346.0 275.5
1 10 45.5 32.5 39.00 390.0 319.5 37.57 4.02
1 11 49.3 37.4 43.35 433.5 363.0
1 12 52.4 43.3 47.85 478.5 408.0
1 13 55.9 53.5 54.70 547.0 476.5
1 14 57.8 61.5 59.65 596.5 526.0
1 15 59.1 70 64.55 645.5 575.0
1 16 60.2 71 65.60 656.0 585.5
1 17 61.3 72 66.65 666.5 596.0
1 18 62.4 73 67.70 677.0 606.5 30.24 5.31
1 19 63.3 74 68.65 686.5 616.0
1 20 64.4 74.5 69.45 694.5 624.0
1 21 65.1 76 70.55 705.5 635.0
1 22 66.5 76.5 71.50 715.0 644.5
1 23 67.8 77.5 72.65 726.5 656.0
1 24 68.7 78 73.35 733.5 663.0
1 25 69.8 78.5 74.15 741.5 671.0
1 26 71.6 80 75.80 758.0 687.5 25.67 6.55
1 27 73.8 80.9 77.35 773.5 703.0
1 28 76.2 82 79.10 791.0 720.5
1 29 79.4 83 81.20 812.0 741.5
1 30 84 84.1 84.05 840.5 770.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 71 + 200 R. 5.00 M Y : 0291143 X : 0486750 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0.9 0.6 0 0 0.0
1 1 3.6 2.6 3.10 31.0 31.0
1 2 5.6 4.7 5.15 51.5 20.5
1 3 7 6.7 6.85 68.5 37.5
1 4 8.5 8.9 8.70 87.0 56.0
1 5 8.6 10 9.30 93.0 62.0
1 6 10.2 10.7 10.45 104.5 73.5
8.75 25.96
1 7 10.5 11.1 10.80 108.0 77.0
1 8 11.2 11.6 11.40 114.0 83.0
1 9 11.9 12 11.95 119.5 88.5
1 10 12.4 12.5 12.45 124.5 93.5
1 11 12.9 13.2 13.05 130.5 99.5
1 12 13.3 13.9 13.60 136.0 105.0
1 13 13.7 14.5 14.10 141.0 110.0
1 14 14 15 14.50 145.0 114.0
1 15 14.5 15.9 15.20 152.0 121.0
1 16 15 15.8 15.40 154.0 123.0
1 17 16 16.1 16.05 160.5 129.5
1 18 16.5 16.9 16.70 167.0 136.0
1 19 17 17.4 17.20 172.0 141.0
1 20 17.5 18.4 17.95 179.5 148.5
1 21 18.2 18.5 18.35 183.5 152.5
6.82 35.73
1 22 18.6 19 18.80 188.0 157.0
1 23 19.2 19.6 19.40 194.0 163.0
1 24 20 20.1 20.05 200.5 169.5
1 25 21 20.6 20.80 208.0 177.0
1 26 21.5 21 21.25 212.5 181.5
1 27 22 21.6 21.80 218.0 187.0
1 28 22.9 22 22.45 224.5 193.5
1 29 23.6 22.6 23.10 231.0 200.0
1 30 24 23.1 23.55 235.5 204.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 71 + 300 L. 5.40 M Y : 0290808 X : 0487447 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0.3 0 0 0 0.0
1 1 6 2.4 4.20 42.0 42.0
1 2 8.5 4.6 6.55 65.5 23.5
1 3 11 7 9.00 90.0 48.0
17.67 10.87
1 4 11.5 10 10.75 107.5 65.5
1 5 12 13.2 12.60 126.0 84.0
1 6 12.4 17.2 14.80 148.0 106.0
1 7 12.6 21 16.80 168.0 126.0
1 8 13 21.5 17.25 172.5 130.5
1 9 13.4 28.5 20.95 209.5 167.5
1 10 14 30 22.00 220.0 178.0
1 11 14.4 34.5 24.45 244.5 202.5
1 12 15 36.5 25.75 257.5 215.5 17.85 10.72
1 13 15.5 38.5 27.00 270.0 228.0
1 14 16.6 40.4 28.50 285.0 243.0
1 15 18.9 42 30.45 304.5 262.5
1 16 21 43.7 32.35 323.5 281.5
1 17 23.4 45.7 34.55 345.5 303.5
1 18 25.5 47.7 36.60 366.0 324.0
1 19 28 49.6 38.80 388.0 346.0
1 20 32 51.6 41.80 418.0 376.0
1 21 35 53.6 44.30 443.0 401.0
1 22 37.2 55.7 46.45 464.5 422.5
1 23 39.7 57.5 48.60 486.0 444.0
1 24 42.4 59.5 50.95 509.5 467.5 19.72 9.45
1 25 44.2 61.2 52.70 527.0 485.0
1 26 48.6 63.2 55.90 559.0 517.0
1 27 50.6 65 57.80 578.0 536.0
1 28 52.6 67 59.80 598.0 556.0
1 29 54.6 68.2 61.40 614.0 572.0
1 30 56.7 70 63.35 633.5 591.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 71 + 400 R. 4.20 M Y : 0290754 X : 0487367 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 2 0 0 0 0.0
1 1 7.9 6 6.95 69.5 69.5
1 2 13 12 12.50 125.0 55.5
1 3 20.2 16.6 18.40 184.0 114.5
48.50 3.01
1 4 23.2 25.4 24.30 243.0 173.5
1 5 25.8 31.5 28.65 286.5 217.0
1 6 32.2 39.9 36.05 360.5 291.0
1 7 39.3 47.5 43.40 434.0 364.5
1 8 46.5 57.6 52.05 520.5 451.0
1 9 55 67.6 61.30 613.0 543.5
1 10 63 74.2 68.60 686.0 616.5
1 11 69.5 80.5 75.00 750.0 680.5 57.37 2.44
1 12 76 86.6 81.30 813.0 743.5
1 13 77.9 91.2 84.55 845.5 776.0
1 14 80.5 96.5 88.50 885.0 815.5
1 15 86 100 93.00 930.0 860.5
1 16 91.9
1 17 97
1 18 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 71 + 500 L. 4.00 M Y : 0290804 X : 0487304 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 3 3.3 3.15 31.5 31.5
1 2 6 7.6 6.80 68.0 36.5
1 3 9.8 9.6 9.70 97.0 65.5
16.75 11.63
1 4 12.4 10.5 11.45 114.5 83.0
1 5 13.3 11.5 12.40 124.0 92.5
1 6 14.3 12.1 13.20 132.0 100.5
1 7 15.5 13 14.25 142.5 111.0
1 8 17.6 15.1 16.35 163.5 132.0
18.70 10.11
1 9 19.5 18.4 18.95 189.5 158.0
1 10 22.2 21.5 21.85 218.5 187.0
1 11 25 23.7 24.35 243.5 212.0
1 12 25.5 26.3 25.90 259.0 227.5
1 13 26 29 27.50 275.0 243.5
1 14 26.5 31 28.75 287.5 256.0
1 15 27 32.7 29.85 298.5 267.0
1 16 28 34.5 31.25 312.5 281.0 16.45 11.90
1 17 28.5 36.5 32.50 325.0 293.5
1 18 29 38 33.50 335.0 303.5
1 19 29.6 40 34.80 348.0 316.5
1 20 30 41.9 35.95 359.5 328.0
1 21 31.5 43.9 37.70 377.0 345.5
1 22 45.8
1 23 48
1 24 50.7
1 25 53
1 26 55
1 27 57.4
1 28 59.5
1 29 61.5
1 30 63
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 71 + 600 R. 3.40 M Y : 0290897 X : 0487265 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0.6 0.2 0 0 0.0
1 1 2.5 1.1 1.80 18.0 18.0
1 2 4 2 3.00 30.0 12.0
1 3 5 2.6 3.80 38.0 20.0
1 4 6 3.6 4.80 48.0 30.0
10.19 21.87
1 5 7 4.5 5.75 57.5 39.5
1 6 9.5 5.5 7.50 75.0 57.0
1 7 12 6.5 9.25 92.5 74.5
1 8 12.5 7.4 9.95 99.5 81.5
1 9 17.5 8.5 13.00 130.0 112.0
1 10 20.2 9.5 14.85 148.5 130.5
1 11 24 11.3 17.65 176.5 158.5
1 12 25 12.3 18.65 186.5 168.5
1 13 28 13 20.50 205.0 187.0
1 14 30.5 13.5 22.00 220.0 202.0 14.66 13.77
1 15 33 14.5 23.75 237.5 219.5
1 16 35.5 15.5 25.50 255.0 237.0
1 17 37.6 16.5 27.05 270.5 252.5
1 18 39.1 17.6 28.35 283.5 265.5
1 19 40.1 19.2 29.65 296.5 278.5
1 20 41.5 21 31.25 312.5 294.5
1 21 42.9 22.6 32.75 327.5 309.5
1 22 44 24.5 34.25 342.5 324.5
1 23 45 26.2 35.60 356.0 338.0
1 24 46 28.2 37.10 371.0 353.0
1 25 47.1 30 38.55 385.5 367.5 14.58 13.86
1 26 48 31.7 39.85 398.5 380.5
1 27 49.2 33.2 41.20 412.0 394.0
1 28 50.5 35 42.75 427.5 409.5
1 29 51.9 37 44.45 444.5 426.5
1 30 53 38.1 45.55 455.5 437.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 71 + 700 R. 2.40 M Y : 0290468 X : 0487001 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1.5 0.4 0 0 0.0
1 1 3.2 1 2.10 21.0 21.0
1 2 5 2 3.50 35.0 14.0
1 3 7 3 5.00 50.0 29.0
1 4 11.2 4 7.60 76.0 55.0
1 5 16.2 4.9 10.55 105.5 84.5
1 6 20.1 6 13.05 130.5 109.5 27.27 6.26
1 7 22 7.1 14.55 145.5 124.5
1 8 23.5 12.6 18.05 180.5 159.5
1 9 26.6 19.6 23.10 231.0 210.0
1 10 30.7 25 27.85 278.5 257.5
1 11 34.5 29.7 32.10 321.0 300.0
1 12 38 34 36.00 360.0 339.0
1 13 41.2 38 39.60 396.0 375.0
1 14 44.4 41.6 43.00 430.0 409.0
1 15 47.3 45 46.15 461.5 440.5
1 16 50.2 47.5 48.85 488.5 467.5
28.00 6.05
1 17 53 50.2 51.60 516.0 495.0
1 18 55 53 54.00 540.0 519.0
1 19 57.1 55.5 56.30 563.0 542.0
1 20 59.5 58 58.75 587.5 566.5
1 21 61.3 60.5 60.90 609.0 588.0
1 22 63.3 62.7 63.00 630.0 609.0
1 23 65.4 65 65.20 652.0 631.0
1 24 67.5 67 67.25 672.5 651.5
1 25 69.5 69 69.25 692.5 671.5
1 26 71.2 71 71.10 711.0 690.0 25.87 6.70
1 27 73.2 72.6 72.90 729.0 708.0
1 28 76.6 74.6 75.60 756.0 735.0
1 29 78.3 76.3 77.30 773.0 752.0
1 30 80 79.4 79.70 797.0 776.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 72 + 000 R. 3.46 M Y : 0291031 X : 0486919 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0.5 3 0 0 0.0
1 1 2.5 6 4.25 42.5 42.5
1 2 6.1 7.9 7.00 70.0 27.5
1 3 8 10.5 9.25 92.5 50.0
1 4 10 14 12.00 120.0 77.5
1 5 12.5 17.2 14.85 148.5 106.0
1 6 16 20.1 18.05 180.5 138.0 19.09 9.85
1 7 18 22 20.00 200.0 157.5
1 8 20 23.5 21.75 217.5 175.0
1 9 21 24.6 22.80 228.0 185.5
1 10 22.1 26 24.05 240.5 198.0
1 11 23.5 27 25.25 252.5 210.0
1 12 24.5 28 26.25 262.5 220.0
1 13 25.1 28.5 26.80 268.0 225.5
1 14 26 29.5 27.75 277.5 235.0
1 15 26.5 30.5 28.50 285.0 242.5
1 16 27.4 32 29.70 297.0 254.5
20.62 8.93
1 17 30 33.5 31.75 317.5 275.0
1 18 34 36.5 35.25 352.5 310.0
1 19 38.5 40.1 39.30 393.0 350.5
1 20 44 43 43.50 435.0 392.5
1 21 49 46.1 47.55 475.5 433.0
1 22 53.5 49.5 51.50 515.0 472.5
1 23 57 52.6 54.80 548.0 505.5
1 24 60 55.6 57.80 578.0 535.5
1 25 62.6 58.4 60.50 605.0 562.5
1 26 65 61 63.00 630.0 587.5 23.02 7.77
1 27 67.5 64.1 65.80 658.0 615.5
1 28 70 66.6 68.30 683.0 640.5
1 29 72.5 69.1 70.80 708.0 665.5
1 30 75 71.6 73.30 733.0 690.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 72 + 100 R. 3.42 M Y : 0291025 X : 0486919 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 5 8 6.50 65.0 65.0
1 2 15 17.5 16.25 162.5 97.5
1 3 27.5 29.5 28.50 285.0 220.0 94.70 1.29
1 4 47 41 44.00 440.0 375.0
1 5 55.2 52.5 53.85 538.5 473.5
1 6 66.5 65.5 66.00 660.0 595.0
1 7 75.6 76.6 76.10 761.0 696.0
1 8 83 89 86.00 860.0 795.0
84.64 1.49
1 9 89.5 91 90.25 902.5 837.5
1 10 95 97 96.00 960.0 895.0
1 11 99.2 100 99.60 996.0 931.0
1 12 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 72 + 200 R. 3.48 M Y : 0291143 X : 0486750 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0.1 0 0 0 0.0
1 1 13.6 7.5 10.55 105.5 105.5
1 2 18.5 15.5 17.00 170.0 64.5
1 3 19.5 24.5 22.00 220.0 114.5
1 4 21.5 28.5 25.00 250.0 144.5
36.56 4.31
1 5 23.6 33.5 28.55 285.5 180.0
1 6 30.5 39.6 35.05 350.5 245.0
1 7 38.1 36 37.05 370.5 265.0
1 8 42.1 37.5 39.80 398.0 292.5
1 9 46 39.2 42.60 426.0 320.5
1 10 51 41.2 46.10 461.0 355.5
1 11 53.9 43 48.45 484.5 379.0
1 12 56.5 44.5 50.50 505.0 399.5
1 13 58 47.5 52.75 527.5 422.0
1 14 59.5 52.3 55.90 559.0 453.5 31.82 5.15
1 15 61.2 56 58.60 586.0 480.5
1 16 65 59.2 62.10 621.0 515.5
1 17 67 63.2 65.10 651.0 545.5
1 18 68.6 66.5 67.55 675.5 570.0
1 19 70.5 71.5 71.00 710.0 604.5
1 20 73.1 74.5 73.80 738.0 632.5
1 21 78.1 80 79.05 790.5 685.0
1 22 83.5 85 84.25 842.5 737.0
35.38 4.50
1 23 85 91 88.00 880.0 774.5
1 24 93 97 95.00 950.0 844.5
1 25 98 100 99.00 990.0 884.5
1 26 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 72 + 300 R. 3.66 M Y : 0291207 X : 0486672 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0.5 0 0 0 0.0
1 1 3 1.5 2.25 22.5 22.5
1 2 5.6 3.2 4.40 44.0 21.5
1 3 10.2 4.5 7.35 73.5 51.0 20.20 9.17
1 4 13.1 6 9.55 95.5 73.0
1 5 17.5 7.2 12.35 123.5 101.0
1 6 21 10.5 15.75 157.5 135.0
1 7 24 14 19.00 190.0 167.5
1 8 29.4 16 22.70 227.0 204.5
1 9 34.6 19.5 27.05 270.5 248.0
1 10 40.5 22.9 31.70 317.0 294.5
26.10 6.62
1 11 44.5 24.6 34.55 345.5 323.0
1 12 46 26 36.00 360.0 337.5
1 13 47.6 27.7 37.65 376.5 354.0
1 14 49.6 29.2 39.40 394.0 371.5
1 15 52.4 30.4 41.40 414.0 391.5
1 16 55.6 31.9 43.75 437.5 415.0
1 17 59.6 32.9 46.25 462.5 440.0
1 18 62 35 48.50 485.0 462.5
1 19 64 37.5 50.75 507.5 485.0
1 20 67.9 39.7 53.80 538.0 515.5
1 21 71 43.3 57.15 571.5 549.0
27.46 6.21
1 22 75 47 61.00 610.0 587.5
1 23 80 49.2 64.60 646.0 623.5
1 24 85 50.1 67.55 675.5 653.0
1 25 91 51 71.00 710.0 687.5
1 26 96.5 52 74.25 742.5 720.0
1 27 100 52.8 76.40 764.0 741.5
1 28 53.7
1 29 55
1 30 56.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 72 + 400 L. 4.59 M Y : 0291239 X : 0486585 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0.6 0 0 0.0
1 1 1.5 2.6 2.05 20.5 20.5
1 2 4 4.3 4.15 41.5 21.0
1 3 6 5.6 5.80 58.0 37.5
1 4 8 6.5 7.25 72.5 52.0
1 5 9 7.5 8.25 82.5 62.0
1 6 10 8.5 9.25 92.5 72.0
1 7 12 10 11.00 110.0 89.5 14.19 14.35
1 8 13.4 11.4 12.40 124.0 103.5
1 9 15.2 12.2 13.70 137.0 116.5
1 10 17.3 13 15.15 151.5 131.0
1 11 19 14.2 16.60 166.0 145.5
1 12 21 15.2 18.10 181.0 160.5
1 13 24 17 20.50 205.0 184.5
1 14 26 19 22.50 225.0 204.5
1 15 29 19.5 24.25 242.5 222.0
1 16 31.5 20 25.75 257.5 237.0
1 17 34.5 20.9 27.70 277.0 256.5
1 18 40 21.6 30.80 308.0 287.5 21.14 8.65
1 19 42 22.5 32.25 322.5 302.0
1 20 55.5 23.6 39.55 395.5 375.0
1 21 63 25.5 44.25 442.5 422.0
1 22 70 27.1 48.55 485.5 465.0
1 23 75 30 52.50 525.0 504.5
1 24 79 33 56.00 560.0 539.5
1 25 83 37.5 60.25 602.5 582.0
1 26 86 42.2 64.10 641.0 620.5
25.73 6.74
1 27 89.9 47 68.45 684.5 664.0
1 28 93 51.6 72.30 723.0 702.5
1 29 94 56 75.00 750.0 729.5
1 30 98 60.5 79.25 792.5 772.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 72 + 500 R. 5.72 M Y : 0291224 X : 0486487 Date : November 12, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 0.1 0 0 0.0
1 1 5.6 4 4.80 48.0 48.0
1 2 10.1 9.1 9.60 96.0 48.0
1 3 16.5 15.5 16.00 160.0 112.0
1 4 12 26.1 19.05 190.5 142.5 64.93 2.08
1 5 31.4 33.4 32.40 324.0 276.0
1 6 40.1 40.1 40.10 401.0 353.0
1 7 52.5 48 50.25 502.5 454.5
1 8 59.2 53.2 56.20 562.0 514.0
1 9 66 57 61.50 615.0 567.0
1 10 69.2 62 65.60 656.0 608.0
1 11 72.1 67.9 70.00 700.0 652.0
1 12 75.4 71.6 73.50 735.0 687.0
53.09 2.69
1 13 78.1 76 77.05 770.5 722.5
1 14 79 80 79.50 795.0 747.0
1 15 80.4 84.5 82.45 824.5 776.5
1 16 90.1 88.1 89.10 891.0 843.0
1 17 100 90.1 95.05 950.5 902.5
1 18 95.5
1 19 96.2
1 20 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 72 + 650 L. 2.30 M Y : 0291293 X : 0486371 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 1 2 1.50 15.0 15.0
1 2 2 4.4 3.20 32.0 17.0
1 3 3 6.4 4.70 47.0 32.0
1 4 4.6 8 6.30 63.0 48.0
13.00 16.04
1 5 6 10 8.00 80.0 65.0
1 6 7.2 11.4 9.30 93.0 78.0
1 7 8.1 13 10.55 105.5 90.5
1 8 9.8 14 11.90 119.0 104.0
1 9 11 15.6 13.30 133.0 118.0
1 10 12 17 14.50 145.0 130.0
1 11 13 19 16.00 160.0 145.0
1 12 14 21 17.50 175.0 160.0 13.67 15.06
1 13 15 23 19.00 190.0 175.0
1 14 16 25 20.50 205.0 190.0
1 15 17 27 22.00 220.0 205.0
1 16 18 29 23.50 235.0 220.0
1 17 19 30.2 24.60 246.0 231.0
1 18 20.5 31.5 26.00 260.0 245.0
13.57 15.19
1 19 21.6 32.4 27.00 270.0 255.0
1 20 23.4 34 28.70 287.0 272.0
1 21 25 35 30.00 300.0 285.0
1 22 27 36.4 31.70 317.0 302.0
1 23 29 38.1 33.55 335.5 320.5
1 24 30.1 41 35.55 355.5 340.5
1 25 32 43 37.50 375.0 360.0
1 26 34 45.5 39.75 397.5 382.5 14.67 13.76
1 27 35 48 41.50 415.0 400.0
1 28 36 50 43.00 430.0 415.0
1 29 37 52 44.50 445.0 430.0
1 30 38 53 45.50 455.0 440.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 72 + 700 L. 3.56 M Y : 0291340 X : 0486334 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 2 0 0 0.0
1 1 2 4 3.00 30.0 30.0
1 2 3.9 5 4.45 44.5 14.5
1 3 5 6 5.50 55.0 25.0
1 4 6 7.1 6.55 65.5 35.5
1 5 8 8 8.00 80.0 50.0
10.30 21.56
1 6 9 9 9.00 90.0 60.0
1 7 10.1 10 10.05 100.5 70.5
1 8 11.2 11.5 11.35 113.5 83.5
1 9 12.1 12.5 12.30 123.0 93.0
1 10 13.1 13.5 13.30 133.0 103.0
1 11 14 14.6 14.30 143.0 113.0
1 12 14.9 15.8 15.35 153.5 123.5
1 13 16 16.7 16.35 163.5 133.5
1 14 17 17.1 17.05 170.5 140.5
1 15 17.5 18.2 17.85 178.5 148.5
9.65 23.42
1 16 18 19.1 18.55 185.5 155.5
1 17 18.9 20.1 19.50 195.0 165.0
1 18 19.5 21.4 20.45 204.5 174.5
1 19 20 22.5 21.25 212.5 182.5
1 20 21.5 23.1 22.30 223.0 193.0
1 21 22 24.5 23.25 232.5 202.5
1 22 22.4 25.7 24.05 240.5 210.5
9.33 24.44
1 23 22.9 27.1 25.00 250.0 220.0
1 24 23.4 27.4 25.40 254.0 224.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 72 + 800 R. 4.20 M Y : 0291401 X : 0486263 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1.5 0 0 0 0.0
1 1 2 1.5 1.75 17.5 17.5
1 2 3 3.6 3.30 33.0 15.5
1 3 4.1 5 4.55 45.5 28.0
1 4 5.1 6.1 5.60 56.0 38.5
1 5 6.6 7.1 6.85 68.5 51.0
1 6 6.9 8.2 7.55 75.5 58.0 9.41 24.19
1 7 7.1 9.1 8.10 81.0 63.5
1 8 8 10.2 9.10 91.0 73.5
1 9 8.6 12 10.30 103.0 85.5
1 10 9 13.1 11.05 110.5 93.0
1 11 10.1 14.1 12.10 121.0 103.5
1 12 11 15.1 13.05 130.5 113.0
1 13 12.4 16.2 14.30 143.0 125.5
1 14 13.5 17.3 15.40 154.0 136.5
1 15 15.6 18.4 17.00 170.0 152.5
11.16 19.48
1 16 16.4 19.9 18.15 181.5 164.0
1 17 18.3 21.4 19.85 198.5 181.0
1 18 19.2 23.1 21.15 211.5 194.0
1 19 20.4 25.5 22.95 229.5 212.0
1 20 21.5 26.5 24.00 240.0 222.5
1 21 22.6 28.7 25.65 256.5 239.0
1 22 24.5 30.1 27.30 273.0 255.5
1 23 26.5 31.2 28.85 288.5 271.0
11.74 18.26
1 24 27.4 32.1 29.75 297.5 280.0
1 25 29.6 33.6 31.60 316.0 298.5
1 26 31.7 35.1 33.40 334.0 316.5
1 27 32.5 34.4 33.45 334.5 317.0
1 28
1 29
1 30
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 72 + 900 L. 3.50 M Y : 0291488 X : 0486222 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0.4 0 0 0 0.0
1 1 4 5.6 4.80 48.0 48.0
1 2 5 11 8.00 80.0 32.0
26.13 6.61
1 3 7 16 11.50 115.0 67.0
1 4 11.5 19 15.25 152.5 104.5
1 5 13.5 21 17.25 172.5 124.5
1 6 15.2 25 20.10 201.0 153.0
1 7 16 29 22.50 225.0 177.0
1 8 18 36 27.00 270.0 222.0 31.14 5.29
1 9 20.5 40 30.25 302.5 254.5
1 10 24.5 45 34.75 347.5 299.5
1 11 30.1 48 39.05 390.5 342.5
1 12 34.1 50 42.05 420.5 372.5
1 13 38.6 52 45.30 453.0 405.0
1 14 48.1 54 51.05 510.5 462.5
1 15 51.2 55 53.10 531.0 483.0
35.47 4.48
1 16 56.3 58 57.15 571.5 523.5
1 17 61.4 60 60.70 607.0 559.0
1 18 70 65.1 67.55 675.5 627.5
1 19 74.4 70 72.20 722.0 674.0
1 20 76.1 76.1 76.10 761.0 713.0
1 21 78.3 78 78.15 781.5 733.5
1 22 80.6 90.1 85.35 853.5 805.5
1 23 83.1 94 88.55 885.5 837.5
34.87 4.58
1 24 86.4 96.1 91.25 912.5 864.5
1 25 88.5 98.5 93.50 935.0 887.0
1 26 89.9 99.9 94.90 949.0 901.0
1 27 92.5 105.4 98.95 989.5 941.5
1 28 94.5
1 29 95.6
1 30 97.7
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 73 + 000 R. 4.50 M Y : 0291462 X : 0486154 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 6 5 5.50 55.0 55.0
1 2 9.5 8 8.75 87.5 32.5
1 3 11.5 10 10.75 107.5 52.5 20.00 9.28
1 4 12.5 14 13.25 132.5 77.5
1 5 14 17 15.50 155.0 100.0
1 6 15.5 20 17.75 177.5 122.5
1 7 16.5 22 19.25 192.5 137.5
1 8 17.6 22.5 20.05 200.5 145.5
1 9 18.7 24.4 21.55 215.5 160.5
15.38 12.95
1 10 19 25.9 22.45 224.5 169.5
1 11 20 27 23.50 235.0 180.0
1 12 21 28.5 24.75 247.5 192.5
1 13 22 29 25.50 255.0 200.0
1 14 23.1 30.5 26.80 268.0 213.0
1 15 24.4 31.5 27.95 279.5 224.5
1 16 25.6 31.9 28.75 287.5 232.5
1 17 26.7 32.7 29.70 297.0 242.0
1 18 27.9 33.5 30.70 307.0 252.0
1 19 28 34.1 31.05 310.5 255.5
13.06 15.95
1 20 29.1 35.2 32.15 321.5 266.5
1 21 30.4 36.6 33.50 335.0 280.0
1 22 31.6 37.2 34.40 344.0 289.0
1 23 32.5 38.5 35.50 355.0 300.0
1 24 33.6 40.5 37.05 370.5 315.5
1 25 34.2 42.1 38.15 381.5 326.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 73 + 100 L. 3.47 M Y : 0291377 X : 0486141 Date : November 11, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 2.1 0 0 0 0.0
1 1 10 7 8.50 85.0 85.0
1 2 18.5 17 17.75 177.5 92.5
1 3 33 24.5 28.75 287.5 202.5
1 4 40 32.1 36.05 360.5 275.5
75.00 1.73
1 5 52 47.1 49.55 495.5 410.5
1 6 58.1 56.4 57.25 572.5 487.5
1 7 66 60.1 63.05 630.5 545.5
1 8 72 65 68.50 685.0 600.0
1 9 74 68 71.00 710.0 625.0
1 10 80 70.1 75.05 750.5 665.5
1 11 84 76.1 80.05 800.5 715.5
1 12 86 80.1 83.05 830.5 745.5
1 13 89 83.3 86.15 861.5 776.5
50.31 2.88
1 14 90 86.4 88.20 882.0 797.0
1 15 92 89.6 90.80 908.0 823.0
1 16 93.7 93.7 93.70 937.0 852.0
1 17 97 96.9 96.95 969.5 884.5
1 18 100 98.1 99.05 990.5 905.5
1 19 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 73 + 200 L. 3 37 M Y : 0291289 X : 0486102 Date : November 12, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 0 0 0 0.0
1 1 5.1 2 3.55 35.5 35.5
1 2 6.5 4 5.25 52.5 17.0
1 3 7.5 8 7.75 77.5 42.0
1 4 8.6 9 8.80 88.0 52.5
13.94 14.69
1 5 10.6 10 10.30 103.0 67.5
1 6 11.7 12.5 12.10 121.0 85.5
1 7 12.5 14 13.25 132.5 97.0
1 8 13.5 15.9 14.70 147.0 111.5
1 9 14.5 16.2 15.35 153.5 118.0
1 10 19.1 17.9 18.50 185.0 149.5
1 11 21.1 19 20.05 200.5 165.0
1 12 25.1 19.5 22.30 223.0 187.5
1 13 30 20 25.00 250.0 214.5
1 14 36 21.5 28.75 287.5 252.0
20.50 9.00
1 15 41 22.6 31.80 318.0 282.5
1 16 46 23.7 34.85 348.5 313.0
1 17 48.1 24.5 36.30 363.0 327.5
1 18 52 26.7 39.35 393.5 358.0
1 19 56.1 27.1 41.60 416.0 380.5
1 20 60.2 28.9 44.55 445.5 410.0
1 21 66.5 29.9 48.20 482.0 446.5
1 22 67.6 30.8 49.20 492.0 456.5
1 23 68.4 32.1 50.25 502.5 467.0
1 24 69.5 33.1 51.30 513.0 477.5
1 25 71.5 35.4 53.45 534.5 499.0
20.15 9.20
1 26 72.6 37.5 55.05 550.5 515.0
1 27 73.9 39.6 56.75 567.5 532.0
1 28 80.1 41.2 60.65 606.5 571.0
1 29 82.4 43.5 62.95 629.5 594.0
1 30 83.5 44.5 64.00 640.0 604.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 73 + 300 L. 3.45 M Y : 0291279 X : 0486003 Date : November 12, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 5 3 4.00 40.0 40.0
1 2 7.4 3.5 5.45 54.5 14.5
1 3 9 4 6.50 65.0 25.0
1 4 10.1 5.5 7.80 78.0 38.0
1 5 12 7.5 9.75 97.5 57.5 11.39 18.98
1 6 13 9.4 11.20 112.0 72.0
1 7 14 10.9 12.45 124.5 84.5
1 8 14.5 12 13.25 132.5 92.5
1 9 15 13.5 14.25 142.5 102.5
1 10 15.5 15 15.25 152.5 112.5
1 11 16 16.5 16.25 162.5 122.5
1 12 16.5 19 17.75 177.5 137.5
1 13 17.5 21.5 19.50 195.0 155.0
12.09 17.60
1 14 18.6 24 21.30 213.0 173.0
1 15 19.7 25 22.35 223.5 183.5
1 16 21.1 26 23.55 235.5 195.5
1 17 22.3 26.8 24.55 245.5 205.5
1 18 23.4 27.2 25.30 253.0 213.0
1 19 24.6 28.1 26.35 263.5 223.5
1 20 25.2 30.4 27.80 278.0 238.0
1 21 26.5 31.6 29.05 290.5 250.5 12.94 16.14
1 22 27.4 32.7 30.05 300.5 260.5
1 23 29.5 36.4 32.95 329.5 289.5
1 24 31.6 38.5 35.05 350.5 310.5
1 25 32.2 40 36.10 361.0 321.0
1 26 33.5 41 37.25 372.5 332.5
1 27 34.5 42.1 38.30 383.0 343.0
13.10 15.89
1 28 37.1 43.2 40.15 401.5 361.5
1 29 39.1 45.4 42.25 422.5 382.5
1 30 40.6 46 43.30 433.0 393.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 73 + 400 L. 3.06 M Y : 0291329 X : 0486019 Date : November 12, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 3 5 4.00 40.0 40.0
1 2 8 10 9.00 90.0 50.0
1 3 18 16.5 17.25 172.5 132.5
1 4 20.6 18.5 19.55 195.5 155.5 29.21 5.74
1 5 21.5 20.1 20.80 208.0 168.0
1 6 24 22 23.00 230.0 190.0
1 7 25.9 23 24.45 244.5 204.5
1 8 27.1 24.5 25.80 258.0 218.0
1 9 28.2 26 27.10 271.0 231.0
1 10 29.4 27.5 28.45 284.5 244.5
1 11 32 28.5 30.25 302.5 262.5
1 12 34.4 30.1 32.25 322.5 282.5
1 13 35 31.2 33.10 331.0 291.0
19.13 9.82
1 14 37.5 32.5 35.00 350.0 310.0
1 15 39.1 33.5 36.30 363.0 323.0
1 16 40 35 37.50 375.0 335.0
1 17 41 36.5 38.75 387.5 347.5
1 18 41.9 37.4 39.65 396.5 356.5
1 19 42.5 38.2 40.35 403.5 363.5
1 20 43.1 39 41.05 410.5 370.5
1 21 45.1 40.5 42.80 428.0 388.0
1 22 46.5 42.6 44.55 445.5 405.5
1 23 47 43.4 45.20 452.0 412.0
17.31 11.15
1 24 48.1 45.2 46.65 466.5 426.5
1 25 49.9 46.3 48.10 481.0 441.0
1 26 51.2 47.7 49.45 494.5 454.5
1 27 53.4 48.1 50.75 507.5 467.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 73 + 500 R. 4.21 M Y : 0291389 X : 0485987 Date : November 12, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 3.1 1 0 0 0.0
1 1 6.1 5 5.55 55.5 55.5
1 2 8.1 7.5 7.80 78.0 22.5
1 3 10.9 10.5 10.70 107.0 51.5 21.50 8.47
1 4 13 13 13.00 130.0 74.5
1 5 17.1 15.5 16.30 163.0 107.5
1 6 20.9 17.7 19.30 193.0 137.5
1 7 24 19 21.50 215.0 159.5
1 8 27.1 20.1 23.60 236.0 180.5
1 9 30.2 21.5 25.85 258.5 203.0 21.04 8.70
1 10 32.4 22.4 27.40 274.0 218.5
1 11 33.5 24 28.75 287.5 232.0
1 12 36.6 25 30.80 308.0 252.5
1 13 39.7 28 33.85 338.5 283.0
1 14 40 29 34.50 345.0 289.5
1 15 40.5 31 35.75 357.5 302.0
1 16 41.1 33.5 37.30 373.0 317.5
1 17 42 37.6 39.80 398.0 342.5 19.12 9.83
1 18 44.2 39 41.60 416.0 360.5
1 19 46.5 40.2 43.35 433.5 378.0
1 20 47.6 41.3 44.45 444.5 389.0
1 21 48.7 42.7 45.70 457.0 401.5
1 22 49.5 43.8 46.65 466.5 411.0
1 23 50 44.2 47.10 471.0 415.5
1 24 50.5 45.1 47.80 478.0 422.5
17.39 11.09
1 25 51.2 46.2 48.70 487.0 431.5
1 26 52.2 48.3 50.25 502.5 447.0
1 27 54.6 50.4 52.50 525.0 469.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 73 + 600 L. 3.00 M Y : 0291413 X : 0485888 Date : November 12, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0.4 0 0 0 0.0
1 1 7 3 5.00 50.0 50.0
1 2 9 5 7.00 70.0 20.0
1 3 11 8 9.50 95.0 45.0
18.75 10.08
1 4 13.5 11 12.25 122.5 72.5
1 5 16 12 14.00 140.0 90.0
1 6 18 14.5 16.25 162.5 112.5
1 7 20 14.6 17.30 173.0 123.0
1 8 21.1 18.1 19.60 196.0 146.0
1 9 22.1 21.1 21.60 216.0 166.0
1 10 23 24.3 23.65 236.5 186.5
1 11 24.1 26.4 25.25 252.5 202.5
17.81 10.75
1 12 26.2 28.6 27.40 274.0 224.0
1 13 27.3 29.7 28.50 285.0 235.0
1 14 29.4 30.1 29.75 297.5 247.5
1 15 30.5 32.2 31.35 313.5 263.5
1 16 33.7 33.3 33.50 335.0 285.0
1 17 34.8 35.4 35.10 351.0 301.0
1 18 36.1 37.5 36.80 368.0 318.0
1 19 37.3 38.6 37.95 379.5 329.5
1 20 38.2 39.7 38.95 389.5 339.5
1 21 39.9 40.9 40.40 404.0 354.0
16.69 11.68
1 22 40.1 41.7 40.90 409.0 359.0
1 23 42.4 43.6 43.00 430.0 380.0
1 24 43.5 45.1 44.30 443.0 393.0
1 25 44.5 47.4 45.95 459.5 409.5
1 26 46.7 50.1 48.40 484.0 434.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 73 + 700 R. 3.04 M Y : 0291401 X : 0485790 Date : November 12, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 4 3 3.50 35.0 35.0
1 2 4.5 5.1 4.80 48.0 13.0
1 3 5.5 7 6.25 62.5 27.5
1 4 6.6 8 7.30 73.0 38.0
1 5 7.5 9.9 8.70 87.0 52.0 12.94 16.13
1 6 8.9 11 9.95 99.5 64.5
1 7 10.7 12.1 11.40 114.0 79.0
1 8 12.1 14.2 13.15 131.5 96.5
1 9 15 15.3 15.15 151.5 116.5
1 10 16.2 19.4 17.80 178.0 143.0
1 11 17.3 20.2 18.75 187.5 152.5
1 12 19.6 21.1 20.35 203.5 168.5
1 13 20.7 22.7 21.70 217.0 182.0
1 14 22.9 23.9 23.40 234.0 199.0
1 15 23.8 25.1 24.45 244.5 209.5
1 16 24.4 26.4 25.40 254.0 219.0 13.84 14.82
1 17 26.5 28.5 27.50 275.0 240.0
1 18 27.5 29.6 28.55 285.5 250.5
1 19 28.6 31.5 30.05 300.5 265.5
1 20 29.5 33.5 31.50 315.0 280.0
1 21 31.1 34.5 32.80 328.0 293.0
1 22 32.2 35.7 33.95 339.5 304.5
1 23 34.3 36.6 35.45 354.5 319.5
1 24 36.4 37.9 37.15 371.5 336.5
1 25 37.6 38.8 38.20 382.0 347.0 13.57 15.19
1 26 38.7 39.1 38.90 389.0 354.0
1 27 40.2 40.1 40.15 401.5 366.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 73 + 800 L. 2.76 M Y : 0291442 X : 0485699 Date : November 12, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 1 1 1.00 10.0 10.0
1 2 2 2.1 2.05 20.5 10.5
1 3 3 3.1 3.05 30.5 20.5
1 4 3.5 4.1 3.80 38.0 28.0
1 5 4.5 6.4 5.45 54.5 44.5
10.20 21.83
1 6 5.1 7.3 6.20 62.0 52.0
1 7 6.2 8.2 7.20 72.0 62.0
1 8 7.1 9.6 8.35 83.5 73.5
1 9 8 11.7 9.85 98.5 88.5
1 10 9 13.4 11.20 112.0 102.0
1 11 10.1 14.5 12.30 123.0 113.0
1 12 11.2 16.6 13.90 139.0 129.0
1 13 12 17.7 14.85 148.5 138.5
1 14 14 18.9 16.45 164.5 154.5
11.64 18.46
1 15 16.4 19.1 17.75 177.5 167.5
1 16 17.6 20.1 18.85 188.5 178.5
1 17 18.4 22.2 20.30 203.0 193.0
1 18 20.5 23.4 21.95 219.5 209.5
1 19 21.5 24.6 23.05 230.5 220.5
1 20 22 25.7 23.85 238.5 228.5
1 21 22.5 26.5 24.50 245.0 235.0
1 22 23 27.5 25.25 252.5 242.5 11.20 19.39
1 23 24.1 29.4 26.75 267.5 257.5
1 24 26 30 28.00 280.0 270.0
1 25 26.5 31.5 29.00 290.0 280.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 73 + 950 R. 2.45 M Y : 0291469 X : 0485572 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 2 0 0 0.0
1 1 5 4 4.50 45.0 45.0
1 2 6.5 5 5.75 57.5 12.5
1 3 7.1 6 6.55 65.5 20.5
1 4 8.2 7 7.60 76.0 31.0
1 5 9.5 8.5 9.00 90.0 45.0
1 6 10.5 9.6 10.05 100.5 55.5 9.86 22.78
1 7 11.6 10 10.80 108.0 63.0
1 8 13.7 11.1 12.40 124.0 79.0
1 9 14 12 13.00 130.0 85.0
1 10 15 13 14.00 140.0 95.0
1 11 16.1 14.6 15.35 153.5 108.5
1 12 17.2 15.7 16.45 164.5 119.5
1 13 18.3 16.9 17.60 176.0 131.0
1 14 19 18.1 18.55 185.5 140.5 12.69 16.55
1 15 20.5 19.4 19.95 199.5 154.5
1 16 29 20.6 24.80 248.0 203.0
1 17 30.5 22 26.25 262.5 217.5
1 18 33 23 28.00 280.0 235.0
1 19 34.1 24.2 29.15 291.5 246.5
1 20 36.2 26.1 31.15 311.5 266.5 13.39 15.45
1 21 37 27.3 32.15 321.5 276.5
1 22 38.1 29 33.55 335.5 290.5
1 23 40.2 30.4 35.30 353.0 308.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 74 + 000 L3.49 M Y : 0291451 X : 0485521 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 2 1 1.50 15.0 15.0
1 2 4.5 2 3.25 32.5 17.5
1 3 6 4 5.00 50.0 35.0
1 4 7 5.6 6.30 63.0 48.0
1 5 8 6.9 7.45 74.5 59.5
11.30 19.17
1 6 9.5 7.5 8.50 85.0 70.0
1 7 10.5 8.5 9.50 95.0 80.0
1 8 11.6 9.9 10.75 107.5 92.5
1 9 12.4 10.1 11.25 112.5 97.5
1 10 13.5 12.1 12.80 128.0 113.0
1 11 14.5 13.2 13.85 138.5 123.5
1 12 15.6 14.4 15.00 150.0 135.0
1 13 16.4 15.5 15.95 159.5 144.5
1 14 18.5 16.7 17.60 176.0 161.0 11.71 18.33
1 15 19.1 17.8 18.45 184.5 169.5
1 16 20.4 19.7 20.05 200.5 185.5
1 17 21.4 21.4 21.40 214.0 199.0
1 18 22 23.6 22.80 228.0 213.0
1 19 23 24.8 23.90 239.0 224.0
1 20 24 25.3 24.65 246.5 231.5 12.52 16.82
1 21 26 26.4 26.20 262.0 247.0
1 22 30.1 28 29.05 290.5 275.5
1 23 29.5
1 24
1 25
1 26
1 27
1 28
1 29
1 30
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 74 + 100 L. 4.73 M Y : 0291445 X : 0485426 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0.1 0 0 0 0.0
1 1 6 2 4.00 40.0 40.0
1 2 13 5.4 9.20 92.0 52.0
1 3 20.5 10 15.25 152.5 112.5
1 4 24 14.5 19.25 192.5 152.5 41.79 3.64
1 5 25 18 21.50 215.0 175.0
1 6 30 21 25.50 255.0 215.0
1 7 42.5 24 33.25 332.5 292.5
1 8 48.1 27 37.55 375.5 335.5
1 9 55.1 30 42.55 425.5 385.5
1 10 61.5 33 47.25 472.5 432.5
1 11 67 36.5 51.75 517.5 477.5 42.00 3.62
1 12 71 40.1 55.55 555.5 515.5
1 13 74.3 44.1 59.20 592.0 552.0
1 14 78.1 47.5 62.80 628.0 588.0
1 15 82.4 51.5 66.95 669.5 629.5
1 16 85 59.1 72.05 720.5 680.5
1 17 90.7 60.9 75.80 758.0 718.0 42.92 3.52
1 18 96.5 65.1 80.80 808.0 768.0
1 19 100 71.1 85.55 855.5 815.5
1 20 75.1
1 21 76
1 22 78
1 23 79.2
1 24 80.1
1 25 82.4
1 26 83.5
1 27 84
1 28 86.4
1 29 87.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 74 + 200 L. 3.79 M Y : 0291414 X : 0485330 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 3 3 3.00 30.0 30.0
1 2 7.5 5 6.25 62.5 32.5
25.00 6.99
1 3 11.5 7.5 9.50 95.0 65.0
1 4 16 10 13.00 130.0 100.0
1 5 21 12 16.50 165.0 135.0
1 6 25.1 14 19.55 195.5 165.5
1 7 29.1 16 22.55 225.5 195.5
1 8 33 18 25.50 255.0 225.0
1 9 35 20 27.50 275.0 245.0
1 10 36 22.1 29.05 290.5 260.5 25.57 6.80
1 11 38 24.5 31.25 312.5 282.5
1 12 39.9 28 33.95 339.5 309.5
1 13 40.1 30 35.05 350.5 320.5
1 14 42 35.1 38.55 385.5 355.5
1 15 44.6 38.1 41.35 413.5 383.5
1 16 46 40.9 43.45 434.5 404.5
1 17 49 43.2 46.10 461.0 431.0
1 18 50.1 45.1 47.60 476.0 446.0
1 19 50.9 47.5 49.20 492.0 462.0
1 20 55.1 49.6 52.35 523.5 493.5
22.48 8.00
1 21 57 52.7 54.85 548.5 518.5
1 22 59 53.4 56.20 562.0 532.0
1 23 60 55 57.50 575.0 545.0
1 24 61.5 56.1 58.80 588.0 558.0
1 25 61.9 56.5 59.20 592.0 562.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 74 + 300 R. 6.10 M Y : 0291395 X : 0485236 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1.1 1 0 0 0.0
1 1 4 4 4.00 40.0 40.0
1 2 5.5 6 5.75 57.5 17.5
1 3 9 9 9.00 90.0 50.0 33.50 4.82
1 4 12 14 13.00 130.0 90.0
1 5 20 21.5 20.75 207.5 167.5
1 6 32 31 31.50 315.0 275.0
1 7 38 39.5 38.75 387.5 347.5
1 8 40 46.1 43.05 430.5 390.5
1 9 53.3 50.1 51.70 517.0 477.0
45.58 3.26
1 10 56.2 54 55.10 551.0 511.0
1 11 60.1 57 58.55 585.5 545.5
1 12 61 60 60.50 605.0 565.0
1 13 64.5 62 63.25 632.5 592.5
1 14 65.5 64 64.75 647.5 607.5
1 15 68.6 67 67.80 678.0 638.0
1 16 69.7 70 69.85 698.5 658.5
1 17 71.2 74 72.60 726.0 686.0
1 18 72 77 74.50 745.0 705.0 35.68 4.45
1 19 74.2 79 76.60 766.0 726.0
1 20 76 81 78.50 785.0 745.0
1 21 78.1 83 80.55 805.5 765.5
1 22 80 85 82.50 825.0 785.0
1 23 83.1 86 84.55 845.5 805.5
1 24 85.4 88 86.70 867.0 827.0
1 25 88.7 90 89.35 893.5 853.5
1 26 89.9 94 91.95 919.5 879.5 32.53 5.00
1 27 92.1 96 94.05 940.5 900.5
1 28 94.4 98.2 96.30 963.0 923.0
1 29 96.7 100 98.35 983.5 943.5
1 30 98.2
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 74 + 400 R. 3.20 M Y : 0291383 X : 0485131 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0 0.0
1 1 5.5 4 4.75 47.5 47.5
1 2 10.1 8 9.05 90.5 43.0
1 3 13.5 11 12.25 122.5 75.0
29.58 5.65
1 4 17 13.5 15.25 152.5 105.0
1 5 21 16 18.50 185.0 137.5
1 6 26 19 22.50 225.0 177.5
1 7 33 20 26.50 265.0 217.5
1 8 41.5 23.1 32.30 323.0 275.5
1 9 42 28.5 35.25 352.5 305.0
1 10 45 34 39.50 395.0 347.5
1 11 56.1 41 48.55 485.5 438.0
37.34 4.20
1 12 64.5 48 56.25 562.5 515.0
1 13 68 52 60.00 600.0 552.5
1 14 70 53 61.50 615.0 567.5
1 15 71 54 62.50 625.0 577.5
1 16 73 56 64.50 645.0 597.5
1 17 74 58.4 66.20 662.0 614.5
1 18 76 60 68.00 680.0 632.5
1 19 78 61 69.50 695.0 647.5
31.80 5.15
1 20 79 63.2 71.10 711.0 663.5
1 21 80 65.1 72.55 725.5 678.0
1 22 81 68.4 74.70 747.0 699.5
1 23 82 70.5 76.25 762.5 715.0
1 24 83 72.4 77.70 777.0 729.5
1 25 84 74.6 79.30 793.0 745.5 29.31 5.71
1 26 86 79.7 82.85 828.5 781.0
1 27 86.9 80.9 83.90 839.0 791.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 74 + 500 L. 2.60 M Y : 0291394 X : 0485034 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 3 9 6.00 60.0 60.0
1 2 4 10 7.00 70.0 10.0
1 3 10 12 11.00 110.0 50.0
25.42 6.85
1 4 13.5 18 15.75 157.5 97.5
1 5 15.4 22 18.70 187.0 127.0
1 6 17.4 25.1 21.25 212.50 152.50
1 7 18.5 34.1 26.30 263.0 203.0
1 8 19.6 39 29.30 293.0 233.0
1 9 20.6 42.1 31.35 313.5 253.5
1 10 21.5 44.5 33.00 330.0 270.0
1 11 23.5 47.6 35.55 355.5 295.5
1 12 24.5 51 37.75 377.5 317.5
22.36 8.06
1 13 25.6 53 39.30 393.0 333.0
1 14 26.5 54 40.25 402.5 342.5
1 15 27.7 55 41.35 413.5 353.5
1 16 28.9 57 42.95 429.5 369.5
1 17 30 58 44.00 440.0 380.0
1 18 33.4 59.1 46.25 462.5 402.5
1 19 36.7 61 48.85 488.5 428.5
1 20 38 62.2 50.10 501.0 441.0
1 21 40 63.1 51.55 515.5 455.5
1 22 42.1 65.4 53.75 537.5 477.5 21.92 8.26
1 23 44.2 67 55.60 556.0 496.0
1 24 47.2 69 58.10 581.0 521.0
1 25 49.1 72.5 60.80 608.0 548.0
1 26 51.2

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 74 + 600 L. 4.60 M Y : 0291374 X : 0484901 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 5 6 5.50 55.0 55.0
1 2 11.5 14 12.75 127.5 72.5
1 3 17.5 20 18.75 187.5 132.5 39.50 3.91
1 4 20.5 24 22.25 222.5 167.5
1 5 22.5 28 25.25 252.5 197.5
1 6 25 32 28.50 285.0 230.0
1 7 27.5 37 32.25 322.5 267.5
1 8 31.5 39.5 35.50 355.0 300.0
36.73 4.29
1 9 36 41 38.50 385.0 330.0
1 10 41.2 43.5 42.35 423.5 368.5
1 11 45.3 46.5 45.90 459.0 404.0
1 12 47 47.7 47.35 473.5 418.5
1 13 49 50.1 49.55 495.5 440.5
1 14 50.1 52.2 51.15 511.5 456.5
30.03 5.54
1 15 52.4 54 53.20 532.0 477.0
1 16 53.5 56.5 55.00 550.0 495.0
1 17 54.7 58.4 56.55 565.5 510.5
1 18 55 59.5 57.25 572.5 517.5
1 19 56.1 61.7 58.90 589.0 534.0
1 20 57.2 62.1 59.65 596.5 541.5
25.28 6.89
1 21 58.9 63 60.95 609.5 554.5
1 22 61.1 64.5 62.80 628.0 573.0
1 23 62.3 65 63.65 636.5 581.5
1 24 65.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 74 + 700 L. 2.00 M Y : 0291402 X : 0484850 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0.1 0 0 0 0.0
1 1 2 3 2.50 25.0 25.0
1 2 5 7 6.00 60.0 35.0
1 3 9 12 10.50 105.0 80.0
1 4 15.4 18 16.70 167.0 142.0
35.00 4.56
1 5 21 20.5 20.75 207.5 182.5
1 6 26.5 22 24.25 242.5 217.5
1 7 31 24 27.50 275.0 250.0
1 8 34.5 26.5 30.50 305.0 280.0
1 9 37.5 28 32.75 327.5 302.5
1 10 39.5 30.4 34.95 349.5 324.5
1 11 41.5 33.6 37.55 375.5 350.5
1 12 44.1 35.7 39.90 399.0 374.0
1 13 46.2 37.1 41.65 416.5 391.5 27.24 6.27
1 14 48.9 39.2 44.05 440.5 415.5
1 15 49.1 41.5 45.30 453.0 428.0
1 16 51.2 42.7 46.95 469.5 444.5
1 17 53.1 44.5 48.80 488.0 463.0
1 18 55.4 46.1 50.75 507.5 482.5
1 19 57.6 48.2 52.90 529.0 504.0
1 20 80.5 50.1 65.30 653.0 628.0 29.95 5.56
1 21 82.2 51 66.60 666.0 641.0
1 22 84.4 52.4 68.40 684.0 659.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 74 + 800 R. 4.10 M Y : 0291489 X : 0484797 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1.1 0 0 0 0.0
1 1 6 6 6.00 60.0 60.0
1 2 12 15 13.50 135.0 75.0
1 3 17 19.5 18.25 182.5 122.5
32.08 5.09
1 4 21.5 21 21.25 212.5 152.5
1 5 22 24 23.00 230.0 170.0
1 6 24.5 26 25.25 252.5 192.5
1 7 27.5 27.5 27.50 275.0 215.0
1 8 30 29 29.50 295.0 235.0
1 9 31.5 34 32.75 327.5 267.5
1 10 32 36 34.00 340.0 280.0
1 11 33.5 38 35.75 357.5 297.5
1 12 34.5 40 37.25 372.5 312.5 24.00 7.36
1 13 36.4 42 39.20 392.0 332.0
1 14 37 44 40.50 405.0 345.0
1 15 39 46 42.50 425.0 365.0
1 16 41.1 48 44.55 445.5 385.5
1 17 43.6 50 46.80 468.0 408.0
1 18 45.7 52 48.85 488.5 428.5
1 19 46.4 54 50.20 502.0 442.0
1 20 47.5 56 51.75 517.5 457.5
1 21 51.2 57 54.10 541.0 481.0
1 22 52.5 59 55.75 557.5 497.5
1 23 54 60.5 57.25 572.5 512.5 20.13 9.21
1 24 56.5 61.5 59.00 590.0 530.0
1 25 57 62.1 59.55 595.5 535.5
1 26 57.5 63.4 60.45 604.5 544.5
1 27 58 64.5 61.25 612.5 552.5
1 28 59.1 65.6 62.35 623.5 563.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 74 + 900 L. 3.90 M Y : 0291515 X : 0484711 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 0 0 0 0.0
1 1 9 10 9.50 95.0 95.0
1 2 18.5 22.5 20.50 205.0 110.0
1 3 26 26 26.00 260.0 165.0
1 4 33 32 32.50 325.0 230.0
1 5 38 37 37.50 375.0 280.0 43.61 3.45
1 6 42 41.5 41.75 417.5 322.5
1 7 44.5 44.5 44.50 445.0 350.0
1 8 46.5 48.5 47.50 475.0 380.0
1 9 48.5 49 48.75 487.5 392.5
1 10 51.5 52 51.75 517.5 422.5
1 11 54 53.5 53.75 537.5 442.5
1 12 56 55.5 55.75 557.5 462.5
1 13 59 57.4 58.20 582.0 487.0
35.00 4.56
1 14 61.1 59.4 60.25 602.5 507.5
1 15 63 62 62.50 625.0 530.0
1 16 65 70 67.50 675.0 580.0
1 17 66 72 69.00 690.0 595.0
1 18 67 74.2 70.60 706.0 611.0
1 19 69.5 75 72.25 722.5 627.5
1 20 71 76.4 73.70 737.0 642.0
1 21 73 80.1 76.55 765.5 670.5 29.56 5.65
1 22 75 81.2 78.10 781.0 686.0
1 23 76 82.2 79.10 791.0 696.0
1 24 77.5 83.4 80.45 804.5 709.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

STA : 75 + 000 R. 5.20 M Y : 0291513 X : 0484708 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 0.1 0 0 0.0
1 1 3 2 2.50 25.0 25.0
1 2 4 4.1 4.05 40.5 15.5
1 3 6.5 5 5.75 57.5 32.5
1 4 9 5.5 7.25 72.5 47.5
1 5 13 8 10.50 105.0 80.0 21.11 8.67
1 6 16 10 13.00 130.0 105.0
1 7 22 11 16.50 165.0 140.0
1 8 26.5 12.5 19.50 195.0 170.0
1 9 29 14 21.50 215.0 190.0
1 10 32 16 24.00 240.0 215.0
1 11 36.5 17.5 27.00 270.0 245.0
1 12 40 18 29.00 290.0 265.0
1 13 40.5 20.5 30.50 305.0 280.0
1 14 42.6 25 33.80 338.0 313.0
20.97 8.74
1 15 44 27.1 35.55 355.5 330.5
1 16 45 29.2 37.10 371.0 346.0
1 17 47 31 39.00 390.0 365.0
1 18 48 32.5 40.25 402.5 377.5
1 19 50.2 34.5 42.35 423.5 398.5
1 20 52 36.5 44.25 442.5 417.5 18.48 10.26
1 21 54.4 37 45.70 457.0 432.0
1 22 55 39.6 47.30 473.0 448.0
1 23 56.5 41.5 49.00 490.0 465.0
1 24 57 42 49.50 495.0 470.0
1 25 58.4 43 50.70 507.0 482.0
1 26 59.3 44.5 51.90 519.0 494.0
1 27 60 46 53.00 530.0 505.0
1 28 61 48.5 54.75 547.5 522.5
1 29 61.7 50.5 56.10 561.0 536.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R

DCP DCP
Point Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 75 + 100 L. 2.30 M Y : 0291587 X : 0484645 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 3.5 2.5 3.00 30.0 30.0 16.43 11.92
1 2 8 8 8.00 80.0 50.0
1 3 9 9 9.00 90.0 60.0
1 4 10 10 10.00 100.0 70.0
1 5 11 11.9 11.45 114.5 84.5
1 6 13 12 12.50 125.0 95.0
1 7 16 13 14.50 145.0 115.0
1 8 18 14 16.00 160.0 130.0 21.67 8.39
1 9 24 15.5 19.75 197.5 167.5
1 10 27 17 22.00 220.0 190.0
1 11 30 18.9 24.45 244.5 214.5
1 12 31.1 20.2 25.65 256.5 226.5
1 13 34 22 28.00 280.0 250.0
1 14 35 25 30.00 300.0 270.0
1 15 37.5 29 33.25 332.5 302.5
1 16 40.5 34.5 37.50 375.0 345.0
1 17 42 36 39.00 390.0 360.0
1 18 44.5 39.5 42.00 420.0 390.0
1 19 45.5 40.7 43.10 431.0 401.0 19.58 9.54
1 20 47 42 44.50 445.0 415.0
1 21 47.5 43.8 45.65 456.5 426.5
1 22 49 49.5 49.25 492.5 462.5
1 23 50.5 50.1 50.30 503.0 473.0
1 24 51.4 51 51.20 512.0 482.0
1 25 52.5 51.4 51.95 519.5 489.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 75 + 200 R. 3.42 M Y : 0484516 X : 0291728 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 1 3 2.00 20.0 20.0
1 2 7 6 6.50 65.0 45.0
1 3 23.5 7 15.25 152.5 132.5
1 4 34.5 9 21.75 217.5 197.5
38.44 4.05
1 5 40 10 25.00 250.0 230.0
1 6 45 11 28.00 280.0 260.0
1 7 49 12 30.50 305.0 285.0
1 8 51.5 14 32.75 327.5 307.5
1 9 53 16 34.50 345.0 325.0
1 10 55.5 18 36.75 367.5 347.5
1 11 56 20.5 38.25 382.5 362.5
26.03 6.64
1 12 57.5 22 39.75 397.5 377.5
1 13 58 24.5 41.25 412.5 392.5
1 14 59 25 42.00 420.0 400.0
1 15 61.1 26 43.55 435.5 415.5
1 16 62 27.4 44.70 447.0 427.0
1 17 63 30 46.50 465.0 445.0 25.79 6.72
1 18 64.5 33.2 48.85 488.5 468.5
1 19 67 35 51.00 510.0 490.0
1 20 70 37.2 53.60 536.0 516.0
1 21 72 39 55.50 555.0 535.0
1 22 73 40 56.50 565.0 545.0
23.14 7.71
1 23 75 40.5 57.75 577.5 557.5
1 24 76 42 59.00 590.0 570.0
1 25 76.7 43 59.85 598.5 578.5
1 26 44.5
1 27 46.4
1 28 48
1 29 49.5
1 30 50.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 75 + 300 L. 3.55 M Y : 0291783 X : 0484435 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 2 0 0 0 0.0
1 1 11 1 6.00 60.0 60.0
1 2 16 4 10.00 100.0 40.0
1 3 22 7 14.50 145.0 85.0
1 4 28.5 9.5 19.00 190.0 130.0
1 5 31.5 11 21.25 212.5 152.5 40.28 3.82
1 6 43 14 28.50 285.0 225.0
1 7 56 15.5 35.75 357.5 297.5
1 8 58 18 38.00 380.0 320.0
1 9 62.5 22 42.25 422.5 362.5
1 10 65.5 27 46.25 462.5 402.5
1 11 68 30 49.00 490.0 430.0
1 12 73.1 40 56.55 565.5 505.5
41.17 3.71
1 13 74 42 58.00 580.0 520.0
1 14 75 48.5 61.75 617.5 557.5
1 15 80 55.5 67.75 677.5 617.5
1 16 86 60.1 73.05 730.5 670.5
1 17 88 62 75.00 750.0 690.0
1 18 90 69.5 79.75 797.5 737.5 41.85 3.63
1 19 97 74 85.50 855.0 795.0
1 20 100 79.4 89.70 897.0 837.0
1 21 85.1

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA: 75 + 400 R. 3.25 M Y: 0291855 X : 0484372 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 2 2 0 0 0.0
1 1 5 5 5.00 50.0 50.0
1 2 6.9 6.5 6.70 67.0 17.0
1 3 7.6 7.4 7.50 75.0 25.0
1 4 8.2 8.2 8.20 82.0 32.0
1 5 9 9.2 9.10 91.0 41.0
1 6 10 9.9 9.95 99.5 49.5 9.14 25.11
1 7 11.1 11 11.05 110.5 60.5
1 8 12.1 12 12.05 120.5 70.5
1 9 13.2 13.1 13.15 131.5 81.5
1 10 14 14 14.00 140.0 90.0
1 11 15 15.1 15.05 150.5 100.5
1 12 16.4 16.2 16.30 163.0 113.0
1 13 16.9 17 16.95 169.5 119.5
1 14 17.1 18.1 17.60 176.0 126.0
1 15 17.5 20 18.75 187.5 137.5
1 16 18 22.3 20.15 201.5 151.5
10.00
1 17 19 23.6 21.30 213.0 163.0 22.39
1 18 20 24.5 22.25 222.5 172.5
1 19 21.5 26.5 24.00 240.0 190.0
1 20 22 27 24.50 245.0 195.0
1 21 24 28 26.00 260.0 210.0
1 22 24.9 29.1 27.00 270.0 220.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 75 + 500 L. 3.44 M Y: 0291866 X: 0484280 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 3 0 0 0 0.0
1 1 15.5 8.5 12.00 120.0 120.0
1 2 24 11 17.50 175.0 55.0
1 3 33.5 14.5 24.00 240.0 120.0
1 4 47 20.6 33.80 338.0 218.0 42.86 3.53
1 5 55 21 38.00 380.0 260.0
1 6 58 22 40.00 400.0 280.0
1 7 60 24 42.00 420.0 300.0
1 8 65 26 45.50 455.0 335.0
1 9 67.5 40 53.75 537.5 417.5
1 10 68 45 56.50 565.0 445.0
1 11 70.5 46.5 58.50 585.0 465.0
1 12 74 47 60.50 605.0 485.0
35.29 4.51
1 13 76 49 62.50 625.0 505.0
1 14 78 52.5 65.25 652.5 532.5
1 15 80 54 67.00 670.0 550.0
1 16 86 56.1 71.05 710.5 590.5
1 17 87 57 72.00 720.0 600.0
1 18 89.5 59.8 74.65 746.5 626.5
1 19 91.5 60.9 76.20 762.0 642.0
1 20 93.1 62 77.55 775.5 655.5
1 21 94 64.4 79.20 792.0 672.0
1 22 96 65 80.50 805.0 685.0 28.65 5.88
1 23 97.5 67.8 82.65 826.5 706.5
1 24 98.4 69.1 83.75 837.5 717.5
1 25 99.3 72.2 85.75 857.5 737.5
1 26 100 73 86.50 865.0 745.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 75 + 600 L. 3.36 M Y: 0291821 X: 0484190 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 1.5 5 3.25 32.5 32.5
1 2 2 6.5 4.25 42.5 10.0
1 3 2.5 7.5 5.00 50.0 17.5
1 4 5 8 6.50 65.0 32.5
1 5 6.5 9 7.75 77.5 45.0 11.39 18.98
1 6 8 10.5 9.25 92.5 60.0
1 7 10 12 11.00 110.0 77.5
1 8 11.5 13.5 12.50 125.0 92.5
1 9 13 14 13.50 135.0 102.5
1 10 14.5 17 15.75 157.5 125.0
1 11 15.5 20 17.75 177.5 145.0
1 12 17 22.5 19.75 197.5 165.0
1 13 20 23.5 21.75 217.5 185.0 15.91
12.41
1 14 25 25.5 25.25 252.5 220.0
1 15 27 26.5 26.75 267.5 235.0
1 16 29.5 27.5 28.50 285.0 252.5
1 17 30.6 30 30.30 303.0 270.5
1 18 38.1 31.5 34.80 348.0 315.5
1 19 39 32 35.50 355.0 322.5
1 20 42.5 34 38.25 382.5 350.0
1 21 44.7 36 40.35 403.5 371.0
1 22 48.5 37.5 43.00 430.0 397.5
17.13 11.30
1 23 50 38.5 44.25 442.5 410.0
1 24 52.5 39 45.75 457.5 425.0
1 25 54 40 47.00 470.0 437.5
1 26 56 40.5 48.25 482.5 450.0
1 27 57.5 41.5 49.50 495.0 462.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 75 + 700 R. 3.50 M Y: 0291774 X: 0484105 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 8 1 4.50 45.0 45.0
1 2 15 2.5 8.75 87.5 42.5
1 3 19 4 11.50 115.0 70.0
1 4 23.5 5.9 14.70 147.0 102.0 37.43 4.19
1 5 28 7 17.50 175.0 130.0
1 6 39.5 9 24.25 242.5 197.5
1 7 50.5 10.9 30.70 307.0 262.0
1 8 56 13 34.50 345.0 300.0
1 9 59 15.5 37.25 372.5 327.5
34.77 4.60
1 10 62 18 40.00 400.0 355.0
1 11 65 20.5 42.75 427.5 382.5
1 12 67 22.5 44.75 447.5 402.5
1 13 70 24.5 47.25 472.5 427.5
1 14 72 27.1 49.55 495.5 450.5
1 15 74 30 52.00 520.0 475.0
1 16 76 33.1 54.55 545.5 500.5 29.80 5.59
1 17 77 36.5 56.75 567.5 522.5
1 18 78.5 40.1 59.30 593.0 548.0
1 19 80 44.3 62.15 621.5 576.5
1 20 82 46.2 64.10 641.0 596.0
1 21 84 48.5 66.25 662.5 617.5
1 22 86 50 68.00 680.0 635.0
1 23 87 52.5 69.75 697.5 652.5
1 24 89 54.5 71.75 717.5 672.5 27.15 6.30
1 25 91.5 56 73.75 737.5 692.5
1 26 92.5 59.4 75.95 759.5 714.5
1 27 94.5 61.1 77.80 778.0 733.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 75 + 800 L. 3.30 M Y: 0291776 X: 0484002 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 18 20.1 19.05 190.5 190.5
1 2 25.5 21 23.25 232.5 202.5
1 3 30 24.5 27.25 272.5 242.5
1 4 34 27 30.50 305.0 275.0 55.57 2.54
1 5 38 29.4 33.70 337.0 307.0
1 6 41.5 31 36.25 362.5 332.5
1 7 48.5 35.3 41.90 419.0 389.0
1 8 55 37 46.00 460.0 430.0
1 9 60 40.2 50.10 501.0 471.0
1 10 70 45 57.50 575.0 545.0
1 11 71 50.1 60.55 605.5 575.5
1 12 73 52 62.50 625.0 595.0 42.66 3.55
1 13 74 54.5 64.25 642.5 612.5
1 14 76 56 66.00 660.0 630.0
1 15 80 58.1 69.05 690.5 660.5
1 16 82 60.5 71.25 712.5 682.5
1 17 84 65.5 74.75 747.5 717.5
1 18 86 70.4 78.20 782.0 752.0
1 19 88 74.5 81.25 812.5 782.5
1 20 90 79.6 84.80 848.0 818.0
40.25 3.82
1 21 92 80.5 86.25 862.5 832.5
1 22 94 84.5 89.25 892.5 862.5
1 23 96 95.5 95.75 957.5 927.5
1 24 100 99.2 99.60 996.0 966.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 75 + 900 R. 3.50 M Y: 0291765 X: 0483904 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 2 1 0 0 0.0
1 1 5.5 5 5.25 52.5 52.5
1 2 6.1 9 7.55 75.5 23.0
1 3 7 9.5 8.25 82.5 30.0
1 4 7.5 10.5 9.00 90.0 37.5
1 5 8 12 10.00 100.0 47.5
10.00 22.39
1 6 10 13 11.50 115.0 62.5
1 7 11.5 13.5 12.50 125.0 72.5
1 8 12.5 14 13.25 132.5 80.0
1 9 14.5 15 14.75 147.5 95.0
1 10 15 15.5 15.25 152.5 100.0
1 11 17 16 16.50 165.0 112.5
1 12 20 17.5 18.75 187.5 135.0
1 13 21.5 18 19.75 197.5 145.0
1 14 22 19.5 20.75 207.5 155.0 12.32 17.17
1 15 24 20.5 22.25 222.5 170.0
1 16 26.5 22.5 24.50 245.0 192.5
1 17 28.4 24 26.20 262.0 209.5
1 18 30.1 25.5 27.80 278.0 225.5
1 19 31 27.4 29.20 292.0 239.5
1 20 32.5 28 30.25 302.5 250.0
1 21 33 30 31.50 315.0 262.5
1 22 35.1 31.4 33.25 332.5 280.0 13.17 15.78
1 23 38.4 32.5 35.45 354.5 302.0
1 24 40.1 33.4 36.75 367.5 315.0
1 25 41.2 35.1 38.15 381.5 329.0
1 26 42.5 36.5 39.50 395.0 342.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 76 + 200 L3.49 M Y: 0291942 X: 0483669 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))

0 0 1 0 0 0 0.0
1 1 6 7.5 6.75 67.5 67.5
1 2 12.5 15 13.75 137.5 70.0
1 3 16.9 19.5 18.20 182.0 114.5
1 4 20 21 20.50 205.0 137.5
1 5 26 23 24.50 245.0 177.5
1 6 29 26 27.50 275.0 207.5
1 7 31.5 33 32.25 322.5 255.0 29.58 5.65
1 8 35 35 35.00 350.0 282.5
1 9 37 36 36.50 365.0 297.5
1 10 38.5 37.1 37.80 378.0 310.5
1 11 40 38.5 39.25 392.5 325.0
1 12 42 39.9 40.95 409.5 342.0
1 13 47.5 42.9 45.20 452.0 384.5
1 14 52.5 44.5 48.50 485.0 417.5
1 15 56 46 51.00 510.0 442.5
1 16 58 47 52.50 525.0 457.5 28.19 6.00
1 17 62 49.5 55.75 557.5 490.0
1 18 65 50 57.50 575.0 507.5
1 19 70.5 51.5 61.00 610.0 542.5
1 20 72 52 62.00 620.0 552.5
1 21 74 53 63.50 635.0 567.5
25.27 6.90
1 22 76.5 54.5 65.50 655.0 587.5
1 23 77 56 66.50 665.0 597.5
1 24 77.4 57.4 67.40 674.0 606.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 76 + 300 L. 4.12 M Y: 0291971 X: 0483572 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 13 2 7.50 75.0 75.0
1 2 18.6 4 11.30 113.0 38.0
1 3 20 8.5 14.25 142.5 67.5
1 4 27.3 15 21.15 211.5 136.5 29.29 5.72
1 5 30 18 24.00 240.0 165.0
1 6 31 19.5 25.25 252.5 177.5
1 7 33 23 28.00 280.0 205.0
1 8 34 24.2 29.10 291.0 216.0
1 9 35.1 26 30.55 305.5 230.5
1 10 36.5 28.5 32.50 325.0 250.0 24.00 7.36
1 11 37.4 30.7 34.05 340.5 265.5
1 12 39.1 33.5 36.30 363.0 288.0
1 13 42.1 36.4 39.25 392.5 317.5
1 14 43 38.5 40.75 407.5 332.5
1 15 45 40.1 42.55 425.5 350.5 23.38 7.61
1 16 47 42 44.50 445.0 370.0
1 17 49 45.5 47.25 472.5 397.5
1 18 51.2 46 48.60 486.0 411.0
1 19 52.4 48.1 50.25 502.5 427.5
1 20 52.9 49 50.95 509.5 434.5
1 21 54 51.1 52.55 525.5 450.5
1 22 55.5 52.5 54.00 540.0 465.0 20.13 9.20
1 23 56.4 54.1 55.25 552.5 477.5
1 24 58.1 55.5 56.80 568.0 493.0
1 25 59 57.4 58.20 582.0 507.0
1 26 60.5 59.2 59.85 598.5 523.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 76 + 400 R. 3.80 M Y: 0291933 X: 0483483 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 4 4 4.00 40.0 40.0
1 2 5 9 7.00 70.0 30.0
1 3 10.5 13 11.75 117.5 77.5
1 4 11 15.9 13.45 134.5 94.5
1 5 13 17 15.00 150.0 110.0
1 6 14 18 16.00 160.0 120.0
1 7 15 19.1 17.05 170.5 130.5
1 8 15.5 20.1 17.80 178.0 138.0 13.13 15.84
1 9 16 21.4 18.70 187.0 147.0
1 10 17 22 19.50 195.0 155.0
1 11 17.5 23.5 20.50 205.0 165.0
1 12 18.5 24 21.25 212.5 172.5
1 13 19 25 22.00 220.0 180.0
1 14 19.5 26.1 22.80 228.0 188.0
1 15 20 27.4 23.70 237.0 197.0
1 16 20.5 30.5 25.50 255.0 215.0
1 17 21 31 26.00 260.0 220.0
1 18 22.5 32.4 27.45 274.5 234.5
1 19 23 33.4 28.20 282.0 242.0
1 20 24 34 29.00 290.0 250.0 12.15 17.49
1 21 25 36.9 30.95 309.5 269.5
1 22 26.5 37 31.75 317.5 277.5
1 23 27 38.1 32.55 325.5 285.5
1 24 27.3 39 33.15 331.5 291.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 76 + 500 L. 4.20 M Y: 0291923 X: 0483390 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0.1 1 0 0 0.0
1 1 4.5 2 3.25 32.5 32.5
1 2 5 6 5.50 55.0 22.5
1 3 6 7.5 6.75 67.5 35.0
1 4 7.5 9.5 8.50 85.0 52.5 15.57 12.76
1 5 11 11.5 11.25 112.5 80.0
1 6 12.2 13 12.60 126.0 93.5
1 7 13.4 14.9 14.15 141.5 109.0
1 8 16 15.2 15.60 156.0 123.5
1 9 18.5 16 17.25 172.5 140.0
1 10 19 16.5 17.75 177.5 145.0
1 11 20.1 17 18.55 185.5 153.0 13.93 14.70
1 12 21 17.5 19.25 192.5 160.0
1 13 23 18 20.50 205.0 172.5
1 14 27 18.5 22.75 227.5 195.0
1 15 29 19 24.00 240.0 207.5
1 16 31 19.5 25.25 252.5 220.0
1 17 33 20 26.50 265.0 232.5
1 18 34 20.4 27.20 272.0 239.5 12.27 17.26
1 19 35.4 21.2 28.30 283.0 250.5
1 20 36.1 22.4 29.25 292.5 260.0
1 21 37 23.5 30.25 302.5 270.0
1 22 24.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 76 + 600 R. 5.20 M Y: 0291975 X: 0483324 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))

0 0 1 1 0 0 0.0
1 1 8.5 4 6.25 62.5 62.5
1 2 11 8 9.50 95.0 32.5
1 3 12 12 12.00 120.0 57.5
30.08 5.53
1 4 13.5 18 15.75 157.5 95.0
1 5 16.6 25 20.80 208.0 145.5
1 6 17.5 31.1 24.30 243.0 180.5
1 7 18 35.2 26.60 266.0 203.5
1 8 18.5 39.5 29.00 290.0 227.5
1 9 19 41 30.00 300.0 237.5 26.14 6.61
1 10 21.5 44.5 33.00 330.0 267.5
1 11 22.5 47.5 35.00 350.0 287.5
1 12 23.5 49.4 36.45 364.5 302.0
1 13 24 50 37.00 370.0 307.5
1 14 25.5 51 38.25 382.5 320.0
1 15 26 52 39.00 390.0 327.5
1 16 26.5 54.4 40.45 404.5 342.0 19.43 9.63
1 17 27 55 41.00 410.0 347.5
1 18 27.4 56.1 41.75 417.5 355.0
1 19 30.4 57.2 43.80 438.0 375.5
1 20 32.2 58 45.10 451.0 388.5
1 21 34.1 60.1 47.10 471.0 408.5
1 22 36 62.2 49.10 491.0 428.5
19.08 9.85
1 23 39.1 63.4 51.25 512.5 450.0
1 24 40.2 63.9 52.05 520.5 458.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 76 + 700 L. 6.50 M Y: 0292076 X: 0483328 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))

0 0 0.1 0.1 0 0 0.0


1 1 5.1 2.2 3.65 36.5 36.5
1 2 12.6 4 8.30 83.0 46.5
1 3 22.7 8 15.35 153.5 117.0
1 4 25 12 18.50 185.0 148.5 32.36 5.04
1 5 27 16 21.50 215.0 178.5
1 6 28 20.1 24.05 240.5 204.0
1 7 30.1 22.5 26.30 263.0 226.5
1 8 32.1 24 28.05 280.5 244.0
1 9 34 25 29.50 295.0 258.5
1 10 35.4 27 31.20 312.0 275.5
1 11 36 31 33.50 335.0 298.5
1 12 37 33 35.00 350.0 313.5
1 13 39 34.1 36.55 365.5 329.0 21.58 8.43
1 14 41.5 35.2 38.35 383.5 347.0
1 15 42 36.3 39.15 391.5 355.0
1 16 43.7 37.5 40.60 406.0 369.5
1 17 44 39.2 41.60 416.0 379.5
1 18 44.5 40.5 42.50 425.0 388.5
1 19 45.9 41.5 43.70 437.0 400.5
1 20 46 42.7 44.35 443.5 407.0
19.32 9.70
1 21 47.1 43.9 45.50 455.0 418.5
1 22 48.3 44 46.15 461.5 425.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 76 + 800 R. 6.50 M Y: 0292075 X: 0483250 Date : November 13, 2013


DCP Reading .
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))

0 0 0 0 0 0 0.0
1 1 3.1 3.1 3.10 31.0 31.0
1 2 6 5.5 5.75 57.5 26.5
1 3 8.2 8 8.10 81.0 50.0
1 4 12 9.5 10.75 107.5 76.5 19.07 9.86
1 5 14.3 11 12.65 126.5 95.5
1 6 15.5 13 14.25 142.5 111.5
1 7 16.5 16.4 16.45 164.5 133.5
1 8 17 17 17.00 170.0 139.0
1 9 18.5 20.4 19.45 194.5 163.5
1 10 19.5 21.5 20.50 205.0 174.0
1 11 20 22 21.00 210.0 179.0
1 12 20.9 23 21.95 219.5 188.5
1 13 22 24.5 23.25 232.5 201.5 14.69 13.73
1 14 22.8 25.5 24.15 241.5 210.5
1 15 23 26.4 24.70 247.0 216.0
1 16 24.5 27.9 26.20 262.0 231.0
1 17 25.5 30.2 27.85 278.5 247.5
1 18 26 33.1 29.55 295.5 264.5
1 19 27.5 34.7 31.10 311.0 280.0 14.00
1 20 28 36.8 32.40 324.0 293.0
1 21 29.4 37.8 33.60 336.0 305.0
14.60
1 22 30.1 39.1 34.60 346.0 315.0
1 23 31.4 40.1 35.75 357.5 326.5
1 24 32.5 40.9 36.70 367.0 336.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 76 + 900 L. 3.30 M Y: 0292008 X: 0483171 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1.2 1 0 0 0.0
1 1 5.5 3 4.25 42.5 42.5
1 2 10.5 9 9.75 97.5 55.0
1 3 15.4 21 18.20 182.0 139.5
48.75 2.99
1 4 18 26 22.00 220.0 177.5
1 5 22 30.5 26.25 262.5 220.0
1 6 28 39 33.50 335.0 292.5
1 7 31 42.4 36.70 367.0 324.5
1 8 33 47 40.00 400.0 357.5
1 9 37.5 50.2 43.85 438.5 396.0
47.46 3.10
1 10 43.4 54.4 48.90 489.0 446.5
1 11 56.3 60.4 58.35 583.5 541.0
1 12 58.4 64 61.20 612.0 569.5
1 13 61.7 69.2 65.45 654.5 612.0
1 14 66.2 72.1 69.15 691.5 649.0
1 15 69 76 72.50 725.0 682.5
1 16 72 80.1 76.05 760.5 718.0
1 17 76 82 79.00 790.0 747.5 39.52 3.91
1 18 79 84.3 81.65 816.5 774.0
1 19 81.1 87.2 84.15 841.5 799.0
1 20 82 89.9 85.95 859.5 817.0
1 21 84.5 90 87.25 872.5 830.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 77 + 000 L. 5.90 M Y: 0291958 X: 0483103 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0.5 1 0 0 0.0
1 1 1 6 3.50 35.0 35.0
1 2 8.5 13 10.75 107.5 72.5
34.08 4.72
1 3 16 18.1 17.05 170.5 135.5
1 4 22 22.4 22.20 222.0 187.0
1 5 23.4 23 23.20 232.0 197.0
1 6 23.9 24 23.95 239.5 204.5
1 7 24.4 24.5 24.45 244.5 209.5
1 8 25.5 25 25.25 252.5 217.5
1 9 27 26 26.50 265.0 230.0
1 10 28 26.4 27.20 272.0 237.0
1 11 30.1 27 28.55 285.5 250.5
18.13 10.52
1 12 31.1 27.4 29.25 292.5 257.5
1 13 32 28.4 30.20 302.0 267.0
1 14 33.5 29 31.25 312.5 277.5
1 15 34 29.3 31.65 316.5 281.5
1 16 35 30 32.50 325.0 290.0
1 17 37 30.6 33.80 338.0 303.0
1 18 39.1 31 35.05 350.5 315.5
1 19 40.8 32.7 36.75 367.5 332.5
1 20 41 33.8 37.40 374.0 339.0
1 21 42.1 34.7 38.40 384.0 349.0 16.40 11.94
1 22 43.9 36 39.95 399.5 364.5
1 23 45.5 38 41.75 417.5 382.5
1 24 46 39 42.50 425.0 390.0
1 25 47.5 41.5 44.50 445.0 410.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 77 + 100 L. 3.42 M Y: 0292006 X: 0483019 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1.2 1 0 0 0.0
1 1 6.4 5.4 5.90 59.0 59.0
1 2 10.1 9 9.55 95.5 36.5
1 3 12.4 11.5 11.95 119.5 60.5
1 4 16 14 15.00 150.0 91.0
1 5 20 15 17.50 175.0 116.0
21.57 8.43
1 6 22 16 19.00 190.0 131.0
1 7 25 17 21.00 210.0 151.0
1 8 26.1 18 22.05 220.5 161.5
1 9 28.5 19 23.75 237.50 178.50
1 10 30.1 20.1 25.10 251.0 192.0
1 11 32 21 26.50 265.0 206.0
1 12 36.1 22.4 29.25 292.5 233.5
1 13 40 25.7 32.85 328.5 269.5
1 14 50 26.9 38.45 384.5 325.5
1 15 51 27.1 39.05 390.5 331.5
1 16 52 28 40.00 400.0 341.0 18.73 10.09
1 17 52.4 29 40.70 407.0 348.0
1 18 53.5 30 41.75 417.5 358.5
1 19 54 30.5 42.25 422.5 363.5
1 20 54.7 31 42.85 428.5 369.5
1 21 55 32 43.50 435.0 376.0
1 22 56.4 33 44.70 447.0 388.0
1 23 57.9 34.1 46.00 460.0 401.0
17.43 11.05
1 24 58 35 46.50 465.0 406.0
1 25 59.1 36.9 48.00 480.0 421.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 77 + 200 R. 5.22 M Y: 0291938 X: 0482936 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0.1 0.4 0 0 0.0
1 1 2.1 6 4.05 40.5 40.5
1 2 4 7 5.50 55.0 14.5
1 3 8 9.2 8.60 86.0 45.5
1 4 16 18.1 17.05 170.5 130.0 56.43 2.49
1 5 25 28.4 26.70 267.0 226.5
1 6 34 38 36.00 360.0 319.5
1 7 43 44.1 43.55 435.5 395.0
1 8 52 49 50.50 505.0 464.5
1 9 60 54 57.00 570.0 529.5
1 10 72 70.1 71.05 710.5 670.0
1 11 75 74 74.50 745.0 704.5
64.27 2.11
1 12 80.4 80 80.20 802.0 761.5
1 13 91 89 90.00 900.0 859.5
1 14 94.5 96.2 95.35 953.5 913.0
1 15 100.2 100.7 100.45 1004.5 964.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 77 + 300 L. 4.80 M Y: 0291933 X: 0482865 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1.1 1 0 0 0.0
1 1 9 4.6 6.80 68.0 68.0
1 2 16 9 12.50 125.0 57.0
1 3 17.4 15 16.20 162.0 94.0
1 4 18.5 20.1 19.30 193.0 125.0
1 5 19.1 23 21.05 210.5 142.5
29.20 5.74
1 6 20.5 27.4 23.95 239.5 171.5
1 7 23 30.1 26.55 265.5 197.5
1 8 27.6 34 30.80 308.0 240.0
1 9 31.9 36 33.95 339.5 271.5
1 10 35 37 36.00 360.0 292.0
1 11 38.7 38 38.35 383.5 315.5
1 12 39.6 39 39.30 393.0 325.0
1 13 40 42 41.00 410.0 342.0 25.47 6.83
1 14 42 43 42.50 425.0 357.0
1 15 43 47 45.00 450.0 382.0
1 16 46 49.9 47.95 479.5 411.5
1 17 47 51.4 49.20 492.0 424.0
1 18 50 53.1 51.55 515.5 447.5
1 19 51.4 55.5 53.45 534.5 466.5 22.70 7.90
1 20 52.7 57.8 55.25 552.5 484.5
1 21 53.1 58 55.55 555.5 487.5
1 22 54 59.5 56.75 567.5 499.5
1 23 56 61.1 58.55 585.5 517.5
1 24 57 62.4 59.70 597.0 529.0
21.23 8.61
1 25 58 63.1 60.55 605.5 537.5
1 26 59.8 64.2 62.00 620.0 552.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 77 + 400 L. 4.90 M Y: 0291962 X: 0482776 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0.1 0 0 0 0.0
1 1 2.9 3 2.95 29.5 29.5
1 2 5 5 5.00 50.0 20.5
1 3 8 8 8.00 80.0 50.5
17.58 10.93
1 4 11 10 10.50 105.0 75.5
1 5 13 11.5 12.25 122.5 93.0
1 6 14 13 13.50 135.0 105.5
1 7 15.6 16.5 16.05 160.5 131.0
1 8 17.6 17.9 17.75 177.5 148.0
1 9 19.5 18.4 18.95 189.5 160.0
1 10 23 19 21.00 210.0 180.5
21.14 8.65
1 11 28 20 24.00 240.0 210.5
1 12 31.5 22 26.75 267.5 238.0
1 13 36 24.9 30.45 304.5 275.0
1 14 39 26.1 32.55 325.5 296.0
1 15 43 29 36.00 360.0 330.5
1 16 46 34.1 40.05 400.5 371.0
1 17 47 36 41.50 415.0 385.5 24.26 7.26
1 18 54 40 47.00 470.0 440.5
1 19 56 42.1 49.05 490.5 461.0
1 20 58 45 51.50 515.0 485.5
1 21 64.1 46 55.05 550.5 521.0
1 22 69.9 50 59.95 599.5 570.0 23.98 7.37
1 23 70 51 60.50 605.0 575.5
1 24 71.8 51.6 61.70 617.0 587.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 77 + 500 R. 4.85 M Y: 0291953 X: 0482678 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0.1 1 0 0 0.0
1 1 3.4 1.7 2.55 25.5 25.5
1 2 4 3 3.50 35.0 9.5
1 3 6 4.5 5.25 52.5 27.0
1 4 8.9 8 8.45 84.5 59.0
1 5 11 10 10.50 105.0 79.5 21.94 8.25
1 6 14 13 13.50 135.0 109.5
1 7 18 15 16.50 165.0 139.5
1 8 23 11 17.00 170.0 144.5
1 9 27.1 17.5 22.30 223.0 197.5
1 10 31 19 25.00 250.0 224.5
1 11 34 20.6 27.30 273.0 247.5
1 12 36 23.7 29.85 298.5 273.0
1 13 39 28 33.50 335.0 309.5
1 14 42 35.1 38.55 385.5 360.0
27.87 6.09
1 15 46 39 42.50 425.0 399.5
1 16 50 45.2 47.60 476.0 450.5
1 17 52.1 47.1 49.60 496.0 470.5
1 18 54.4 49.6 52.00 520.0 494.5
1 19 57 54 55.50 555.0 529.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 77 + 600 L. 4.30 M Y: 0291920 X: 0482595 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 3.1 0 0 0 0.0
1 1 8 4 6.00 60.0 60.0
1 2 9 7 8.00 80.0 20.0
1 3 9.5 8 8.75 87.5 27.5
1 4 10 9 9.50 95.0 35.0
1 5 11 10 10.50 105.0 45.0
1 6 11.6 11.4 11.50 115.0 55.0 10.05 22.26
1 7 12 12.6 12.30 123.0 63.0
1 8 13 13.7 13.35 133.5 73.5
1 9 14 15 14.50 145.0 85.0
1 10 15 16 15.50 155.0 95.0
1 11 16.4 17.7 17.05 170.5 110.5
1 12 17 18 17.50 175.0 115.0
1 13 18 19.7 18.85 188.5 128.5
1 14 20 20 20.00 200.0 140.0
1 15 21 21.4 21.20 212.0 152.0 10.69 20.56
1 16 22.5 22 22.25 222.5 162.5
1 17 24 23.5 23.75 237.5 177.5
1 18 25 25.5 25.25 252.5 192.5
1 19 28 29.6 28.80 288.0 228.0
1 20 30.1 32.1 31.10 311.0 251.0
1 21 33 34.5 33.75 337.5 277.5
1 22 35.4 36 35.70 357.0 297.0 13.20 15.74
1 23 37 36.5 36.75 367.5 307.5
1 24 38 37.5 37.75 377.5 317.5
1 25 39.1 38.9 39.00 390.0 330.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 77 + 700 R. 5.05 M Y: 0291871 X: 0482490 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 2 3.2 2.60 26.0 26.0
1 2 4 4.3 4.15 41.5 15.5
1 3 4.6 5.1 4.85 48.5 22.5
1 4 6 6.4 6.20 62.0 36.0
12.63 16.65
1 5 9 7 8.00 80.0 54.0
1 6 10 10.6 10.30 103.0 77.0
1 7 11.7 11 11.35 113.5 87.5
1 8 13 12.4 12.70 127.00 101.00
1 9 15 13 14.00 140.0 114.0
1 10 15.4 14 14.70 147.0 121.0
1 11 16 15.5 15.75 157.5 131.5
1 12 18.5 16 17.25 172.5 146.5
1 13 19 17 18.00 180.0 154.0
1 14 20 18.9 19.45 194.5 168.5
11.45 18.85
1 15 20.4 20 20.20 202.0 176.0
1 16 21 21 21.00 210.0 184.0
1 17 22.4 22.6 22.50 225.0 199.0
1 18 23 23 23.00 230.0 204.0
1 19 24.5 24 24.25 242.5 216.5
1 20 25 26 25.50 255.0 229.0
1 21 27
1 22 27.5
1 23 28

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 77 + 800 CL Y: 0291888 X: 0482399 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0.1 0 0 0 0.0
1 1 2 1 1.50 15.0 15.0
1 2 4 2 3.00 30.0 15.0
1 3 8 6 7.00 70.0 55.0 21.50 8.47
1 4 10.4 9 9.70 97.0 82.0
1 5 13 11.5 12.25 122.5 107.5
1 6 15.1 14 14.55 145.5 130.5
1 7 16.6 16.5 16.55 165.5 150.5
1 8 18 20 19.00 190.0 175.0
1 9 20 22.4 21.20 212.0 197.0
1 10 22 26 24.00 240.0 225.0
1 11 24.5 30 27.25 272.5 257.5 24.25 7.27
1 12 27 33 30.00 300.0 285.0
1 13 30 37.7 33.85 338.5 323.5
1 14 33.1 40.1 36.60 366.0 351.0
1 15 36 42 39.00 390.0 375.0
1 16 38 44.5 41.25 412.5 397.5
1 17 40.1 46 43.05 430.5 415.5
1 18 42.3 48 45.15 451.5 436.5
1 19 45 51 48.00 480.0 465.0
1 20 46.7 52 49.35 493.5 478.5
1 21 47.5 54 50.75 507.5 492.5
21.44 8.50
1 22 48.1 56 52.05 520.5 505.5
1 23 49 58 53.50 535.0 520.0
1 24 50 59 54.50 545.0 530.0
1 25 50.7 59.5 55.10 551.0 536.0
1 26 51.2 60 55.60 556.0 541.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 77 + 900 R. 4.02 M Y: 0291942 X: 0482324 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 5 5.4 5.20 52.0 52.0
1 2 9 8 8.50 85.0 33.0
1 3 14.1 11 12.55 125.5 73.5
1 4 19 15 17.00 170.0 118.0
1 5 23 19 21.00 210.0 158.0 32.28 5.05
1 6 26 22 24.00 240.0 188.0
1 7 30 24 27.00 270.0 218.0
1 8 35 26.7 30.85 308.5 256.5
1 9 40.5 28 34.25 342.5 290.5
1 10 46.4 30 38.20 382.0 330.0
1 11 49 32 40.50 405.0 353.0
1 12 52 35 43.50 435.0 383.0
1 13 55 36 45.50 455.0 403.0
1 14 58 37 47.50 475.0 423.0 27.53 6.19
1 15 59.9 39 49.45 494.5 442.5
1 16 61.1 41 51.05 510.5 458.5
1 17 63 43.3 53.15 531.5 479.5
1 18 64.5 45 54.75 547.5 495.5
1 19 66.7 46.7 56.70 567.0 515.0
1 20 67 47 57.00 570.0 518.0
1 21 69.1 49.4 59.25 592.5 540.5
1 22 70 52.1 61.05 610.5 558.5 23.84 7.43
1 23 72 53.1 62.55 625.5 573.5
1 24 73 55 64.00 640.0 588.0
1 25 73.9 55.7 64.80 648.0 596.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 78 + 000 L. 5.00 M Y: 0292019 X: 0482251 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 3 4 3.50 35.0 35.0
1 2 6 6 6.00 60.0 25.0
1 3 8.9 9 8.95 89.5 54.5
1 4 15 11 13.00 130.0 95.0
44.63 3.35
1 5 21.6 18 19.80 198.0 163.0
1 6 27 23 25.00 250.0 215.0
1 7 32 28 30.00 300.0 265.0
1 8 45 33.4 39.20 392.0 357.0
1 9 51.5 39.4 45.45 454.5 419.5
1 10 58 45 51.50 515.0 480.0
1 11 65 48 56.50 565.0 530.0
42.32 3.58
1 12 68 49.4 58.70 587.0 552.0
1 13 70 50 60.00 600.0 565.0
1 14 71.5 54 62.75 627.5 592.5
1 15 72.4 58 65.20 652.0 617.0
1 16 73 65 69.00 690.0 655.0
1 17 74 69 71.50 715.0 680.0
1 18 75.1 70 72.55 725.5 690.5
1 19 76 74 75.00 750.0 715.0 34.91 4.58
1 20 78.1 77.5 77.80 778.0 743.0
1 21 80 79.9 79.95 799.5 764.5
1 22 82 82 82.00 820.0 785.0
1 23 84.1 83.5 83.80 838.0 803.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 78 + 100 L. 3.62 M Y : 0292076 X : 0482212 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 15.4 3 9.20 92.0 92.0
1 2 25 12 18.50 185.0 93.0
55.00 2.57
1 3 31.2 22 26.60 266.0 174.0
1 4 34 28.4 31.20 312.0 220.0
1 5 39 34 36.50 365.0 273.0
1 6 44.4 39 41.70 417.0 325.0
1 7 50 44 47.00 470.0 378.0
58.40 2.38
1 8 61.6 50.4 56.00 560.0 468.0
1 9 67 55 61.00 610.0 518.0
1 10 75.2 60 67.60 676.0 584.0
1 11 77 66.7 71.85 718.5 626.5
1 12 80.1 69 74.55 745.5 653.5
1 13 90.2 74.1 82.15 821.5 729.5 53.87 2.64
1 14 95 76.6 85.80 858.0 766.0
1 15 100 80 90.00 900.0 808.0
1 86.1
1 95.1
1 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 78 + 200 R. 4.65 M Y : 0292057 X : 0482116 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 9 1 5.00 50.0 50.0
1 2 14 11.4 12.70 127.0 77.0
1 3 21.2 16.1 18.65 186.5 136.5 39.00 3.98
1 4 24 19 21.50 215.0 165.0
1 5 27 22 24.50 245.0 195.0
1 6 30.1 25 27.55 275.5 225.5
1 7 37 29.1 33.05 330.5 280.5
1 8 44 36.4 40.20 402.0 352.0
53.18 2.68
1 9 54 43 48.50 485.0 435.0
1 10 61 49.4 55.20 552.0 502.0
1 11 70 57 63.50 635.0 585.0
1 12 78.1 64 71.05 710.5 660.5
1 13 80.2 70 75.10 751.0 701.0
1 14 86 79.2 82.60 826.0 776.0
1 15 89 80.5 84.75 847.5 797.5 51.39 2.80
1 16 91 87.1 89.05 890.5 840.5
1 17 96 90.1 93.05 930.5 880.5
1 18 100 95 97.50 975.0 925.0
1 19 98.6
1 20 100.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 78 + 300 L. 4.21 M Y : 0292101 X : 0482109 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 4 11 7.50 75.0 75.0
1 2 8 27 17.50 175.0 100.0
1 3 12.6 36.1 24.35 243.5 168.5
1 4 20 45.9 32.95 329.5 254.5 56.43 2.49
1 5 26 54.8 40.40 404.0 329.0
1 6 30.1 56 43.05 430.5 355.5
1 7 34 60 47.00 470.0 395.0
1 8 41 69 55.00 550.0 475.0
1 9 50.1 72.1 61.10 611.0 536.0
1 10 55 79.4 67.20 672.0 597.0
1 11 60 82.5 71.25 712.5 637.5
1 12 68 86 77.00 770.0 695.0 52.94 2.70
1 13 72.1 90.1 81.10 811.0 736.0
1 14 76.5 94 85.25 852.5 777.5
1 15 79.3 99.1 89.20 892.0 817.0
1 16 84.4 100 92.20 922.0 847.0
1 17 87.2
1 18 94.6
1 19 97
1 20 99.7

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 78 + 400 L. 4.41 M Y : 0292160 X : 0482178 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 21.1 25 23.05 230.5 230.5
1 2 36.4 40 38.20 382.0 290.0
1 3 43 49.1 46.05 460.5 368.5 102.40 1.17
1 4 51.6 55.7 53.65 536.5 444.5
1 5 59.9 60.9 60.40 604.0 512.0
1 6 65 69.5 67.25 672.5 580.5
1 7 74 75 74.50 745.0 653.0
1 8 79.1 89 84.05 840.5 748.5 79.09 1.62
1 9 84 91.1 87.55 875.5 783.5
1 10 92.4 100 96.20 962.0 870.0
1 11 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 78 + 500 L. 4.80 M Y : 0292336 X : 0482125 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 4 4 4.00 40.0 40.0
1 2 10.3 8 9.15 91.5 51.5
1 3 16 9.5 12.75 127.5 87.5
45.00 3.31
1 4 24.6 11 17.80 178.0 138.0
1 5 36 16 26.00 260.0 220.0
1 6 41 21 31.00 310.0 270.0
1 7 45 24 34.50 345.0 305.0
1 8 47 27 37.00 370.0 330.0
1 9 50 29 39.50 395.0 355.0 36.36 4.34
1 10 51 31 41.00 410.0 370.0
1 11 52 36 44.00 440.0 400.0
1 12 53 40 46.50 465.0 425.0
1 13 54 46 50.00 500.0 460.0
1 14 56 48 52.00 520.0 480.0
1 15 58 50 54.00 540.0 500.0 31.94 5.12
1 16 59 56 57.50 575.0 535.0
1 17 62 58 60.00 600.0 560.0
1 18 63 60 61.50 615.0 575.0
1 19 64 67 65.50 655.0 615.0
1 20 70 71 70.50 705.0 665.0
1 21 73 74 73.50 735.0 695.0
1 22 77 76 76.50 765.0 725.0
33.75 4.78
1 23 79 78 78.50 785.0 745.0
1 24 82 89 85.50 855.0 815.0
1 25 85 97 91.00 910.0 870.0
1 26 85.5 98 91.75 917.5 877.5
98.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 78 + 600 R. 4.62 M Y : 0292326 X : 0482133 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1.1 0 0 0.0
1 1 3.1 11.2 7.15 71.5 71.5
1 2 9 20 14.50 145.0 73.5
1 3 12.4 29 20.70 207.0 135.5
1 4 22.6 37.1 29.85 298.5 227.0 66.86 2.00
1 5 31 44 37.50 375.0 303.5
1 6 42.3 50.3 46.30 463.0 391.5
1 7 51.9 56 53.95 539.5 468.0
1 8 59.8 59 59.40 594.0 522.5
1 9 62.1 60.4 61.25 612.5 541.0
1 10 65.1 65 65.05 650.5 579.0
51.58 2.79
1 11 67.3 69.5 68.40 684.0 612.5
1 12 71.7 70.3 71.00 710.0 638.5
1 13 74.4 74 74.20 742.0 670.5
1 14 77 77.7 77.35 773.5 702.0
1 15 79.8 82.9 81.35 813.5 742.0
1 16 80.2 84 82.10 821.0 749.5
1 17 86.4 86.2 86.30 863.0 791.5 43.26 3.48
1 18 90 90.1 90.05 900.5 829.0
1 19 97 93.4 95.20 952.0 880.5
1 20 100 96 98.00 980.0 908.5
1 21 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 78 + 700 L. 3.92 M Y : 0292404 X : 0482186 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 2 3 2.50 25.0 25.0
1 2 4 6 5.00 50.0 25.0
1 3 7 8 7.50 75.0 50.0
1 4 9 10 9.50 95.0 70.0 16.71 11.66
1 5 10.1 11 10.55 105.5 80.5
1 6 12 12.9 12.45 124.5 99.5
1 7 14.4 14 14.20 142.0 117.0
1 8 16.5 16 16.25 162.5 137.5
1 9 18 19 18.50 185.0 160.0
1 10 19 22 20.50 205.0 180.0
1 11 20 23.1 21.55 215.5 190.5
1 12 22 24 23.00 230.0 205.0 24.69 7.10
1 13 24 29 26.50 265.0 240.0
1 14 27 40.5 33.75 337.5 312.5
1 15 29 46 37.50 375.0 350.0
1 16 30 54 42.00 420.0 395.0
1 17 30.5 56 43.25 432.5 407.5
1 18 31 58 44.50 445.0 420.0
1 19 32 60 46.00 460.0 435.0 23.71 7.48
1 20 33 62 47.50 475.0 450.0
1 21 34.6 70 52.30 523.0 498.0
1 22 36 71 53.50 535.0 510.0
1 23 46.1 72 59.05 590.5 565.5
1 24 50.6 73 61.80 618.0 593.0
1 25 55 74 64.50 645.0 620.0 24.64 7.12
1 26 59 74.7 66.85 668.5 643.5
1 27 62 75 68.50 685.0 660.0
1 28 66.5 76.5 71.50 715.0 690.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 78 + 800 R. 3.25 M Y : 0292444 X : 0482218 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 3 2.6 2.80 28.0 28.0
1 2 5 5.4 5.20 52.0 24.0
1 3 7 7.1 7.05 70.5 42.5
1 4 8 9.2 8.60 86.0 58.0
13.38 15.47
1 5 9 11 10.00 100.0 72.0
1 6 10 12 11.00 110.0 82.0
1 7 10.9 14 12.45 124.5 96.5
1 8 11 16 13.50 135.0 107.0
1 9 13 18 15.50 155.0 127.0
1 10 14 21.3 17.65 176.5 148.5
1 11 15 23.7 19.35 193.5 165.5
1 12 16 26.2 21.10 211.0 183.0
16.06 12.26
1 13 17 29.1 23.05 230.5 202.5
1 14 17.7 31 24.35 243.5 215.5
1 15 20.1 33.3 26.70 267.0 239.0
1 16 22 35 28.50 285.0 257.0
1 17 24.3 43 33.65 336.5 308.5
1 18 27 48 37.50 375.0 347.0
1 19 29.1 53 41.05 410.5 382.5
1 20 31 55.5 43.25 432.5 404.5
1 21 34.4 57 45.70 457.0 429.0
19.13 9.82
1 22 35 59 47.00 470.0 442.0
1 23 36.5 61.1 48.80 488.0 460.0
1 24 37 63.4 50.20 502.0 474.0
1 25 37.4 64.9 51.15 511.5 483.5
1 26 38 67.1 52.55 525.5 497.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 78 + 900 L. 4.10 M Y : 0292468 X : 0482118 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 0 0 0 0.0
1 1 5.1 5 5.05 50.5 50.5
1 2 8.3 8 8.15 81.5 31.0
1 3 10.1 12 11.05 110.5 60.0
1 4 12.4 16 14.20 142.0 91.5 27.79 6.11
1 5 15.5 20 17.75 177.5 127.0
1 6 18 24 21.00 210.0 159.5
1 7 22 27 24.50 245.0 194.5
1 8 24.6 30 27.30 273.0 222.5
1 9 25 31 28.00 280.0 229.5
1 10 27 32 29.50 295.0 244.5
22.77 7.87
1 11 30.2 35 32.60 326.0 275.5
1 12 31 36 33.50 335.0 284.5
1 13 32.3 37 34.65 346.5 296.0
1 14 34.4 38 36.20 362.0 311.5
1 15 35 40 37.50 375.0 324.5
1 16 37.3 41 39.15 391.5 341.0
1 17 38.9 42 40.45 404.5 354.0
1 18 40.1 42.7 41.40 414.0 363.5
18.72 10.10
1 19 42.2 43.1 42.65 426.5 376.0
1 20 43.1 44.2 43.65 436.5 386.0
1 21 45.1 45 45.05 450.5 400.0
1 22 46 45.9 45.95 459.5 409.0
1 23 46.2 50 48.10 481.0 430.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 79 + 000 R. 6.40 M Y : 0292426 X : 0482028 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 4.3 3.8 4.05 40.5 40.5
1 2 6.2 5.7 5.95 59.5 19.0
1 3 10.1 8.6 9.35 93.5 53.0
1 4 17 7 12.00 120.0 79.5
1 5 22 9.5 15.75 157.5 117.0 21.83 8.30
1 6 26 11.2 18.60 186.0 145.5
1 7 27.2 13.3 20.25 202.5 162.0
1 8 28.3 14.4 21.35 213.5 173.0
1 9 29 18.4 23.70 237.0 196.5
1 10 30.1 19.4 24.75 247.5 207.0
1 11 31 22 26.50 265.0 224.5
1 12 31.7 25.3 28.50 285.0 244.5
1 13 32.9 28.1 30.50 305.0 264.5
1 14 35 31.7 33.35 333.5 293.0
1 15 36.7 31.8 34.25 342.5 302.0 18.08 10.56
1 16 40 33 36.50 365.0 324.5
1 17 42.7 33.5 38.10 381.0 340.5
1 18 42 34 38.00 380.0 339.5
1 19 43.6 35.5 39.55 395.5 355.0
1 20 43.9 36.5 40.20 402.0 361.5
1 21 44.4 37.4 40.90 409.0 368.5
1 22 45.3 38.1 41.70 417.0 376.5
1 23 46.2 39.8 43.00 430.0 389.5 16.28 12.06
1 24 47.3 40.4 43.85 438.5 398.0
1 25 48.8 40.7 44.75 447.5 407.0
1 26 49.9

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 79 + 100 R. 3.33 M Y : 0292492 X : 0481951 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0.1 0 0 0.0
1 1 5.6 3.1 4.35 43.5 43.5
1 2 7.9 6 6.95 69.5 26.0
1 3 9.9 9 9.45 94.5 51.0
16.92 11.48
1 4 11 12 11.50 115.0 71.5
1 5 12 13.4 12.70 127.0 83.5
1 6 14 15 14.50 145.0 101.5
1 7 15.9 16 15.95 159.5 116.0
1 8 17.9 17.4 17.65 176.5 133.0
1 9 19.8 18.9 19.35 193.5 150.0
1 10 22 19.4 20.70 207.0 163.5
1 11 24 20 22.00 220.0 176.5
1 12 25 21.1 23.05 230.5 187.0
1 13 26 22 24.00 240.0 196.5 14.84 13.56
1 14 29.4 23 26.20 262.0 218.5
1 15 31 24 27.50 275.0 231.5
1 16 32.5 25 28.75 287.5 244.0
1 17 34 26 30.00 300.0 256.5
1 18 36 27 31.50 315.0 271.5
1 19 37 28.1 32.55 325.5 282.0
1 20 40 29.2 34.60 346.0 302.5
1 21 42.6 30.4 36.50 365.0 321.5
1 22 44.5 32 38.25 382.5 339.0
1 23 47 33 40.00 400.0 356.5
15.50 12.83
1 24 48 34.1 41.05 410.5 367.0
1 25 49.8 36 42.90 429.0 385.5
1 26 51 37.4 44.20 442.0 398.5
1 27 52.3 40.1 46.20 462.0 418.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 79 + 200 L. 4.41 M Y : 0292573 X : 0481995 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 2 0 0 0 0.0
1 1 5.1 5 5.05 50.5 50.5
1 2 7 9 8.00 80.0 29.5
1 3 8.5 18 13.25 132.5 82.0
1 4 10.2 26 18.10 181.0 130.5 30.00 5.55
1 5 12 28 20.00 200.0 149.5
1 6 14 36 25.00 250.0 199.5
1 7 15.1 37 26.05 260.5 210.0
1 8 16.1 40.1 28.10 281.0 230.5
1 9 17.6 43.2 30.40 304.0 253.5
1 10 20 46.1 33.05 330.5 280.0
1 11 23 50 36.50 365.0 314.5
1 12 27 54 40.50 405.0 354.5
30.26 5.49
1 13 30 56 43.00 430.0 379.5
1 14 35.1 59 47.05 470.5 420.0
1 15 41 64 52.50 525.0 474.5
1 16 42 69 55.50 555.0 504.5
1 17 43 70 56.50 565.0 514.5
1 18 74
1 19 79
1 20 80

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 79 + 300 L. 390 M Y : 0292667 X : 0481859 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0.2 0.1 0 0 0.0
1 1 4 2.4 3.20 32.0 32.0
1 2 5 3 4.00 40.0 8.0
1 3 7 4.2 5.60 56.0 24.0
1 4 8 7.9 7.95 79.5 47.5
1 5 9 12.8 10.90 109.0 77.0
29.10 5.77
1 6 12 18.2 15.10 151.0 119.0
1 7 13.4 21.1 17.25 172.5 140.5
1 8 14 28.4 21.20 212.0 180.0
1 9 15.1 36.1 25.60 256.0 224.0
1 10 22.4 42.2 32.30 323.0 291.0
1 11 26 48.1 37.05 370.5 338.5
1 12 27 54 40.50 405.0 373.0
1 13 32 59 45.50 455.0 423.0
36.47 4.33
1 14 37 61.1 49.05 490.5 458.5
1 15 42 73.2 57.60 576.0 544.0
1 16 46.1 77 61.55 615.5 583.5
1 17 50.2 81 65.60 656.0 624.0
1 18 55 84.1 69.55 695.5 663.5
1 19 61 87 74.00 740.0 708.0
38.55 4.03
1 20 67 91 79.00 790.0 758.0
1 21 72 98 85.00 850.0 818.0
1 22 76 100 88.00 880.0 848.0
1 23 79

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 79 + 400 R. 4.70 M Y : 0292761 X : 0481843 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 1 1.1 1.05 10.5 10.5
1 2 2 2.4 2.20 22.0 11.5
1 3 3.1 3.4 3.25 32.5 22.0
1 4 4.1 4.2 4.15 41.5 31.0
1 5 5 5 5.00 50.0 39.5
1 6 6 5.9 5.95 59.5 49.0 9.27 24.64
1 7 7 6.6 6.80 68.0 57.5
1 8 7.5 7.5 7.50 75.0 64.5
1 9 8 8 8.00 80.0 69.5
1 10 10 9.1 9.55 95.5 85.0
1 11 12.1 10.4 11.25 112.5 102.0
1 12 14 12 13.00 130.0 119.5
1 13 15.1 13 14.05 140.5 130.0
1 14 17 14 15.50 155.0 144.5
1 15 18.2 15 16.60 166.0 155.5
10.74 20.45
1 16 19.2 15.9 17.55 175.5 165.0
1 17 20.3 16.8 18.55 185.5 175.0
1 18 22.4 17.4 19.90 199.0 188.5
1 19 24.1 18.8 21.45 214.5 204.0
1 20 26 20.4 23.20 232.0 221.5
1 21 28.4 22 25.20 252.0 241.5
1 22 29.5 23.5 26.50 265.0 254.5
1 23 31.4 25 28.20 282.0 271.5
1 24 33 26 29.50 295.0 284.5
1 25 34.5 27 30.75 307.5 297.0 12.40 17.04
1 26 36 28.1 32.05 320.5 310.0
1 27 39 29.2 34.10 341.0 330.5
1 28 39.9 31 35.45 354.5 344.0
1 29 41 32.5 36.75 367.5 357.0
1 30 42.5 34 38.25 382.5 372.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 79 + 500 L. 4.23 M Y : 0292825 X : 0481810 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 3.1 1.2 2.15 21.5 21.5
1 2 6.6 3 4.80 48.0 26.5
1 3 9 5 7.00 70.0 48.5
19.75 9.43
1 4 10 8 9.00 90.0 68.5
1 5 13 10 11.50 115.0 93.5
1 6 16 12 14.00 140.0 118.5
1 7 17.1 14.1 15.60 156.0 134.5
1 8 19.2 16.2 17.70 177.0 155.5
1 9 20 17 18.50 185.0 163.5
1 10 21 18.1 19.55 195.5 174.0
1 11 22.9 19.9 21.40 214.0 192.5 17.60 10.92
1 12 24 21 22.50 225.0 203.5
1 13 26 22 24.00 240.0 218.5
1 14 27 23.4 25.20 252.0 230.5
1 15 29.1 28 28.55 285.5 264.0
1 16 36.1 33.1 34.60 346.0 324.5
1 17 42.1 40 41.05 410.5 389.0
1 18 49.2 47.5 48.35 483.5 462.0
1 19 53 54.1 53.55 535.5 514.0
1 20 58.1 59 58.55 585.5 564.0 29.19 5.74
1 21 62 62 62.00 620.0 598.5
1 22 66 65 65.50 655.0 633.5
1 23 69.1 69.5 69.30 693.0 671.5
1 24 73.3 71.1 72.20 722.0 700.5
1 25 75.1 74.3 74.70 747.0 725.5
1 26 79.2 78.4 78.80 788.0 766.5
1 27 83 82.5 82.75 827.5 806.0
30.82 5.36
1 28 87.4 87.1 87.25 872.5 851.0
1 29 90 91 90.50 905.0 883.5
1 30 93.2 96 94.60 946.0 924.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 79 + 600 R. 3.55 M Y : 0292881 X : 0481742 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0.2 0 0 0 0.0
1 1 2.5 1 1.75 17.5 17.5
1 2 3.1 2.1 2.60 26.0 8.5
1 3 4 3.8 3.90 39.0 21.5
1 4 5.1 4.9 5.00 50.0 32.5
1 5 6 5.1 5.55 55.5 38.0
1 6 7 6.4 6.70 67.0 49.5
1 7 7.6 7.5 7.55 75.5 58.0 7.88 30.28
1 8 8 8 8.00 80.0 62.5
1 9 8.9 9.1 9.00 90.0 72.5
1 10 10 10 10.00 100.0 82.5
1 11 10.6 11.1 10.85 108.5 91.0
1 12 11.5 11.9 11.70 117.0 99.5
1 13 12 12 12.00 120.0 102.5
1 14 13 12.5 12.75 127.5 110.0
1 15 14 13 13.50 135.0 117.5
1 16 14.8 14 14.40 144.0 126.5 7.97 29.85
1 17 15 15 15.00 150.0 132.5
1 18 16 16.2 16.10 161.0 143.5
1 19 16.7
1 20 17
1 21 18
1 22 20
1 23 21

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 79 + 800 R. 3.22 M Y : 0291587 X : 0484645 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 0 0 0 0.0
1 1 2 2.1 2.05 20.5 20.5
1 2 3 3 3.00 30.0 9.5
1 3 4 4 4.00 40.0 19.5
1 4 5 5.1 5.05 50.5 30.0
1 5 6 6 6.00 60.0 39.5 11.33 19.10
1 6 8.1 7 7.55 75.5 55.0
1 7 9 10 9.50 95.0 74.5
1 8 10 12 11.00 110.0 89.5
1 9 10.5 14 12.25 122.5 102.0
1 10 12.6 15 13.80 138.0 117.5
1 11 13 17 15.00 150.0 129.5
1 12 14 18 16.00 160.0 139.5
1 13 16 19.2 17.60 176.0 155.5
1 14 17.1 20 18.55 185.5 165.0 11.50 18.75
1 15 18 21 19.50 195.0 174.5
1 16 19 22 20.50 205.0 184.5
1 17 20.1 23.4 21.75 217.5 197.0
1 18 21 24.5 22.75 227.5 207.0
1 19 22.2 25.6 23.90 239.0 218.5
1 20 23 26 24.50 245.0 224.5
1 21 24 27.1 25.55 255.5 235.0
1 22 25 28.4 26.70 267.0 246.5
10.83 20.24
1 23 26.1 29.1 27.60 276.0 255.5
1 24 27 30.1 28.55 285.5 265.0
1 25 27.9 31.2 29.55 295.5 275.0
1 26 28 32.4 30.20 302.0 281.5
1 27 29.1
1 28 30
1 29 31
1 30 32
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 79 + 900 R. 3.65 M Y : 0292933 X : 0481492 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 1.5 2.1 1.80 18.0 18.0
1 2 3 3 3.00 30.0 12.0
1 3 4.5 4 4.25 42.5 24.5
1 4 6 5.1 5.55 55.5 37.5
12.75 16.44
1 5 10 6.2 8.10 81.0 63.0
1 6 12 7.1 9.55 95.5 77.5
1 7 13 9 11.00 110.0 92.0
1 8 14 10 12.00 120.0 102.0
1 9 15 11 13.00 130.0 112.0
1 10 16 12 14.00 140.0 122.0
1 11 17 15.9 16.45 164.5 146.5
1 12 19 18.1 18.55 185.5 167.5 13.27 15.63
1 13 20 19.2 19.60 196.0 178.0
1 14 21.1 20 20.55 205.5 187.5
1 15 22 21.4 21.70 217.0 199.0
1 16 27.4 22.1 24.75 247.5 229.5
1 17 30 23 26.50 265.0 247.0
1 18 31 24 27.50 275.0 257.0 14.45 14.03
1 19 32.1 27 29.55 295.5 277.5
1 20 33 28.4 30.70 307.0 289.0
1 21 35 35.5 35.25 352.5 334.5
1 22 36.7 37 36.85 368.5 350.5
1 23 37.9 38 37.95 379.5 361.5
1 24 38.4 39 38.70 387.0 369.0
1 25 40.2 40.2 40.20 402.0 384.0
15.52 12.81
1 26 44.4 42 43.20 432.0 414.0
1 27 46.5 43.4 44.95 449.5 431.5
1 28 47 46.5 46.75 467.5 449.5
1 29 48 47 47.50 475.0 457.0
1 30 48.6 48.1 48.35 483.5 465.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 80 + 000 L. 3.90 M Y : 0292879 X : 0481492 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 0 0 0 0.0
1 1 2.6 2.1 2.35 23.5 23.5
1 2 6 4.1 5.05 50.5 27.0
1 3 11 5.5 8.25 82.5 59.0
1 4 14 7 10.50 105.0 81.5
1 5 17 8 12.50 125.0 101.5 28.50 5.92
1 6 23.5 9.1 16.30 163.0 139.5
1 7 29 11 20.00 200.0 176.5
1 8 34.5 14.5 24.50 245.0 221.5
1 9 38 18 28.00 280.0 256.5
1 10 46 20.5 33.25 332.5 309.0
1 11 51 23.4 37.20 372.0 348.5
1 12 55.4 26 40.70 407.0 383.5
1 13 58 29.1 43.55 435.5 412.0
1 14 61 32 46.50 465.0 441.5 32.06 5.10
1 15 66 35.6 50.80 508.0 484.5
1 16 70.1 39.4 54.75 547.5 524.0
1 17 72 42 57.00 570.0 546.5
1 18 73 47.1 60.05 600.5 577.0
1 19 75 51.3 63.15 631.5 608.0
1 20 76 54.2 65.10 651.0 627.5
1 21 77 56 66.50 665.0 641.5
1 22 78 57.1 67.55 675.5 652.0
1 23 79 58 68.50 685.0 661.5
1 24 80 59.1 69.55 695.5 672.0
25.22 6.92
1 25 82 60 71.00 710.0 686.5
1 26 84 60.5 72.25 722.5 699.0
1 27 85 61 73.00 730.0 706.5
1 28 86 61.9 73.95 739.5 716.0
1 29 88 62 75.00 750.0 726.5
1 30 91 65 78.00 780.0 756.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 80 + 100 R. 3.32 M Y : 0292870 X : 0481396 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 2 3 2.50 25.0 25.0
1 2 3.9 4 3.95 39.5 14.5
1 3 5 5 5.00 50.0 25.0
1 4 6.1 6.1 6.10 61.0 36.0
1 5 7 7 7.00 70.0 45.0 22.39
10.00
1 6 8 8 8.00 80.0 55.0
1 7 9 10 9.50 95.0 70.0
1 8 10 11 10.50 105.0 80.0
1 9 11 12.2 11.60 116.0 91.0
1 10 11.9 13.1 12.50 125.0 100.0
1 11 12.1 14.2 13.15 131.5 106.5
1 12 13 15 14.00 140.0 115.0
1 13 13.5 16 14.75 147.5 122.5
1 14 14 17 15.50 155.0 130.0
1 15 14.9 18 16.45 164.5 139.5
1 16 15.2 18.9 17.05 170.5 145.5
9.18 24.95
1 17 16 19.8 17.90 179.0 154.0
1 18 17 21 19.00 190.0 165.0
1 19 18 22.1 20.05 200.5 175.5
1 20 18.9 23 20.95 209.5 184.5
1 21 19.8 24.1 21.95 219.5 194.5
1 22 20.4 25 22.70 227.0 202.0
1 23 21.5 26 23.75 237.5 212.5
1 24 22.4 27 24.70 247.0 222.0
1 25 23.5 28 25.75 257.5 232.5 9.26 24.69
1 26 24 29 26.50 265.0 240.0
1 27 25 30 27.50 275.0 250.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 80 + 200 L. 4.05 Y : 0292909 X : 0481305 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 2 1 1.50 15.0 15.0
1 2 5 2.1 3.55 35.5 20.5
1 3 6 4 5.00 50.0 35.0
14.17 14.38
1 4 7 6 6.50 65.0 50.0
1 5 8.1 7 7.55 75.5 60.5
1 6 10 10 10.00 100.0 85.0
1 7 11.2 15 13.10 131.0 116.0
1 8 12 17 14.50 145.0 130.0
1 9 14 18.8 16.40 164.0 149.0
1 10 17 21.2 19.10 191.0 176.0
1 11 23 24.5 23.75 237.5 222.5 19.33 9.69
1 12 24 26 25.00 250.0 235.0
1 13 25 28 26.50 265.0 250.0
1 14 25.6 29 27.30 273.0 258.0
1 15 26 35 30.50 305.0 290.0
1 16 26.9 42 34.45 344.5 329.5
1 17 27 48 37.50 375.0 360.0
1 18 28 53 40.50 405.0 390.0
1 19 29 58.1 43.55 435.5 420.5
1 20 30 63 46.50 465.0 450.0
28.20 6.00
1 21 31.4 69.1 50.25 502.5 487.5
1 22 34 75.1 54.55 545.5 530.5
1 23 38.9 82 60.45 604.5 589.5
1 24 42 89 65.50 655.0 640.0
1 25 44 100 72.00 720.0 705.0
1 26 55
1 27 60.5
1 28 65.4
1 29 72
1 30 75
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 80 + 300 R. 5.30 M Y : 0292898 X : 0481206 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 4 0 0 0.0
1 1 2 7 4.50 45.0 45.0
1 2 3 8 5.50 55.0 10.0
1 3 4.2 8.5 6.35 63.5 18.5
1 4 6 9.6 7.80 78.0 33.0
12.50 16.86
1 5 8.1 10.4 9.25 92.5 47.5
1 6 10.2 12 11.10 111.0 66.0
1 7 11.6 12.9 12.25 122.5 77.5
1 8 13 16 14.50 145.0 100.0
1 9 14 18 16.00 160.0 115.0
1 10 15 19 17.00 170.0 125.0
1 11 15.5 19.4 17.45 174.5 129.5
1 12 16 20 18.00 180.0 135.0
1 13 16.6 20.5 18.55 185.5 140.5 10.47 21.12
1 14 17 21 19.00 190.0 145.0
1 15 19.8 22 20.90 209.0 164.0
1 16 20.4 23 21.70 217.0 172.0
1 17 21 23.6 22.30 223.0 178.0
1 18 31.5
1 19 22
1 20 23
1 21 24
1 22 25
1 23 20

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 80 + 400 L.2.90 M Y : 0292952 X : 0481123 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 2.8 4.5 3.65 36.5 36.5
1 2 4.8 6.4 5.60 56.0 19.5
1 3 6.1 8 7.05 70.5 34.0
1 4 8.4 9.1 8.75 87.5 51.0
16.13 12.20
1 5 10 11 10.50 105.0 68.5
1 6 11 12.1 11.55 115.5 79.0
1 7 13 14.2 13.60 136.0 99.5
1 8 15.6 17.5 16.55 165.5 129.0
1 9 18 19.5 18.75 187.5 151.0
1 10 21.5 21 21.25 212.5 176.0
1 11 25 22 23.50 235.0 198.5
1 12 28 26 27.00 270.0 233.5
1 13 27.9 28 27.95 279.5 243.0
1 14 38 37.9 37.95 379.5 343.0 26.08 6.63
1 15 45 45 45.00 450.0 413.5
1 16 51 50 50.50 505.0 468.5
1 17 52 51 51.50 515.0 478.5
1 18 53 52 52.50 525.0 488.5
1 19 53.4 53 53.20 532.0 495.5
1 20 54 54 54.00 540.0 503.5
1 21 55 55 55.00 550.0 513.5
1 22 55.6 55.5 55.55 555.5 519.0
1 23 56 56 56.00 560.0 523.5 20.81 8.83
1 24 57 56.4 56.70 567.0 530.5
1 25 57.6 57 57.30 573.0 536.5
1 26 58 57.5 57.75 577.5 541.0
1 27 59
1 28 59.4
1 29 60
1 30 60.4
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 80 + 500 R. 4.87 M Y : 0292965 X : 0481023 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 0 0 0 0.0
1 1 2 3 2.50 25.0 25.0
1 2 5.6 5 5.30 53.0 28.0
1 3 10 6.3 8.15 81.5 56.5
18.75 10.08
1 4 12 8 10.00 100.0 75.0
1 5 14 10.2 12.10 121.0 96.0
1 6 15.5 12 13.75 137.5 112.5
1 7 17.6 13.2 15.40 154.0 129.0
1 8 19 14.5 16.75 167.5 142.5
1 9 20.4 16 18.20 182.0 157.0
1 10 22 17.4 19.70 197.0 172.0 16.15 12.18
1 11 23.9 18.5 21.20 212.0 187.0
1 12 25 19.6 22.30 223.0 198.0
1 13 27 20 23.50 235.0 210.0
1 14 30 21.5 25.75 257.5 232.5
1 15 33 23.6 28.30 283.0 258.0
1 16 36 25 30.50 305.0 280.0 16.83 11.55
1 17 38 26 32.00 320.0 295.0
1 18 39 26.6 32.80 328.0 303.0
1 19 40.5 29.5 35.00 350.0 325.0
1 20 43 28.7 35.85 358.5 333.5
1 21 45 29 37.00 370.0 345.0
17.08 11.34
1 22 49 30 39.50 395.0 370.0
1 23 50 31 40.50 405.0 380.0
1 24 54 33 43.50 435.0 410.0
1 25 56.6 35 45.80 458.0 433.0
1 26 60.1 38 49.05 490.5 465.5
1 27 62 42.1 52.05 520.5 495.5
20.00 9.28
1 28 70 45 57.50 575.0 550.0
1 29 72 48 60.00 600.0 575.0
1 30 74 51 62.50 625.0 600.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 80 + 600 L. 3.44 M Y : 0292992 X : 0480934 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 2 0 0 0.0
1 1 3 4 3.50 35.0 35.0
1 2 5 6.5 5.75 57.5 22.5
1 3 8 11 9.50 95.0 60.0
1 4 19.9 13 16.45 164.5 129.5 43.57 3.45
1 5 45 15 30.00 300.0 265.0
1 6 48 16 32.00 320.0 285.0
1 7 51 17 34.00 340.0 305.0
1 8 57.1 17.9 37.50 375.0 340.0
1 9 60 18 39.00 390.0 355.0
1 10 63 20 41.50 415.0 380.0
1 11 74 22 48.00 480.0 445.0 45.36 3.28
1 12 80 24 52.00 520.0 485.0
1 13 90 26 58.00 580.0 545.0
1 14 100 34 67.00 670.0 635.0
1 15 35.1
1 16 36
1 17 37
1 18 37.5
1 19 39
1 20 40
1 21 42
1 22 43.5
1 23 45.1
1 24 46
1 25 47
1 26 47.5
1 27 48
49
50
51
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 80 + 700 L. 3. 40 M Y : 0293064 X : 0480900 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 3.5 5.5 4.50 45.0 45.0
1 2 8 13 10.50 105.0 60.0
1 3 10 19 14.50 145.0 100.0
1 4 11 27 19.00 190.0 145.0 42.86 3.53
1 5 23 29 26.00 260.0 215.0
1 6 28 34 31.00 310.0 265.0
1 7 34 35 34.50 345.0 300.0
1 8 36 40 38.00 380.0 335.0
1 9 37 42 39.50 395.0 350.0
1 10 39 43 41.00 410.0 365.0
1 11 40 44.5 42.25 422.5 377.5
33.67 4.79
1 12 42 45.5 43.75 437.5 392.5
1 13 46 47 46.50 465.0 420.0
1 14 50 50 50.00 500.0 455.0
1 15 54 56 55.00 550.0 505.0
1 16 58 60 59.00 590.0 545.0
1 17 60 62 61.00 610.0 565.0
1 18 62 63.5 62.75 627.5 582.5 30.50 5.43
1 19 63 65 64.00 640.0 595.0
1 20 64 67 65.50 655.0 610.0
1 21 65 69 67.00 670.0 625.0
1 22 66 70.1 68.05 680.5 635.5
1 23 67 71 69.00 690.0 645.0
1 24 68 72 70.00 700.0 655.0
1 25 72 73.9 72.95 729.5 684.5
24.83 7.05
1 26 73 74.8 73.90 739.0 694.0
1 27 74.5 75.6 75.05 750.5 705.5
1 28 75.9 76.4 76.15 761.5 716.5
1 29 76 78.9 77.45 774.5 729.5
1 30 78 80 79.00 790.0 745.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 80 + 800 L. 5.80 M Y : 0293174 X : 0480890 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 2 2 2.00 20.0 20.0
1 2 3 3 3.00 30.0 10.0
1 3 4 6 5.00 50.0 30.0
1 4 9 7 8.00 80.0 60.0
1 5 18 9 13.50 135.0 115.0
1 6 35 10 22.50 225.0 205.0 26.91 6.37
1 7 38 11 24.50 245.0 225.0
1 8 39.5 12 25.75 257.5 237.5
1 9 40 18 29.00 290.0 270.0
1 10 42 19 30.50 305.0 285.0
1 11 43.2 20 31.60 316.0 296.0
1 12 43.8 21 32.40 324.0 304.0
1 13 44 31 37.50 375.0 355.0
1 14 45 32 38.50 385.0 365.0
23.82 7.43
1 15 46 35 40.50 405.0 385.0
1 16 47 36 41.50 415.0 395.0
1 17 48 37 42.50 425.0 405.0
1 18 48.5 38 43.25 432.5 412.5
1 19 49 39 44.00 440.0 420.0
1 20 50.1 40 45.05 450.5 430.5
1 21 50.9 41 45.95 459.5 439.5
1 22 51 42 46.50 465.0 445.0
1 23 52 43 47.50 475.0 455.0
1 24 53 44 48.50 485.0 465.0 17.67 10.87
1 25 54 46 50.00 500.0 480.0
1 26 55 47 51.00 510.0 490.0
1 27 56 48 52.00 520.0 500.0
1 28 57 49 53.00 530.0 510.0
1 29 58 50 54.00 540.0 520.0
1 30 59 51 55.00 550.0 530.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 80 + 900 R. 4.40 M Y : 0293185 X : 0480804 Date : November 13, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 1 3 2.00 20.0 20.0
1 2 2 10 6.00 60.0 40.0
1 3 6 14 10.00 100.0 80.0
1 4 11 15 13.00 130.0 110.0
25.00 6.99
1 5 12 16 14.00 140.0 120.0
1 6 18 18 18.00 180.0 160.0
1 7 22 19 20.50 205.0 185.0
1 8 24 20 22.00 220.0 200.0
1 9 25 21 23.00 230.0 210.0
1 10 26 31 28.50 285.0 265.0
1 11 27 35 31.00 310.0 290.0
1 12 28 36 32.00 320.0 300.0 27.67 6.15
1 13 29 38 33.50 335.0 315.0
1 14 31 42 36.50 365.0 345.0
1 15 39 48 43.50 435.0 415.0
1 16 47.1 49 48.05 480.5 460.5
1 17 54 50 52.00 520.0 500.0
1 18 61 51 56.00 560.0 540.0
1 19 69 57 63.00 630.0 610.0
31.09 5.30
1 20 72 61 66.50 665.0 645.0
1 21 75 63 69.00 690.0 670.0
1 22 78 65 71.50 715.0 695.0
1 23 80 67 73.50 735.0 715.0
1 24 81 70 75.50 755.0 735.0
1 25 82 77 79.50 795.0 775.0
1 26 84 79 81.50 815.0 795.0
1 27 86 80 83.00 830.0 810.0 29.83 5.59
1 28 90 81 85.50 855.0 835.0
1 29 91 84 87.50 875.0 855.0
1 30 96 87 91.50 915.0 895.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 81 + 000 L.3.80 M Y : 0293159 X : 0480707 Date : November 14, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))

0 0 0 0 0 0 0.0
1 1 2 3 2.50 25.0 25.0
1 2 2.5 5.5 4.00 40.0 15.0
1 3 3 7 5.00 50.0 25.0
1 4 4 8 6.00 60.0 35.0
1 5 6 9.2 7.60 76.0 51.0
1 6 7 11 9.00 90.0 65.0 9.55 23.75
1 7 8 12.1 10.05 100.5 75.5
1 8 9 12.9 10.95 109.5 84.5
1 9 10.1 13 11.55 115.5 90.5
1 10 11 13.5 12.25 122.5 97.5
1 11 12 14 13.00 130.0 105.0
1 12 13 15.1 14.05 140.5 115.5
1 13 14 16 15.00 150.0 125.0
1 14 15 17.5 16.25 162.5 137.5
1 15 16 18.4 17.20 172.0 147.0
1 16 17 20 18.50 185.0 160.0 10.40 21.30
1 17 18 21 19.50 195.0 170.0
1 18 19.4 22.3 20.85 208.5 183.5
1 19 20 24 22.00 220.0 195.0
1 20 20.5 26.1 23.30 233.0 208.0
1 21 22 28.1 25.05 250.5 225.5
1 22 25 29 27.00 270.0 245.0
1 23 27.1 30.2 28.65 286.5 261.5
1 24 28.9 32 30.45 304.5 279.5
1 25 30 33 31.50 315.0 290.0
11.17 19.46
1 26 30.9 34 32.45 324.5 299.5
1 27 31.5 35 33.25 332.5 307.5
1 28 32 36 34.00 340.0 315.0
1 29 33 37 35.00 350.0 325.0
1 30 34 38 36.00 360.0 335.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 81 + 100 L. 4.00 M Y : 0293156 X : 0480605 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 8.1 4.4 23.00 230.0 230.0
1 2 12 7.2 30.00 300.0 70.0
1 3 30.2 11.3 37.00 370.0 140.0
1 4 47.2 26.1 46.00 460.0 230.0
66.67 2.01
1 5 53 33.4 53.00 530.0 300.0
1 6 56.4 41 62.00 620.0 390.0
1 7 57.9 46 65.00 650.0 420.0
1 8 59 50.1 71.00 710.0 480.0
1 9 61.2 62.1 83.00 830.0 600.0
1 10 64 63
1 11 67.3 64
1 12 69 66.5
1 13 73 67.4
1 14 77.5 69
1 15 78.1 70
1 16 81.4 74 77.70 777.0 547.0
1 17 83 78.4 80.70 807.0 577.0
1 18 84 82 83.00 830.0 600.0
29.52 5.66
1 19 85 82.6 83.80 838.0 608.0
1 20 85.5 83 84.25 842.5 612.5
1 21 86 84 85.00 850.0 620.0
1 22 86.4 86.3 86.35 863.5 633.5
1 23 87 88 87.50 875.0 645.0
1 24 87.3 89.2 88.25 882.5 652.5
1 25 90 90 90.00 900.0 670.0
26.55 6.48
1 26 92.2 93 92.60 926.0 696.0
1 27 94.4 94 94.20 942.0 712.0
1 28 96.2 97 96.60 966.0 736.0
1 29 100 100 100.00 1000.0 770.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 81 + 200 R. 3.76 M Y : 0293227 X : 0480570 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 2 1 1.50 15.0 15.0
1 2 3 3 3.00 30.0 15.0
1 3 3.4 4 3.70 37.0 22.0
1 4 5 5 5.00 50.0 35.0 8.29 28.43
1 5 6.2 5.9 6.05 60.5 45.5
1 6 7.4 6 6.70 67.0 52.0
1 7 8 6.6 7.30 73.0 58.0
1 8 8.5 7 7.75 77.5 62.5
1 9 9.1 7.1 8.10 81.0 66.0
1 10 10 8 9.00 90.0 75.0
1 11 10.6 9 9.80 98.0 83.0
1 12 11 11.4 11.20 112.0 97.0
7.53 32.10
1 13 11.4 11.9 11.65 116.5 101.5
1 14 12 12.8 12.40 124.0 109.0
1 15 12.6 13 12.80 128.0 113.0
1 16 13 14 13.50 135.0 120.0
1 17 13.6 15 14.30 143.0 128.0
1 18 14.5 16.1 15.30 153.0 138.0
1 19 15.6 17.1 16.35 163.5 148.5
1 20 15.9 18.3 17.10 171.0 156.0
1 21 16 23 19.50 195.0 180.0
1 22 17.8 27 22.40 224.0 209.0
1 23 18 30.9 24.45 244.5 229.5
11.90 17.96
1 24 19.1 34.1 26.60 266.0 251.0
1 25 20.1 37.2 28.65 286.5 271.5
1 26 21 40.6 30.80 308.0 293.0
1 27 22.1 43.3 32.70 327.0 312.0
1 28 22 46 34.00 340.0 325.0
1 29 24 48 36.00 360.0 345.0
1 30 48.9
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 81 + 300 L . 3.00 M Y : 0293324 X : 0480579 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 1 9.1 5.05 50.5 50.5
1 2 4 15.4 9.70 97.0 46.5
1 3 5 17 11.00 110.0 59.5
1 4 6 18.5 12.25 122.5 72.0
1 5 9 24 16.50 165.0 114.5 31.67 5.18
1 6 14 26 20.00 200.0 149.5
1 7 23 29.1 26.05 260.5 210.0
1 8 28.5 33.4 30.95 309.5 259.0
1 9 32.1 35 33.55 335.5 285.0
1 10 35.4 38.6 37.00 370.0 319.5
1 11 44.7 40 42.35 423.5 373.0
1 12 47.2 42 44.60 446.0 395.5
1 13 49.7 44.3 47.00 470.0 419.5
1 14 51.8 46.1 48.95 489.5 439.0
1 15 53.1 48 50.55 505.5 455.0 27.40 6.22
1 16 55 50 52.50 525.0 474.5
1 17 58 52.1 55.05 550.5 500.0
1 18 59 54 56.50 565.0 514.5
1 19 60 58 59.00 590.0 539.5
1 20 62.4 57.3 59.85 598.5 548.0
1 21 63.1 58 60.55 605.5 555.0
1 22 64.2 59 61.60 616.0 565.5
1 23 64.9 60 62.45 624.5 574.0
1 24 65 60.9 62.95 629.5 579.0
1 25 66.1 61.2 63.65 636.5 586.0
20.93 8.76
1 26 67 62 64.50 645.0 594.5
1 27 68 63 65.50 655.0 604.5
1 28 69 64 66.50 665.0 614.5
1 29 70 64.5 67.25 672.5 622.0
1 30 70.7 65 67.85 678.5 628.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 81 + 400 R . 4.60 M Y : 0293370 X : 0480502 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 2 4 3.00 30.0 30.0
1 2 2.9 4.5 3.70 37.0 7.0
1 3 3 6 4.50 45.0 15.0
1 4 4 7 5.50 55.0 25.0
1 5 4.5 9 6.75 67.5 37.5
1 6 5 10 7.50 75.0 45.0
8.79 26.37
1 7 6 11 8.50 85.0 55.0
1 8 7 11.5 9.25 92.5 62.5
1 9 8.4 12 10.20 102.0 72.0
1 10 9.2 13.1 11.15 111.5 81.5
1 11 10.1 14.5 12.30 123.0 93.0
1 12 11 16.1 13.55 135.5 105.5
1 13 12.4 17 14.70 147.0 117.0
1 14 16.1 18 17.05 170.5 140.5
1 15 20.1 19.2 19.65 196.5 166.5
11.25 19.28
1 16 22 20.4 21.20 212.0 182.0
1 17 23 21 22.00 220.0 190.0
1 18 24.5 22 23.25 232.5 202.5
1 19 25 23 24.00 240.0 210.0
1 20 26 24 25.00 250.0 220.0
1 21 27.5 27 27.25 272.5 242.5
1 22 28 30 29.00 290.0 260.0
11.67 18.39
1 23 28.5 31.2 29.85 298.5 268.5
1 24 29 32 30.50 305.0 275.0
1 25 30 35 32.50 325.0 295.0
1 26 30.7 36 33.35 333.5 303.5
1 27 37
1 28 38.5
1 29 39
1 30 40
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 81 + 500 L. 5.20 M Y : 0293385 X : 0480399 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 0 0 0 0.0
1 1 3 1 2.00 20.0 20.0
1 2 4 4 4.00 40.0 20.0
1 3 9 5 7.00 70.0 50.0
1 4 10.1 10 10.05 100.5 80.5
34.63 4.62
1 5 19.5 15 17.25 172.5 152.5
1 6 24.1 16 20.05 200.5 180.5
1 7 28.2 20 24.10 241.0 221.0
1 8 34.2 25.2 29.70 297.0 277.0
1 9 41.5 28 34.75 347.5 327.5
1 10 47 33 40.00 400.0 380.0
1 11 48 37 42.50 425.0 405.0
35.71 4.45
1 12 51 43 47.00 470.0 450.0
1 13 54.1 48.1 51.10 511.0 491.0
1 14 55 49 52.00 520.0 500.0
1 15 62.7 50.3 56.50 565.0 545.0
1 16 69.9 54 61.95 619.5 599.5
1 17 69.1 59 64.05 640.5 620.5
1 18 70.2 61.1 65.65 656.5 636.5
1 19 71 62.3 66.65 666.5 646.5 30.09 5.53
1 20 72 63.2 67.60 676.0 656.0
1 21 73.4 64.5 68.95 689.5 669.5
1 22 74 65.7 69.85 698.5 678.5
1 23 75 67.4 71.20 712.0 692.0
1 24 76 68.2 72.10 721.0 701.0
1 25 76.6 69.4 73.00 730.0 710.0
1 26 77.1 70 73.55 735.5 715.5
1 27 78 71.6 74.80 748.0 728.0 25.32 6.88
1 28 80 72 76.00 760.0 740.0
1 29 81.2 73 77.10 771.0 751.0
1 30 81.9 74 77.95 779.5 759.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 81 + 600 R. 4.70 M Y : 0293416 X : 0480308 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0.4 1 0 0 0.0
1 1 7 2.5 4.75 47.5 47.5
1 2 11.9 3 7.45 74.5 27.0
1 3 15.4 4.1 9.75 97.5 50.0
1 4 17.3 5.2 11.25 112.5 65.0 15.14 13.22
1 5 19.3 6.1 12.70 127.0 79.5
1 6 21.9 7 14.45 144.5 97.0
1 7 22.5 8.2 15.35 153.5 106.0
1 8 24.6 10.3 17.45 174.5 127.0
1 9 27.1 13.9 20.50 205.0 157.5
1 10 29.8 17.8 23.80 238.0 190.5
1 11 32.4 21 26.70 267.0 219.5
25.20 6.92
1 12 35 26.1 30.55 305.5 258.0
1 13 39.1 30.5 34.80 348.0 300.5
1 14 42 36.5 39.25 392.5 345.0
1 15 46.1 39 42.55 425.5 378.0
1 16 51.2 41.5 46.35 463.5 416.0
1 17 53.4 43.1 48.25 482.5 435.0
1 18 54.1 44.5 49.30 493.0 445.5
1 19 55.2 45.5 50.35 503.5 456.0
21.65 8.39
1 20 56.5 46.7 51.60 516.0 468.5
1 21 57 48 52.50 525.0 477.5
1 22 58.1 49.1 53.60 536.0 488.5
1 23 59.1 50 54.55 545.5 498.0
1 24 60.3 50.4 55.35 553.5 506.0
1 25 61.4 51 56.20 562.0 514.5
1 26 62.7 52 57.35 573.5 526.0
1 27 63.1 54 58.55 585.5 538.0 18.93 9.95
1 28 64 55 59.50 595.0 547.5
1 29 65 56.5 60.75 607.5 560.0
1 30 66.1 57 61.55 615.5 568.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 81 + 700 L. 4.80 M Y : 0293515 X : 0480265 Date : 41,592.00


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 0 0 0 0.0
1 1 9.8 5 7.40 74.0 74.0
1 2 17.2 11 14.10 141.0 67.0
1 3 20.5 15.6 18.05 180.5 106.5
1 4 27.1 21 24.05 240.5 166.5
1 5 32.4 27 29.70 297.0 223.0
97.88 1.24
1 6 35.2 30.4 32.80 328.0 254.0
1 7 36 34.5 35.25 352.5 278.5
1 8 37.4 40 38.70 387.0 313.0
1 9 38.2 48 43.10 431.0 357.0
1 10 40 53.1 46.55 465.5 391.5
1 11 44 56.6 50.30 503.0 429.0
1 12 47 60 53.50 535.0 461.0
1 13 48 65.2 56.60 566.0 492.0
1 14 50 70.1 60.05 600.5 526.5
1 15 52 75 63.50 635.0 561.0
1 16 53.4 78 65.70 657.0 583.0 50.40 2.87
1 17 55 80 67.50 675.0 601.0
1 18 57 82 69.50 695.0 621.0
1 19 60 94 77.00 770.0 696.0
1 20 64 96 80.00 800.0 726.0
1 21 66 100 83.00 830.0 756.0
1 22 68
1 23 71
1 24 74
1 25 76
1 26 78
1 27 79
1 28 80
1 29 82
1 30 84
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 81 + 800 R. 5.81 M Y : 0293483 X : 0480117 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0 0.0
1 1 5.6 4.1 4.85 48.5 48.5
1 2 10.4 6.9 8.65 86.5 38.0
1 3 17.1 11.1 14.10 141.0 92.5
1 4 24 16 20.00 200.0 151.5
49.81 2.91
1 5 29.6 20.9 25.25 252.5 204.0
1 6 35 28 31.50 315.0 266.5
1 7 42 38 40.00 400.0 351.5
1 8 45.1 44.3 44.70 447.0 398.5
1 9 49 49 49.00 490.0 441.5
1 10 53 53.4 53.20 532.0 483.5
1 11 57.2 57.5 57.35 573.5 525.0
1 12 60.2 60.5 60.35 603.5 555.0 39.93 3.86
1 13 62 62 62.00 620.0 571.5
1 14 63.3 63 63.15 631.5 583.0
1 15 64.4 65.1 64.75 647.5 599.0
1 16 65.4 67 66.20 662.0 613.5
1 17 66 68.1 67.05 670.5 622.0
1 18 67 69 68.00 680.0 631.5
1 19 67.5 70.1 68.80 688.0 639.5
1 20 68 72 70.00 700.0 651.5
27.86 6.09
1 21 68.6 73 70.80 708.0 659.5
1 22 69 74 71.50 715.0 666.5
1 23 70 75 72.50 725.0 676.5
1 24 71 76.1 73.55 735.5 687.0
1 25 71.5 77.5 74.50 745.0 696.5
1 26 72 78 75.00 750.0 701.5
1 27 72.6 79.6 76.10 761.0 712.5
1 28 73 80 76.50 765.0 716.5 24.22 7.28
1 29 73.6 80.5 77.05 770.5 722.0
1 30 74 81 77.50 775.0 726.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 81 + 900 L. 2.04 M Y : 0293570 X : 0480062 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 2 0 0 0.0
1 1 1 7.5 4.25 42.5 42.5
1 2 2 9 5.50 55.0 12.5
1 3 3.1 10.9 7.00 70.0 27.5
1 4 4.2 12.7 8.45 84.5 42.0
12.56 16.76
1 5 5 14.1 9.55 95.5 53.0
1 6 6.5 17 11.75 117.5 75.0
1 7 7 19.6 13.30 133.0 90.5
1 8 8.1 20.5 14.30 143.0 100.5
1 9 10.9 21 15.95 159.5 117.0
1 10 15.1 22 18.55 185.5 143.0
1 11 20.1 23.4 21.75 217.5 175.0
1 12 27.5 26 26.75 267.5 225.0
1 13 33.5 30.5 32.00 320.0 277.5
28.19 6.00
1 14 38.6 34.1 36.35 363.5 321.0
1 15 43 38.1 40.55 405.5 363.0
1 16 48 41.5 44.75 447.5 405.0
1 17 54 46 50.00 500.0 457.5
1 18 59 51 55.00 550.0 507.5
1 19 65.4 55.2 60.30 603.0 560.5
1 20 70.1 59.1 64.60 646.0 603.5
1 21 73.2 64 68.60 686.0 643.5
1 22 80 70 75.00 750.0 707.5
1 23 85.2 77.2 81.20 812.0 769.5 33.65 4.79
1 24 87 83 85.00 850.0 807.5
1 25 91.2 85.4 88.30 883.0 840.5
1 26 95 88 91.50 915.0 872.5
1 27 100 90.2 95.10 951.0 908.5
1 28 92
1 29 95.1
1 30 100
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 82 + 000 L. 4.50 M Y : 0293667 X : 0480039 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 4.8 1.5 3.15 31.5 31.5
1 2 7.9 3 5.45 54.5 23.0
1 3 10 4 7.00 70.0 38.5
1 4 10.5 5 7.75 77.5 46.0
13.00 16.04
1 5 11.2 6.5 8.85 88.5 57.0
1 6 12.3 10.1 11.20 112.0 80.5
1 7 13.4 12 12.70 127.0 95.5
1 8 14 13.1 13.55 135.5 104.0
1 9 15 14.9 14.95 149.5 118.0
1 10 16 15 15.50 155.0 123.5
1 11 17.1 16 16.55 165.5 134.0
1 12 19.3 17.1 18.20 182.0 150.5
1 13 21.1 18 19.55 195.5 164.0
1 14 23 19.2 21.10 211.0 179.5 15.37 12.97
1 15 25.6 20 22.80 228.0 196.5
1 16 27.7 21.1 24.40 244.0 212.5
1 17 30.1 23 26.55 265.5 234.0
1 18 33.2 25.2 29.20 292.0 260.5
1 19 36.6 28.1 32.35 323.5 292.0
1 20 40 31.2 35.60 356.0 324.5
1 21 44 34.5 39.25 392.5 361.0
1 22 47.8 38.1 42.95 429.5 398.0
1 23 51.4 42 46.70 467.0 435.5
1 24 55.2 46.3 50.75 507.5 476.0
1 25 59.2 50.2 54.70 547.0 515.5 21.63 8.40
1 26 62.2 54.2 58.20 582.0 550.5
1 27 65.1 58 61.55 615.5 584.0
1 28 68.1 60.5 64.30 643.0 611.5
1 29 70.1 65 67.55 675.5 644.0
1 30 71 65.1 68.05 680.5 649.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 82 + 100 R . 3.47 M Y : 0293758 X : 0480071 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 3.1 3.4 3.25 32.5 32.5
1 2 8 4.4 6.20 62.0 29.5
1 3 13 5.6 9.30 93.0 60.5
17.83 10.74
1 4 13.5 8 10.75 107.5 75.0
1 5 15.6 9.8 12.70 127.0 94.5
1 6 17.1 10.8 13.95 139.5 107.0
1 7 18.4 11.8 15.10 151.0 118.5
1 8 20.4 13 16.70 167.0 134.5
1 9 21.3 13.9 17.60 176.0 143.5
1 10 22.5 15 18.75 187.5 155.0
1 11 26.6 16 21.30 213.0 180.5
1 12 28.4 17.1 22.75 227.5 195.0 16.65 11.72
1 13 31.1 18 24.55 245.5 213.0
1 14 32 20 26.00 260.0 227.5
1 15 33 22.1 27.55 275.5 243.0
1 16 34 25.2 29.60 296.0 263.5
1 17 35.1 28 31.55 315.5 283.0
1 18 38.1 30.2 34.15 341.5 309.0
1 19 43.1 35 39.05 390.5 358.0
1 20 47.2 38.2 42.70 427.0 394.5
1 21 52 39.6 45.80 458.0 425.5
1 22 57.1 40.5 48.80 488.0 455.5
1 23 58 41.6 49.80 498.0 465.5
1 24 59.2 43 51.10 511.0 478.5 19.38 9.66
1 25 60.1 45.4 52.75 527.5 495.0
1 26 61 48.1 54.55 545.5 513.0
1 27 61.5 51.4 56.45 564.5 532.0
1 28 62 55 58.50 585.0 552.5
1 29 62.4 57 59.70 597.0 564.5
1 30 63 59.8 61.40 614.0 581.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 82 + 200 L. 3.47 M Y : 0293761 X : 0480013 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 7.1 3 5.05 50.5 50.5
1 2 11.2 4.1 7.65 76.5 26.0
1 3 14 9.6 11.80 118.0 67.5
1 4 15 12.4 13.70 137.0 86.5
1 5 16 16.6 16.30 163.0 112.5
20.50 9.00
1 6 17 19.8 18.40 184.0 133.5
1 7 18 22.1 20.05 200.5 150.0
1 8 19 25 22.00 220.0 169.5
1 9 20.1 27.1 23.60 236.0 185.5
1 10 22 29.1 25.55 255.5 205.0
1 11 24 30 27.00 270.0 219.5
1 12 26.6 32 29.30 293.0 242.5
1 13 28.5 33 30.75 307.5 257.0
18.56 10.21
1 14 30.5 34.1 32.30 323.0 272.5
1 15 31 35.6 33.30 333.0 282.5
1 16 32.4 37.1 34.75 347.5 297.0
1 17 33 38.4 35.70 357.0 306.5
1 18 34 40 37.00 370.0 319.5
1 19 35.6 41 38.30 383.0 332.5
1 20 36 42.5 39.25 392.5 342.0
16.44 11.91
1 21 38.4 44 41.20 412.0 361.5
1 22 40.1 45.2 42.65 426.5 376.0
1 23 41 46.3 43.65 436.5 386.0
1 24 41.5 47.5 44.50 445.0 394.5
1 25 43 48.2 45.60 456.0 405.5
1 26 44.5 49 46.75 467.5 417.0
1 27 46 50.1 48.05 480.5 430.0
15.32 13.03
1 28 47 51 49.00 490.0 439.5
1 29 48 52.1 50.05 500.5 450.0
1 30 49 53 51.00 510.0 459.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 82 + 300 R. 4.21 M Y : 0293851 X : 0480022 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1.5 0 0 0 0.0
1 1 7.2 2 4.60 46.0 46.0
1 2 14.3 7 10.65 106.5 60.5
1 3 19.5 11 15.25 152.5 106.5 38.90 3.99
1 4 24 16.2 20.10 201.0 155.0
1 5 27 21.1 24.05 240.5 194.5
1 6 31.1 25.2 28.15 281.5 235.5
1 7 34.2 30.6 32.40 324.0 278.0
1 8 38 35.6 36.80 368.0 322.0 39.50 3.91
1 9 43 38.1 40.55 405.5 359.5
1 10 46.1 42.1 44.10 441.0 395.0
1 11 48.2 46 47.10 471.0 425.0
1 12 50.5 50.5 50.50 505.0 459.0
1 13 52.2 55.5 53.85 538.5 492.5
1 14 54.2 60 57.10 571.0 525.0 38.76 4.01
1 15 58 66 62.00 620.0 574.0
1 16 65.2 70 67.60 676.0 630.0
1 17 70 71 70.50 705.0 659.0
1 18 71
1 19 72
1 20 72.5
1 21 73
1 22 73.2
1 23 74
1 24 75
1 25 75.5
1 26 76
1 27 76.5
1 28 77
1 29 78
1 30 79
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 82 + 400 R. 5.32 M Y : 0293936 X : 0489968 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 1 3 2.00 20.0 20.0
1 2 3 4.9 3.95 39.5 19.5
1 3 5 7.1 6.05 60.5 40.5
16.83 11.55
1 4 7.1 9.1 8.10 81.0 61.0
1 5 9 11.1 10.05 100.5 80.5
1 6 11.2 13 12.10 121.0 101.0
1 7 12.6 13.5 13.05 130.5 110.5
1 8 16.5 14 15.25 152.5 132.5
1 9 19 14.7 16.85 168.5 148.5
1 10 21 15.6 18.30 183.0 163.0
14.71 13.71
1 11 22 16.7 19.35 193.5 173.5
1 12 24.1 17.8 20.95 209.5 189.5
1 13 25 18.2 21.60 216.0 196.0
1 14 26.2 19 22.60 226.0 206.0
1 15 27.4 20 23.70 237.0 217.0
1 16 28.4 20.8 24.60 246.0 226.0
1 17 30.5 21.5 26.00 260.0 240.0
1 18 32 22 27.00 270.0 250.0
1 19 34 23 28.50 285.0 265.0 16.85 11.54
1 20 37.1 25.1 31.10 311.0 291.0
1 21 41 28 34.50 345.0 325.0
1 22 44 30.5 37.25 372.5 352.5
1 23 48 33.5 40.75 407.5 387.5
1 24 53.1 37 45.05 450.5 430.5
1 25 57.8 42.2 50.00 500.0 480.0
1 26 61 47.7 54.35 543.5 523.5
1 27 67 53 60.00 600.0 580.0 23.58 7.53
1 28 70.1 59 64.55 645.5 625.5
1 29 74 63.4 68.70 687.0 667.0
1 30 80.1 65.4 72.75 727.5 707.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 82 + 500 L. 3.80 M Y : 0293984 X : 0489880 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 0 0 0 0.0
1 1 11.5 1 6.25 62.5 62.5
1 2 26.6 7 16.80 168.0 105.5
1 3 39.4 12 25.70 257.0 194.5
1 4 40 28 34.00 340.0 277.5
1 5 43.1 32 37.55 375.5 313.0 55.33 2.55
1 6 50 39 44.50 445.0 382.5
1 7 52.1 46 49.05 490.5 428.0
1 8 55 49.5 52.25 522.5 460.0
1 9 58.1 54 56.05 560.5 498.0
1 10 61 57.5 59.25 592.5 530.0
1 11 63 62 62.50 625.0 562.5
1 12 67.4 64 65.70 657.0 594.5
1 13 70.2 68 69.10 691.0 628.5
1 14 71.4 72.4 71.90 719.0 656.5
1 15 73.9 76 74.95 749.5 687.0 39.20 3.95
1 16 74 79.2 76.60 766.0 703.5
1 17 76.6 81.5 79.05 790.5 728.0
1 18 78.1 83.5 80.80 808.0 745.5
1 19 79.5 86.5 83.00 830.0 767.5
1 20 81.3 88 84.65 846.5 784.0
1 21 84 89.6 86.80 868.0 805.5
1 22 85.2 90 87.60 876.0 813.5
1 23 86.2 93 89.60 896.0 833.5
1 24 87.2 94 90.60 906.0 843.5
1 25 88.2 95 91.60 916.0 853.5
30.50 5.43
1 26 89.3 95.5 92.40 924.0 861.5
1 27 90.5 96 93.25 932.5 870.0
1 28 91.5 97 94.25 942.5 880.0
1 29 93.3 98.2 95.75 957.5 895.0
1 30 95.5 100 97.75 977.5 915.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 82 + 600 R. 1. 60 M Y : 0293969 X : 0489787 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0 0.0
1 1 3 3 3.00 30.0 30.0
1 2 7 5 6.00 60.0 30.0
1 3 11.8 9.9 10.85 108.5 78.5
1 4 14 11 12.50 125.0 95.0
1 5 16.4 13 14.70 147.0 117.0 23.75 7.46
1 6 19.9 15 17.45 174.5 144.5
1 7 18.9 16.1 17.50 175.0 145.0
1 8 25 17 21.00 210.0 180.0
1 9 26 18 22.00 220.0 190.0
1 10 31.9 19.1 25.50 255.0 225.0
1 11 37 20 28.50 285.0 255.0
1 12 40.7 21.1 30.90 309.0 279.0
1 13 43 23 33.00 330.0 300.0
22.13 8.16
1 14 45 24 34.50 345.0 315.0
1 15 47 25.4 36.20 362.0 332.0
1 16 48.6 27 37.80 378.0 348.0
1 17 50.1 32.6 41.35 413.5 383.5
1 18 51.5 35.6 43.55 435.5 405.5
1 19 53 38.9 45.95 459.5 429.5
1 20 55 42.2 48.60 486.0 456.0
1 21 58.1 45 51.55 515.5 485.5
1 22 61 48 54.50 545.0 515.0
1 23 63.1 49 56.05 560.5 530.5
1 24 64 50.1 57.05 570.5 540.5 23.41 7.60
1 25 65 52 58.50 585.0 555.0
1 26 66.3 54.4 60.35 603.5 573.5
1 27 67 57.6 62.30 623.0 593.0
1 28 68.2 58.1 63.15 631.5 601.5
1 29 69.1 60.3 64.70 647.0 617.0
1 30 70.1 61.2 65.65 656.5 626.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 82 + 700 R. 3.90 M Y : 0293961 X : 0489681 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 0 0 0 0.0
1 1 6.9 7 6.95 69.5 69.5
1 2 11.1 11 11.05 110.5 41.0
1 3 15.1 14 14.55 145.5 76.0
1 4 24.9 18 21.45 214.5 145.0
1 5 27 23.4 25.20 252.0 182.5
28.90 5.82
1 6 28 26.1 27.05 270.5 201.0
1 7 29.1 30.2 29.65 296.5 227.0
1 8 32.2 31.9 32.05 320.5 251.0
1 9 34.1 33 33.55 335.5 266.0
1 10 37.2 34.5 35.85 358.5 289.0
1 11 46.1 36.7 41.40 414.0 344.5
1 12 48 38 43.00 430.0 360.5
1 13 49.1 41 45.05 450.5 381.0
1 14 53 45.1 49.05 490.5 421.0
1 15 57 49.2 53.10 531.0 461.5
1 16 60.1 52.2 56.15 561.5 492.0 27.90 6.08
1 17 62.4 54 58.20 582.0 512.5
1 18 65.1 56 60.55 605.5 536.0
1 19 67.1 57.5 62.30 623.0 553.5
1 20 68.5 58 63.25 632.5 563.0
1 21 72.1 59 65.55 655.5 586.0
1 22 74.5 60 67.25 672.5 603.0
1 23 76 61 68.50 685.0 615.5
1 24 79.1 62 70.55 705.5 636.0
1 25 82.1 62.4 72.25 722.5 653.0
25.97 6.66
1 26 85.3 63 74.15 741.5 672.0
1 27 89 63.5 76.25 762.5 693.0
1 28 94 64 79.00 790.0 720.5
1 29 100 64.5 82.25 822.5 753.0
1 30 65
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 82 + 800 R. 2.70 M Y : 0293938 X : 0489590 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 4 6 0 0 0.0
1 1 14 19 16.50 165.0 165.0
1 2 15 27 21.00 210.0 45.0
1 3 16 35 25.50 255.0 90.0
35.00 4.56
1 4 19 38 28.50 285.0 120.0
1 5 21 46.5 33.75 337.5 172.5
1 6 22 53 37.50 375.0 210.0
1 7 23 55.4 39.20 392.0 227.0
1 8 24 57 40.50 405.0 240.0
1 9 24.6 58 41.30 413.0 248.0
1 10 25 59 42.00 420.0 255.0
1 11 26 60.5 43.25 432.5 267.5 20.17 9.19
1 12 27 62 44.50 445.0 280.0
1 13 27.4 63 45.20 452.0 287.0
1 14 28 63.9 45.95 459.5 294.5
1 15 29 64.5 46.75 467.5 302.5
1 16 29.4 65 47.20 472.0 307.0
1 17 30 66 48.00 480.0 315.0
1 18 31.9 67 49.45 494.5 329.5 18.63 10.16
1 19 35 68 51.50 515.0 350.0
1 20 39 68.5 53.75 537.5 372.5
1 21 45 69 57.00 570.0 405.0
1 22 51 69.5 60.25 602.5 437.5
1 23 56.1 70 63.05 630.5 465.5
1 24 57.5 70.5 64.00 640.0 475.0
1 25 58 71 64.50 645.0 480.0
17.07 11.35
1 26 59 71.5 65.25 652.5 487.5
1 27 60 72 66.00 660.0 495.0
1 28 60.5 72.5 66.50 665.0 500.0
1 29 61 73 67.00 670.0 505.0
1 30 62 73.4 67.70 677.0 512.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 82 + 900 L. 5.80 M Y : 0293871 X : 0489520 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 0 0 0 0.0
1 1 9.5 3.5 6.50 65.0 65.0
1 2 17.8 11 14.40 144.0 79.0
1 3 23 16 19.50 195.0 130.0
37.00 4.25
1 4 25 20.1 22.55 225.5 160.5
1 5 27.5 22.4 24.95 249.5 184.5
1 6 32 25.4 28.70 287.0 222.0
1 7 37 29 33.00 330.0 265.0
1 8 42 30 36.00 360.0 295.0
1 9 44 35 39.50 395.0 330.0
1 10 46.1 36 41.05 410.5 345.5 35.07
4.55
1 11 53.2 37 45.10 451.0 386.0
1 12 57 45 51.00 510.0 445.0
1 13 60.1 47 53.55 535.5 470.5
1 14 62.2 49 55.60 556.0 491.0
1 15 65.1 51 58.05 580.5 515.5
1 16 63.2 54.5 58.85 588.5 523.5
1 17 73.1 58.5 65.80 658.0 593.0
1 18 80.1 62.5 71.30 713.0 648.0
36.59 4.31
1 19 83.1 65.4 74.25 742.5 677.5
1 20 86 69.5 77.75 777.5 712.5
1 21 96.2 72 84.10 841.0 776.0
1 22 100 74 87.00 870.0 805.0
1 23 76
1 24 78.5
1 25 80
1 26 83.2
1 27 86
1 28 87
1 29 88
1 30 89
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 83 + 000 R. 3.26 M Y : 0293389 X : 0489460 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2.4 0 0 0 0.0
1 1 9.5 7 8.25 82.5 82.5
1 2 12 8.9 10.45 104.5 22.0
1 3 13 10.1 11.55 115.5 33.0
1 4 14.2 11.9 13.05 130.5 48.0 16.07 12.25
1 5 15.2 13 14.10 141.0 58.5
1 6 16 15.5 15.75 157.5 75.0
1 7 17 22 19.50 195.0 112.5
1 8 18 22.5 20.25 202.5 120.0
1 9 19.9 24 21.95 219.5 137.0
1 10 20.5 26 23.25 232.5 150.0
1 11 21 27 24.00 240.0 157.5
1 12 22 27.5 24.75 247.5 165.0
1 13 22.4 28 25.20 252.0 169.5
10.87 20.14
1 14 23 28.5 25.75 257.5 175.0
1 15 24 29 26.50 265.0 182.5
1 16 24.4 29.5 26.95 269.5 187.0
1 17 25 30 27.50 275.0 192.5
1 18 26 30.1 28.05 280.5 198.0
1 19 27 30.8 28.90 289.0 206.5
1 20 28.1 31 29.55 295.5 213.0
1 21 28.9 31.8 30.35 303.5 221.0
1 22 29 32 30.50 305.0 222.5
1 23 30 33 31.50 315.0 232.5
1 24 31.1 34 32.55 325.5 243.0
1 25 32 35 33.50 335.0 252.5 9.75 23.12
1 26 33 35.6 34.30 343.0 260.5
1 27 33.5 36 34.75 347.5 265.0
1 28 34 37 35.50 355.0 272.5
1 29 35.4 38 36.70 367.0 284.5
1 30 36 39 37.50 375.0 292.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 83 + 100 R. 3.40 M Y : 0293718 X : 0489391 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 27 33 0 0 0.0
1 1 28.5 37 32.75 327.5 327.5
1 2 32 45.1 38.55 385.5 155.5
1 3 41.6 54.2 47.90 479.0 249.0
78.33 1.64
1 4 49 62.1 55.55 555.5 325.5
1 5 53 68 60.50 605.0 375.0
1 6 68 72 70.00 700.0 470.0
1 7 74 76 75.00 750.0 520.0
1 8 78 80 79.00 790.0 560.0
1 9 82 84 83.00 830.0 600.0
1 10 86 87 86.50 865.0 635.0 58.46 2.38
1 11 90 90 90.00 900.0 670.0
1 12 98 96 97.00 970.0 740.0
1 13 100 98 99.00 990.0 760.0
1 14 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 83 + 200 L. 3.00 M Y : 0293644 X : 0489322 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 2 8.1 5.05 50.5 50.5
1 2 5 14 9.50 95.0 -135.0
1 3 9.1 17 13.05 130.5 -99.5 -6.00 Err:502
1 4 12.5 21.4 16.95 169.5 -60.5
1 5 14 26 20.00 200.0 -30.0
1 6 22 34.2 28.10 281.0 51.0
1 7 25 40.3 32.65 326.5 96.5
1 8 27 46.1 36.55 365.5 135.5
20.00 9.28
1 9 31 46.9 38.95 389.5 159.5
1 10 35 48 41.50 415.0 185.0
1 11 41 49 45.00 450.0 220.0
1 12 50 52 51.00 510.0 280.0
1 13 59 52.4 55.70 557.0 327.0
1 14 69.1 57.9 63.50 635.0 405.0
1 15 75 60 67.50 675.0 445.0
33.16 4.88
1 16 78 63.4 70.70 707.0 477.0
1 17 90 68 79.00 790.0 560.0
1 18 96 69 82.50 825.0 595.0
1 19 100 72 86.00 860.0 630.0
1 20 75
1 21 78
1 22 82
1 23 84
1 24 86.5
1 25 89.5
1 26 93.5
1 27 97
1 28 99
1 29 100
1 30
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 83 + 300 R. 3.26 M Y : 0293599 X : 0489238 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 0 0 0 0.0
1 1 7 6 6.50 65.0 65.0
1 2 17.8 13.5 15.65 156.5 91.5
1 3 18.2 14.5 16.35 163.5 98.5
1 4 20 16 18.00 180.0 115.0
1 5 20.5 18.5 19.50 195.0 130.0
1 6 21 19.5 20.25 202.5 137.5
1 7 22.1 20.5 21.30 213.0 148.0 15.00 13.38
1 8 22.3 21.4 21.85 218.5 153.5
1 9 23 22 22.50 225.0 160.0
1 10 24 22.3 23.15 231.5 166.5
1 11 25 23.6 24.30 243.0 178.0
1 12 26 24 25.00 250.0 185.0
1 13 27 25 26.00 260.0 195.0
1 14 27.6 26 26.80 268.0 203.0
1 15 28 27 27.50 275.0 210.0
1 16 29 27.9 28.45 284.5 219.5
1 17 30 28 29.00 290.0 225.0
1 18 31 29 30.00 300.0 235.0
1 19 32 30 31.00 310.0 245.0
11.62 18.50
1 20 33 30.9 31.95 319.5 254.5
1 21 33.9 31 32.45 324.5 259.5
1 22 34 32 33.00 330.0 265.0
1 23 34.6 33 33.80 338.0 273.0
1 24 35 34.1 34.55 345.5 280.5
1 25 36 35.1 35.55 355.5 290.5
1 26 37 37 37.00 370.0 305.0
1 27 38 39 38.50 385.0 320.0
1 28 39 40.2 39.60 396.0 331.0 12.17 17.45
1 29 40 42.3 41.15 411.5 346.5
1 30 41 45 43.00 430.0 365.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 83 + 400 L. 5.80 M Y : 0293572 X : 0479137 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 5.5 2 3.75 37.5 37.5
1 2 13.5 4 8.75 87.5 50.0
1 3 15 5 10.00 100.0 62.5
1 4 16.5 7.2 11.85 118.5 81.0
1 5 20 13.6 16.80 168.0 130.5 58.89 2.36
1 6 24 19.9 21.95 219.5 182.0
1 7 30 27.2 28.60 286.0 248.5
1 8 39 58.2 48.60 486.0 448.5
1 9 51.5 62 56.75 567.5 530.0
1 10 58.5 68 63.25 632.5 595.0
1 11 64 78.9 71.45 714.5 677.0
1 12 74 86.2 80.10 801.0 763.5
1 13 76 88 82.00 820.0 782.5
54.85 2.58
1 14 83 94 88.50 885.0 847.5
1 15 87 97 92.00 920.0 882.5
1 16 91 99 95.00 950.0 912.5
1 17 94 100 97.00 970.0 932.5
1 18 97
1 19 99.5
1 20 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 83 + 500 R. 4.56 M Y : 0293527 X : 0489051 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 3 3 3.00 30.0 30.0
1 2 5 5 5.00 50.0 20.0
1 3 6 7 6.50 65.0 35.0
1 4 6.9 8.6 7.75 77.5 47.5
1 5 7 10 8.50 85.0 55.0
10.25 21.70
1 6 8 11.4 9.70 97.0 67.0
1 7 9 12 10.50 105.0 75.0
1 8 10 13 11.50 115.0 85.0
1 9 11 13.4 12.20 122.0 92.0
1 10 11.5 15 13.25 132.5 102.5
1 11 12 16 14.00 140.0 110.0
1 12 12.9 17 14.95 149.5 119.5
1 13 13 18 15.50 155.0 125.0
1 14 13.5 19 16.25 162.5 132.5
1 15 14 20 17.00 170.0 140.0
1 16 14.5 21 17.75 177.5 147.5
9.09 25.27
1 17 15 22 18.50 185.0 155.0
1 18 16 23.1 19.55 195.5 165.5
1 19 18 24 21.00 210.0 180.0
1 20 19 24.9 21.95 219.5 189.5
1 21 19.6 25 22.30 223.0 193.0
1 22 20 26 23.00 230.0 200.0
1 23 21 27 24.00 240.0 210.0
1 24 22 28 25.00 250.0 220.0
1 25 22.4 29 25.70 257.0 227.0
1 26 23 30 26.50 265.0 235.0
9.33 24.44
1 27 24 31 27.50 275.0 245.0
1 28 25 32 28.50 285.0 255.0
1 29 26.5 33 29.75 297.5 267.5
1 30 28.6 33.4 31.00 310.0 280.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 83 + 600 L. 3.60 M Y : 0293572 X : 0488993 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 1 0 0 0.0
1 1 4 4 4.00 40.0 40.0
1 2 5 5 5.00 50.0 10.0
1 3 6 6 6.00 60.0 20.0
1 4 8 7 7.50 75.0 35.0
1 5 11 9 10.00 100.0 60.0 13.33 15.54
1 6 12 11 11.50 115.0 75.0
1 7 13 11.5 12.25 122.5 82.5
1 8 15 12.5 13.75 137.5 97.5
1 9 18 14 16.00 160.0 120.0
1 10 20 15 17.50 175.0 135.0
1 11 22.5 16 19.25 192.5 152.5
1 12 24.5 17 20.75 207.5 167.5
1 13 27 18 22.50 225.0 185.0
1 14 32 19 25.50 255.0 215.0
1 15 34 20 27.00 270.0 230.0 15.05 13.32
1 16 35 21 28.00 280.0 240.0
1 17 38 21.7 29.85 298.5 258.5
1 18 40 22 31.00 310.0 270.0
1 19 42.2 23 32.60 326.0 286.0
1 20 44.2 24 34.10 341.0 301.0
1 21 47 24.5 35.75 357.5 317.5
1 22 49.5 25 37.25 372.5 332.5
1 23 52.4 26 39.20 392.0 352.0
1 24 55.5 27 41.25 412.5 372.5
1 25 58.5 28 43.25 432.5 392.5
17.17 11.27
1 26 63.5 29 46.25 462.5 422.5
1 27 70 30 50.00 500.0 460.0
1 28 74 30.6 52.30 523.0 483.0
1 29 77 31 54.00 540.0 500.0
1 30 79 32 55.50 555.0 515.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 83 + 700 R. 2.90 M Y : 0293657 X : 0478920 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 5 4 4.50 45.0 45.0
1 2 9 5 7.00 70.0 25.0
1 3 15 9 12.00 120.0 75.0
1 4 19 12 15.50 155.0 110.0
1 5 21.9 14 17.95 179.5 134.5
1 6 22 14.5 18.25 182.5 137.5 17.73 10.82
1 7 25.4 15 20.20 202.0 157.0
1 8 27 16 21.50 215.0 170.0
1 9 28 17 22.50 225.0 180.0
1 10 28.5 18 23.25 232.5 187.5
1 11 29 19 24.00 240.0 195.0
1 12 29.6 20 24.80 248.0 203.0
1 13 30 20.4 25.20 252.0 207.0
1 14 31 21 26.00 260.0 215.0
1 15 31.5 22 26.75 267.5 222.5
1 16 32 22.4 27.20 272.0 227.0
1 17 33 23 28.00 280.0 235.0
1 18 33.5 24 28.75 287.5 242.5
1 19 34 25 29.50 295.0 250.0 11.46 18.83
1 20 34.5 26 30.25 302.5 257.5
1 21 35 27 31.00 310.0 265.0
1 22 36 27.4 31.70 317.0 272.0
1 23 37 28 32.50 325.0 280.0
1 24 37.5 29 33.25 332.5 287.5
1 25 38 29.5 33.75 337.5 292.5
1 26 38.6 30 34.30 343.0 298.0
1 27 39 31 35.00 350.0 305.0
1 28 39.6 32 35.80 358.0 313.0
10.75 20.42
1 29 40 32.5 36.25 362.5 317.5
1 30 40.5 33 36.75 367.5 322.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 83 + 800 R. 3.00 M Y : 0293717 X : 0478880 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 7 3 5.00 50.0 50.0
1 2 14 6 10.00 100.0 50.0
1 3 22 10 16.00 160.0 110.0
1 4 30 16 23.00 230.0 180.0 41.43 3.68
1 5 34 22 28.00 280.0 230.0
1 6 36 25 30.50 305.0 255.0
1 7 38 30 34.00 340.0 290.0
1 8 39 34 36.50 365.0 315.0
1 9 40 36 38.00 380.0 330.0
1 10 41 37 39.00 390.0 340.0
1 11 43 38 40.50 405.0 355.0
26.53 6.48
1 12 44 39 41.50 415.0 365.0
1 13 45 40 42.50 425.0 375.0
1 14 46 41.1 43.55 435.5 385.5
1 15 47.5 42.1 44.80 448.0 398.0
1 16 48 43.3 45.65 456.5 406.5
1 17 49 44.5 46.75 467.5 417.5
1 18 50.1 45.6 47.85 478.5 428.5
1 19 51 46 48.50 485.0 435.0
1 20 51.2 47.6 49.40 494.0 444.0
1 21 52 48 50.00 500.0 450.0 18.94 9.95
1 22 53 49 51.00 510.0 460.0
1 23 54 50 52.00 520.0 470.0
1 24 54.5 51 52.75 527.5 477.5
1 25 55 51.5 53.25 532.5 482.5
1 26 56 52.5 54.25 542.5 492.5
1 27 56.9 53.5 55.20 552.0 502.0
1 28 57 54.5 55.75 557.5 507.5
17.45 11.04
1 29 58 55 56.50 565.0 515.0
1 30 59 55.7 57.35 573.5 523.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 83 + 900 R.3.31 M Y : 0293755 X : 0478877 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0 0.0
1 1 1 4 2.50 25.0 25.0
1 2 3 6 4.50 45.0 20.0
1 3 7 9 8.00 80.0 55.0
1 4 11 12 11.50 115.0 90.0
1 5 15 16 15.50 155.0 130.0 31.67 5.18
1 6 19 19 19.00 190.0 165.0
1 7 23 21 22.00 220.0 195.0
1 8 28 23 25.50 255.0 230.0
1 9 32 30 31.00 310.0 285.0
1 10 37 35 36.00 360.0 335.0
1 11 39 38 38.50 385.0 360.0
1 12 40 40 40.00 400.0 375.0
1 13 41 42 41.50 415.0 390.0 30.00 5.55
1 14 45 44 44.50 445.0 420.0
1 15 49.1 46 47.55 475.5 450.5
1 16 52 49 50.50 505.0 480.0
1 17 55.1 52 53.55 535.5 510.5
1 18 57 55 56.00 560.0 535.0
29.25 5.73
1 19 58 57 57.50 575.0 550.0
1 20 59 63 61.00 610.0 585.0
1 21 60 68 64.00 640.0 615.0
1 22 61 73 67.00 670.0 645.0
1 23 61.4 76 68.70 687.0 662.0
1 24 62 78 70.00 700.0 675.0
1 25 63 79 71.00 710.0 685.0
25.17 6.93
1 26 63.5 81 72.25 722.5 697.5
1 27 64 84 74.00 740.0 715.0
1 28 65 86 75.50 755.0 730.0
1 29 66 88 77.00 770.0 745.0
1 30 67 89 78.00 780.0 755.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 84 + 000 L. 2.82 M Y : 0293830 X : 0478840 Date : November 14, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 2 0 0 0.0
1 1 6 7 6.50 65.0 65.0
1 2 10 11 10.50 105.0 40.0
1 3 11 12 11.50 115.0 50.0
1 4 12 14 13.00 130.0 65.0
1 5 13 15.6 14.30 143.0 78.0 12.78 16.40
1 6 13.6 16.4 15.00 150.0 85.0
1 7 14 17 15.50 155.0 90.0
1 8 14.4 18 16.20 162.0 97.0
1 9 15 21 18.00 180.0 115.0
1 10 15.4 22.5 18.95 189.5 124.5
1 11 16 24.4 20.20 202.0 137.0
1 12 16.5 27.4 21.95 219.5 154.5
1 13 17 29 23.00 230.0 165.0 12.94 16.14
1 14 17.4 32 24.70 247.0 182.0
1 15 18 34 26.00 260.0 195.0
1 16 19 35.4 27.20 272.0 207.0
1 17 21 36.4 28.70 287.0 222.0
1 18 22 37.4 29.70 297.0 232.0
1 19 24.1 38.5 31.30 313.0 248.0
1 20 26 40.5 33.25 332.5 267.5
1 21 27 45 36.00 360.0 295.0
1 22 28 49 38.50 385.0 320.0
1 23 29 53 41.00 410.0 345.0
15.83 12.49
1 24 29.4 57 43.20 432.0 367.0
1 25 31 61 46.00 460.0 395.0
1 26 32 64 48.00 480.0 415.0
1 27 33 66 49.50 495.0 430.0
1 28 34 69 51.50 515.0 450.0
1 29 35 71 53.00 530.0 465.0
1 30 35.5 72.5 54.00 540.0 475.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL of
HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 84 + 100 R.3.50 M Y : 0293925 X : 047886 Date : November 18, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 10 18 14.00 140.0 140.0
1 2 21 31.2 26.10 261.0 121.0
1 3 28 40 34.00 340.0 200.0 75.00 1.73
1 4 35.4 51 43.20 432.0 292.0
1 5 46 59 52.50 525.0 385.0
1 6 58 60 59.00 590.0 450.0
1 7 68 61 64.50 645.0 505.0
1 8 77 62 69.50 695.0 555.0
1 9 81 63 72.00 720.0 580.0 53.85 2.64
1 10 86 64 75.00 750.0 610.0
1 11 93 65 79.00 790.0 650.0
1 12 96 66 81.00 810.0 670.0
1 13 100 68 84.00 840.0 700.0
1 14 72
1 15 74
1 16 76
1 17 71
1 18 74
1 19 82
1 20 84
1 21 91
1 22 96
1 23 98
1 24 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 84 + 200 R. 4.05 M Y : 0294033 X : 0478853 Date : November 18, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 7 6 6.50 65.0 65.0
1 2 11 13.2 12.10 121.0 56.0
1 3 13 20 16.50 165.0 100.0 41.50 3.67
1 4 15 28.2 21.60 216.0 151.0
1 5 18 31.5 24.75 247.5 182.5
1 6 23 38 30.50 305.0 240.0
1 7 29 42.1 35.55 355.5 290.5
1 8 35 46 40.50 405.0 340.0
1 9 39 48 43.50 435.0 370.0
1 10 42.5 49.5 46.00 460.0 395.0
1 11 44.5 50.5 47.50 475.0 410.0
1 12 46 52 49.00 490.0 425.0 30.78 5.37
1 13 48 53 50.50 505.0 440.0
1 14 50 54.4 52.20 522.0 457.0
1 15 51.5 56.5 54.00 540.0 475.0
1 16 53 58.5 55.75 557.5 492.5
1 17 54 60.5 57.25 572.5 507.5
1 18 55 63 59.00 590.0 525.0
1 19 58 64 61.00 610.0 545.0 27.98 6.06
1 20 62 65 63.50 635.0 570.0
1 21 65 65.5 65.25 652.5 587.5
1 22 68 66 67.00 670.0 605.0
1 23 71 64.4 67.70 677.0 612.0
1 24 74 67 70.50 705.0 640.0
1 25 76 67.5 71.75 717.5 652.5
1 26 79 70 74.50 745.0 680.0 24.50 7.17
1 27 80 70.6 75.30 753.0 688.0
1 28 82 72 77.00 770.0 705.0
1 29 83 73 78.00 780.0 715.0
1 30 85 75 80.00 800.0 735.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 84 + 300 L. 4.71 M Y : 0294116 X : 0478829 Date : November 18, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 7 8.5 7.75 77.5 77.5
1 2 12 13 12.50 125.0 47.5
1 3 15 16 15.50 155.0 77.5
1 4 17 18 17.50 175.0 97.5 22.78 7.87
1 5 18 20 19.00 190.0 112.5
1 6 20 23 21.50 215.0 137.5
1 7 21 26 23.50 235.0 157.5
1 8 23 28.5 25.75 257.5 180.0
1 9 25 31.5 28.25 282.5 205.0
1 10 29 34.5 31.75 317.5 240.0
1 11 30 37.2 33.60 336.0 258.5
1 12 33 40 36.50 365.0 287.5
1 13 36 41.5 38.75 387.5 310.0 22.21 8.13
1 14 37 43.5 40.25 402.5 325.0
1 15 39 45.5 42.25 422.5 345.0
1 16 41 47.5 44.25 442.5 365.0
1 17 42 49 45.50 455.0 377.5
1 18 44 59 51.50 515.0 437.5
1 19 46 53 49.50 495.0 417.5
1 20 48 55.1 51.55 515.5 438.0
1 21 53 57 55.00 550.0 472.5
1 22 54 58.4 56.70 567.0 489.5
1 23 55 59.5 58.50 585.0 507.5
1 24 57.5 60.5 59.75 597.5 520.0 19.20 9.78
1 25 59 61.5 60.75 607.5 530.0
1 26 60 62.5 61.75 617.5 540.0
1 27 61 63.5 62.75 627.5 550.0
1 28 62 65 63.75 637.5 560.0
1 29 62.5 66 64.75 647.5 570.0
1 30 63.5 67.2 65.35 653.5 576.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 84 + 400 R. 3.50 M Y : 0294187 X : 0478756 Date : November 18, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 7.2 5 6.10 61.0 61.0
1 2 14 9.5 11.75 117.5 56.5
1 3 18 11.5 14.75 147.5 86.5
1 4 20 14 17.00 170.0 109.0 29.14 5.75
1 5 22.2 20 21.10 211.0 150.0
1 6 24.5 23 23.75 237.5 176.5
1 7 27 26 26.50 265.0 204.0
1 8 32 30.2 31.10 311.0 250.0
1 9 37 36 36.50 365.0 304.0
1 10 42 43 42.50 425.0 364.0
1 11 47 49 48.00 480.0 419.0 40.64 3.77
1 12 53 53 53.00 530.0 469.0
1 13 60 57 58.50 585.0 524.0
1 14 66 60 63.00 630.0 569.0
1 15 72 63 67.50 675.0 614.0
1 16 77 67 72.00 720.0 659.0
1 17 82 71 76.50 765.0 704.0
1 18 85 75 80.00 800.0 739.0
1 19 86 79 82.50 825.0 764.0 33.54 4.81
1 20 90 81 85.50 855.0 794.0
1 21 94 83 88.50 885.0 745.0
1 22 96 85 90.50 905.0 765.0
1 23 98 87 92.50 925.0 785.0
1 24 100 89 94.50 945.0 805.0
1 25 91
1 26 93
1 27 94
1 28 95
1 29 96
1 30 97
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 84 + 500 L. 3.50 M Y : 0294217 X : 0478666 Date : November 18, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1.5 0 0 0.0
1 1 1 5.5 3.25 32.5 32.5
1 2 4 9 6.50 65.0 32.5
1 3 8.5 12 10.25 102.5 70.0
1 4 9 15 12.00 120.0 87.5 23.00 7.77
1 5 10.5 18 14.25 142.5 110.0
1 6 12 21 16.50 165.0 132.5
1 7 14 24 19.00 190.0 157.5
1 8 16.5 26.8 21.65 216.5 184.0
1 9 18.4 29 23.70 237.0 204.5
1 10 20.4 32 26.20 262.0 229.5
1 11 23 34.1 28.55 285.5 253.0
1 12 25.4 36.2 30.80 308.0 275.5
1 13 28.2 38 33.10 331.0 298.5 21.61 8.41
1 14 30.2 39 34.60 346.0 313.5
1 15 32.5 41 36.75 367.5 335.0
1 16 35 42 38.50 385.0 352.5
1 17 37 44 40.50 405.0 372.5
1 18 38.3 46 42.15 421.5 389.0
1 19 39.9 48 43.95 439.5 407.0
1 20 41 49 45.00 450.0 417.5
1 21 42 50 46.00 460.0 427.5
1 22 43.3 51 47.15 471.5 439.0
1 23 45 52 48.50 485.0 452.5
1 24 46 52.3 49.15 491.5 459.0 17.08 11.34
1 25 47 53 50.00 500.0 467.5
1 26 48 54 51.00 510.0 477.5
1 27 49.5 54.5 52.00 520.0 487.5
1 28 50.5 55 52.75 527.5 495.0
1 29 51 56 53.50 535.0 502.5
1 30 52 57 54.50 545.0 512.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 84 + 600 L. 4.90 M Y : 0294224 X : 0478569 Date : November 18, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 7.2 5 6.10 61.0 61.0
1 2 14 9.5 11.75 117.5 56.5
1 3 18 11.5 14.75 147.5 86.5
1 4 20 14 17.00 170.0 109.0 29.14 5.75
1 5 22.2 20 21.10 211.0 150.0
1 6 24.5 23 23.75 237.5 176.5
1 7 27 26 26.50 265.0 204.0
1 8 32 30.2 31.10 311.0 250.0
1 9 37 36 36.50 365.0 304.0
1 10 42 43 42.50 425.0 364.0
1 11 47 49 48.00 480.0 419.0
1 12 53 53 53.00 530.0 469.0 41.19 3.71
1 13 60 57 58.50 585.0 524.0
1 14 66 60 63.00 630.0 569.0
1 15 72 63 67.50 675.0 614.0
1 16 77 67 72.00 720.0 659.0
1 17 82 71 76.50 765.0 704.0
1 18 85 75 80.00 800.0 739.0
1 19 86 79 82.50 825.0 764.0
1 20 90 81 85.50 855.0 794.0 36.83 4.27
1 21 94 83 88.50 885.0 824.0
1 22 96 85 90.50 905.0 844.0
1 23 98 87 92.50 925.0 864.0
1 24 100 89 94.50 945.0 884.0
1 25 91
1 26 93
1 27 94
1 28 95
1 29 96
1 30 97
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 84 + 700 R. 2.61 M Y : 0294244 X : 0478470 Date : November 18, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 2 0 0 0.0
1 1 4 5 4.50 45.0 45.0
1 2 10 8.5 9.25 92.5 47.5
1 3 13.4 11 12.20 122.0 77.0 30.71 5.38
1 4 17 13 15.00 150.0 105.0
1 5 20 17 18.50 185.0 140.0
1 6 22 23 22.50 225.0 180.0
1 7 24 28 26.00 260.0 215.0
1 8 26 30.2 28.10 281.0 236.0
1 9 28 32.1 30.05 300.5 255.5
1 10 29.3 34.1 31.70 317.0 272.0
1 11 31 36 33.50 335.0 290.0
1 12 32.3 38.1 35.20 352.0 307.0 23.56 7.54
1 13 34.1 40 37.05 370.5 325.5
1 14 36 42 39.00 390.0 345.0
1 15 38 44.4 41.20 412.0 367.0
1 16 39.5 46.4 42.95 429.5 384.5
1 17 41 48.1 44.55 445.5 400.5
1 18 44 50.5 47.25 472.5 427.5
1 19 46 53 49.50 495.0 450.0
1 20 48 55 51.50 515.0 470.0
1 21 50.2 57.5 53.85 538.5 493.5
1 22 52.1 59.5 55.80 558.0 513.0
1 23 54.4 61 57.70 577.0 532.0 20.67 8.90
1 24 56 62 59.00 590.0 545.0
1 25 58 63 60.50 605.0 560.0
1 26 59.2 64.5 61.85 618.5 573.5
1 27 61 65.5 63.25 632.5 587.5
1 28 62 66.5 64.25 642.5 597.5
1 29 63.2 68 65.60 656.0 611.0
1 30 64 69 66.50 665.0 620.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 84 + 800 R. 5.20 M Y : 0294252 X : 0478381 Date : November 18, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 2 0 0 0.0
1 1 7 5 6.00 60.0 60.0
1 2 12.5 10 11.25 112.5 52.5
1 3 18 18 18.00 180.0 120.0
1 4 18.9 19.8 19.35 193.5 133.5
1 5 19 21 20.00 200.0 140.0 22.83 7.85
1 6 20 23 21.50 215.0 155.0
1 7 20.8 26 23.40 234.0 174.0
1 8 21.8 28 24.90 249.0 189.0
1 9 23.1 30 26.55 265.5 205.5
1 10 25 35 30.00 300.0 240.0
1 11 26.5 39.2 32.85 328.5 268.5
1 12 27 44 35.50 355.0 295.0
1 13 27.5 48.5 38.00 380.0 320.0
1 14 29 53 41.00 410.0 350.0
1 15 30 56.2 43.10 431.0 371.0
1 16 31 59 45.00 450.0 390.0 23.43 7.59
1 17 32 61.4 46.70 467.0 407.0
1 18 33 64 48.50 485.0 425.0
1 19 35 66 50.50 505.0 445.0
1 20 37 68.1 52.55 525.5 465.5
1 21 40 70.4 55.20 552.0 492.0
1 22 42.1 73 57.55 575.5 515.5
1 23 45 75.6 60.30 603.0 543.0
1 24 47 78 62.50 625.0 565.0
1 25 49 82 65.50 655.0 595.0 24.33 7.24
1 26 54 86 70.00 700.0 640.0
1 27 55 88 71.50 715.0 655.0
1 28 57 90 73.50 735.0 675.0
1 29 59 94 76.50 765.0 705.0
1 30 61 97 79.00 790.0 730.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 84 + 900 L. 3.93 M Y : 0294276 X : 0478284 Date : November 18, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 1 0 0 0.0
1 1 6 6 6.00 60.0 60.0
1 2 9.5 10.8 10.15 101.5 41.5
1 3 11.4 12 11.70 117.0 57.0
1 4 13 13.4 13.20 132.0 72.0
1 5 15.5 15 15.25 152.5 92.5 18.18 10.48
1 6 18 17 17.50 175.0 115.0
1 7 19 19 19.00 190.0 130.0
1 8 21 22 21.50 215.0 155.0
1 9 22 24 23.00 230.0 170.0
1 10 23 25.2 24.10 241.0 181.0
1 11 25 27 26.00 260.0 200.0
1 12 28 29.6 28.80 288.0 228.0
1 13 31 33 32.00 320.0 260.0
1 14 34 36.5 35.25 352.5 292.5
1 15 37.5 40 38.75 387.5 327.5 26.43 6.52
1 16 40.8 44.5 42.65 426.5 366.5
1 17 44 49 46.50 465.0 405.0
1 18 47.5 53 50.25 502.5 442.5
1 19 51 56 53.50 535.0 475.0
1 20 55 60 57.50 575.0 515.0
1 21 59 64 61.50 615.0 555.0
1 22 64 70.2 67.10 671.0 611.0
1 23 69 76 72.50 725.0 665.0
1 24 74 80.2 77.10 771.0 711.0
1 25 79 85 82.00 820.0 760.0 32.07 5.10
1 26 84 89 86.50 865.0 805.0
1 27 88 93 90.50 905.0 845.0
1 28 93 98 95.50 955.0 895.0
1 29 98 100 99.00 990.0 930.0
1 30 100
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 85 + 000 R. 4.80 M Y : 0294229 X : 0478197 Date : November 18, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 4 2 3.00 30.0 30.0
1 2 7 4 5.50 55.0 25.0
1 3 9 6 7.50 75.0 45.0
1 4 11 8 9.50 95.0 65.0
1 5 12 10 11.00 110.0 80.0 18.18 10.48
1 6 13 12 12.50 125.0 95.0
1 7 15 14 14.50 145.0 115.0
1 8 17 16.5 16.75 167.5 137.5
1 9 19.2 19 19.10 191.0 161.0
1 10 21 21 21.00 210.0 180.0
1 11 23 23 23.00 230.0 200.0
1 12 25 25 25.00 250.0 220.0
1 13 27 27.2 27.10 271.0 241.0
1 14 29 29.2 29.10 291.0 261.0
1 15 31 32 31.50 315.0 285.0 21.84 8.30
1 16 35 35.6 35.30 353.0 323.0
1 17 39 38.5 38.75 387.5 357.5
1 18 40 42 41.00 410.0 380.0
1 19 42 47 44.50 445.0 415.0
1 20 43 51.5 47.25 472.5 442.5
1 21 45 54 49.50 495.0 465.0
1 22 47.1 57.5 52.30 523.0 493.0
1 23 48.2 61 54.60 546.0 516.0
1 24 50.2 64 57.10 571.0 541.0 24.00 7.36
1 25 52.2 68 60.10 601.0 571.0
1 26 56 72 64.00 640.0 610.0
1 27 59 75.1 67.05 670.5 640.5
1 28 62 77 69.50 695.0 665.0
1 29 65.1 78.5 71.80 718.0 688.0
1 30 70 80 75.00 750.0 720.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 85 + 100 R.3.40 M Y : 0294228 X : 0478099 Date : November 18, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 3 2 2.50 25.0 25.0
1 2 4 6 5.00 50.0 25.0
1 3 8 11 9.50 95.0 70.0
1 4 12 15 13.50 135.0 110.0
1 5 16 18.8 17.40 174.0 149.0 27.27 6.26
1 6 19 21.5 20.25 202.5 177.5
1 7 22 25 23.50 235.0 210.0
1 8 23 29 26.00 260.0 235.0
1 9 26 31 28.50 285.0 260.0
1 10 28 34 31.00 310.0 285.0
1 11 30 35 32.50 325.0 300.0
1 12 32.5 38 35.25 352.5 327.5
1 13 35 39 37.00 370.0 345.0
1 14 38 40 39.00 390.0 365.0
1 15 40 41 40.50 405.0 380.0
1 16 42.5 42 42.25 422.5 397.5
1 17 45 43 44.00 440.0 415.0 23.18 7.70
1 18 46 44 45.00 450.0 425.0
1 19 49 45.5 47.25 472.5 447.5
1 20 54 47 50.50 505.0 480.0
1 21 55 48 51.50 515.0 490.0
1 22 57 50 53.50 535.0 510.0
1 23 58.8 51 54.90 549.0 524.0
1 24 60.1 53.1 56.60 566.0 541.0
1 25 61 55 58.00 580.0 555.0
1 26 62 57 59.50 595.0 570.0 20.68 8.90
1 27 63.2 59 61.10 611.0 586.0
1 28 64.5 60.5 62.50 625.0 600.0
1 29 65 62 63.50 635.0 610.0
1 30 66 63.1 64.55 645.5 620.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 85 + 200 R. 3.47 M Y : 0294159 X : 0478051 Date : November 18, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 0 0 0 0.0
1 1 2 1 1.50 15.0 15.0
1 2 4.2 3 3.60 36.0 21.0
1 3 7 5 6.00 60.0 45.0
1 4 12 7.5 9.75 97.5 82.5
1 5 14 10.6 12.30 123.0 108.0
1 6 15 13.6 14.30 143.0 128.0 27.27 6.26
1 7 18.2 16.5 17.35 173.5 158.5
1 8 22.4 18 20.20 202.0 187.0
1 9 30 19.3 24.65 246.5 231.5
1 10 34 20.5 27.25 272.5 257.5
1 11 41 22 31.50 315.0 300.0
1 12 43 26 34.50 345.0 330.0
1 13 45 32 38.50 385.0 370.0
1 14 46 37.5 41.75 417.5 402.5
1 15 48 41.2 44.60 446.0 431.0
1 16 50 43 46.50 465.0 450.0
1 17 52 44.2 48.10 481.0 466.0 24.14 7.31
1 18 54.1 45.5 49.80 498.0 483.0
1 19 55.5 46.6 51.05 510.5 495.5
1 20 57 47.8 52.40 524.0 509.0
1 21 58.2 49 53.60 536.0 521.0
1 22 59.2 50 54.60 546.0 531.0
1 23 60 51 55.50 555.0 540.0
1 24 61 52 56.50 565.0 550.0
1 25 62 52.6 57.30 573.0 558.0
1 26 63 53.3 58.15 581.5 566.5 20.08 9.23
1 27 64.2 54 59.10 591.0 576.0
1 28 65 55 60.00 600.0 585.0
1 29 65.6 56 60.80 608.0 593.0
1 30 67 56.5 61.75 617.5 602.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 85 + 300 L. 4.95 M Y : 0294081 X : 0477991 Date : November 18, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 7.2 7 7.10 71.0 71.0
1 2 13 15 14.00 140.0 69.0
1 3 20 23 21.50 215.0 144.0
1 4 27 32 29.50 295.0 224.0 51.13 2.82
1 5 28 39.1 33.55 335.5 264.5
1 6 34 46 40.00 400.0 329.0
1 7 39.2 49 44.10 441.0 370.0
1 8 45 51 48.00 480.0 409.0
1 9 49 52.2 50.60 506.0 435.0
1 10 52 54 53.00 530.0 459.0
1 11 56 57.1 56.55 565.5 494.5
1 12 60.1 61 60.55 605.5 534.5 50.25 2.88
1 13 67 64 65.50 655.0 584.0
1 14 73 68 70.50 705.0 634.0
1 15 94 71 82.50 825.0 754.0
1 16 100 75 87.50 875.0 804.0
1 17 79
1 18 83
1 19 86
1 20 89
1 21 96
1 22 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 85 + 400 L. 3.07 M Y : 0294044 X : 0477913 Date : November 18, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0 0.0
1 1 1 7 4.00 40.0 40.0
1 2 4 9 6.50 65.0 25.0
1 3 8 13.5 10.75 107.5 67.5
1 4 12 18.1 15.05 150.5 110.5 29.55 5.65
1 5 16 23.1 19.55 195.5 155.5
1 6 21 28 24.50 245.0 205.0
1 7 27 29 28.00 280.0 240.0
1 8 30.5 29.4 29.95 299.5 259.5
1 9 33 30.2 31.60 316.0 276.0
1 10 36 31.1 33.55 335.5 295.5
1 11 40 32 36.00 360.0 320.0
1 12 45 33 39.00 390.0 350.0
1 13 49 33.4 41.20 412.0 372.0
1 14 53 34.5 43.75 437.5 397.5
1 15 56 36 46.00 460.0 420.0 27.22 6.28
1 16 60 37 48.50 485.0 445.0
1 17 63 38 50.50 505.0 465.0
1 18 67 39 53.00 530.0 490.0
1 19 71 41 56.00 560.0 520.0
1 20 74.1 44 59.05 590.5 550.5
1 21 78 49 63.50 635.0 595.0
1 22 81.5 53 67.25 672.5 632.5 30.10 5.52
1 23 86.8 56 71.40 714.0 674.0
1 24 92 59 75.50 755.0 715.0
1 25 96 62 79.00 790.0 750.0
1 26 100 64.5 82.25 822.5 782.5
68
71
73.4
76
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 85 + 500 L. 3.27 M Y : 0294010 X : 0477829 Date : November 18, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 4 4 4.00 40.0 40.0
1 2 7.5 9 8.25 82.5 42.5
1 3 11.5 14 12.75 127.5 87.5
1 4 14.3 19 16.65 166.5 126.5
1 5 18 20 19.00 190.0 150.0 34.75 4.60
1 6 22 25.4 23.70 237.0 197.0
1 7 26 30 28.00 280.0 240.0
1 8 29.1 34 31.55 315.5 275.5
1 9 32 38 35.00 350.0 310.0
1 10 36 41.5 38.75 387.5 347.5
1 11 39.2 45 42.10 421.0 381.0
1 12 43 48.5 45.75 457.5 417.5
1 13 46.9 52.3 49.60 496.0 456.0
1 14 50.2 56.4 53.30 533.0 493.0 36.22 4.37
1 15 55 60.4 57.70 577.0 537.0
1 16 59.4 64.5 61.95 619.5 579.5
1 17 62.5 67 64.75 647.5 607.5
1 18 63.5 68 65.75 657.5 617.5
1 19 64.1 69 66.55 665.5 625.5
1 20 65 70 67.50 675.0 635.0
1 21 65.5 70.4 67.95 679.5 639.5
1 22 66 71 68.50 685.0 645.0 23.17 7.70
1 23 66.5 72 69.25 692.5 652.5
1 24 67 73 70.00 700.0 660.0
1 25 67.5 74 70.75 707.5 667.5
1 26 68 74.5 71.25 712.5 672.5
1 27 68.4 75 71.70 717.0 677.0
1 28 69 75.5 72.25 722.5 682.5
1 29 70 76 73.00 730.0 690.0
1 30 70.5 76.5 73.50 735.0 695.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 85 +600 L. 3.31 M Y : 0293898 X : 0477782 Date : November 20, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0 0.0
1 1 6 5 5.50 55.0 55.0
1 2 11 11 11.00 110.0 55.0
1 3 16 17 16.50 165.0 110.0
1 4 19.6 22.3 20.95 209.5 154.5 46.88 3.15
1 5 24 28.9 26.45 264.5 209.5
1 6 31 34 32.50 325.0 270.0
1 7 36 39.2 37.60 376.0 321.0
1 8 41 45 43.00 430.0 375.0
1 9 46 49.6 47.80 478.0 423.0
1 10 49.5 53 51.25 512.5 457.5
1 11 53 57 55.00 550.0 495.0 44.62 3.35
1 12 57 61 59.00 590.0 535.0
1 13 61 66 63.50 635.0 580.0
1 14 65 70.5 67.75 677.5 622.5
1 15 69 76.5 72.75 727.5 672.5
1 16 74 82.1 78.05 780.5 725.5
1 17 78 87 82.50 825.0 770.0 43.57 3.45
1 18 82 91.2 86.60 866.0 811.0
1 19 86 96 91.00 910.0 855.0
1 20 90 99 94.50 945.0 890.0
1 21 94 100 97.00 970.0 915.0
1 22 96
1 23 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 85 + 700 R. 3.26 M Y : 0293897 X : 0477686 Date : November 20, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 4 4.5 4.25 42.5 42.5
1 2 8 8.5 8.25 82.5 40.0
1 3 11 12 11.50 115.0 72.5
1 4 14 15 14.50 145.0 102.5 32.94 4.93
1 5 17 19 18.00 180.0 137.5
1 6 20.3 22.6 21.45 214.5 172.0
1 7 25 26 25.50 255.0 212.5
1 8 28.9 30.5 29.70 297.0 254.5
1 9 33.2 34.6 33.90 339.0 296.5
1 10 38 37.6 37.80 378.0 335.5
1 11 43 41.6 42.30 423.0 380.5 34.82 4.59
1 12 49.1 46 47.55 475.5 433.0
1 13 51.4 50.1 50.75 507.5 465.0
1 14 53 53 53.00 530.0 487.5
1 15 54 54.5 54.25 542.5 500.0
1 16 55 56 55.50 555.0 512.5
1 17 56 57.1 56.55 565.5 523.0
1 18 57 58.2 57.60 576.0 533.5
1 19 57.6 59.5 58.55 585.5 543.0
1 20 58 60.5 59.25 592.5 550.0
1 21 59 61.5 60.25 602.5 560.0
1 22 59.5 62.4 60.95 609.5 567.0 20.23 9.15
1 23 60 63 61.50 615.0 572.5
1 24 60.5 63.9 62.20 622.0 579.5
1 25 61 64 62.50 625.0 582.5
1 26 61.5 64.5 63.00 630.0 587.5
1 27 62 65 63.50 635.0 592.5
1 28 62.5 65.5 64.00 640.0 597.5
1 29 63 66 64.50 645.0 602.5
1 30 63.5 66.4 64.95 649.5 607.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 85 + 800 L. 4.12 M Y : 0293821 X : 0477626 Date : November 20, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 5 5 5.00 50.0 50.0
1 2 9 9.5 9.25 92.5 42.5
1 3 14 14.5 14.25 142.5 92.5
1 4 20.2 16 18.10 181.0 131.0
1 5 25 18 21.50 215.0 165.0 34.86 4.58
1 6 30 21 25.50 255.0 205.0
1 7 34 25 29.50 295.0 245.0
1 8 37.6 28 32.80 328.0 278.0
1 9 41 30.6 35.80 358.0 308.0
1 10 45 34 39.50 395.0 345.0
1 11 48.5 38.2 43.35 433.5 383.5
1 12 52 42.5 47.25 472.5 422.5
1 13 55 46 50.50 505.0 455.0
1 14 58 50 54.00 540.0 490.0
1 15 61.2 53 57.10 571.0 521.0 31.67 5.18
1 16 63.2 55 59.10 591.0 541.0
1 17 64.4 57 60.70 607.0 557.0
1 18 65 59 62.00 620.0 570.0
1 19 65.5 62.5 64.00 640.0 590.0
1 20 66 65 65.50 655.0 605.0
1 21 66.5 66 66.25 662.5 612.5 27.17 6.29
1 22 67 67 67.00 670.0 620.0
1 23 67.5 67.5 67.50 675.0 625.0
1 24 68
1 25 68.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 85 +900 R. 2.95 M Y : 0293836 X : 0477522 Date : November 20, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 6 5.3 5.65 56.5 56.5
1 2 8 8 8.00 80.0 23.5
1 3 10.2 10.6 10.40 104.0 47.5
1 4 13 14 13.50 135.0 78.5 28.13 6.02
1 5 16.4 17.5 16.95 169.5 113.0
1 6 19.4 21 20.20 202.0 145.5
1 7 23 25 24.00 240.0 183.5
1 8 26.5 29.8 28.15 281.5 225.0
1 9 31 34 32.50 325.0 268.5
1 10 37 39 38.00 380.0 323.5
1 11 41.4 44.5 42.95 429.5 373.0 37.46 4.18
1 12 45.2 48.4 46.80 468.0 411.5
1 13 51 52.5 51.75 517.5 461.0
1 14 56 60.2 58.10 581.0 524.5
1 15 58 63 60.50 605.0 548.5
1 16 59 68.3 63.65 636.5 580.0
1 17 61 73 67.00 670.0 613.5
1 18 63 76 69.50 695.0 638.5 35.84 4.43
1 19 64.5 83 73.75 737.5 681.0
1 20 68.4 87.4 77.90 779.0 722.5
1 21 72 92 82.00 820.0 763.5
1 22 77 94 85.50 855.0 798.5 35.14 4.54
1 23 80 97 88.50 885.0 828.5
1 24 84 98 91.00 910.0 853.5
1 25 87 100 93.50 935.0 878.5
1 26 89
1 27 93
1 28 95
1 29 97
1 30 99
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 86 + 000 L. 2.40 M Y : 0293863 X : 0477838 Date : November 20, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 7 5 6.00 60.0 60.0
1 2 10 9 9.50 95.0 35.0
1 3 13 11.9 12.45 124.5 64.5
1 4 15 15 15.00 150.0 90.0
1 5 16 17.8 16.90 169.0 109.0 20.78 8.84
1 6 16.5 21 18.75 187.5 127.5
1 7 17.5 24 20.75 207.5 147.5
1 8 20 25.5 22.75 227.5 167.5
1 9 23.4 26 24.70 247.0 187.0
1 10 26 29 27.50 275.0 215.0
1 11 28.1 30 29.05 290.5 230.5
1 12 30 30.5 30.25 302.5 242.5
1 13 31 31 31.00 310.0 250.0 16.25 12.08
1 14 32 32 32.00 320.0 260.0
1 15 33 33 33.00 330.0 270.0
1 16 34 33.8 33.90 339.0 279.0
1 17 35 34.4 34.70 347.0 287.0
1 18 35.5 35 35.25 352.5 292.5
1 19 36 36 36.00 360.0 300.0
1 20 37 36.5 36.75 367.5 307.5
1 21 37.5 37 37.25 372.5 312.5
1 22 38 38 38.00 380.0 320.0
1 23 38.9 38.5 38.70 387.0 327.0
1 24 39.5 39 39.25 392.5 332.5 12.10 17.57
1 25 40 39.5 39.75 397.5 337.5
1 26 40.8 40 40.40 404.0 344.0
1 27 41 40.5 40.75 407.5 347.5
1 28 41.6 41 41.30 413.0 353.0
1 29 42 41.5 41.75 417.5 357.5
1 30 42.6 42 42.30 423.0 363.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 86 + 100 L. 3.48 M Y : 0293872 X : 0477335 Date : November 20, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 2 0 0 0.0
1 1 5.5 7.5 6.50 65.0 65.0
1 2 9 11.1 10.05 100.5 35.5
1 3 10.5 13.3 11.90 119.0 54.0
1 4 13 14.3 13.65 136.5 71.5 18.50 10.25
1 5 15.8 16 15.90 159.0 94.0
1 6 18 18 18.00 180.0 115.0
1 7 20 19.8 19.90 199.0 134.0
1 8 21.5 21.4 21.45 214.5 149.5
1 9 23 24 23.50 235.0 170.0
1 10 24 26 25.00 250.0 185.0
1 11 26 33 29.50 295.0 230.0
1 12 27 40 33.50 335.0 270.0
1 13 31 46 38.50 385.0 320.0
1 14 36 52 44.00 440.0 375.0 32.50 5.01
1 15 41 59 50.00 500.0 435.0
1 16 47 66 56.50 565.0 500.0
1 17 52 71.5 61.75 617.5 552.5
1 18 59 77 68.00 680.0 615.0
1 19 64 81 72.50 725.0 660.0
1 20 71 84 77.50 775.0 710.0
1 21 77 86 81.50 815.0 750.0 36.00 4.40
1 22 82 90 86.00 860.0 795.0
1 23 86 93 89.50 895.0 830.0
1 24 90 96 93.00 930.0 865.0
1 25 93 100 96.50 965.0 900.0
1 26 96
1 27 98
1 28 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 86 + 200 L. 3.50 M Y : 0293807 X : 0477284 Date : November 20, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 2 0 0 0.0
1 1 1 5 3.00 30.0 30.0
1 2 2.5 7 4.75 47.5 17.5
1 3 3 8 5.50 55.0 25.0
1 4 4 10 7.00 70.0 40.0
1 5 6 12.6 9.30 93.0 63.0 21.00 8.73
1 6 10 15 12.50 125.0 95.0
1 7 12.5 18 15.25 152.5 122.5
1 8 15 21 18.00 180.0 150.0
1 9 18 24 21.00 210.0 180.0
1 10 19 29 24.00 240.0 210.0
1 11 20 35 27.50 275.0 245.0
1 12 21 38 29.50 295.0 265.0
1 13 24 42 33.00 330.0 300.0
1 14 25.5 45 35.25 352.5 322.5
1 15 31 48 39.50 395.0 365.0 28.42 5.94
1 16 35 52 43.50 435.0 405.0
1 17 40 57 48.50 485.0 455.0
1 18 43 62 52.50 525.0 495.0
1 19 47 67 57.00 570.0 540.0
1 20 50.5 71 60.75 607.5 577.5
1 21 56 77 66.50 665.0 635.0
1 22 61 82 71.50 715.0 685.0 33.60 4.80
1 23 66 86 76.00 760.0 730.0
1 24 70 92 81.00 810.0 780.0
1 25 74 100 87.00 870.0 840.0
1 26 77
1 27 80
1 28 83
1 29 85
1 30 87
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 86 + 600 L. 5.21 M Y : 0293824 X : 0476960 Date : November 20, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 5.5 5 5.25 52.5 52.5
1 2 11 8 9.50 95.0 42.5
1 3 12.5 13 12.75 127.5 75.0
1 4 13.5 20 16.75 167.5 115.0
1 5 16.5 26 21.25 212.5 160.0 43.06 3.51
1 6 19 34 26.50 265.0 212.5
1 7 23 36 29.50 295.0 242.5
1 8 31 40.1 35.55 355.5 303.0
1 9 41 47 44.00 440.0 387.5
1 10 48 54 51.00 510.0 457.5
1 11 53 60.4 56.70 567.0 514.5
1 12 58 66 62.00 620.0 567.5
1 13 63 72 67.50 675.0 622.5
1 14 67.5 76 71.75 717.5 665.0 48.19 3.04
1 15 73 80 76.50 765.0 712.5
1 16 79 84 81.50 815.0 762.5
1 17 80 90 85.00 850.0 797.5
1 18 84 100 92.00 920.0 867.5
1 19 86
1 20 90
1 21 94
1 22 96
1 23 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 86 + 700 R. 3.33 M Y : 0293783 X : 0476877 Date : November 20, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow DCP
Point 1 Point 2 Average Penetration =10^(2.62-
No Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 3 0 0 0.0
1 1 5 6 5.50 55.0 55.0
1 2 8 8.6 8.30 83.0 28.0
1 3 10.2 11 10.60 106.0 51.0
1 4 12.2 13.2 12.70 127.0 72.0
1 5 14.5 16 15.25 152.5 97.5 23.42 7.60
1 6 17 19 18.00 180.0 125.0
1 7 19 22 20.50 205.0 150.0
1 8 22.5 25 23.75 237.5 182.5
1 9 25 27 26.00 260.0 205.0
1 10 27.2 29.5 28.35 283.5 228.5
1 11 29.2 32 30.60 306.0 251.0
1 12 32 35.2 33.60 336.0 281.0
1 13 35 39 37.00 370.0 315.0
1 14 37.1 41.8 39.45 394.5 339.5
1 15 39 44 41.50 415.0 360.0
1 16 41 45.5 43.25 432.5 377.5
1 17 43 47 45.00 450.0 395.0
1 18 44 48.5 46.25 462.5 407.5 23.38 7.61
1 19 45.2 51.5 48.35 483.5 428.5
1 20 46.6 57 51.80 518.0 463.0
1 21 48 61.2 54.60 546.0 491.0
1 22 50.2 64.5 57.35 573.5 518.5
1 23 53.5 67 60.25 602.5 547.5
1 24 57 69.1 63.05 630.5 575.5
1 25 60 71.2 65.60 656.0 601.0
1 26 62.5 75.5 69.00 690.0 635.0 23.92 7.40
1 27 66 76 71.00 710.0 655.0
1 28 68.5 78.5 73.50 735.0 680.0
1 29 70.1 81 75.55 755.5 700.5
1 30 72 82.5 77.25 772.5 717.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 86 + 800 L. 3.50 M Y : 0293746 X : 0476776 Date : November 20, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow
Point 1 Point 2 Average Penetration DCP (mm/Blow) =10^(2.62-
No Blow
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 14 0 0 0.0
1 1 9 18 13.50 135.0 135.0
1 2 22 21 21.50 215.0 80.0
1 3 63 26 44.50 445.0 310.0
1 4 70 37 53.50 535.0 400.0 73.13 1.79
1 5 71 46 58.50 585.0 450.0
1 6 74 50 62.00 620.0 485.0
1 7 75 56 65.50 655.0 520.0
1 8 77 67 72.00 720.0 585.0
1 9 78 69 73.50 735.0 600.0
1 10 81 70 75.50 755.0 620.0
1 11 86 82 84.00 840.0 705.0 61.79 2.22
1 12 89 89 89.00 890.0 755.0
1 13 91 90 90.50 905.0 770.0
1 14 100 100 100.00 1000.0 865.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DINAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 86 + 900 R. 3.49 M Y : 0293798 X : 0476693 Date : November 20, 2013


DCP Reading Cumulative CBR (%)
Blow Cumulative Blow
Point 1 Point 2 Average Penetration DCP (mm/Blow) =10^(2.62-
No Blow
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 4 3 3.50 35.0 35.0
1 2 8 4 6.00 60.0 25.0
1 3 12 5 8.50 85.0 50.0 43.21 3.49
1 4 16 7 11.50 115.0 80.0
1 5 24 10 17.00 170.0 135.0
1 6 36 13.5 24.75 247.5 212.5
1 7 50 17.5 33.75 337.5 302.5
1 8 61 22 41.50 415.0 380.0
1 9 69 31.5 50.25 502.5 467.5
1 10 81 42 61.50 615.0 580.0 58.83 2.36
1 11 94 46 70.00 700.0 665.0
1 12 100 48.2 74.10 741.0 706.0
1 13 53.5
1 14 58.5
1 15 64
1 16 69.5
1 17 74
1 18 78
1 19 82
1 20 86.5
1 21 90
1 22 94
1 23 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Lt NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 86 + 300 R. 3.25 M Y : 0298646 X : 0469459 Date : December 19, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1.3 0 0 0 0.0
1 1 5 4.9 4.95 49.5 49.5
1 2 8.8 8.3 8.55 85.5 36.0
1 3 11.5 12.2 11.85 118.5 69.0
1 4 13 16.5 14.75 147.5 98.0 24.28 7.26
1 5 15.5 20.5 18.00 180.0 130.5
1 6 17.6 23 20.30 203.0 153.5
1 7 19.8 25.1 22.45 224.5 175.0
1 8 22.5 26.7 24.60 246.0 196.5
1 9 25.2 28.4 26.80 268.0 218.5
1 10 28 30 29.00 290.0 240.5
1 11 30.7 32 31.35 313.5 264.0
1 12 34 34.1 34.05 340.5 291.0
1 13 38.2 36.5 37.35 373.5 324.0 23.47 7.58
1 14 41 38.5 39.75 397.5 348.0
1 15 43 40.5 41.75 417.5 368.0
1 16 45.2 42.5 43.85 438.5 389.0
1 17 47.1 44.1 45.60 456.0 406.5
1 18 49.2 45.2 47.20 472.0 422.5
1 19 50.4 46.2 48.30 483.0 433.5
1 20 53.2 47.1 50.15 501.5 452.0 21.83 8.31
1 21 55.5 48.2 51.85 518.5 469.0
1 22 57.2 49.5 53.35 533.5 484.0
1 23 59.1 51.2 55.15 551.5 502.0
1 24 60.2 52.9 56.55 565.5 516.0
1 25 61.5 54.5 58.00 580.0 530.5
1 26 62.5 55.5 59.00 590.0 540.5
1 27 63.8 56.6 60.20 602.0 552.5 19.58 9.53
1 28 64.5 57.4 60.95 609.5 560.0
1 29 66.1 57.9 62.00 620.0 570.5
1 30 68.1 59.3 63.70 637.0 587.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( FARHAN ) ( ANAS KHALIL) ( SULHAIMI )


NIP.1972 0208201212 1 001 Lab. Tech. Lab. Tech.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 86 + 400 L. 3.25 M Y : 0293824 X : 0467148 Date : December 19, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow
Point 1 Point 2 Average
Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))

0 0 17.3 2.5 0 0 0
1 1 34.6 26.3 30.45 304.5 304.5
1 2 39.4 36.2 37.80 378.0 73.5
1 3 42.3 37.7 40.00 400.0 95.5 45.17 3.30
1 4 44.7 39.4 42.05 420.5 116.0
1 5 46.9 42.1 44.50 445.0 140.5
1 6 62.8 52.3 57.55 575.5 271.0
1 7 67.4 58.5 62.95 629.5 325.0
1 8 68.4 62.8 65.60 656.0 351.5
1 9 69.3 64.7 67.00 670.0 365.5
1 10 70.3 65.7 68.00 680.0 375.5 30.81 5.36
1 11 71 66.5 68.75 687.5 383.0
1 12 71.9 67.4 69.65 696.5 392.0
1 13 72.7 68.3 70.50 705.0 400.5
1 14 73.6 69.2 71.40 714.0 409.5
1 15 74.4 70.1 72.25 722.5 418.0
1 16 75.2 71.9 73.55 735.5 431.0
1 17 76 72.1 74.05 740.5 436.0
1 18 76.7 73 74.85 748.5 444.0
1 19 77.4 74 75.70 757.0 452.5 20.63 8.93
1 20 78.1 75 76.55 765.5 461.0
1 21 78.8 75.5 77.15 771.5 467.0
1 22 79.5 76.5 78.00 780.0 475.5
1 23 80.3 77.4 78.85 788.5 484.0
1 24 81 78.9 79.95 799.5 495.0
1 25 81.6 80.4 81.00 810.0 505.5
1 26 82.4 82 82.20 822.0 517.5
1 27 83.2 83.1 83.15 831.5 527.0 18.72 10.10
1 28 84.5 84.3 84.40 844.0 539.5
1 29 86 85 85.50 855.0 550.5
1 30 87.1 86.1 86.60 866.0 561.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( FARHAN ) ( ANAS KHALIL) ( SULHAIMI )


NIP.1972 0208201212 1 001 Lab. Tech. Lab. Tech.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 86 + 475 CL Y : 0293830 X : 0477075 Date : December 19, 2013


DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 3.5 2 0
1 1 9 6.8 7.90 79.0 79.0
1 2 15.4 12.1 13.75 137.5 58.5
1 3 20.2 17.3 18.75 187.5 108.5
1 4 25.4 22 23.70 237.0 158.0
1 5 30 26.7 28.35 283.5 204.5 43.41 3.47
1 6 34.7 31.8 33.25 332.5 253.5
1 7 40.2 36.7 38.45 384.5 305.5
1 8 45 41.6 43.30 433.0 354.0
1 9 50.7 45.6 48.15 481.5 402.5
1 10 55.4 49 52.20 522.0 443.0
1 11 59 52.3 55.65 556.5 477.5
1 12 62.2 56.2 59.20 592.0 513.0
1 13 66 60.1 63.05 630.5 551.5
1 14 71 64.6 67.80 678.0 599.0
1 15 75.4 69 72.20 722.0 643.0
1 16 80.6 73 76.80 768.0 689.0 40.14 3.83
1 17 84 77.7 80.85 808.5 729.5
1 18 87.3 81.1 84.20 842.0 763.0
1 19 90 84.2 87.10 871.0 792.0
1 20 94 87.6 90.80 908.0 829.0
1 21 98 91.5 94.75 947.5 868.5
1 22 100 92.4 96.20 962.0 883.0
1 23 96
1 24 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( FARHAN ) ( ANAS KHALIL) ( SULHAIMI )


NIP.1972 0208201212 1 001 Lab. Tech. Lab. Tech.
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 87 + 000 L. 3.28 M Y : 029 3858 X : 047 6610 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 3 4 3.50 35.0 35.0
1 2 4.5 6 5.25 52.5 17.5
1 3 7 7 7.00 70.0 35.0
1 4 9 9 9.00 90.0 55.0 13.75 14.94
1 5 11 10.5 10.75 107.5 72.5
1 6 12.5 11.5 12.00 120.0 85.0
1 7 14 12.4 13.20 132.0 97.0
1 8 16 13 14.50 145.0 110.0
1 9 17 14 15.50 155.0 120.0
1 10 18 15 16.50 165.0 130.0
1 11 20 16 18.00 180.0 145.0
1 12 21 17 19.00 190.0 155.0 12.44 16.97
1 13 22.2 18 20.10 201.0 166.0
1 14 24 18.8 21.40 214.0 179.0
1 15 25.2 19 22.10 221.0 186.0
1 16 27 19.8 23.40 234.0 199.0
1 17 28.2 20 24.10 241.0 206.0
1 18 30 20.8 25.40 254.0 219.0
1 19 32 21 26.50 265.0 230.0
1 20 34 22 28.00 280.0 245.0 12.40 17.04
1 21 35.5 23 29.25 292.5 257.5
1 22 37 24 30.50 305.0 270.0
1 23 39 25.5 32.25 322.5 287.5
1 24 40 26.5 33.25 332.5 297.5
1 25 41.1 27.2 34.15 341.5 306.5
1 26 43 28 35.50 355.0 320.0
1 27 44 29.5 36.75 367.5 332.5 12.17 17.45
1 28 45 31 38.00 380.0 345.0
1 29 46 32 39.00 390.0 355.0
1 30 47 33 40.00 400.0 365.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 87 + 100 R. 3.48 M Y : 029 3904 X : 047 6531 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 2 6 0 0 0.0
1 1 8.4 10.5 9.45 94.5 94.5
1 2 13 14.5 13.75 137.5 43.0
1 3 16 18.5 17.25 172.5 78.0 23.44 7.59
1 4 19.4 21 20.20 202.0 107.5
1 5 21 23 22.00 220.0 125.5
1 6 22 26 24.00 240.0 145.5
1 7 24 29 26.50 265.0 170.5
1 8 26 30.4 28.20 282.0 187.5
1 9 30 32.4 31.20 312.0 217.5
1 10 34 34 34.00 340.0 245.5
1 11 36 36 36.00 360.0 265.5
1 12 38 38 38.00 380.0 285.5 23.31 7.64
1 13 40 41 40.50 405.0 310.5
1 14 42.5 42.2 42.35 423.5 329.0
1 15 45 43 44.00 440.0 345.5
1 16 48 45.5 46.75 467.5 373.0
1 17 51 49 50.00 500.0 405.5
1 18 53 53 53.00 530.0 435.5
1 19 54 55.5 54.75 547.5 453.0 24.43 7.20
1 20 59 58 58.50 585.0 490.5
1 21 62 59.5 60.75 607.5 513.0
1 22 65 61 63.00 630.0 535.5
1 23 69 64 66.50 665.0 570.5
1 24 73 67.2 70.10 701.0 606.5
1 25 80 70.2 75.10 751.0 656.5
1 26 88 73 80.50 805.0 710.5 28.23 6.0
1 27 96 75 85.50 855.0 760.5
1 28 100 77 88.50 885.0 790.5
1 29 78
1 30 81
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 87 + 200 R. 3.50 M Y : 029 3994 X : 047 6478 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 6 5 5.50 55.0 55.0
1 2 14 10 12.00 120.0 65.0
1 3 21 16 18.50 185.0 130.0
1 4 26 22 24.00 240.0 185.0 43.17 3.49
1 5 31 26 28.50 285.0 230.0
1 6 35 31 33.00 330.0 275.0
1 7 39 36 37.50 375.0 320.0
1 8 42 41 41.50 415.0 360.0
1 9 45 43.7 44.35 443.5 388.5
1 10 46.5 45.7 46.10 461.0 406.0
1 11 48 47 47.50 475.0 420.0
1 12 49 48.7 48.85 488.5 433.5
1 13 49.5 50.5 50.00 500.0 445.0 27.50 6.20
1 14 50 52.2 51.10 511.0 456.0
1 15 51 53.4 52.20 522.0 467.0
1 16 51.5 55 53.25 532.5 477.5
1 17 52.2 56 54.10 541.0 486.0
1 18 53 57 55.00 550.0 495.0
1 19 54 58.2 56.10 561.0 506.0
1 20 54.5 59.3 56.90 569.0 514.0
1 21 55 60.3 57.65 576.5 521.5
1 22 56 61.4 58.95 589.5 534.5
1 23 56.5 62.5 59.85 598.5 543.5
1 24 57.2 63.6 60.80 608.0 553.0 20.15 9.20
1 25 58 64.9 61.95 619.5 564.5
1 26 59 66 62.80 628.0 573.0
1 27 59.6 67.1 63.70 637.0 582.0
1 28 60.3 68.3 64.65 646.5 591.5
1 29 61 69 65.45 654.5 599.5
1 30 61.9 70 65.95 659.5 604.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 87 + 300 L. 3.49 M Y : 029 4068 X : 047 6425 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 5 5.5 5.25 52.5 52.5
1 2 10 9.4 9.70 97.0 44.5
1 3 14 13.5 13.75 137.5 85.0
1 4 19 17.5 18.25 182.5 130.0 38.21 4.08
1 5 23.1 21.6 22.35 223.5 171.0
1 6 28 27.2 27.60 276.0 223.5
1 7 34 30 32.00 320.0 267.5
1 8 36.1 32.2 34.15 341.5 289.0
1 9 37.5 34 35.75 357.5 305.0
1 10 38.5 36.6 37.55 375.5 323.0
1 11 41 40.5 40.75 407.5 355.0 34.11 4.71
1 12 42.6 45 43.80 438.0 385.5
1 13 47 50.5 48.75 487.5 435.0
1 14 50 56 53.00 530.0 477.5
1 15 53.5 62 57.75 577.5 525.0
1 16 57 69 63.00 630.0 577.5
1 17 60 78 69.00 690.0 637.5
1 18 63.5 86 74.75 747.5 695.0 39.52 3.91
1 19 67 91 79.00 790.0 737.5
1 20 70 96 83.00 830.0 777.5
1 21 73 100 86.50 865.0 830.0
1 22 76
1 23 80
1 24 83
1 25 89
1 26 95
1 27 98
1 28 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 87 + 400 R. 3.90 M Y : 029 4088 X : 047 6360 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 4 3.5 3.75 37.5 37.5
1 2 8 7 7.50 75.0 37.5
1 3 12 10.5 11.25 112.5 75.0
1 4 16 11 13.50 135.0 97.5 23.44 7.59
1 5 20 12 16.00 160.0 122.5
1 6 22 13 17.50 175.0 137.5
1 7 23 16 19.50 195.0 157.5
1 8 25 20 22.50 225.0 187.5
1 9 27 24 25.50 255.0 217.5
1 10 28 27 27.50 275.0 237.5
1 11 29.8 29 29.40 294.0 256.5
1 12 31.6 30.5 31.05 310.5 273.0
1 13 35 32 33.50 335.0 297.5 21.28 8.58
1 14 37 34 35.50 355.0 317.5
1 15 38.6 35.6 37.10 371.0 333.5
1 16 40 37.6 38.80 388.0 350.5
1 17 41.5 39 40.25 402.5 365.0
1 18 44 40.1 42.05 420.5 383.0
1 19 46.2 42 44.10 441.0 403.5
1 20 48.5 43 45.75 457.5 420.0
1 21 51 44 47.50 475.0 437.5
1 22 53.5 44.9 49.20 492.0 454.5
1 23 55.5 45.8 50.65 506.5 469.0
1 24 57 46.5 51.75 517.5 480.0 18.25 10.43
1 25 58.5 47.5 53.00 530.0 492.5
1 26 60 48.5 54.25 542.5 505.0
1 27 61 50 55.50 555.0 517.5
1 28 62 51 56.50 565.0 527.5
1 29 63 52 57.50 575.0 537.5
1 30 64 53 58.50 585.0 547.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 87 + 500 L. 3.49 M Y : 029 4090 X : 047 6361 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 2 4 3.00 30.0 30.0
1 2 4 5 4.50 45.0 15.0
1 3 6.5 6 6.25 62.5 32.5
1 4 7.5 7 7.25 72.5 42.5
1 5 8 8 8.00 80.0 50.0 10.75 20.42
1 6 9 9 9.00 90.0 60.0
1 7 10 10 10.00 100.0 70.0
1 8 11.2 11 11.10 111.0 81.0
1 9 12.2 12.4 12.30 123.0 93.0
1 10 13.1 14.4 13.75 137.5 107.5
1 11 15 17 16.00 160.0 130.0
1 12 16.2 20 18.10 181.0 151.0
1 13 18 22.1 20.05 200.5 170.5
1 14 20.2 24.5 22.35 223.5 193.5 15.37 12.97
1 15 22.2 27.2 24.70 247.0 217.0
1 16 25 28.4 26.70 267.0 237.0
1 17 27.4 29.5 28.45 284.5 254.5
1 18 29.5 31.2 30.35 303.5 273.5
1 19 31 33.4 32.20 322.0 292.0
1 20 32.4 35.5 33.95 339.5 309.5
1 21 34 36 35.00 350.0 320.0
1 22 35.4 37 36.20 362.0 332.0
1 23 37 37.5 37.25 372.5 342.5
1 24 38.4 38 38.20 382.0 352.0
1 25 40 39.2 39.60 396.0 366.0 13.72 14.99
1 26 42 40 41.00 410.0 380.0
1 27 43 41 42.00 420.0 390.0
1 28 43.8 42 42.90 429.0 399.0
1 29 44.5 42.6 43.55 435.5 405.5
1 30 45 43.3 44.15 441.5 411.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 87 + 600 R. 3.52 M Y : 029 4140 X : 047 6251 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 3 3 0 0 0.0
1 1 11 10 10.50 105.0 105.0
1 2 18 17 17.50 175.0 70.0
1 3 23 22 22.50 225.0 120.0
1 4 26 26.1 26.05 260.5 155.5
1 5 28.5 31 29.75 297.5 192.5 43.33 3.48
1 6 32.5 35 33.75 337.5 232.5
1 7 38 40 39.00 390.0 285.0
1 8 43 45.1 44.05 440.5 335.5
1 9 48 51 49.50 495.0 390.0
1 10 52.5 57 54.75 547.5 442.5
1 11 57 63 60.00 600.0 495.0
1 12 60.5 68.3 64.40 644.0 539.0
1 13 64.4 74 69.20 692.0 587.0 45.33 3.28
1 14 68.4 79 73.70 737.0 632.0
1 15 73 84 78.50 785.0 680.0
1 16 77.5 90 83.75 837.5 732.5
1 17 82.5 95 88.75 887.5 782.5 44.74 3.34
1 18 87 98 92.50 925.0 820.0
1 19 91 100 95.50 955.0 850.0
1 20 94
1 21 97
1 22 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 87 + 700 L.3.50 M Y : 029 4105 X : 047 6193 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 2 0 0 0.0
1 1 7 5 6.00 60.0 60.0
1 2 14.5 11 12.75 127.5 67.5
1 3 23 16.5 19.75 197.5 137.5
1 4 33.5 30 31.75 317.5 257.5
1 5 41 26 33.50 335.0 275.0
1 6 46 33 39.50 395.0 335.0 55.95 2.51
1 7 51 41.5 46.25 462.5 402.5
1 8 55.5 47.5 51.50 515.0 455.0
1 9 60.5 52.5 56.50 565.0 505.0
1 10 65.4 58.5 61.95 619.5 559.5
1 11 69 66 67.50 675.0 615.0
1 12 73 72 72.50 725.0 665.0
1 13 75.4 76 75.70 757.0 697.0
1 14 78.5 81 79.75 797.5 737.5
1 15 81 84 82.50 825.0 765.0
1 16 83 87 85.00 850.0 790.0 42.86 3.53
1 17 84 88 86.00 860.0 800.0
1 18 86 94 90.00 900.0 840.0
1 19 88 96 92.00 920.0 860.0
1 20 89 98 93.50 935.0 875.0
1 21 92 100 96.00 960.0 900.0
1 22 94
1 23 95
1 24 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 87 + 800 L. 3.49 M Y : 029 4146 X : 047 6194 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 5 5 5.00 50.0 50.0
1 2 10 12 11.00 110.0 60.0
1 3 15 16.5 15.75 157.5 107.5
1 4 21 19.6 20.30 203.0 153.0
1 5 31 27 29.00 290.0 240.0 40.00 3.85
1 6 35.5 29 32.25 322.5 272.5
1 7 39.4 31 35.20 352.0 302.0
1 8 44 32.5 38.25 382.5 332.5
1 9 47 35 41.00 410.0 360.0
1 10 51 39.4 45.20 452.0 402.0
1 11 55 44 49.50 495.0 445.0
1 12 59 47.2 53.10 531.0 481.0 39.67 3.89
1 13 62 50.4 56.20 562.0 512.0
1 14 66 54 60.00 600.0 550.0
1 15 70 59 64.50 645.0 595.0
1 16 74 62 68.00 680.0 630.0
1 17 79 67 73.00 730.0 680.0
1 18 89 73 81.00 810.0 760.0 44.50 3.36
1 19 96 79 87.50 875.0 825.0
1 20 100 88 94.00 940.0 890.0
1 21 98
1 22 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 87 + 900 R. 4.62 M Y : 029 4246 X : 047 6185 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 2 0 0 0.0
1 1 2 3 2.50 25.0 25.0
1 2 5 6 5.50 55.0 30.0
1 3 9 7.8 8.40 84.0 59.0
1 4 12 9.8 10.90 109.0 84.0
1 5 14 11.7 12.85 128.5 103.5 28.27 5.98
1 6 16 13 14.50 145.0 120.0
1 7 18 15 16.50 165.0 140.0
1 8 20 17.2 18.60 186.0 161.0
1 9 22.2 20.5 21.35 213.5 188.5
1 10 25 25.5 25.25 252.5 227.5
1 11 29 38.2 33.60 336.0 311.0
1 12 34 32 33.00 330.0 305.0
1 13 39.2 40 39.60 396.0 371.0
1 14 41.7 42 41.85 418.5 393.5
1 15 44 46 45.00 450.0 425.0 28.95 5.80
1 16 47 50 48.50 485.0 460.0
1 17 49.2 53 51.10 511.0 486.0
1 18 51.2 57 54.10 541.0 516.0
1 19 54 61 57.50 575.0 550.0
1 20 57 64.5 60.75 607.5 582.5
1 21 60 68 64.00 640.0 615.0
1 22 63 72 67.50 675.0 650.0
1 23 65.5 76 70.75 707.5 682.5
1 24 68 80 74.00 740.0 715.0 30.86 5.35
1 25 71 84 77.50 775.0 750.0
1 26 74 88 81.00 810.0 785.0
1 27 77 93 85.00 850.0 825.0
1 28 80.2 96 88.10 881.0 856.0
1 29 84 100 92.00 920.0 895.0
1 30 87.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 88 + 000 L.2.90 M Y : 029 4311 X : 047 6227 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 2 0 0 0.0
1 1 7 5 6.00 60.0 60.0
1 2 15 11.4 13.20 132.0 72.0
1 3 22 19 20.50 205.0 145.0
1 4 24 28 26.00 260.0 200.0
1 5 27.4 38 32.70 327.0 267.0 47.50 3.09
1 6 35 40 37.50 375.0 315.0
1 7 41 41.5 41.25 412.5 352.5
1 8 45 43 44.00 440.0 380.0
1 9 49 44.5 46.75 467.5 407.5
1 10 51.2 46.5 48.85 488.5 428.5
1 11 54 48 51.00 510.0 450.0
1 12 56.1 50 53.05 530.5 470.5 35.91 4.42
1 13 59 52 55.50 555.0 495.0
1 14 61.8 54 57.90 579.0 519.0
1 15 64.1 57 60.55 605.5 545.5
1 16 66.4 60.5 63.45 634.5 574.5
1 17 68.8 64 66.40 664.0 604.0
1 18 70.4 67.1 68.75 687.5 627.5
1 19 72.3 70 71.15 711.5 651.5
1 20 74 73.4 73.70 737.0 677.0 32.59 4.99
1 21 76.8 76 76.40 764.0 704.0
1 22 77.9 77.5 77.70 777.0 717.0
1 23 79.5 78.5 79.00 790.0 730.0
1 24 82 81 81.50 815.0 755.0
1 25 84 82 83.00 830.0 770.0
1 26 86.2 83.4 84.80 848.0 788.0 28.33 5.96
1 27 88 85 86.50 865.0 805.0
1 28 89.5 87 88.25 882.5 822.5
1 29 90 89 89.50 895.0 835.0
1 30 92 90 91.00 910.0 850.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 88 + 100 R. 5.21 M Y : 029 4413 X : 047 6233 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 5 5 5.00 50.0 50.0
1 2 9 9 9.00 90.0 40.0
1 3 12 12 12.00 120.0 70.0
1 4 15 15 15.00 150.0 100.0
1 5 17.4 17.3 17.35 173.5 123.5
1 6 20 21 20.50 205.0 155.0 35.45 4.49
1 7 23.4 24.5 23.95 239.5 189.5
1 8 27.6 29 28.30 283.0 233.0
1 9 33 34 33.50 335.0 285.0
1 10 39 39.4 39.20 392.0 342.0
1 11 44 44 44.00 440.0 390.0
1 12 49.6 48 48.80 488.0 438.0
1 13 55 53 54.00 540.0 490.0
1 14 60 58 59.00 590.0 540.0
1 15 65 62.5 63.75 637.5 587.5 38.89 3.99
1 16 69 67 68.00 680.0 630.0
1 17 72.5 71 71.75 717.5 667.5
1 18 76 74 75.00 750.0 700.0
1 19 79.4 77 78.20 782.0 732.0
1 20 82.4 80.2 81.30 813.0 763.0
1 21 86 83 84.50 845.0 795.0
1 22 89 88 88.50 885.0 835.0
1 23 93 92.5 92.75 927.5 877.5 37.60 4.16
1 24 96 96 96.00 960.0 910.0
1 25 98 100 99.00 990.0 940.0
1 26 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 88 + 200 L. 3.26 M Y : 029 4499 X : 047 6288 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 2 0 0 0.0
1 1 2 4 3.00 30.0 30.0
1 2 4 6 5.00 50.0 20.0
1 3 6 7 6.50 65.0 35.0
1 4 8 7.8 7.90 79.0 49.0 12.13 17.53
1 5 10 8.5 9.25 92.5 62.5
1 6 11.5 9.5 10.50 105.0 75.0
1 7 13 10.5 11.75 117.5 87.5
1 8 14.2 11.2 12.70 127.0 97.0
1 9 16 12.2 14.10 141.0 111.0
1 10 17 13 15.00 150.0 120.0
1 11 17.5 14 15.75 157.5 127.5
1 12 18 14.5 16.25 162.5 132.5
1 13 19 15 17.00 170.0 140.0
1 14 21 16 18.50 185.0 155.0 11.55 18.64
1 15 23 18 20.50 205.0 175.0
1 16 25 19 22.00 220.0 190.0
1 17 26 19.5 22.75 227.5 197.5
1 18 27 20 23.50 235.0 205.0
1 19 28.9 21 24.95 249.5 219.5
1 20 31.2 21.5 26.35 263.5 233.5
1 21 34.5 22 28.25 282.5 252.5
1 22 37.4 23 30.20 302.0 272.0
1 23 40.5 24 32.25 322.5 292.5
1 24 43.6 24.5 34.05 340.5 310.5
1 25 45.3 25 35.15 351.5 321.5 13.23 15.68
1 26 46.5 26 36.25 362.5 332.5
1 27 47.5 28 37.75 377.5 347.5
1 28 48.5 30 39.25 392.5 362.5
1 29 50 33 41.50 415.0 385.0
1 30 51.1 35.3 43.20 432.0 397.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 88 + 300 R. 3.91 M Y : 029 4557 X : 047 6231 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 2 1.8 1.90 19.0 19.0
1 2 4 3.4 3.70 37.0 18.0
1 3 7 5 6.00 60.0 41.0
1 4 10 7 8.50 85.0 66.0 22.29 8.09
1 5 13 9 11.00 110.0 91.0
1 6 16 12.3 14.15 141.5 122.5
1 7 19 16 17.50 175.0 156.0
1 8 22 20 21.00 210.0 191.0
1 9 26 24 25.00 250.0 231.0
1 10 30 28.6 29.30 293.0 274.0
1 11 33.5 33.6 33.55 335.5 316.5
1 12 37.6 39.1 38.35 383.5 364.5 34.59 4.63
1 13 42.2 45.3 43.75 437.5 418.5
1 14 46.2 53.3 49.75 497.5 478.5
1 15 50.5 58 54.25 542.5 523.5
1 16 54.5 60 57.25 572.5 553.5
1 17 58 65 61.50 615.0 596.0
1 18 61.5 69 65.25 652.5 633.5
1 19 65 72.6 68.80 688.0 669.0 33.91 4.75
1 20 69 75.5 72.25 722.5 703.5
1 21 71.5 77.4 74.45 744.5 725.5
1 22 75 78 76.50 765.0 746.0
1 23 79 81 80.00 800.0 781.0
1 24 82 84 83.00 830.0 811.0
1 25 85 86.5 85.75 857.5 838.5
1 26 89 89 89.00 890.0 871.0 32.97 4.92
1 27 93.5 91 92.25 922.5 903.5
1 28 95 93 94.00 940.0 921.0
1 29 100 95 97.50 975.0 956.0
1 30 96.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 88 + 400 L. 3.72 M Y : 029 4584 X : 047 6142 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 2 0 0 0.0
1 1 4.5 3 3.75 37.5 37.5
1 2 8 6 7.00 70.0 32.5
1 3 11 9 10.00 100.0 62.5
1 4 14 11 12.50 125.0 87.5
1 5 16.5 12.5 14.50 145.0 107.5 25.50 6.82
1 6 19.2 14.5 16.85 168.5 131.0
1 7 22.3 16.5 19.40 194.0 156.5
1 8 26.2 19 22.60 226.0 188.5
1 9 31.1 22 26.55 265.5 228.0
1 10 33.5 25 29.25 292.5 255.0
1 11 42 29 35.50 355.0 317.5
1 12 48 33 40.50 405.0 367.5
1 13 56 37.5 46.75 467.5 430.0 35.15 4.54
1 14 64 42.5 53.25 532.5 495.0
1 15 68.5 48 58.25 582.5 545.0
1 16 70.5 51.5 61.00 610.0 572.5
1 17 73.5 53.5 63.50 635.0 597.5
1 18 77.5 57 67.25 672.5 635.0
1 19 82 59.5 70.75 707.5 670.0
1 20 87.5 61 74.25 742.5 705.0 159.46 0.66
1 21 93.5 62 77.75 777.5 740.0
1 22 97 63 80.00 800.0 762.5
1 23 100 641 370.50 3705.0 3667.5
1 24 64.5
1 25 65.5
1 26 66.2
1 27 67
1 28 68
1 29 69
1 30 70
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 88 +500 R. 4.14 M Y : 029 4650 X : 047 6069 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 1 3 2.00 20.0 20.0
1 2 4 4.5 4.25 42.5 22.5
1 3 6 7 6.50 65.0 45.0
1 4 7.5 9 8.25 82.5 62.5 17.63 10.90
1 5 9.5 10.5 10.00 100.0 80.0
1 6 11 12 11.50 115.0 95.0
1 7 13 15 14.00 140.0 120.0
1 8 15 17.2 16.10 161.0 141.0
1 9 17 19 18.00 180.0 160.0
1 10 18 21 19.50 195.0 175.0
1 11 20 22.5 21.25 212.5 192.5
1 12 22 24 23.00 230.0 210.0
1 13 24 27 25.50 255.0 235.0 20.03 9.27
1 14 26 30 28.00 280.0 260.0
1 15 28 32.5 30.25 302.5 282.5
1 16 31 35 33.00 330.0 310.0
1 17 34.1 38 36.05 360.5 340.5
1 18 36.4 41.3 38.85 388.5 368.5
1 19 38.4 45 41.70 417.0 397.0
1 20 41 49 45.00 450.0 430.0
1 21 44.5 52 48.25 482.5 462.5
1 22 48.1 54 51.05 510.5 490.5
1 23 51.4 57 54.20 542.0 522.0 22.37 8.05
1 24 53 62.3 57.65 576.5 556.5
1 25 54 65.4 59.70 597.0 577.0
1 26 55 68 61.50 615.0 595.0
1 27 55.5 71 63.25 632.5 612.5
1 28 56 74 65.00 650.0 630.0
1 29 57.2 78 67.60 676.0 656.0
1 30 58.2 80 69.10 691.0 671.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 88 + 600 L. 3.32 M Y : 029 4653 X : 047 5959 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 2 2 2.00 20.0 20.0
1 2 5 4.1 4.55 45.5 25.5
1 3 8 7 7.50 75.0 55.0
1 4 11.5 10 10.75 107.5 87.5
1 5 16 13 14.50 145.0 125.0 28.00 6.05
1 6 21 17 19.00 190.0 170.0
1 7 24 21.5 22.75 227.5 207.5
1 8 26 25.5 25.75 257.5 237.5
1 9 27 28 27.50 275.0 255.0
1 10 29 31 30.00 300.0 280.0
1 11 31 35 33.00 330.0 310.0
1 12 34 35.6 34.80 348.0 328.0
1 13 37 36 36.50 365.0 345.0
1 14 41 37 39.00 390.0 370.0
1 15 45 37.5 41.25 412.5 392.5 24.38 7.22
1 16 49 38 43.50 435.0 415.0
1 17 51.2 39 45.10 451.0 431.0
1 18 54 39.5 46.75 467.5 447.5
1 19 56.2 40.5 48.35 483.5 463.5
1 20 59 42.5 50.75 507.5 487.5
1 21 62 45 53.50 535.0 515.0
1 22 64.5 47 55.75 557.5 537.5
1 23 68.5 50 59.25 592.5 572.5
1 24 73 52 62.50 625.0 605.0
1 25 77 54 65.50 655.0 635.0 26.67 6.44
1 26 81 56.8 68.90 689.0 669.0
1 27 85 59 72.00 720.0 700.0
1 28 88 61 74.50 745.0 725.0
1 29 92 63 77.50 775.0 755.0
1 30 98 66 82.00 820.0 800.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 88 + 700 R. 6.10 M Y : 029 4650 X : 047 5874 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 4 4 4.00 40.0 40.0
1 2 7 5 6.00 60.0 20.0
1 3 11 5.5 8.25 82.5 42.5
1 4 14.2 6 10.10 101.0 61.0
1 5 18 7 12.50 125.0 85.0 34.00 4.73
1 6 22.2 10 16.10 161.0 121.0
1 7 30 15 22.50 225.0 185.0
1 8 38 19 28.50 285.0 245.0
1 9 44 25.2 34.60 346.0 306.0
1 10 45 36 40.50 405.0 365.0
1 11 46 40 43.00 430.0 390.0
1 12 46.5 43.5 45.00 450.0 410.0
1 13 47 47.5 47.25 472.5 432.5 30.78 5.37
1 14 48 52 50.00 500.0 460.0
1 15 48.5 56.5 52.50 525.0 485.0
1 16 49 57.5 53.25 532.5 492.5
1 17 49.5 58.5 54.00 540.0 500.0
1 18 50 59.6 54.80 548.0 508.0
1 19 50.6 60.5 55.55 555.5 515.5
1 20 51 61.5 56.25 562.5 522.5
1 21 51.5 62.5 57.00 570.0 530.0
1 22 52 63.5 57.75 577.5 537.5 22.25 8.11
1 23 53.1 65 59.05 590.5 550.5
1 24 54.2 67 60.60 606.0 566.0
1 25 55.5 69 62.25 622.5 582.5
1 26 57.1 70.5 63.80 638.0 598.0
1 27 58.5 72.5 65.50 655.0 615.0
1 28 60 74.4 67.20 672.0 632.0
1 29 61.5 76.5 69.00 690.0 650.0
1 30 63 78.5 70.75 707.5 667.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 88 +800 L. 3.26 M Y : 029 4726 X : 047 5824 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 3 1 0 0 0.0
1 1 7 3 5.00 50.0 50.0
1 2 10 6 8.00 80.0 30.0
1 3 11.5 8 9.75 97.5 47.5
1 4 12 8.5 10.25 102.5 52.5 12.50 16.86
1 5 12.5 9.5 11.00 110.0 60.0
1 6 13.5 10.5 12.00 120.0 70.0
1 7 14 12 13.00 130.0 80.0
1 8 16 14 15.00 150.0 100.0
1 9 17 16 16.50 165.0 115.0
1 10 19 18 18.50 185.0 135.0
1 11 20 19.5 19.75 197.5 147.5
1 12 21 20.5 20.75 207.5 157.5 13.00 16.04
1 13 22 22 22.00 220.0 170.0
1 14 22.5 24 23.25 232.5 182.5
1 15 24 25 24.50 245.0 195.0
1 16 26 26 26.00 260.0 210.0
1 17 28 29.5 28.75 287.5 237.5
1 18 29.5 35 32.25 322.5 272.5 17.86 10.72
1 19 31 40 35.50 355.0 305.0
1 20 33 45.5 39.25 392.5 342.5
1 21 35 50 42.50 425.0 375.0
1 22 36.5 56.5 46.50 465.0 415.0
1 23 38.5 57.5 48.00 480.0 430.0
1 24 40 58.5 49.25 492.5 442.5
1 25 43 59 51.00 510.0 460.0
1 26 45.5 60 52.75 527.5 477.5 18.67 10.13
1 27 48 61 54.50 545.0 495.0
1 28 51.5 62 56.75 567.5 517.5
1 29 56 63 59.50 595.0 545.0
1 30 58 64 61.00 610.0 560.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 88 + 900 R. 3.51 M Y : 029 4820 X : 047 5850 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 2 0 0 0.0
1 1 4 6 5.00 50.0 50.0
1 2 7 10 8.50 85.0 35.0
1 3 12 12 12.00 120.0 70.0
1 4 14 14.5 14.25 142.5 92.5
1 5 16 16 16.00 160.0 110.0 23.63 7.51
1 6 17.8 18 17.90 179.0 129.0
1 7 20.8 21 20.90 209.0 159.0
1 8 23 24.8 23.90 239.0 189.0
1 9 25.5 29 27.25 272.5 222.5
1 10 27.5 34.2 30.85 308.5 258.5
1 11 31 40.5 35.75 357.5 307.5
1 12 36 72 54.00 540.0 490.0 48.39 3.02
1 13 41 92 66.50 665.0 615.0
1 14 45.5 100 72.75 727.5 677.5
1 15 51
1 16 56
1 17 64
1 18 72
1 19 83
1 20 86
1 21 87
1 22 89
1 23 92
1 24 95
1 25 98
1 26 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 89 + 000 R. 4.49 M Y : 029 4861 X : 047 5833 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 2 1 0 0 0.0
1 1 6.7 4 5.35 53.5 53.5
1 2 13 7 10.00 100.0 46.5
1 3 19 11.5 15.25 152.5 99.0
1 4 24.5 14.5 19.50 195.0 141.5 33.31 4.86
1 5 27 20 23.50 235.0 181.5
1 6 28.5 23.5 26.00 260.0 206.5
1 7 30.5 28 29.25 292.5 239.0
1 8 33 31 32.00 320.0 266.5
1 9 37.5 35.4 36.45 364.5 311.0
1 10 42 41 41.50 415.0 361.5
1 11 47.2 49 48.10 481.0 427.5
1 12 54 55.5 54.75 547.5 494.0
1 13 57 63.5 60.25 602.5 549.0
1 14 59 65.5 62.25 622.5 569.0 36.00 4.40
1 15 63 66.2 64.60 646.0 592.5
1 16 66 67.3 66.65 666.5 613.0
1 17 69 68.3 68.65 686.5 633.0
1 18 72 69.5 70.75 707.5 654.0
1 19 76 71.5 73.75 737.5 684.0
1 20 81 74.5 77.75 777.5 724.0
1 21 86 77.5 81.75 817.5 764.0
1 22 92 81 86.50 865.0 811.5 36.73 4.29
1 23 96 84 90.00 900.0 846.5
1 24 100 87 93.50 935.0 881.5
1 25 90
1 26 93
1 27 96
1 28 98.5
1 29 100
1 30
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 89 + 100 L. 1.90 M Y : 029 4889 X : 047 5754 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 4 6 5.00 50.0 50.0
1 2 6 10 8.00 80.0 30.0
1 3 8 13.5 10.75 107.5 57.5 22.50 7.99
1 4 9 17 13.00 130.0 80.0
1 5 10 22.5 16.25 162.5 112.5
1 6 11 27.5 19.25 192.5 142.5
1 7 12.5 31.4 21.95 219.5 169.5
1 8 14 34 24.00 240.0 190.0
1 9 15.2 35 25.10 251.0 201.0
1 10 16.5 36.5 26.50 265.0 215.0 20.00 9.28
1 11 18 37.5 27.75 277.5 227.5
1 12 20 39 29.50 295.0 245.0
1 13 21 40.5 30.75 307.5 257.5
1 14 23 43 33.00 330.0 280.0
1 15 26.2 45.5 35.85 358.5 308.5
1 16 28.5 48.3 38.40 384.0 334.0
1 17 30.5 50 40.25 402.5 352.5
1 18 32.5 51.3 41.90 419.0 369.0
1 19 34.4 54.4 44.40 444.0 394.0 21.09 8.68
1 20 36.4 56.5 46.45 464.5 414.5
1 21 38 58.8 48.40 484.0 434.0
1 22 40 62 51.00 510.0 460.0
1 23 41.5 65.5 53.50 535.0 485.0
1 24 44.5 70.5 57.50 575.0 525.0
1 25 46.5 76.5 61.50 615.0 565.0
1 26 47.5 82.5 65.00 650.0 600.0
1 27 48 87 67.50 675.0 625.0 24.14 7.31
1 28 49 89 69.00 690.0 640.0
1 29 50 100 75.00 750.0 700.0
1 30 52
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 89+ 200 R. 3.40 M Y : 029 4941 X : 047 5679 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 3 0 0 0.0
1 1 1 8 4.50 45.0 45.0
1 2 5 10.6 7.80 78.0 33.0
1 3 9 12 10.50 105.0 60.0
1 4 12 13.5 12.75 127.5 82.5
1 5 14 14 14.00 140.0 95.0 23.75 7.46
1 6 16 16 16.00 160.0 115.0
1 7 20 19.2 19.60 196.0 151.0
1 8 24 23 23.50 235.0 190.0
1 9 27.5 27 27.25 272.5 227.5
1 10 31 32 31.50 315.0 270.0
1 11 34 37 35.50 355.0 310.0
1 12 38 42 40.00 400.0 355.0
1 13 42 45 43.50 435.0 390.0 27.68 6.14
1 14 45 46.5 45.75 457.5 412.5
1 15 47 49 48.00 480.0 435.0
1 16 48 52 50.00 500.0 455.0
1 17 49 54.1 51.55 515.5 470.5
1 18 51 59.5 55.25 552.5 507.5
1 19 54 64 59.00 590.0 545.0
1 20 57 67.5 62.25 622.5 577.5
1 21 60 73 66.50 665.0 620.0
1 22 63.5 78 70.75 707.5 662.5 32.96 4.92
1 23 67.5 84 75.75 757.5 712.5
1 24 72 89 80.50 805.0 760.0
1 25 77.2 90 83.60 836.0 791.0
1 26 83 94 88.50 885.0 840.0
1 27 87 100 93.50 935.0 890.0
1 28 92
1 29 95
1 30 100
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 89 + 300 L. 3.26 M Y : 029 5037 X : 047 5684 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 2 0 0 0.0
1 1 3 6 4.50 45.0 45.0
1 2 9 11 10.00 100.0 55.0
1 3 12.5 14.5 13.50 135.0 90.0
1 4 15.5 17 16.25 162.5 117.5 25.86 6.70
1 5 18 18.2 18.10 181.0 136.0
1 6 20.2 20.3 20.25 202.5 157.5
1 7 23.2 22 22.60 226.0 181.0
1 8 25 25.1 25.05 250.5 205.5
1 9 26 28 27.00 270.0 225.0
1 10 28 30.5 29.25 292.5 247.5
1 11 29 32 30.50 305.0 260.0 21.81 8.32
1 12 30.2 33 31.60 316.0 271.0
1 13 31.2 34.5 32.85 328.5 283.5
1 14 33 37.5 35.25 352.5 307.5
1 15 34.1 40 37.05 370.5 325.5
1 16 35.4 41.5 38.45 384.5 339.5
1 17 36.4 43 39.70 397.0 352.0
1 18 37.4 43.5 40.45 404.5 359.5 16.80 11.58
1 19 39 44 41.50 415.0 370.0
1 20 40 44.5 42.25 422.5 377.5
1 21 41.4 45 43.20 432.0 387.0
1 22 42 45.5 43.75 437.5 392.5
1 23 43 43.3 43.15 431.5 386.5
1 24 43.2 47 45.10 451.0 406.0
1 25 44 48 46.00 460.0 415.0
1 26 44.5 48.8 46.65 466.5 421.5
1 27 45 50.2 47.60 476.0 431.0 15.38 12.96
1 28 45.5 51.4 48.45 484.5 439.5
1 29 46 53.4 49.70 497.0 452.0
1 30 46.8 54.5 50.65 506.5 461.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 89 + 400 L. 3.40 M Y : 029 5132 X : 047 5695 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 6.5 8.5 7.50 75.0 75.0
1 2 10.3 15 12.65 126.5 51.5
1 3 16 18 17.00 170.0 95.0 38.70 4.01
1 4 21.1 23 22.05 220.5 145.5
1 5 28.2 25.5 26.85 268.5 193.5
1 6 32.5 30 31.25 312.5 237.5
1 7 37 35 36.00 360.0 285.0
1 8 42.5 39 40.75 407.5 332.5
1 9 45.6 42.2 43.90 439.0 364.0 45.19 3.30
1 10 52 47 49.50 495.0 420.0
1 11 54.5 56 55.25 552.5 477.5
1 12 57.5 64 60.75 607.5 532.5
1 13 60.5 72 66.25 662.5 587.5
1 14 61.2 77 69.10 691.0 616.0
1 15 63 80 71.50 715.0 640.0
1 16 64.1 82 73.05 730.5 655.5
1 17 66 86 76.00 760.0 685.0 38.25 4.07
1 18 70 88 79.00 790.0 715.0
1 19 74 89 81.50 815.0 740.0
1 20 78 90 84.00 840.0 765.0
1 21 83 92 87.50 875.0 800.0
1 22 94 94 94.00 940.0 865.0 38.54 4.04
1 23 96 96 96.00 960.0 885.0
1 24 100 100 100.00 1000.0 925.0

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 89 + 500 R. 5.12 M Y : 029 5097 X : 047 5605 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 0 0 0 0.0
1 1 4 5.5 4.75 47.5 47.5
1 2 8 11.5 9.75 97.5 50.0
1 3 12.3 18 15.15 151.5 104.0 37.00 4.25
1 4 17 22.4 19.70 197.0 149.5
1 5 21.5 25 23.25 232.5 185.0
1 6 24.6 28 26.30 263.0 215.5
1 7 27 30.1 28.55 285.5 238.0
1 8 29.1 33 31.05 310.5 263.0
1 9 32.2 36.2 34.20 342.0 294.5 36.63 4.31
1 10 35 40.5 37.75 377.5 330.0
1 11 38.5 46.5 42.50 425.0 377.5
1 12 42.4 55 48.70 487.0 439.5
1 13 45 68 56.50 565.0 517.5
1 14 50 75.5 62.75 627.5 580.0
1 15 56 83.1 69.55 695.5 648.0 45.69 3.25
1 16 62 89 75.50 755.0 707.5
1 17 67.5 94 80.75 807.5 760.0
1 18 74 100 87.00 870.0 822.5
1 19 78.5
1 20 83
1 21 86
1 22 90
1 23 94
1 24 96
1 25 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 89 + 600 L . 3.42 M Y : 029 5095 X : 047 5517 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 3 5 4.00 40.0 40.0
1 2 5.5 7.5 6.50 65.0 25.0
1 3 8 11 9.50 95.0 55.0
1 4 10 16 13.00 130.0 90.0 38.57 4.03
1 5 13 24 18.50 185.0 145.0
1 6 16 33.4 24.70 247.0 207.0
1 7 20.5 41.5 31.00 310.0 270.0
1 8 25.5 52.5 39.00 390.0 350.0
1 9 30.5 57 43.75 437.5 397.5
1 10 35.5 60.2 47.85 478.5 438.5
1 11 42.5 62 52.25 522.5 482.5 47.21 3.12
1 12 53 64 58.50 585.0 545.0
1 13 59.5 65 62.25 622.5 582.5
1 14 71 69.2 70.10 701.0 661.0
1 15 77.5 72.5 75.00 750.0 710.0
1 16 83 75.5 79.25 792.5 752.5
1 17 88.2 79.5 83.85 838.5 798.5
1 18 91 83 87.00 870.0 830.0 42.73 3.54
1 19 92 87 89.50 895.0 855.0
1 20 94 90 92.00 920.0 880.0
1 21 96 93 94.50 945.0 905.0
1 22 100 96 98.00 980.0 940.0
1 23 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 89 +700 R.3.62 M Y : 029 5178 X : 047 5423 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 2 2 2.00 20.0 20.0
1 2 4 4.5 4.25 42.5 22.5
1 3 6 6.2 6.10 61.0 41.0
1 4 7 7.6 7.30 73.0 53.0 14.00 14.60
1 5 9 10 9.50 95.0 75.0
1 6 9.5 11.6 10.55 105.5 85.5
1 7 10 13.6 11.80 118.0 98.0
1 8 11.4 16.5 13.95 139.5 119.5
1 9 13 19.5 16.25 162.5 142.5
1 10 14 22.5 18.25 182.5 162.5
1 11 15.1 25.5 20.30 203.0 183.0
1 12 16 28 22.00 220.0 200.0
1 13 16.5 29.6 23.05 230.5 210.5
1 14 17.5 31.2 24.35 243.5 223.5 14.88 13.52
1 15 19 33 26.00 260.0 240.0
1 16 20.2 34.2 27.20 272.0 252.0
1 17 22 36 29.00 290.0 270.0
1 18 23 37 30.00 300.0 280.0
1 19 24 38 31.00 310.0 290.0
1 20 24.5 39 31.75 317.5 297.5
1 21 25 39.6 32.30 323.0 303.0
1 22 25.6 42.2 33.90 339.0 319.0
1 23 26 41.5 33.75 337.5 317.5
1 24 26.7 42.7 34.70 347.0 327.0
1 25 27.2 44 35.60 356.0 336.0 12.77 16.42
1 26 28 45.2 36.60 366.0 346.0
1 27 29 46.2 37.60 376.0 356.0
1 28 29.6 47.5 38.55 385.5 365.5
1 29 30.6 48.5 39.55 395.5 375.5
1 30 31 49.6 40.30 403.0 383.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 89 + 800 R .3.29 M Y : 029 5137 X : 047 5330 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 5 3 4.00 40.0 40.0
1 2 8 4 6.00 60.0 20.0
1 3 12 7 9.50 95.0 55.0 27.40 6.22
1 4 16 9.4 12.70 127.0 87.0
1 5 22.4 13 17.70 177.0 137.0
1 6 27.2 23.4 25.30 253.0 213.0
1 7 30 27.2 28.60 286.0 246.0
1 8 33 30.4 31.70 317.0 277.0
1 9 36.4 35 35.70 357.0 317.0 34.55 4.64
1 10 40.6 37 38.80 388.0 348.0
1 11 44.5 39.5 42.00 420.0 380.0
1 12 48.5 43 45.75 457.5 417.5
1 13 53 48 50.50 505.0 465.0
1 14 56.2 51 53.60 536.0 496.0 34.41 4.66
1 15 60 54.2 57.10 571.0 531.0
1 16 63 56 59.50 595.0 555.0
1 17 65 60 62.50 625.0 585.0
1 18 68.2 63 65.60 656.0 616.0
1 19 70 70 70.00 700.0 660.0
1 20 72 79 75.50 755.0 715.0 38.05 4.10
1 21 73.4 92 82.70 827.0 787.0
1 22 75.4 100 87.70 877.0 837.0
1 23 78
1 24 82
1 25 86.4
1 26 91
1 27 93
1 28 96
1 29 100
1 30
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 89 + 900 R. 3.00 M Y : 029 5144 X : 047 5225 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 4 5 4.50 45.0 45.0
1 2 7 7 7.00 70.0 25.0
1 3 9 9 9.00 90.0 45.0 16.67 11.70
1 4 10 11 10.50 105.0 60.0
1 5 12 13 12.50 125.0 80.0
1 6 13 16 14.50 145.0 100.0
1 7 14 18.5 16.25 162.5 117.5
1 8 15 21.4 18.20 182.0 137.0
1 9 15.9 24.2 20.05 200.5 155.5
1 10 17 27.2 22.10 221.0 176.0
1 11 18 29 23.50 235.0 190.0 17.81 10.75
1 12 19.5 30.5 25.00 250.0 205.0
1 13 21 32 26.50 265.0 220.0
1 14 23 34 28.50 285.0 240.0
1 15 24 37 30.50 305.0 260.0
1 16 26 40 33.00 330.0 285.0
1 17 27 43.5 35.25 352.5 307.5
1 18 29 46.5 37.75 377.5 332.5
1 19 32 49.5 40.75 407.5 362.5
1 20 34 52 43.00 430.0 385.0
1 21 37 54.5 45.75 457.5 412.5 20.63 8.93
1 22 40.2 56.5 48.35 483.5 438.5
1 23 44 58.5 51.25 512.5 467.5
1 24 48 60 54.00 540.0 495.0
1 25 51 63 57.00 570.0 525.0
1 26 53 65 59.00 590.0 545.0
1 27 55 67 61.00 610.0 565.0 20.83 8.81
1 28 57 69 63.00 630.0 585.0
1 29 59 72 65.50 655.0 610.0
1 30 61 73 67.00 670.0 625.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 90 + 000 L. 3.00 M Y : 029 5217 X : 047 5175 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 6 4 5.00 50.0 50.0
1 2 12 9 10.50 105.0 55.0
1 3 18 12 15.00 150.0 100.0 47.50 3.09
1 4 26.4 15 20.70 207.0 157.0
1 5 37 20.5 28.75 287.5 237.5
1 6 45.5 24.5 35.00 350.0 300.0
1 7 63.5 25 44.25 442.5 392.5
1 8 70.5 26.3 48.40 484.0 434.0 48.15 3.04
1 9 75 27 51.00 510.0 460.0
1 10 78 28.3 53.15 531.5 481.5
1 11 81.4 29.5 55.45 554.5 504.5
1 12 84 30 57.00 570.0 520.0
1 13 86 39 62.50 625.0 575.0
1 14 88 49 68.50 685.0 635.0 46.39 3.19
1 15 91 57 74.00 740.0 690.0
1 16 94 68 81.00 810.0 760.0
1 17 96 73.3 84.65 846.5 796.5
1 18 100 77 88.50 885.0 835.0
1 19 80
1 20 83
1 21 86
1 22 88
1 23 90
1 24 92
1 25 96
1 26 100
1 27
1 28
1 29
1 30
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 90 + 100 R. 4.16 M Y : 029 5280 X : 047 5127 Date : November 21, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 2 0 0 0.0
1 1 3 4 3.50 35.0 35.0
1 2 5.2 6 5.60 56.0 21.0
1 3 7.4 8 7.70 77.0 42.0
1 4 9 9 9.00 90.0 55.0 13.44 15.38
1 5 11 10 10.50 105.0 70.0
1 6 13 11 12.00 120.0 85.0
1 7 14 12.5 13.25 132.5 97.5
1 8 14.5 14 14.25 142.5 107.5
1 9 15.5 15 15.25 152.5 117.5
1 10 16.4 15.5 15.95 159.5 124.5
1 11 18 16.5 17.25 172.5 137.5
1 12 19.5 17 18.25 182.5 147.5
1 13 21.4 17.5 19.45 194.5 159.5 11.74 18.27
1 14 23.3 18 20.65 206.5 171.5
1 15 25 19 22.00 220.0 185.0
1 16 25.5 19.4 22.45 224.5 189.5
1 17 26.4 20.5 23.45 234.5 199.5
1 18 27.5 21.5 24.50 245.0 210.0
1 19 28.5 22.5 25.50 255.0 220.0
1 20 29.3 23.6 26.45 264.5 229.5
1 21 30 25 27.50 275.0 240.0
1 22 31 26 28.50 285.0 250.0 11.98 17.80
1 23 33 27 30.00 300.0 265.0
1 24 34.4 28.5 31.45 314.5 279.5
1 25 36.4 30.5 33.45 334.5 299.5
1 26 39 32.5 35.75 357.5 322.5
1 27 41.3 35 38.15 381.5 346.5
1 28 43.2 37.5 40.35 403.5 368.5 13.67 15.06
1 29 45.6 40 42.80 428.0 393.0
1 30 48 41 44.50 445.0 410.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY YACHIO ENGINEERING Co. Ltd
OF PUBLIC WORKS DIRECTORATE
GENERAL of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.
Project : Aceh Reconstruction Project (IP-545) Road Sub Project
Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 90 + 200 R. 3.28 M Y : 029 5327 X : 047 5027 Date : November 21, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 3.4 3 3.20 32.0 32.0
1 2 6 4.5 5.25 52.5 20.5
1 3 8.6 6.2 7.40 74.0 42.0 17.75 10.80
1 4 11 8 9.50 95.0 63.0
1 5 14 9.5 11.75 117.5 85.5
1 6 16.2 11.5 13.85 138.5 106.5
1 7 19 15 17.00 170.0 138.0
1 8 21.6 17.5 19.55 195.5 163.5
1 9 25 20.6 22.80 228.0 196.0
1 10 28.6 24 26.30 263.0 231.0 21.11 8.67
1 11 30.5 26.6 28.55 285.5 253.5
1 12 32 29.6 30.80 308.0 276.0
1 13 32.5 31 31.75 317.5 285.5
1 14 34 31.5 32.75 327.5 295.5
1 15 35.4 32 33.70 337.0 305.0
1 16 36 32.6 34.30 343.0 311.0
1 17 37 33.5 35.25 352.5 320.5
1 18 37.5 35 36.25 362.5 330.5
1 19 38 36 37.00 370.0 338.0
1 20 38.5 37 37.75 377.5 345.5
1 21 39 38 38.50 385.0 353.0 13.52 15.27
1 22 39.5 39 39.25 392.5 360.5
1 23 40 39.5 39.75 397.5 365.5
1 24 40.6 40 40.30 403.0 371.0
1 25 41 40.5 40.75 407.5 375.5
1 26 41.7 41.2 41.45 414.5 382.5
1 27 42 42 42.00 420.0 388.0
1 28 42.7 42.5 42.60 426.0 394.0
1 29 43 43 43.00 430.0 398.0
1 30 44 43.5 43.75 437.5 405.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 90 + 300 R. 5.05 M Y : 0295385 X : 0474955 Date : November 21, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0 0.0
1 1 1 4.5 2.75 27.5 27.5
1 2 6 10 8.00 80.0 52.5
1 3 11.5 15 13.25 132.5 105.0 28.21 6.00
1 4 16 19 17.50 175.0 147.5
1 5 20 20 20.00 200.0 172.5
1 6 21.5 21 21.25 212.5 185.0
1 7 23.5 21.5 22.50 225.0 197.5
1 8 25.5 22.5 24.00 240.0 212.5
1 9 26.5 23.5 25.00 250.0 222.5
1 10 27 24.4 25.70 257.0 229.5
1 11 27.5 25.4 26.45 264.5 237.0
1 12 28 26.4 27.20 272.0 244.5 16.53 11.83
1 13 28.5 27.5 28.00 280.0 252.5
1 14 29 29.2 29.10 291.0 263.5
1 15 29.5 30.6 30.05 300.5 273.0
1 16 30 32 31.00 310.0 282.5
1 17 30.4 33 31.70 317.0 289.5
1 18 31 34 32.50 325.0 297.5
1 19 31.4 35.2 33.30 333.0 305.5
1 20 32 36.4 34.20 342.0 314.5
1 21 33 37.2 35.10 351.0 323.5
1 22 34 38 36.00 360.0 332.5 14.88 13.51
1 23 34.5 39.1 36.80 368.0 340.5
1 24 35.4 41 38.20 382.0 354.5
1 25 36.4 43.5 39.95 399.5 372.0
1 26 37.2 46 41.60 416.0 388.5
1 27 38 48 43.00 430.0 402.5
1 28 38.7 50 44.35 443.5 416.0 15.00 13.38
1 29 40 52.2 46.10 461.0 433.5
1 30 40.5 55 47.75 477.5 450.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 90 + 400 L. 2.49 M Y : 0295446 X : 0474869 Date : November 21, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 4 2 3.00 30.0 30.0
1 2 7 3 5.00 50.0 20.0
1 3 10 5.5 7.75 77.5 47.5
1 4 12.4 18 15.20 152.0 122.0
1 5 18.5 24 21.25 212.5 182.5 42.50 3.56
1 6 23.3 27 25.15 251.5 221.5
1 7 29.5 33 31.25 312.5 282.5
1 8 42 36 39.00 390.0 360.0
1 9 44 38.5 41.25 412.5 382.5
1 10 49 40.4 44.70 447.0 417.0
1 11 55 42.5 48.75 487.5 457.5
1 12 57 45 51.00 510.0 480.0
1 13 58 49 53.50 535.0 505.0
1 14 59 52.3 55.65 556.5 526.5 33.17 4.88
1 15 59.5 56 57.75 577.5 547.5
1 16 60.1 58.5 59.30 593.0 563.0
1 17 61 61.5 61.25 612.5 582.5
1 18 61.4 64 62.70 627.0 597.0
1 19 62 66 64.00 640.0 610.0
1 20 63 68 65.50 655.0 625.0
1 21 64 69 66.50 665.0 635.0
1 22 64.4 70.4 67.40 674.0 644.0
1 23 65 71.2 68.10 681.0 651.0
1 24 66 72 69.00 690.0 660.0 26.70 6.43
1 25 66.5 73 69.75 697.5 667.5
1 26 67 74 70.50 705.0 675.0
1 27 67.5 74.4 70.95 709.5 679.5
1 28 68 75 71.50 715.0 685.0
1 29 68.5 75.5 72.00 720.0 690.0
1 30 69 76 72.50 725.0 695.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 90 + 500 R. 4.80 M Y : 0295543 X : 0474871 Date : November 21, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 2 4 3.00 30.0 30.0
1 2 5 6 5.50 55.0 25.0
1 3 7 8 7.50 75.0 45.0 20.00 9.28
1 4 11 10.5 10.75 107.5 77.5
1 5 13 13 13.00 130.0 100.0
1 6 14 14 14.00 140.0 110.0
1 7 16 15 15.50 155.0 125.0
1 8 17 16.4 16.70 167.0 137.0
1 9 18 17.5 17.75 177.5 147.5
1 10 19 18.5 18.75 187.5 157.5
1 11 20 19 19.50 195.0 165.0 12.31 17.19
1 12 21 20 20.50 205.0 175.0
1 13 21.5 20.5 21.00 210.0 180.0
1 14 22 21 21.50 215.0 185.0
1 15 22.5 22 22.25 222.5 192.5
1 16 23 22.4 22.70 227.0 197.0
1 17 23.5 23 23.25 232.5 202.5
1 18 24 23.5 23.75 237.5 207.5
1 19 24.4 24 24.20 242.0 212.0
1 20 25.4 24.5 24.95 249.5 219.5
1 21 26.3 25 25.65 256.5 226.5
1 22 27 25.4 26.20 262.0 232.0 9.50 23.89
1 23 28 26 27.00 270.0 240.0
1 24 28.5 26.4 27.45 274.5 244.5
1 25 29.4 27 28.20 282.0 252.0
1 26 30 27.5 28.75 287.5 257.5
1 27 31 28 29.50 295.0 265.0
1 28 31.5 28.5 30.00 300.0 270.0
1 29 32.5 29 30.75 307.5 277.5
1 30 33.5 29.5 31.50 315.0 285.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 90 + 600 L. 3.27 M Y : 0295545 X : 0474816 Date : November 21, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 5 6 5.50 55.0 55.0
1 2 11.1 8.9 10.00 100.0 45.0
1 3 15 12.5 13.75 137.5 82.5
1 4 19.2 17 18.10 181.0 126.0 58.75 2.36
1 5 21.8 20.5 21.15 211.5 156.5
1 6 26 27.5 26.75 267.5 212.5
1 7 32 42 37.00 370.0 315.0
1 8 42 63 52.50 525.0 470.0
1 9 49 64 56.50 565.0 510.0
1 10 59 65 62.00 620.0 565.0
1 11 61 65.5 63.25 632.5 577.5
1 12 61.5 66 63.75 637.5 582.5 39.83 3.87
1 13 62 66.5 64.25 642.5 587.5
1 14 62.5 67 64.75 647.5 592.5
1 15 63 67.5 65.25 652.5 597.5
1 16 63.4 68 65.70 657.0 602.0
1 17 64 68.5 66.25 662.5 607.5
1 18 64.5 69 66.75 667.5 612.5 31.38 5.24
1 19 65 70 67.50 675.0 620.0
1 20 65.5 71 68.25 682.5 627.5
1 21 66
1 22 66.5
1 23
1 24
1 25
1 26
1 27
1 28
1 29
1 30
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 90 + 700 R. 4.49 M Y : 0295470 X : 0474749 Date : November 21, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 2 1 1.50 15.0 15.0
1 2 4 3 3.50 35.0 20.0
1 3 6 6 6.00 60.0 45.0
1 4 8 8 8.00 80.0 65.0
1 5 9 10.4 9.70 97.0 82.0 21.39 8.52
1 6 10.3 15 12.65 126.5 111.5
1 7 11.3 20 15.65 156.5 141.5
1 8 12 25 18.50 185.0 170.0
1 9 13 28.5 20.75 207.5 192.5
1 10 14.5 31 22.75 227.5 212.5
1 11 16.2 35.2 25.70 257.0 242.0
1 12 19 37.4 28.20 282.0 267.0
1 13 22.1 39.4 30.75 307.5 292.5
1 14 27 43 35.00 350.0 335.0
1 15 31.5 45.9 38.70 387.0 372.0 26.05 6.64
1 16 37 48.5 42.75 427.5 412.5
1 17 40.2 51 45.60 456.0 441.0
1 18 43.5 53.4 48.45 484.5 469.5
1 19 46 56 51.00 510.0 495.0
1 20 48 58.5 53.25 532.5 517.5
1 21 49 60.5 54.75 547.5 532.5
1 22 51.5 63 57.25 572.5 557.5
1 23 54 65.2 59.60 596.0 581.0
1 24 56 67.1 61.55 615.5 600.5
1 25 58 70 64.00 640.0 625.0 24.35 7.23
1 26 60.5 73 66.75 667.5 652.5
1 27 64 75.2 69.60 696.0 681.0
1 28 66.5 77 71.75 717.5 702.5
1 29 67.5 78.2 72.85 728.5 713.5
1 30 69 80.1 74.55 745.5 730.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 90 + 800 R. 3.41 M Y : 0295511 X : 0474668 Date : November 21, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0 0.0
1 1 5 4 4.50 45.0 45.0
1 2 9 8 8.50 85.0 40.0
1 3 13 13.2 13.10 131.0 86.0 29.29 5.72
1 4 15 18.5 16.75 167.5 122.5
1 5 17 22.4 19.70 197.0 152.0
1 6 18 27 22.50 225.0 180.0
1 7 21 29 25.00 250.0 205.0
1 8 24 31.6 27.80 278.0 233.0
1 9 26 34.5 30.25 302.5 257.5
1 10 28.6 37.5 33.05 330.5 285.5
1 11 31.8 41 36.40 364.0 319.0
1 12 34.6 45.2 39.90 399.0 354.0 30.81 5.36
1 13 37 48.3 42.65 426.5 381.5
1 14 39.5 53.6 46.55 465.5 420.5
1 15 43 58.6 50.80 508.0 463.0
1 16 45.6 62 53.80 538.0 493.0
1 17 47 64.2 55.60 556.0 511.0
1 18 48 67 57.50 575.0 530.0
1 19 49.3 71 60.15 601.5 556.5
1 20 51 75.5 63.25 632.5 587.5 29.57 5.65
1 21 53.4 79.2 66.30 663.0 618.0
1 22 56 82.5 69.25 692.5 647.5
1 23 59 86 72.50 725.0 680.0
1 24 62.1 89 75.55 755.5 710.5
1 25 65.2 91.5 78.35 783.5 738.5
1 26 68.2 94 81.10 811.0 766.0 29.46 5.68
1 27 71.5 96 83.75 837.5 792.5
1 28 74 100 87.00 870.0 825.0
1 29 76.5
1 30 79
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 90 + 900 R. 3.50 M Y : 0295494 X : 0474560 Date : November 21, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 1 0 0 0.0
1 1 7.5 5.5 6.50 65.0 65.0
1 2 14 11 12.50 125.0 60.0
1 3 17 15.1 16.05 160.5 95.5 28.57 5.90
1 4 19 19.1 19.05 190.5 125.5
1 5 21 22 21.50 215.0 150.0
1 6 24 24.5 24.25 242.5 177.5
1 7 26 27 26.50 265.0 200.0
1 8 28 29.6 28.80 288.0 223.0
1 9 32 33 32.50 325.0 260.0
1 10 38 36.5 37.25 372.5 307.5
1 11 45 40.3 42.65 426.5 361.5
1 12 51.5 44 47.75 477.5 412.5 34.71 4.61
1 13 56.2 48 52.10 521.0 456.0
1 14 58.5 53 55.75 557.5 492.5
1 15 60.2 58 59.10 591.0 526.0
1 16 62 64 63.00 630.0 565.0
1 17 63 68 65.50 655.0 590.0
1 18 66.4 73.3 69.85 698.5 633.5
1 19 69.5 77.5 73.50 735.0 670.0
1 20 72 91 81.50 815.0 750.0
1 21 75 85 80.00 800.0 735.0
1 22 79 88.5 83.75 837.5 772.5 34.42 4.66
1 23 82 91.2 86.60 866.0 801.0
1 24 85 95 90.00 900.0 835.0
1 25 89 98 93.50 935.0 870.0
1 26 92 100 96.00 960.0 895.0
1 27 95
1 28 100
1 29
1 30
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 91 + 000 L. 3.48 M Y : 0295539 X : 0474473 Date : November 21, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 8 7 7.50 75.0 75.0
1 2 10 9 9.50 95.0 20.0
1 3 11.5 11.5 11.50 115.0 40.0
1 4 12.5 13.6 13.05 130.5 55.5
1 5 14 17.3 15.65 156.5 81.5
1 6 14.5 22 18.25 182.5 107.5 29.50 5.67
1 7 17 28 22.50 225.0 150.0
1 8 20.2 36.5 28.35 283.5 208.5
1 9 23 44.5 33.75 337.5 262.5
1 10 27 47 37.00 370.0 295.0
1 11 31.5 49.6 40.55 405.5 330.5
1 12 36 52 44.00 440.0 365.0
1 13 40.3 54.4 47.35 473.5 398.5
1 14 42.5 57.5 50.00 500.0 425.0 29.41 5.69
1 15 45.3 60.3 52.80 528.0 453.0
1 16 48.3 62 55.15 551.5 476.5
1 17 50 65 57.50 575.0 500.0
1 18 51.5 67 59.25 592.5 517.5
1 19 53.5 98.5 76.00 760.0 685.0
1 20 55.5 69 62.25 622.5 547.5
1 21 57 70.5 63.75 637.5 562.5 25.54 6.80
1 22 58.4 71.5 64.95 649.5 574.5
1 23 60 72.5 66.25 662.5 587.5
1 24 62 74.5 68.25 682.5 607.5
1 25 63.1 76.3 69.70 697.0 622.0
1 26 64 78.2 71.10 711.0 636.0 22.83 7.85
1 27 64.5 80 72.25 722.5 647.5
1 28 65 83.1 74.05 740.5 665.5
1 29 65.5 84 74.75 747.5 672.5
1 30 66 86 76.00 760.0 685.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 91 + 100 R. 3.51 M Y : 0295542 X : 0474375 Date : November 21, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0 0.0
1 1 5.5 4 4.75 47.5 47.5
1 2 12.2 8 10.10 101.0 53.5
1 3 19.5 11.2 15.35 153.5 106.0 44.81 3.33
1 4 23.3 15 19.15 191.5 144.0
1 5 24.5 20.5 22.50 225.0 177.5
1 6 29 25.8 27.40 274.0 226.5
1 7 35.3 32 33.65 336.5 289.0
1 8 42 39.2 40.60 406.0 358.5
1 9 48.1 47.4 47.75 477.5 430.0
1 10 54.2 55.2 54.70 547.0 499.5
1 11 62 67 64.50 645.0 597.5
1 12 73 74 73.50 735.0 687.5 52.92 2.70
1 13 79 78 78.50 785.0 737.5
1 14 83 81 82.00 820.0 772.5
1 15 88 85 86.50 865.0 817.5
1 16 90 90.2 90.10 901.0 853.5
1 17 95 95 95.00 950.0 902.5
1 18 100 100 100.00 1000.0 952.5

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 91 + 200 L. 3.49 M Y : 0295610 X : 0474322 Date : November 21, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 2 0 0 0.0
1 1 3 5 4.00 40.0 40.0
1 2 7 9.2 8.10 81.0 41.0
1 3 9 15 12.00 120.0 80.0
1 4 12 18.8 15.40 154.0 114.0
1 5 15.3 21.5 18.40 184.0 144.0
1 6 19 24.5 21.75 217.5 177.5 27.05 6.33
1 7 21.4 27 24.20 242.0 202.0
1 8 24.3 28 26.15 261.5 221.5
1 9 27.8 29 28.40 284.0 244.0
1 10 32 30.1 31.05 310.5 270.5
1 11 36 32.1 34.05 340.5 300.5
1 12 37.6 34 35.80 358.0 318.0
1 13 38.6 35.5 37.05 370.5 330.5
1 14 39 36.5 37.75 377.5 337.5
1 15 39.6 37.6 38.60 386.0 346.0
1 16 40.5 39 39.75 397.5 357.5
1 17 41 40.8 40.90 409.0 369.0 17.61 10.91
1 18 41.6 42 41.80 418.0 378.0
1 19 42 42.6 42.30 423.0 383.0
1 20 42.5 43.2 42.85 428.5 388.5
1 21 43 44 43.50 435.0 395.0
1 22 43.4 44.6 44.00 440.0 400.0
1 23 44 45 44.50 445.0 405.0
1 24 45.5
1 25 46
1 26 46.4
1 27 49
1 28 47
1 29 47.5
1 30 48
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 91 + 300 L. 3.51 M Y : 0295619 X : 0474237 Date : November 21, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0 0.0
1 1 4 5 4.50 45.0 45.0
1 2 5.3 8 6.65 66.5 21.5
1 3 7.5 11 9.25 92.5 47.5
1 4 9.5 12 10.75 107.5 62.5 13.75 14.94
1 5 10.5 14 12.25 122.5 77.5
1 6 11.2 15 13.10 131.0 86.0
1 7 12 16 14.00 140.0 95.0
1 8 14 17 15.50 155.0 110.0
1 9 16.2 18.5 17.35 173.5 128.5
1 10 18.3 20 19.15 191.5 146.5
1 11 20.4 21.3 20.85 208.5 163.5
1 12 22.2 23 22.60 226.0 181.0 18.13 10.52
1 13 25.3 25 25.15 251.5 206.5
1 14 29.1 27 28.05 280.5 235.5
1 15 33 29.2 31.10 311.0 266.0
1 16 35 32 33.50 335.0 290.0
1 17 36 33.4 34.70 347.0 302.0
1 18 37 35.8 36.40 364.0 319.0
1 19 39 39.4 39.20 392.0 347.0
1 20 40 43 41.50 415.0 370.0
1 21 43.5 46.5 45.00 450.0 405.0
1 22 47.5 50 48.75 487.5 442.5
1 23 51 54 52.50 525.0 480.0
1 24 53 56.5 54.75 547.5 502.5 23.83 7.43
1 25 55 58.5 56.75 567.5 522.5
1 26 62 61.5 61.75 617.5 572.5
1 27 65.1 66 65.55 655.5 610.5
1 28 68.2 70.5 69.35 693.5 648.5
1 29 70.5 75.5 73.00 730.0 685.0
1 30 72 80 76.00 760.0 715.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 91 + 400 R. 2.20 M Y : 0295641 X : 0474149 Date : November 21, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0 0.0
1 1 6 6 6.00 60.0 60.0
1 2 9 10.5 9.75 97.5 37.5
1 3 10 13.5 11.75 117.5 57.5 17.50 11.00
1 4 11 16.5 13.75 137.5 77.5
1 5 12 19 15.50 155.0 95.0
1 6 12.5 20.5 16.50 165.0 105.0
1 7 13 21 17.00 170.0 110.0
1 8 14 22 18.00 180.0 120.0
1 9 15 23 19.00 190.0 130.0
1 10 16 24 20.00 200.0 140.0
1 11 18 25 21.50 215.0 155.0 13.57 15.19
1 12 19.5 26 22.75 227.5 167.5
1 13 21 26.8 23.90 239.0 179.0
1 14 22.5 27.5 25.00 250.0 190.0
1 15 24 28.2 26.10 261.0 201.0
1 16 26 29 27.50 275.0 215.0
1 17 27 29.6 28.30 283.0 223.0
1 18 28 30 29.00 290.0 230.0
1 19 29 31 30.00 300.0 240.0 12.39 17.05
1 20 30.1 32 31.05 310.5 250.5
1 21 31 33 32.00 320.0 260.0
1 22 32 34 33.00 330.0 270.0
1 23 34 35 34.50 345.0 285.0
1 24 38
1 25 42.5
1 26 47
1 27 52.2
1 28 57
1 29 62.1
1 30 67.2
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 91+ 500 R. 2.90 M Y : 0295693 X : 0474063 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 5.2 7 6.10 61.0 61.0
1 2 6 8 7.00 70.0 9.0
1 3 8.5 9.5 9.00 90.0 29.0
1 4 11 12 11.50 115.0 54.0 15.71 12.61
1 5 15.5 13 14.25 142.5 81.5
1 6 16.5 14 15.25 152.5 91.5
1 7 19 15.2 17.10 171.0 110.0
1 8 20 16 18.00 180.0 119.0
1 9 20.5 17 18.75 187.5 126.5
1 10 21.4 18.6 20.00 200.0 139.0
1 11 22.4 20.5 21.45 214.5 153.5
1 12 23 22 22.50 225.0 164.0
1 13 23.5 23 23.25 232.5 171.5 11.17 19.46
1 14 24 24 24.00 240.0 179.0
1 15 24.4 24.5 24.45 244.5 183.5
1 16 25 25 25.00 250.0 189.0
1 17 26 25.5 25.75 257.5 196.5
1 18 26.4 26 26.20 262.0 201.0
1 19 27.2 26.5 26.85 268.5 207.5
1 20 28 28 28.00 280.0 219.0
1 21 29 29.1 29.05 290.5 229.5
1 22 30.5 31 30.75 307.5 246.5
1 23 32 32 32.00 320.0 259.0
1 24 33 33 33.00 330.0 269.0 11.00 19.83
1 25 34 34.2 34.10 341.0 280.0
1 26 34.5 35.4 34.95 349.5 288.5
1 27 35.5 36.5 36.00 360.0 299.0
1 28 36.5 37.5 37.00 370.0 309.0
1 29 37.3 39 38.15 381.5 320.5
1 30 38 40.2 39.10 391.0 330.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 91 + 600 R. 3.00 M Y : 0295727 X : 0473979 Date : November 21, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0 0.0
1 1 1 3 2.00 20.0 20.0
1 2 3 4 3.50 35.0 15.0
1 3 4 6 5.00 50.0 30.0
1 4 5 7 6.00 60.0 40.0
1 5 6 8.5 7.25 72.5 52.5 11.11 19.58
1 6 6.5 10 8.25 82.5 62.5
1 7 7 12 9.50 95.0 75.0
1 8 8 14 11.00 110.0 90.0
1 9 9 15 12.00 120.0 100.0
1 10 10 16.4 13.20 132.0 112.0
1 11 12 18 15.00 150.0 130.0
1 12 14 19.3 16.65 166.5 146.5
1 13 16 21 18.50 185.0 165.0
1 14 19 22 20.50 205.0 185.0
1 15 22.6 24 23.30 233.0 213.0 15.13 13.24
1 16 26 25.5 25.75 257.5 237.5
1 17 27.5 27 27.25 272.5 252.5
1 18 29 29.2 29.10 291.0 271.0
1 19 30.5 31 30.75 307.5 287.5
1 20 31.5 33 32.25 322.5 302.5
1 21 33 35 34.00 340.0 320.0
1 22 34.5 37 35.75 357.5 337.5
1 23 35.5 38.5 37.00 370.0 350.0
1 24 36.4 40 38.20 382.0 362.0
1 25 37 40.5 38.75 387.5 367.5 13.25 15.66
1 26 38 41.5 39.75 397.5 377.5
1 27 38.4 42 40.20 402.0 382.0
1 28 39 42.5 40.75 407.5 387.5
1 29 39.5 43 41.25 412.5 392.5
1 30 40 43.5 41.75 417.5 397.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 91 + 700 R. 3.62 M Y : 0295738 X : 0473894 Date : November 21, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 2 0 0 0.0
1 1 5 3 4.00 40.0 40.0
1 2 7 6 6.50 65.0 25.0
1 3 9 9 9.00 90.0 50.0
1 4 12 12.2 12.10 121.0 81.0
1 5 15 14 14.50 145.0 105.0 24.19 7.29
1 6 19 16.5 17.75 177.5 137.5
1 7 21 20.1 20.55 205.5 165.5
1 8 23.6 23.1 23.35 233.5 193.5
1 9 26.6 25.1 25.85 258.5 218.5
1 10 29 27 28.00 280.0 240.0
1 11 33 30 31.50 315.0 275.0
1 12 37 33 35.00 350.0 310.0 24.53 7.16
1 13 40.2 35.3 37.75 377.5 337.5
1 14 42.5 36.6 39.55 395.5 355.5
1 15 44.5 38.4 41.45 414.5 374.5
1 16 46 40.5 43.25 432.5 392.5
1 17 47 42.5 44.75 447.5 407.5
1 18 48 44.5 46.25 462.5 422.5
1 19 49 46.5 47.75 477.5 437.5
1 20 50 48 49.00 490.0 450.0
1 21 50.7 50 50.35 503.5 463.5
1 22 51.2 51 51.10 511.0 471.0 19.76 9.43
1 23 52 52 52.00 520.0 480.0
1 24 53 52.5 52.75 527.5 487.5
1 25 53.5 53.3 53.40 534.0 494.0
1 26 54.1 54.2 54.15 541.5 501.5
1 27 55 55.4 55.20 552.0 512.0
1 28 55.5 56.5 56.00 560.0 520.0 18.25 10.43
1 29 56.5 58 57.25 572.5 532.5
1 30 57.5 60 58.75 587.5 547.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 91 + 800 L. 3.34 M Y : 0295735 X : 0473802 Date : November 21, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 12 14.5 13.25 132.5 132.5
1 2 17 16 16.50 165.0 32.5
1 3 21 16.5 18.75 187.5 55.0 15.00 13.38
1 4 23 17 20.00 200.0 67.5
1 5 26 17.5 21.75 217.5 85.0
1 6 27 18 22.50 225.0 92.5
1 7 28 19.5 23.75 237.5 105.0
1 8 29 22.5 25.75 257.5 125.0
1 9 30 24 27.00 270.0 137.5
1 10 31 25 28.00 280.0 147.5
1 11 32 26 29.00 290.0 157.5
1 12 33 27 30.00 300.0 167.5 11.91 17.93
1 13 33.5 28 30.75 307.5 175.0
1 14 34 29 31.50 315.0 182.5
1 15 35 29.5 32.25 322.5 190.0
1 16 35.4 30.1 32.75 327.5 195.0
1 17 36 31 33.50 335.0 202.5
1 18 37 32 34.50 345.0 212.5
1 19 38 33 35.50 355.0 222.5
1 20 40 33.5 36.75 367.5 235.0
1 21 42 34 38.00 380.0 247.5
1 22 43.2 35 39.10 391.0 258.5 14.08 14.49
1 23 45.4 36 40.70 407.0 274.5
1 24 47 36.5 41.75 417.5 285.0
1 25 49 37 43.00 430.0 297.5
1 26 55 38 46.50 465.0 332.5
1 27 58 38.5 48.25 482.5 350.0
1 28 65 40 52.50 525.0 392.5
1 29 68 40.5 54.25 542.5 410.0
1 30 70 41 55.50 555.0 422.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 91 + 900 L. 3.31 M Y : 0295684 X : 0473728 Date : November 21, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 1 3 2.00 20.0 20.0
1 2 5.5 7 6.25 62.5 42.5
1 3 9 10.5 9.75 97.5 77.5
1 4 12 13.2 12.60 126.0 106.0
1 5 14 16 15.00 150.0 130.0 17.77 10.78
1 6 15 18.4 16.70 167.0 147.0
1 7 15.5 19.5 17.50 175.0 155.0
1 8 16 20.5 18.25 182.5 162.5
1 9 17 21.4 19.20 192.0 172.0
1 10 19 22.3 20.65 206.5 186.5
1 11 20.1 23 21.55 215.5 195.5
1 12 21 24 22.50 225.0 205.0
1 13 22 25 23.50 235.0 215.0
1 14 23 25.5 24.25 242.5 222.5
1 15 23.5 26.1 24.80 248.0 228.0 14.53 13.93
1 16 24 27 25.50 255.0 235.0
1 17 25 28 26.50 265.0 245.0
1 18 26 29.5 27.75 277.5 257.5
1 19 27.2 32 29.60 296.0 276.0
1 20 29 35.5 32.25 322.5 302.5
1 21 31 38.5 34.75 347.5 327.5
1 22 34 41 37.50 375.0 355.0
1 23 37 42 39.50 395.0 375.0
1 24 39.5 43 41.25 412.5 392.5
1 25 42 43.5 42.75 427.5 407.5 16.08 12.24
1 26 44.5 44.3 44.40 444.0 424.0
1 27 47 45 46.00 460.0 440.0
1 28 47.2 45.6 46.40 464.0 444.0
1 29 51.1 46.2 48.65 486.5 466.5
1 30 53.5 47 50.25 502.5 482.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 92 + 025 R. 3.44 M Y : 0295751 X : 0473626 Date : November 21, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 3 3 3.00 30.0 30.0
1 2 10 6 8.00 80.0 50.0
1 3 14.5 9.5 12.00 120.0 90.0
1 4 20.5 13.5 17.00 170.0 140.0
1 5 23.5 20.5 22.00 220.0 190.0 31.67 5.18
1 6 26 24 25.00 250.0 220.0
1 7 28 26.4 27.20 272.0 242.0
1 8 30 29 29.50 295.0 265.0
1 9 32 31 31.50 315.0 285.0
1 10 35 32.5 33.75 337.5 307.5
1 11 37 34.5 35.75 357.5 327.5
1 12 40 36.4 38.20 382.0 352.0
1 13 43.1 39.5 41.30 413.0 383.0
1 14 46 43 44.50 445.0 415.0
1 15 47 47.5 47.25 472.5 442.5
1 16 48.5 52 50.25 502.5 472.5 29.00 5.79
1 17 50 55.5 52.75 527.5 497.5
1 18 52.4 58 55.20 552.0 522.0
1 19 55 62 58.50 585.0 555.0
1 20 57 65 61.00 610.00 580.00
1 21 59 67.5 63.25 632.5 602.5
1 22 60.4 70 65.20 652.0 622.0
1 23 62 73 67.50 675.0 645.0
1 24 64 76 70.00 700.0 670.0 26.58 6.47
1 25 65 78 71.50 715.0 685.0
1 26 69 80 74.50 745.0 715.0
1 27 71.4 81.5 76.45 764.5 734.5
1 28 73 83 78.00 780.0 750.0
1 29 75.5 85 80.25 802.5 772.5
1 30 77.5 88 82.75 827.5 797.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 92 + 100 R. 2.92 M Y : 0295770 X : 0473549 Date : November 21, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 12 2 7.00 70.0 70.0
1 2 14 10 12.00 120.0 50.0
1 3 16.5 12 14.25 142.5 72.5
1 4 18.5 16 17.25 172.5 102.5
1 5 21 19.1 20.05 200.5 130.5 23.11 7.73
1 6 22 20 21.00 210.0 140.0
1 7 23 22 22.50 225.0 155.0
1 8 24 27 25.50 255.0 185.0
1 9 24.6 31 27.80 278.0 208.0
1 10 26 35 30.50 305.0 235.0
1 11 28 36.1 32.05 320.5 250.5
1 12 30.5 41.2 35.85 358.5 288.5
1 13 32.5 52.4 42.45 424.5 354.5 30.56 5.42
1 14 35 60.4 47.70 477.0 407.0
1 15 38 65.1 51.55 515.5 445.5
1 16 40.5 71.3 55.90 559.0 489.0
1 17 50.5 75.3 62.90 629.0 559.0
1 18 59 80.1 69.55 695.5 625.5
1 19 66 84.3 75.15 751.5 681.5 37.50 4.18
1 20 71 89 80.00 800.0 730.0
1 21 75.5 94 84.75 847.5 777.5
1 22 79 100 89.50 895.0 825.0
1 23 82
1 24 87
1 25 92
1 26 97
1 27 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 92 + 200 L. 3.32 M Y : 029 5749 X : 047 3453 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0 0.0
1 1 2 12 7.00 70.0 70.0
1 2 9 14.2 11.60 116.0 46.0
1 3 12 17.3 14.65 146.5 76.5
1 4 15 20.3 17.65 176.5 106.5 27.21 6.28
1 5 17 24 20.50 205.0 135.0
1 6 20 26 23.00 230.0 160.0
1 7 24.1 28 26.05 260.5 190.5
1 8 27.2 29.5 28.35 283.5 213.5
1 9 31.1 31 31.05 310.5 240.5
1 10 33 32.5 32.75 327.5 257.5
1 11 34.5 34 34.25 342.5 272.5 22.50 7.99
1 12 36 35 35.50 355.0 285.0
1 13 37 35.5 36.25 362.5 292.5
1 14 38.2 36.5 37.35 373.5 303.5
1 15 39.4 37 38.20 382.0 312.0
1 16 40.2 38 39.10 391.0 321.0
1 17 41 39 40.00 400.0 330.0
1 18 42.3 40 41.15 411.5 341.5 17.80 10.77
1 19 43.7 40.5 42.10 421.0 351.0
1 20 45.7 41.5 43.60 436.0 366.0
1 21 47.2 42.5 44.85 448.5 378.5
1 22 49 43.3 46.15 461.5 391.5
1 23 50.5 44 47.25 472.5 402.5
1 24 51.5 45.1 48.30 483.0 413.0
1 25 52.5 46.5 49.50 495.0 425.0
1 26 53.5 47.8 50.65 506.5 436.5 16.00 12.32
1 27 54.7 48 51.35 513.5 443.5
1 28 56.7 49 52.85 528.5 458.5
1 29 58.8 49.5 54.15 541.5 471.5
1 30 60 50 55.00 550.0 480.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 92 + 300 R. 5.10 M Y : 029 5696 X : 047 3363 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 7 3 5.00 50.0 50.0
1 2 16 7 11.50 115.0 65.0
1 3 26.5 17 21.75 217.5 167.5
1 4 36 30.5 33.25 332.5 282.5 54.64 2.59
1 5 38.5 36 37.25 372.5 322.5
1 6 41 38.5 39.75 397.5 347.5
1 7 46.1 40.4 43.25 432.5 382.5
1 8 51.1 42 46.55 465.5 415.5
1 9 55.5 43 49.25 492.5 442.5
1 10 63 44 53.50 535.0 485.0
1 11 72.3 45 58.65 586.5 536.5 51.14 2.82
1 12 82 47.1 64.55 645.5 595.5
1 13 94 50.5 72.25 722.5 672.5
1 14 100 53.2 76.60 766.0 716.0
1 15 55.5
1 16 57
1 17 58
1 18 59
1 19 59.4
1 20 60
1 21 60.5
1 22 61
1 23 62

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 92 + 400 L. 3.25 M Y : 029 5727 X : 047 3271 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 1 0 0 0.0
1 1 7 5 6.00 60.0 60.0
1 2 8.5 8 8.25 82.5 22.5
1 3 10.5 9 9.75 97.5 37.5
1 4 12 10.5 11.25 112.5 52.5
1 5 13 11.5 12.25 122.5 62.5 11.67 18.41
1 6 14 13 13.50 135.0 75.0
1 7 15 14 14.50 145.0 85.0
1 8 16.1 15 15.55 155.5 95.5
1 9 17 16 16.50 165.0 105.0
1 10 18 16.6 17.30 173.0 113.0
1 11 18.6 17 17.80 178.0 118.0
1 12 19 18 18.50 185.0 125.0
1 13 20.1 18.5 19.30 193.0 133.0
1 14 21.2 19 20.10 201.0 141.0
1 15 22.5 20 21.25 212.5 152.5 9.50 23.89
1 16 23.5 20.5 22.00 220.0 160.0
1 17 24.5 21 22.75 227.5 167.5
1 18 25 22 23.50 235.0 175.0
1 19 25.5 22.5 24.00 240.0 180.0
1 20 26.5 23.5 25.00 250.0 190.0
1 21 28 24.2 26.10 261.0 201.0
1 22 30 25.3 27.65 276.5 216.5
1 23 31.2 26.5 28.85 288.5 228.5
1 24 33 28.6 30.80 308.0 248.0
1 25 34 30.2 32.10 321.0 261.0 11.25 19.28
1 26 37 32 34.50 345.0 285.0
1 27 38.5 33.5 36.00 360.0 300.0
1 28 39.5 34.5 37.00 370.0 310.0
1 29 41 35.6 38.30 383.0 323.0
1 30 42.5 37 39.75 397.5 337.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 92 + 500 R. 3.25 M Y : 029 5806 X : 047 3248 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 0 0 0 0.0
1 1 6 6 6.00 60.0 60.0
1 2 8 9 8.50 85.0 25.0
1 3 10 11 10.50 105.0 45.0
1 4 12.2 12 12.10 121.0 61.0
1 5 14.5 14 14.25 142.5 82.5 20.00 9.28
1 6 17.5 16 16.75 167.5 107.5
1 7 20 18.5 19.25 192.5 132.5
1 8 22 19.5 20.75 207.5 147.5
1 9 25 21 23.00 230.0 170.0
1 10 29 23 26.00 260.0 200.0
1 11 32.1 25 28.55 285.5 225.5
1 12 33.5 26.5 30.00 300.0 240.0
1 13 35 28.5 31.75 317.5 257.5
1 14 37 30 33.50 335.0 275.0
1 15 38.5 31 34.75 347.5 287.5
1 16 40.3 31.5 35.90 359.0 299.0
1 17 42.2 32.5 37.35 373.5 313.5 16.93 11.47
1 18 44.2 34 39.10 391.0 331.0
1 19 45.5 35 40.25 402.5 342.5
1 20 46.3 36 41.15 411.5 351.5
1 21 47 37.5 42.25 422.5 362.5
1 22 47.5 39 43.25 432.5 372.5
1 23 48 41.5 44.75 447.5 387.5
1 24 48.5 43.5 46.00 460.0 400.0
1 25 49 44 46.50 465.0 405.0
1 26 49.5 45 47.25 472.5 412.5 14.58 13.86
1 27 50 45.5 47.75 477.5 417.5
1 28 50.5 46 48.25 482.5 422.5
1 29 51 47 49.00 490.0 430.0
1 30 51.5 48 49.75 497.5 437.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 92 + 600 L. 3.24 M Y : 029 5884 X : 047 3299 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 4 3 3.50 35.0 35.0
1 2 6.5 4.5 5.50 55.0 20.0
1 3 8.5 5 6.75 67.5 32.5 14.29 14.23
1 4 10 7.5 8.75 87.5 52.5
1 5 12 9 10.50 105.0 70.0
1 6 13.2 10.5 11.85 118.5 83.5
1 7 15 12 13.50 135.0 100.0
1 8 17 13.5 15.25 152.5 117.5
1 9 19 14 16.50 165.0 130.0
1 10 20.5 15 17.75 177.5 142.5
1 11 22 15.5 18.75 187.5 152.5
1 12 23 16 19.50 195.0 160.0 14.72 13.70
1 13 24 17 20.50 205.0 170.0
1 14 25.5 18 21.75 217.5 182.5
1 15 27 20 23.50 235.0 200.0
1 16 28.5 23 25.75 257.5 222.5
1 17 29.6 25.1 27.35 273.5 238.5
1 18 31 29 30.00 300.0 265.0
1 19 32 30 31.00 310.0 275.0
1 20 33 31.2 32.10 321.0 286.0
1 21 34 33 33.50 335.0 300.0
1 22 35 34 34.50 345.0 310.0
1 23 36.2 35.5 35.85 358.5 323.5
1 24 37.5 37 37.25 372.5 337.5 13.67 15.06
1 25 39 38.5 38.75 387.5 352.5
1 26 40.2 40.5 40.35 403.5 368.5
1 27 41.2 42 41.60 416.0 381.0
1 28 42 43 42.50 425.0 390.0
1 29 43.5 44 43.75 437.5 402.5
1 30 44 45 44.50 445.0 410.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 92 + 700 R. 3.62 M Y : 029 5939 X : 047 3220 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 2 0 0 0.0
1 1 5 5 5.00 50.0 50.0
1 2 8 7 7.50 75.0 25.0
1 3 11 9.5 10.25 102.5 52.5 16.67 11.70
1 4 12.5 12 12.25 122.5 72.5
1 5 14 14 14.00 140.0 90.0
1 6 15 15 15.00 150.0 100.0
1 7 16.5 16.1 16.30 163.0 113.0
1 8 19 18.2 18.60 186.0 136.0
1 9 22.4 21.5 21.95 219.5 169.5
1 10 25 25 25.00 250.0 200.0
1 11 27.2 28 27.60 276.0 226.0 19.43 9.63
1 12 29 30.1 29.55 295.5 245.5
1 13 20.3 32 26.15 261.5 211.5
1 14 32 34 33.00 330.0 280.0
1 15 33.3 35 34.15 341.5 291.5
1 16 35.2 36 35.60 356.0 306.0
1 17 37 37 37.00 370.0 320.0
1 18 38.2 37.8 38.00 380.0 330.0
1 19 39.5 39 39.25 392.5 342.5 17.11 11.32
1 20 41.5 40 40.75 407.5 357.5
1 21 43.2 41 42.10 421.0 371.0
1 22 44.3 42 43.15 431.5 381.5
1 23 45.5 43.2 44.35 443.5 393.5
1 24 46.5 44.2 45.35 453.5 403.5
1 25 48 45.2 46.60 466.0 416.0
1 26 50 46.5 48.25 482.5 432.5 16.68 11.69
1 27 52 48.1 50.05 500.5 450.5
1 28 53.8 50 51.90 519.0 469.0
1 29 55 51.6 53.30 533.0 483.0
1 30 56.6 53.5 55.05 550.5 500.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 92 + 850 R. 4.68 M Y : 029 6060 X : 047 3130 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 9 3 6.00 60.0 60.0
1 2 12 6 9.00 90.0 30.0
1 3 13 9 11.00 110.0 50.0 17.08 11.34
1 4 13.5 13 13.25 132.5 72.5
1 5 14.2 15 14.60 146.0 86.0
1 6 15 17.5 16.25 162.5 102.5
1 7 15.5 20 17.75 177.5 117.5
1 8 16 21 18.50 185.0 125.0
1 9 16.5 22.1 19.30 193.0 133.0
1 10 17 26 21.50 215.0 155.0 14.69 13.73
1 11 17.5 30.5 24.00 240.0 180.0
1 12 18 31.5 24.75 247.5 187.5
1 13 18.2 32 25.10 251.0 191.0
1 14 19

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 92 + 900 R. 6.15 M Y : 029 6086 X : 047 3114 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 2 0 0 0.0
1 1 4 3.4 3.70 37.0 37.0
1 2 5.1 5 5.05 50.5 13.5
1 3 7 6 6.50 65.0 28.0
1 4 8 7 7.50 75.0 38.0
1 5 11 8.5 9.75 97.5 60.5 12.22 17.35
1 6 12 10 11.00 110.0 73.0
1 7 14 11 12.50 125.0 88.0
1 8 15 12 13.50 135.0 98.0
1 9 16 13.4 14.70 147.0 110.0
1 10 17.5 14.5 16.00 160.0 123.0
1 11 18.5 16 17.25 172.5 135.5
1 12 19 17 18.00 180.0 143.0
1 13 20 17.5 18.75 187.5 150.5
1 14 21 18 19.50 195.0 158.0
1 15 22 19 20.50 205.0 168.0 10.40 21.30
1 16 22.5 19.5 21.00 210.0 173.0
1 17 23.4 20.5 21.95 219.5 182.5
1 18 24 21.5 22.75 227.5 190.5
1 19 25 22 23.50 235.0 198.0
1 20 26 23 24.50 245.0 208.0
1 21 27 23.3 25.15 251.5 214.5
1 22 27.5 24 25.75 257.5 220.5
1 23 28 25 26.50 265.0 228.0
1 24 29 25.5 27.25 272.5 235.5
1 25 30 26 28.00 280.0 243.0 9.18 24.95
1 26 30.5 26.5 28.50 285.0 248.0
1 27 31.2 27 29.10 291.0 254.0
1 28 32 27.5 29.75 297.5 260.5
1 29 33 28 30.50 305.0 268.0
1 30 34 28.5 31.25 312.5 275.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 93 + 000 L. 3.12 M Y : 029 6165 X : 047 3036 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 5 0 0 0.0
1 1 5 10 7.50 75.0 75.0
1 2 7 12 9.50 95.0 20.0
1 3 8 13 10.50 105.0 30.0 11.75 18.24
1 4 9 14 11.50 115.0 40.0
1 5 11 15.1 13.05 130.5 55.5
1 6 12 17.1 14.55 145.5 70.5
1 7 14 21 17.50 175.0 100.0
1 8 17 24 20.50 205.0 130.0
1 9 18.5 26 22.25 222.5 147.5
1 10 20.5 27.5 24.00 240.0 165.0
1 11 23 29 26.00 260.0 185.0
1 12 25 32 28.50 285.0 210.0
1 13 27 36.5 31.75 317.5 242.5 36.11 4.38
1 14 28 43.2 35.60 356.0 281.0
1 15 29 53.5 41.25 412.5 337.5
1 16 31 66.6 48.80 488.0 413.0
1 17 35 83 59.00 590.0 515.0
1 18 45 100 72.50 725.0 650.0
1 19 56
1 20 74
1 21 100
1
1
1
1
1
1
1
1
1
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 93 + 100 L. 3.41 M Y : 029 6232 X : 047 2972 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 4 4 4.00 40.0 40.0
1 2 7.5 8 7.75 77.5 37.5
1 3 11 11.5 11.25 112.5 72.5 34.17 4.70
1 4 16 16 16.00 160.0 120.0
1 5 23.5 20 21.75 217.5 177.5
1 6 25 24 24.50 245.0 205.0
1 7 30 30 30.00 300.0 260.0
1 8 34.5 38 36.25 362.5 322.5
1 9 39 43 41.00 410.0 370.0
1 10 41.4 47 44.20 442.0 402.0
1 11 43.2 53.5 48.35 483.5 443.5 39.83 3.87
1 12 45.5 58.5 52.00 520.0 480.0
1 13 49 62.5 55.75 557.5 517.5
1 14 53 66 59.50 595.0 555.0
1 15 57.5 70 63.75 637.5 597.5
1 16 62 73 67.50 675.0 635.0
1 17 66 77 71.50 715.0 675.0
1 18 70 80 75.00 750.0 710.0
1 19 75 84 79.50 795.0 755.0 39.35 3.93
1 20 79.1 89 84.05 840.5 800.5
1 21 82 94 88.00 880.0 840.0
1 22 88 96 92.00 920.0 880.0
1 23 89 100 94.50 945.0 905.0
1 24 93
1 25 95
1 26 97
1 27 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 93 + 200 L. 3.62 M Y : 029 6210 X : 047 2877 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 3 2 0 0 0.0
1 1 6 5 5.50 55.0 55.0
1 2 7 7.5 7.25 72.5 17.5
1 3 9 10.3 9.65 96.5 41.5 18.33 10.37
1 4 11 13 12.00 120.0 65.0
1 5 12.5 16 14.25 142.5 87.5
1 6 14.5 18.5 16.50 165.0 110.0
1 7 17 24.5 20.75 207.5 152.5
1 8 19 28.5 23.75 237.5 182.5
1 9 22.5 35 28.75 287.5 232.5
1 10 26 39.2 32.60 326.0 271.0
1 11 30 47.3 38.65 386.5 331.5
1 12 33.1 51.2 42.15 421.5 366.5 33.11 4.89
1 13 37.1 57 47.05 470.5 415.5
1 14 42 67.3 54.65 546.5 491.5
1 15 44 71 57.50 575.0 520.0
1 16 46 76.5 61.25 612.5 557.5
1 17 48.5 78 63.25 632.5 577.5
1 18 51.1 79.1 65.10 651.0 596.0
1 19 53 80.5 66.75 667.5 612.5
1 20 55.5 82 68.75 687.5 632.5
1 21 62 83 72.50 725.0 670.0
1 22 69 84.5 76.75 767.5 712.5
1 23 78 87 82.50 825.0 770.0 33.70 4.78
1 24 83 88.5 85.75 857.5 802.5
1 25 89 91 90.00 900.0 845.0
1 26 91 96 93.50 935.0 880.0
1 27 93 100 96.50 965.0 910.0
1 28 95
1 29 96
1 30 100
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 93 +300 R. 3.29 M Y : 029 6207 X : 047 2775 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 3 4 3.50 35.0 35.0
1 2 5 7 6.00 60.0 25.0
1 3 7 9 8.00 80.0 45.0
1 4 9 11 10.00 100.0 65.0 15.71 12.61
1 5 10.5 12 11.25 112.5 77.5
1 6 12 14 13.00 130.0 95.0
1 7 14 15 14.50 145.0 110.0
1 8 15 17 16.00 160.0 125.0
1 9 17 18 17.50 175.0 140.0
1 10 19 18.5 18.75 187.5 152.5
1 11 21 19 20.00 200.0 165.0
1 12 23 20 21.50 215.0 180.0 13.67 15.06
1 13 24 21 22.50 225.0 190.0
1 14 24.5 22 23.25 232.5 197.5
1 15 25 23 24.00 240.0 205.0
1 16 26 24 25.00 250.0 215.0
1 17 27 25 26.00 260.0 225.0
1 18 28 26.5 27.25 272.5 237.5
1 19 29 28 28.50 285.0 250.0 12.85 16.28
1 20 30 29 29.50 295.0 260.0
1 21 32 30.4 31.20 312.0 277.0
1 22 33 31.1 32.05 320.5 285.5
1 23 34 32.1 33.05 330.5 295.5
1 24 35.5 33 34.25 342.5 307.5
1 25 36.5 34.5 35.50 355.0 320.0
1 26 38 36 37.00 370.0 335.0
1 27 40 37.5 38.75 387.5 352.5 13.83 14.83
1 28 44 39 41.50 415.0 380.0
1 29 46.5 40 43.25 432.5 397.5
1 30 48 42 45.00 450.0 415.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 93 +400 R. 3.64 M Y : 029 6213 X : 047 2879 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 2 0 0 0.0
1 1 7.5 9 8.25 82.5 82.5
1 2 13.5 14 13.75 137.5 55.0
1 3 20 17 18.50 185.0 102.5
1 4 22 22 22.00 220.0 137.5 28.21 6.00
1 5 24 24.5 24.25 242.5 160.0
1 6 26 26 26.00 260.0 177.5
1 7 29 27 28.00 280.0 197.5
1 8 31 28.9 29.95 299.5 217.0
1 9 32 29.5 30.75 307.5 225.0
1 10 33 31 32.00 320.0 237.5
1 11 34.2 33.4 33.80 338.0 255.5
1 12 35.5 35.5 35.50 355.0 272.5 21.86 8.29
1 13 37 37.7 37.35 373.5 291.0
1 14 38.5 40 39.25 392.5 310.0
1 15 40.5 42.5 41.50 415.0 332.5
1 16 43 44.4 43.70 437.0 354.5
1 17 45 46.5 45.75 457.5 375.0
1 18 47.2 48 47.60 476.0 393.5
1 19 49 50 49.50 495.0 412.5
1 20 50 51.5 50.75 507.5 425.0
1 21 51 53 52.00 520.0 437.5
1 22 52 54 53.00 530.0 447.5
1 23 53 55.5 54.25 542.5 460.0 17.40 11.08
1 24 53.4 57 55.20 552.0 469.5
1 25 54 58.2 56.10 561.0 478.5
1 26 54.5 59.2 56.85 568.5 486.0
1 27 55 60.4 57.70 577.0 494.5
1 28 56 61.5 58.75 587.5 505.0
1 29 57 62.5 59.75 597.5 515.0
1 30 57.5 63.4 60.45 604.5 522.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 93 +500 L. 3.47 M Y : 029 6339 X : 047 2620 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 0 0 0 0.0
1 1 6 5 5.50 55.0 55.0
1 2 9 10 9.50 95.0 40.0
1 3 12 11.5 11.75 117.5 62.5
1 4 13 14 13.50 135.0 80.0 15.43 12.91
1 5 13.5 15 14.25 142.5 87.5
1 6 14 16 15.00 150.0 95.0
1 7 15.1 17.5 16.30 163.0 108.0
1 8 16.2 19 17.60 176.0 121.0
1 9 17 20 18.50 185.0 130.0
1 10 18.2 21 19.60 196.0 141.0
1 11 18.9 22 20.45 204.5 149.5
1 12 19.5 23.5 21.50 215.0 160.0 12.94 16.14
1 13 20.5 24 22.25 222.5 167.5
1 14 22 25.5 23.75 237.5 182.5
1 15 23 27.5 25.25 252.5 197.5
1 16 24 28.4 26.20 262.0 207.0
1 17 25 29.5 27.25 272.5 217.5
1 18 26 30 28.00 280.0 225.0
1 19 26.5 30.5 28.50 285.0 230.0
1 20 27 31 29.00 290.0 235.0
1 21 28 31.5 29.75 297.5 242.5
1 22 28.5 32 30.25 302.5 247.5
1 23 29 32.5 30.75 307.5 252.5 9.75 23.12
1 24 30 33 31.50 315.0 260.0
1 25 30.5 34 32.25 322.5 267.5
1 26 31 34.5 32.75 327.5 272.5
1 27 31.5 35 33.25 332.5 277.5
1 28 32 35.5 33.75 337.5 282.5
1 29 32.5 36 34.25 342.5 287.5
1 30 33 36.5 34.75 347.5 292.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 93 +600 R. 4.16 M Y : 029 6403 X : 047 2588 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 4 0 0 0.0
1 1 4 5 4.50 45.0 45.0
1 2 8 7 7.50 75.0 30.0
1 3 12 12 12.00 120.0 75.0
1 4 16 16.5 16.25 162.5 117.5
1 5 19 19 19.00 190.0 145.0 23.11 7.73
1 6 21 20.5 20.75 207.5 162.5
1 7 23 22 22.50 225.0 180.0
1 8 24.5 23.5 24.00 240.0 195.0
1 9 26.1 24.5 25.30 253.0 208.0
1 10 27.6 25.5 26.55 265.5 220.5
1 11 29.6 26.6 28.10 281.0 236.0
1 12 30 27.8 28.90 289.0 244.0
1 13 31 29 30.00 300.0 255.0
1 14 32.5 30 31.25 312.5 267.5
1 15 33 31.4 32.20 322.0 277.0
1 16 33.5 34 33.75 337.5 292.5 18.14 10.51
1 17 34.5 37.5 36.00 360.0 315.0
1 18 35.5 40 37.75 377.5 332.5
1 19 36 42.5 39.25 392.5 347.5
1 20 37 46 41.50 415.0 370.0
1 21 40 47.2 43.60 436.0 391.0
1 22 40.5 48.3 44.40 444.0 399.0
1 23 41 49.2 45.10 451.0 406.0
1 24 41.6 50.3 45.95 459.5 414.5
1 25 42.2 51 46.60 466.0 421.0
1 26 43 52.3 47.65 476.5 431.5 15.33 13.01
1 27 43.5 53.3 48.40 484.0 439.0
1 28 44 54.5 49.25 492.5 447.5
1 29 44.5 55 49.75 497.5 452.5
1 30 45 56 50.50 505.0 460.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 93 +700 L. 3.32 M Y : 029 6428 X : 047 2506 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 0 0 0 0.0
1 1 2 3 2.50 25.0 25.0
1 2 4 5 4.50 45.0 20.0
1 3 6 7 6.50 65.0 40.0
1 4 8 9 8.50 85.0 60.0
1 5 9 10 9.50 95.0 70.0 12.69 16.55
1 6 10 11 10.50 105.0 80.0
1 7 11 12 11.50 115.0 90.0
1 8 12.5 12.8 12.65 126.5 101.5
1 9 13.5 13.2 13.35 133.5 108.5
1 10 15 14 14.50 145.0 120.0
1 11 15.5 14.5 15.00 150.0 125.0
1 12 16.5 15 15.75 157.5 132.5
1 13 18 16 17.00 170.0 145.0
1 14 19 16.5 17.75 177.5 152.5
1 15 20 17 18.50 185.0 160.0 9.64 23.45
1 16 21 17.5 19.25 192.5 167.5
1 17 22 18 20.00 200.0 175.0
1 18 23 19 21.00 210.0 185.0
1 19 24 19.5 21.75 217.5 192.5
1 20 24.5 20 22.25 222.5 197.5
1 21 25 20.5 22.75 227.5 202.5
1 22 25.5 21 23.25 232.5 207.5
1 23 26 21.5 23.75 237.5 212.5
1 24 27 22 24.50 245.0 220.0
1 25 27.5 22.5 25.00 250.0 225.0 8.67 26.85
1 26 28 23 25.50 255.0 230.0
1 27 29.2 23.5 26.35 263.5 238.5
1 28 30 24 27.00 270.0 245.0
1 29 31 24.5 27.75 277.5 252.5
1 30 32 25 28.50 285.0 260.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 93 +800 R. 3.66 M Y : 029 6502 X : 047 2538 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 15 10.5 12.75 127.5 127.5
1 2 21 19 20.00 200.0 72.5
1 3 34 24 29.00 290.0 162.5 32.42 5.03
1 4 35.8 25.5 30.65 306.5 179.0
1 5 37 26 31.50 315.0 187.5
1 6 38 26.4 32.20 322.0 194.5
1 7 39 27 33.00 330.0 202.5
1 8 40.5 27.5 34.00 340.0 212.5
1 9 41.6 28 34.80 348.0 220.5
1 10 42.2 28.5 35.35 353.5 226.0
1 11 43 29 36.00 360.0 232.5
1 12 43.2 29.5 36.35 363.5 236.0
1 13 44 30 37.00 370.0 242.5
1 14 44.5 30.5 37.50 375.0 247.5
1 15 45 31 38.00 380.0 252.5 12.44 16.97
1 16 45.5 31.4 38.45 384.5 257.0
1 17 46 32 39.00 390.0 262.5
1 18 46.5 32.4 39.45 394.5 267.0
1 19 47 33 40.00 400.0 272.5
1 20 47.5 33.6 40.55 405.5 278.0
1 21 48 34 41.00 410.0 282.5
1 22 48.5 34.6 41.55 415.5 288.0
1 23 49 35 42.00 420.0 292.5
1 24 49.5 35.7 42.60 426.0 298.5
1 25 50 36 43.00 430.0 302.5
1 26 50.4 36.8 43.60 436.0 308.5
1 27 51 37.8 44.40 444.0 316.5 11.17 19.46
1 28 51.5 38 44.75 447.5 320.0
1 29 52 39.4 45.70 457.0 329.5
1 30 52.5 40 46.25 462.5 335.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 93 +900 L. 3.48 M Y : 029 6553 X : 047 2475 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 3 4 3.50 35.0 35.0
1 2 4 6 5.00 50.0 15.0
1 3 5 9 7.00 70.0 35.0 15.71 12.61
1 4 7 11.5 9.25 92.5 57.5
1 5 8 13 10.50 105.0 70.0
1 6 9.5 15 12.25 122.5 87.5
1 7 12 17 14.50 145.0 110.0
1 8 15 19 17.00 170.0 135.0
1 9 17 22 19.50 195.0 160.0
1 10 18 23.5 20.75 207.5 172.5
1 11 19 26 22.50 225.0 190.0
1 12 22 28 25.00 250.0 215.0 18.93 9.95
1 13 25 29 27.00 270.0 235.0
1 14 26 29.5 27.75 277.5 242.5
1 15 29.8 34 31.90 319.0 284.0
1 16 33.3 35 34.15 341.5 306.5
1 17 36 36 36.00 360.0 325.0
1 18 37 37 37.00 370.0 335.0
1 19 38 38 38.00 380.0 345.0 17.73 10.82
1 20 39 40.5 39.75 397.5 362.5
1 21 40 42.2 41.10 411.0 376.0
1 22 41 44 42.50 425.0 390.0
1 23 42 46 44.00 440.0 405.0
1 24 43.2 47 45.10 451.0 416.0
1 25 45 48 46.50 465.0 430.0
1 26 47.5 50 48.75 487.5 452.5 17.40 11.08
1 27 49.5 51 50.25 502.5 467.5
1 28 50.5 55.4 52.95 529.5 494.5
1 29 51 56 53.50 535.0 500.0
1 30 53 58.4 55.70 557.0 522.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 94 +000 R. 4.21 M Y : 029 6583 X : 047 2379 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 3 4 3.50 35.0 35.0
1 2 4 7 5.50 55.0 20.0
1 3 6 10 8.00 80.0 45.0
1 4 7 11 9.00 90.0 55.0 14.06 14.52
1 5 8 12 10.00 100.0 65.0
1 6 9 14 11.50 115.0 80.0
1 7 10.1 15 12.55 125.5 90.5
1 8 12.5 17 14.75 147.5 112.5
1 9 13 18 15.50 155.0 120.0
1 10 13.5 20.1 16.80 168.0 133.0
1 11 14 21.8 17.90 179.0 144.0
1 12 15 23.5 19.25 192.5 157.5 13.13 15.85
1 13 17 25 21.00 210.0 175.0
1 14 19 26 22.50 225.0 190.0
1 15 20 26.5 23.25 232.5 197.5
1 16 22 27 24.50 245.0 210.0
1 17 23 27.5 25.25 252.5 217.5
1 18 24.5 28 26.25 262.5 227.5
1 19 26 29.5 27.75 277.5 242.5
1 20 29 30.5 29.75 297.5 262.5
1 21 31 31.6 31.30 313.0 278.0
1 22 32.5 33 32.75 327.5 292.5 14.17 14.38
1 23 34 34.6 34.30 343.0 308.0
1 24 35.5 36 35.75 357.5 322.5
1 25 38 37 37.50 375.0 340.0
1 26 40 38 39.00 390.0 355.0
1 27 40.5 40 40.25 402.5 367.5
1 28 41.5 43 42.25 422.5 387.5
1 29 42.5 45 43.75 437.5 402.5
1 30 44 48 46.00 460.0 425.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

STA : 94 +100 L. 3.76 M Y : 029 6645 X : 047 2315 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 3 2 0 0 0.0
1 1 4 3 3.50 35.0 35.0
1 2 6 5 5.50 55.0 20.0
1 3 8 7 7.50 75.0 40.0 15.71 12.61
1 4 10.5 9 9.75 97.5 62.5
1 5 13.1 10.4 11.75 117.5 82.5
1 6 14.5 11 12.75 127.5 92.5
1 7 15 14 14.50 145.0 110.0
1 8 19.1 15.5 17.30 173.0 138.0
1 9 22 17 19.50 195.0 160.0
1 10 24.5 19.2 21.85 218.5 183.5
1 11 26.5 22 24.25 242.5 207.5
1 12 29 24 26.50 265.0 230.0 23.38 7.61
1 13 31.5 26.1 28.80 288.0 253.0
1 14 35 29 32.00 320.0 285.0
1 15 38 32 35.00 350.0 315.0
1 16 42 36 39.00 390.0 355.0
1 17 45.5 41 43.25 432.5 397.5
1 18 48 44 46.00 460.0 425.0
1 19 48.5 46 47.25 472.5 437.5
1 20 49 47 48.00 480.0 445.0
1 21 49.5 47.5 48.50 485.0 450.0 20.24 9.14
1 22 50 48 49.00 490.0 455.0
1 23 51.5 48.6 50.05 500.5 465.5
1 24 61.2 49 55.10 551.0 516.0
1 25 62 49.5 55.75 557.5 522.5
1 26 63 50 56.50 565.0 530.0
1 27 63.4 50.6 57.00 570.0 535.0 18.58 10.19
1 28 65 51.2 58.10 581.0 546.0
1 29 65.5 52 58.75 587.5 552.5
1 30 66 52.5 59.25 592.5 557.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L CL R
DCP
DCP Point
Point

NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer


ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 94 + 200 L. 2.97 M Y : 029 6663 X : 047 2230 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0 0.0
1 1 4.5 3 3.75 37.5 37.5
1 2 7 5 6.00 60.0 22.5
1 3 9 7.5 8.25 82.5 45.0
1 4 10.5 8 9.25 92.5 55.0
1 5 12 11 11.50 115.0 77.5
1 6 13 12.5 12.75 127.5 90.0 13.54 15.23
1 7 13.6 13 13.30 133.0 95.5
1 8 14 15 14.50 145.0 107.5
1 9 15 16.5 15.75 157.5 120.0
1 10 17 18 17.50 175.0 137.5
1 11 18 19.5 18.75 187.5 150.0
1 12 19 21 20.00 200.0 162.5
1 13 20.1 23 21.55 215.5 178.0
1 14 22 24.5 23.25 232.5 195.0
1 15 24 26 25.00 250.0 212.5 14.08 14.49
1 16 25.1 27.8 26.45 264.5 227.0
1 17 26 29.8 27.90 279.0 241.5
1 18 27.2 31 29.10 291.0 253.5
1 19 28 33.5 30.75 307.5 270.0
1 20 29 34 31.50 315.0 277.5
1 21 30 35.5 32.75 327.5 290.0
1 22 31 36.1 33.55 335.5 298.0
1 23 32.2 37 34.60 346.0 308.5 12.50 16.86
1 24 33.5 37.6 35.55 355.5 318.0
1 25 34.5 38 36.25 362.5 325.0
1 26 35.5 38.9 37.20 372.0 334.5
1 27 36.5 39.8 38.15 381.5 344.0
1 28 37.5 40.5 39.00 390.0 352.5
1 29 38.5 41 39.75 397.5 360.0
1 30 39 43.5 41.25 412.5 375.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 94 +300 R. 4.10 M Y : 029 6709 X : 047 2129 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 21 16.4 18.70 187.0 187.0
1 2 28 28.5 28.25 282.5 95.5
1 3 35.2 37 36.10 361.0 174.0 47.33 3.11
1 4 39.1 41.5 40.30 403.0 216.0
1 5 43 44 43.50 435.0 248.0
1 6 46.2 48 47.10 471.0 284.0
1 7 48 52.5 50.25 502.5 315.5
1 8 50 54 52.00 520.0 333.0
1 9 51 58 54.50 545.0 358.0
1 10 52.2 56 54.10 541.0 354.0
1 11 54 61 57.50 575.0 388.0 32.87 4.94
1 12 56 63.2 59.60 596.0 409.0
1 13 58.8 66 62.40 624.0 437.0
1 14 64.1 68.5 66.30 663.0 476.0
1 15 67 69 68.00 680.0 493.0
1 16 78 72 75.00 750.0 563.0
1 17 80 73.2 76.60 766.0 579.0
1 18 82.1 75 78.55 785.5 598.5
1 19 83.1 77 80.05 800.5 613.5
1 20 84 78.4 81.20 812.0 625.0 28.08 6.03
1 21 86 79 82.50 825.0 638.0
1 22 87 79.8 83.40 834.0 647.0
1 23 90 80.3 85.15 851.5 664.5
1 24 94 81.5 87.75 877.5 690.5
1 25 96 82.4 89.20 892.0 705.0
1 26 100 83.4 91.70 917.0 730.0
1 27 85
1 28 86

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 94 +400 L. 3.21 M Y : 029 6692 X : 047 2052 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 3 5 4.00 40.0 40.0
1 2 4 6 5.00 50.0 10.0
1 3 4.5 7 5.75 57.5 17.5
1 4 6 7.5 6.75 67.5 27.5 13.44 15.38
1 5 9 8.5 8.75 87.5 47.5
1 6 11 9.6 10.30 103.0 63.0
1 7 13.6 11 12.30 123.0 83.0
1 8 17 12.5 14.75 147.5 107.5
1 9 20.8 14 17.40 174.0 134.0
1 10 22 15 18.50 185.0 145.0
1 11 23.5 17 20.25 202.5 162.5
1 12 24.6 18.2 21.40 214.0 174.0
1 13 25.5 19 22.25 222.5 182.5
1 14 27 21 24.00 240.0 200.0 13.70 15.01
1 15 28.5 21.5 25.00 250.0 210.0
1 16 29.8 23 26.40 264.0 224.0
1 17 31 24 27.50 275.0 235.0
1 18 33 25 29.00 290.0 250.0
1 19 34 25.5 29.75 297.5 257.5
1 20 36 26.8 31.40 314.0 274.0
1 21 37.5 27.3 32.40 324.0 284.0
1 22 39.5 28 33.75 337.5 297.5
1 23 41.2 28.5 34.85 348.5 308.5
1 24 43 29 36.00 360.0 320.0
1 25 44.5 29.4 36.95 369.5 329.5 13.57 15.20
1 26 47 30.2 38.60 386.0 346.0
1 27 50 31 40.50 405.0 365.0
1 28 52 31.4 41.70 417.0 377.0
1 29 54 32 43.00 430.0 390.0
1 30 56.4 33 44.70 447.0 407.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 94 +500 R. 3.53 M Y : 029 6674 X : 047 1965 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 3 0 0 0.0
1 1 3.5 4.4 3.95 39.5 39.5
1 2 4.2 5.5 4.85 48.5 9.0
1 3 5.2 6.4 5.80 58.0 18.5
1 4 6.6 7.4 7.00 70.0 30.5
1 5 7.8 9 8.40 84.0 44.5 10.30 21.56
1 6 9 10.7 9.85 98.5 59.0
1 7 10 12 11.00 110.0 70.5
1 8 11 13.1 12.05 120.5 81.0
1 9 12.3 14 13.15 131.5 92.0
1 10 14 14.5 14.25 142.5 103.0
1 11 15.5 15 15.25 152.5 113.0
1 12 17 15.5 16.25 162.5 123.0
1 13 18 16 17.00 170.0 130.5
1 14 19 17 18.00 180.0 140.5
1 15 20 19 19.50 195.0 155.5 9.53 23.81
1 16 21 20.5 20.75 207.5 168.0
1 17 21.4 21.5 21.45 214.5 175.0
1 18 22 22 22.00 220.0 180.5
1 19 22.5 22.5 22.50 225.0 185.5
1 20 23 23 23.00 230.0 190.5
1 21 23.6 23.5 23.55 235.5 196.0
1 22 24.2 24 24.10 241.0 201.5
1 23 24.6 24.4 24.50 245.0 205.5
1 24 25 25 25.00 250.0 210.5
1 25 25.4 25.4 25.40 254.0 214.5 8.02 29.64
1 26 26 26 26.00 260.0 220.5
1 27 26.5 26.5 26.50 265.0 225.5
1 28 27 27 27.00 270.0 230.5
1 29 27.5 27.5 27.50 275.0 235.5
1 30 28 28 28.00 280.0 240.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 94 +600 R. 5.14 M Y : 029 6727 X : 047 1934 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 3 0 0 0.0
1 1 9.5 11.5 10.50 105.0 105.0
1 2 15 18 16.50 165.0 60.0
1 3 25.6 21.2 23.40 234.0 129.0 33.33 4.85
1 4 29.5 24.1 26.80 268.0 163.0
1 5 32 25.2 28.60 286.0 181.0
1 6 35 26 30.50 305.0 200.0
1 7 37 26.5 31.75 317.5 212.5
1 8 39 27.8 33.40 334.0 229.0
1 9 41 30 35.50 355.0 250.0
1 10 42.6 34 38.30 383.0 278.0
1 11 44.2 37 40.60 406.0 301.0
1 12 46 38.6 42.30 423.0 318.0 24.63 7.13
1 13 47.2 40.2 43.70 437.0 332.0
1 14 48.7 43 45.85 458.5 353.5
1 15 49.7 46.6 48.15 481.5 376.5
1 16 51 48.8 49.90 499.0 394.0
1 17 52.5 51 51.75 517.5 412.5
1 18 54.5 53 53.75 537.5 432.5
1 19 56.6 55 55.80 558.0 453.0
1 20 58 56.5 57.25 572.5 467.5
1 21 60 58 59.00 590.0 485.0
1 22 61 59.6 60.30 603.0 498.0 18.75 10.08
1 23 62 60.5 61.25 612.5 507.5
1 24 62.4 61.2 61.80 618.0 513.0
1 25 63 62.1 62.55 625.5 520.5
1 26 63.5 63 63.25 632.5 527.5
1 27 64 64 64.00 640.0 535.0
1 28 64.5 65.2 64.85 648.5 543.5
1 29 65 66.8 65.90 659.0 554.0
1 30 65.5 68 66.75 667.5 562.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 94+700 L. 3.76 M Y : 0296910 X : 0471907 Date : November 22, 2013


DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 2 0 0 0.0
1 1 7.3 5 6.15 61.5 61.5
1 2 11.5 9 10.25 102.5 41.0
1 3 12.4 12 12.20 122.0 60.5 21.83 8.30
1 4 13 16.5 14.75 147.5 86.0
1 5 14 20.5 17.25 172.5 111.0
1 6 14.5 24 19.25 192.5 131.0
1 7 16 27.3 21.65 216.5 155.0
1 8 17.4 29.8 23.60 236.0 174.5
1 9 19.5 32.1 25.80 258.0 196.5
1 10 22.5 34.4 28.45 284.5 223.0
1 11 25 36.5 30.75 307.5 246.0
1 12 28 38.4 33.20 332.0 270.5
1 13 31 39.6 35.30 353.0 291.5 23.00 7.77
1 14 33 41.3 37.15 371.5 310.0
1 15 37 43.3 40.15 401.5 340.0
1 16 39 46.2 42.60 426.0 364.5
1 17 42 48.5 45.25 452.5 391.0
1 18 44 51 47.50 475.0 413.5
1 19 48 54 51.00 510.0 448.5
1 20 53 58 55.50 555.0 493.5 25.80 6.72
1 21 57 62.2 59.60 596.0 534.5
1 22 58 67 62.50 625.0 563.5
1 23 59 72 65.50 655.0 593.5
1 24 60 75.1 67.55 675.5 614.0
1 25 62 78 70.00 700.0 638.5
1 26 64.5 84 74.25 742.5 681.0 28.57 5.90
1 27 57.5 89.2 73.35 733.5 672.0
1 28 72.3 100 86.15 861.5 800.0
1 29 78
1 30 83
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 94 +800 R. 3.71 M Y : 029 6810 X : 047 1806 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 3 0 0 0.0
1 1 1.5 9 5.25 52.5 52.5
1 2 3.6 11 7.30 73.0 20.5
1 3 6.5 13 9.75 97.5 45.0 18.25 10.43
1 4 9.6 15 12.30 123.0 70.5
1 5 11.5 17.2 14.35 143.5 91.0
1 6 13.4 19 16.20 162.0 109.5
1 7 14.7 20.6 17.65 176.5 124.0
1 8 16.5 22.3 19.40 194.0 141.5
1 9 18.3 23.4 20.85 208.5 156.0
1 10 20 25 22.50 225.0 172.5
1 11 21.6 26.5 24.05 240.5 188.0
1 12 23.5 28 25.75 257.5 205.0 17.29 11.17
1 13 25.4 29.8 27.60 276.0 223.5
1 14 27.5 31 29.25 292.5 240.0
1 15 29.3 32.2 30.75 307.5 255.0
1 16 31.5 34 32.75 327.5 275.0
1 17 33.3 36 34.65 346.5 294.0
1 18 35.5 38.1 36.80 368.0 315.5
1 19 37.6 40.5 39.05 390.5 338.0
1 20 39.8 43 41.40 414.0 361.5
1 21 41 45.3 43.15 431.5 379.0
1 22 44.3 47.4 45.85 458.5 406.0 18.58 10.19
1 23 46 49.5 47.75 477.5 425.0
1 24 49 51.5 50.25 502.5 450.0
1 25 50.2 54 52.10 521.0 468.5
1 26 52 56.4 54.20 542.0 489.5
1 27 53.4 58.2 55.80 558.0 505.5
1 28 55 60.2 57.60 576.0 523.5
1 29 57.5 61 59.25 592.5 540.0
1 30 60 62 61.00 610.0 557.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 94 +900 L. 3.49 M Y : 029 6786 X : 048 1720 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 3 4.5 3.75 37.5 37.5
1 2 5 6 5.50 55.0 17.5
1 3 6 7.2 6.60 66.0 28.5
1 4 7 8 7.50 75.0 37.5
1 5 8 8.6 8.30 83.0 45.5
1 6 9 9 9.00 90.0 52.5 10.05 22.25
1 7 10.2 10 10.10 101.0 63.5
1 8 11.5 11 11.25 112.5 75.0
1 9 13 12 12.50 125.0 87.5
1 10 14.1 13.5 13.80 138.0 100.5
1 11 15 15 15.00 150.0 112.5
1 12 16 16 16.00 160.0 122.5
1 13 17.1 16.5 16.80 168.0 130.5
1 14 18.1 17.5 17.80 178.0 140.5 9.91 22.64
1 15 19 18 18.50 185.0 147.5
1 16 20.1 19 19.55 195.5 158.0
1 17 21.2 20 20.60 206.0 168.5
1 18 22.3 21 21.65 216.5 179.0
1 19 23.3 22 22.65 226.5 189.0
1 20 25 22.9 23.95 239.5 202.0
1 21 26.1 23.4 24.75 247.5 210.0 9.83 22.89
1 22 27 24 25.50 255.0 217.5
1 23 28.2 24.5 26.35 263.5 226.0
1 24 29.6 25 27.30 273.0 235.5
1 25 30.5 26 28.25 282.5 245.0
1 26 31 27 29.00 290.0 252.5 9.45 24.05
1 27 32 27.8 29.90 299.0 261.5
1 28 32.5 28.6 30.55 305.5 268.0
1 29 33 29.3 31.15 311.5 274.0
1 30 34 30.2 32.10 321.0 283.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 95 +000 R. 3.00 M Y : 029 6725 X : 047 1639 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 3 0 0 0.0
1 1 9 8 8.50 85.0 85.0
1 2 11 11 11.00 110.0 25.0
1 3 13 13.5 13.25 132.5 47.5 16.43 11.92
1 4 15 15 15.00 150.0 65.0
1 5 17 16.2 16.60 166.0 81.0
1 6 18.5 18 18.25 182.5 97.5
1 7 20 20 20.00 200.0 115.0
1 8 20.9 20.5 20.70 207.0 122.0
1 9 22 21.1 21.55 215.5 130.5
1 10 23 22 22.50 225.0 140.0
1 11 24 22.5 23.25 232.5 147.5
1 12 25.5 23 24.25 242.5 157.5 11.67 18.41
1 13 26.6 23.5 25.05 250.5 165.5
1 14 27.6 24 25.80 258.0 173.0
1 15 28 25 26.50 265.0 180.0
1 16 29.5 25.5 27.50 275.0 190.0
1 17 30 26 28.00 280.0 195.0
1 18 32 27 29.50 295.0 210.0
1 19 33 29 31.00 310.0 225.0
1 20 35 30.5 32.75 327.5 242.5
1 21 36.5 32 34.25 342.5 257.5
1 22 38.2 33 35.60 356.0 271.0
1 23 39.8 34 36.90 369.0 284.0
1 24 41.1 34.5 37.80 378.0 293.0 11.53 18.68
1 25 42.5 35.5 39.00 390.0 305.0
1 26 43.5 36 39.75 397.5 312.5
1 27 44.5 37 40.75 407.5 322.5
1 28 45.5 38 41.75 417.5 332.5
1 29 45.9 39 42.45 424.5 339.5
1 30 46 40.2 43.10 431.0 346.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 95 +125 L. 3.21 M Y : 029 6782 X : 047 1630 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 2 0 0 0.0
1 1 4 3 3.50 35.0 35.0
1 2 5 4.5 4.75 47.5 12.5
1 3 6 6 6.00 60.0 25.0
1 4 6.5 7.4 6.95 69.5 34.5
1 5 7 8.2 7.60 76.0 41.0 9.90 22.67
1 6 8 9.1 8.55 85.5 50.5
1 7 9 10.2 9.60 96.0 61.0
1 8 10 12 11.00 110.0 75.0
1 9 11 13.5 12.25 122.5 87.5
1 10 12 14.8 13.40 134.0 99.0
1 11 13 16.2 14.60 146.0 111.0
1 12 14 17.3 15.65 156.5 121.5
1 13 15 18.5 16.75 167.5 132.5
1 14 16.1 20.4 18.25 182.5 147.5 11.65 18.45
1 15 17.7 22.5 20.10 201.0 166.0
1 16 18 24.5 21.25 212.5 177.5
1 17 20.6 26 23.30 233.0 198.0
1 18 21.5 28.2 24.85 248.5 213.5
1 19 23 30 26.50 265.0 230.0
1 20 25.6 31.5 28.55 285.5 250.5
1 21 27.7 32.6 30.15 301.5 266.5
1 22 29.6 33.6 31.60 316.0 281.0
1 23 31.2 35.6 33.40 334.0 299.0 14.28 14.24
1 24 32.5 37.2 34.85 348.5 313.5
1 25 34 39.6 36.80 368.0 333.0
1 26 35 43 39.00 390.0 355.0
1 27 36.5 45.7 41.10 411.0 376.0
1 28 38 48.3 43.15 431.5 396.5
1 29 39.5 50.5 45.00 450.0 415.0
1 30 40.6 52.1 46.35 463.5 428.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 95 + 200 R. 3.61 M Y : 029 6941 X : 047 1680 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 10.4 3 6.70 67.0 67.0
1 2 11.1 10.5 10.80 108.0 41.0
1 3 12 18.5 15.25 152.5 85.5
1 4 12.5 24 18.25 182.5 115.5
1 5 13 27 20.00 200.0 133.0 19.80 9.40
1 6 14 31 22.50 225.0 158.0
1 7 14.6 33 23.80 238.0 171.0
1 8 15 34 24.50 245.0 178.0
1 9 16 35 25.50 255.0 188.0
1 10 17 36 26.50 265.0 198.0
1 11 20 37 28.50 285.0 218.0
1 12 27 38 32.50 325.0 258.0
1 13 32 39 35.50 355.0 288.0
1 14 35.5 40 37.75 377.5 310.5
1 15 36.6 40.5 38.55 385.5 318.5
1 16 37.5 41 39.25 392.5 325.5 18.23 10.44
1 17 39.5 42 40.75 407.5 340.5
1 18 42.1 43 42.55 425.5 358.5
1 19 45 44 44.50 445.0 378.0
1 20 46 44.5 45.25 452.5 385.5
1 21 47 45.5 46.25 462.5 395.5
1 22 47.1 46.5 46.80 468.0 401.0
1 23 47.5
1 24 49
1 25 50
1 26 51

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 95 + 300 R. 5.21 M Y : 029 6910 X : 047 1751 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 2 0 0 0.0
1 1 4 24.5 14.25 142.5 142.5
1 2 17 33.1 25.05 250.5 108.0
1 3 34.5 43.5 39.00 390.0 247.5 117.08 1.0
1 4 55.5 51.2 53.35 533.5 391.0
1 5 76.5 61.5 69.00 690.0 547.5
1 6 100 69 84.50 845.0 702.5
1 7 82
1 8 100

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 95 + 400 R. 3.26 M Y : 029 6966 X : 047 1683 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 4 7 5.50 55.0 55.0
1 2 8 9.5 8.75 87.5 32.5
1 3 11 11 11.00 110.0 55.0
1 4 15.5 13 14.25 142.5 87.5 23.44 7.59
1 5 18.3 16 17.15 171.5 116.5
1 6 20 18.5 19.25 192.5 137.5
1 7 23 21 22.00 220.0 165.0
1 8 25.5 23 24.25 242.5 187.5
1 9 29 27 28.00 280.0 225.0
1 10 32.2 29 30.60 306.0 251.0
1 11 35.5 32.5 34.00 340.0 285.0
1 12 39.5 37 38.25 382.5 327.5
1 13 43 41 42.00 420.0 365.0 29.00 5.79
1 14 46 44 45.00 450.0 395.0
1 15 48 46.5 47.25 472.5 417.5
1 16 52 49.5 50.75 507.5 452.5
1 17 55.5 52.5 54.00 540.0 485.0
1 18 59 55.5 57.25 572.5 517.5
1 19 62 58.5 60.25 602.5 547.5
1 20 65 62 63.50 635.0 580.0
1 21 67.5 65 66.25 662.5 607.5
1 22 70 68 69.00 690.0 635.0
1 23 72.5 70 71.25 712.5 657.5
1 24 74.1 73 73.55 735.5 680.5
1 25 76.5 75.2 75.85 758.5 703.5 27.33 6.24
1 26 78 78 78.00 780.0 725.0
1 27 79.5 82 80.75 807.5 752.5
1 28 82 85.1 83.55 835.5 780.5
1 29 84 86 85.00 850.0 795.0
1 30 86 89 87.50 875.0 820.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 95 +500 L. 3.58 M Y : 029 7018 X : 047 1595 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 3 3 3.00 30.0 30.0
1 2 5 4 4.50 45.0 15.0
1 3 6.5 5 5.75 57.5 27.5
1 4 8 6.5 7.25 72.5 42.5
1 5 10 7 8.50 85.0 55.0 10.00 22.39
1 6 11.5 8 9.75 97.5 67.5
1 7 13 9 11.00 110.0 80.0
1 8 14 10 12.00 120.0 90.0
1 9 14.5 10.5 12.50 125.0 95.0
1 10 15 11 13.00 130.0 100.0
1 11 16 12 14.00 140.0 110.0
1 12 16.5 13 14.75 147.5 117.5
1 13 17 14 15.50 155.0 125.0
1 14 18 15 16.50 165.0 135.0
1 15 19 17 18.00 180.0 150.0 10.63 20.73
1 16 20 18 19.00 190.0 160.0
1 17 21.5 19 20.25 202.5 172.5
1 18 22.5 20.5 21.50 215.0 185.0
1 19 23 22 22.50 225.0 195.0
1 20 24.5 24 24.25 242.5 212.5
1 21 25.5 25 25.25 252.5 222.5
1 22 26.5 26 26.25 262.5 232.5
1 23 27.5 27.4 27.45 274.5 244.5
1 24 28.5 28.5 28.50 285.0 255.0
1 25 30 29.5 29.75 297.5 267.5 11.18 19.42
1 26 31 30.5 30.75 307.5 277.5
1 27 32 32.5 32.25 322.5 292.5
1 28 33 35 34.00 340.0 310.0
1 29 34.5 36.5 35.50 355.0 325.0
1 30 35.6 37.5 36.55 365.5 335.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 95 +600 R. 3.51 M Y : 029 7071 X : 047 1515 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 4 0 0 0.0
1 1 7 10 8.50 85.0 85.0
1 2 9.5 12 10.75 107.5 22.5
1 3 11.4 14 12.70 127.0 42.0
1 4 13 15 14.00 140.0 55.0 12.56 16.76
1 5 14.5 16.1 15.30 153.0 68.0
1 6 15.6 17.1 16.35 163.5 78.5
1 7 17 18.1 17.55 175.5 90.5
1 8 17.9 19.2 18.55 185.5 100.5
1 9 18.5 20.1 19.30 193.0 108.0
1 10 19.5 21 20.25 202.5 117.5
1 11 20 22 21.00 210.0 125.0
1 12 21 23 22.00 220.0 135.0
1 13 22 24 23.00 230.0 145.0
1 14 23 25 24.00 240.0 155.0 10.38 21.36
1 15 24 26 25.00 250.0 165.0
1 16 25 26.6 25.80 258.0 173.0
1 17 25.5 27.6 26.55 265.5 180.5
1 18 26 28.2 27.10 271.0 186.0
1 19 26.5 29.5 28.00 280.0 195.0
1 20 27.5 31 29.25 292.5 207.5
1 21 28.4 32 30.20 302.0 217.0
1 22 29.3 33 31.15 311.5 226.5
1 23 30.3 34.5 32.40 324.0 239.0 10.10 22.11
1 24 31 35 33.00 330.0 245.0
1 25 31.5 36 33.75 337.5 252.5
1 26 32 37 34.50 345.0 260.0
1 27 32.4 38 35.20 352.0 267.0
1 28 33.4 39 36.20 362.0 277.0 9.68 23.32
1 29 34 39.5 36.75 367.5 282.5
1 30 34.6 40.5 37.55 375.5 290.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 95 +700 L. 3.31 M Y : 029 7168 X : 047 1502 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0 0.0
1 1 3.2 4 3.60 36.0 36.0
1 2 5 5 5.00 50.0 14.0
1 3 7.6 6.5 7.05 70.5 34.5
1 4 9 8.2 8.60 86.0 50.0
1 5 10 9 9.50 95.0 59.0
1 6 10.5 9.5 10.00 100.0 64.0 8.46 27.69
1 7 11.2 10 10.60 106.0 70.0
1 8 12 10.4 11.20 112.0 76.0
1 9 13 11 12.00 120.0 84.0
1 10 13.6 11.5 12.55 125.5 89.5
1 11 14.2 12 13.10 131.0 95.0
1 12 15 12.5 13.75 137.5 101.5
1 13 15.8 13 14.40 144.0 108.0
1 14 17 13.5 15.25 152.5 116.5
1 15 17.8 14 15.90 159.0 123.0
1 16 19 15 17.00 170.0 134.0
1 17 19.8 16 17.90 179.0 143.0
1 18 20.8 17 18.90 189.0 153.0 8.50 27.52
1 19 21.5 17.5 19.50 195.0 159.0
1 20 22.2 18.5 20.35 203.5 167.5
1 21 23 19 21.00 210.0 174.0
1 22 24 20 22.00 220.0 184.0
1 23 25 21 23.00 230.0 194.0
1 24 26 22 24.00 240.0 204.0
1 25 27.1 23 25.05 250.5 214.5
1 26 28.2 23.5 25.85 258.5 222.5
1 27 29.6 24.2 26.90 269.0 233.0 8.88 26.02
1 28 31 25.3 28.15 281.5 245.5
1 29 32.2 26 29.10 291.0 255.0
1 30 33.5 27 30.25 302.5 266.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 95 +800 R. 3.50 M Y : 029 7249 X : 047 1474 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 3 4 3.50 35.0 35.0
1 2 4 6.5 5.25 52.5 17.5
1 3 5 8.5 6.75 67.5 32.5
1 4 7 9.5 8.25 82.5 47.5 13.25 15.66
1 5 8.1 11 9.55 95.5 60.5
1 6 9.5 13.4 11.45 114.5 79.5
1 7 11 15 13.00 130.0 95.0
1 8 12 16.2 14.10 141.0 106.0
1 9 13.4 17.8 15.60 156.0 121.0
1 10 14.5 19.2 16.85 168.5 133.5
1 11 16 20.2 18.10 181.0 146.0
1 12 18 21.4 19.70 197.0 162.0 13.33 15.54
1 13 20 22 21.00 210.0 175.0
1 14 21.4 23 22.20 222.0 187.0
1 15 23 24 23.50 235.0 200.0
1 16 24.6 25 24.80 248.0 213.0
1 17 26 26 26.00 260.0 225.0
1 18 27.5 26.8 27.15 271.5 236.5
1 19 29 27.8 28.40 284.0 249.0
1 20 30 28.9 29.45 294.5 259.5 12.29 17.23
1 21 31 29.8 30.40 304.0 269.0
1 22 32 30.5 31.25 312.5 277.5
1 23 33 31 32.00 320.0 285.0
1 24 34 32 33.00 330.0 295.0
1 25 35 32.6 33.80 338.0 303.0
1 26 35.6 33.5 34.55 345.5 310.5
1 27 36.1 34 35.05 350.5 315.5 11.45 18.85
1 28 37 35 36.00 360.0 325.0
1 29 38 36 37.00 370.0 335.0
1 30 38.7 37 37.85 378.5 343.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 95 +900 R. 3.42 M Y : 029 7322 X : 047 1291 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 2 0 0 0.0
1 1 5 7 6.00 60.0 60.0
1 2 7.5 9.6 8.55 85.5 25.5
1 3 8 10.5 9.25 92.5 32.5
1 4 10 12.5 11.25 112.5 52.5
1 5 11.5 13 12.25 122.5 62.5 11.11 19.58
1 6 13 14 13.50 135.0 75.0
1 7 13.5 15 14.25 142.5 82.5
1 8 14 16.2 15.10 151.0 91.0
1 9 15 17 16.00 160.0 100.0
1 10 16.4 17.5 16.95 169.5 109.5
1 11 17 18 17.50 175.0 115.0
1 12 18 19 18.50 185.0 125.0
1 13 18.4 19.5 18.95 189.5 129.5
1 14 19 20 19.50 195.0 135.0
1 15 19.5 20.5 20.00 200.0 140.0
1 16 20 21 20.50 205.0 145.0 8.25 28.58
1 17 20.4 21.5 20.95 209.5 149.5
1 18 21 22 21.50 215.0 155.0
1 19 21.5 22.5 22.00 220.0 160.0
1 20 22 23 22.50 225.00 165.00
1 21 22.5 23.5 23.00 230.0 170.0
1 22 23 24 23.50 235.0 175.0
1 23 23.5 24.5 24.00 240.0 180.0
1 24 24 25.2 24.60 246.0 186.0 7.38 32.91
1 25 24.5 26.2 25.35 253.5 193.5
1 26 25 27 26.00 260.0 200.0
1 27 25.5 27.5 26.50 265.0 205.0
1 28 26 28 27.00 270.0 210.0
1 29 26.5 28.5 27.50 275.0 215.0
1 30 27 29.3 28.15 281.5 221.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 96 +000 L. 3.36 M Y : 029 7337 X : 047 1292 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 1 0 0 0.0
1 1 5 2 3.50 35.0 35.0
1 2 6 2.5 4.25 42.5 7.5
1 3 7.5 4 5.75 57.5 22.5
1 4 8 5 6.50 65.0 30.0
1 5 8.5 6 7.25 72.5 37.5
1 6 9 7.5 8.25 82.5 47.5
1 7 9.5 8.5 9.00 90.0 55.0 7.14 34.32
1 8 10 9.2 9.60 96.0 61.0
1 9 10.5 10 10.25 102.5 67.5
1 10 11.5 10.4 10.95 109.5 74.5
1 11 12 11 11.50 115.0 80.0
1 12 13 12 12.50 125.0 90.0
1 13 13.5 12.4 12.95 129.5 94.5
1 14 14 13 13.50 135.0 100.0
1 15 15 14 14.50 145.0 110.0
1 16 15.5 14.6 15.05 150.5 115.5
1 17 16 15.5 15.75 157.5 122.5
1 18 17 16.1 16.55 165.5 130.5
1 19 18 17 17.50 175.0 140.0
1 20 18.5 17.6 18.05 180.5 145.5
1 21 19 18.1 18.55 185.5 150.5
1 22 19.5 19 19.25 192.5 157.5 6.83 36.31
1 23 20.4 19.4 19.90 199.0 164.0
1 24 21 20 20.50 205.0 170.0
1 25 21.5 20.5 21.00 210.0 175.0
1 26 22.4 21 21.70 217.0 182.0
1 27 23 21.4 22.20 222.0 187.0
1 28 24 22 23.00 230.0 195.0
1 29 24.5 22.6 23.55 235.5 200.5
1 30 25 23 24.00 240.0 205.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 96 +100 R 3.50 M Y : 029 7303 X : 047 1202 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 2 0 0 0.0
1 1 3.3 4 3.65 36.5 36.5
1 2 4.2 4.5 4.35 43.5 7.0
1 3 6 5 5.50 55.0 18.5
1 4 8 6 7.00 70.0 33.5
1 5 9.2 8 8.60 86.0 49.5
1 6 10 10.2 10.10 101.0 64.5 9.64 23.47
1 7 10.6 12 11.30 113.0 76.5
1 8 11.2 13 12.10 121.0 84.5
1 9 12 13.5 12.75 127.5 91.0
1 10 13 14 13.50 135.0 98.5
1 11 14 14.5 14.25 142.5 106.0
1 12 14.5 15 14.75 147.5 111.0
1 13 15 16 15.50 155.0 118.5
1 14 15.5 16.5 16.00 160.0 123.5
1 15 16.4 17 16.70 167.0 130.5
1 16 17 18 17.50 175.0 138.5
1 17 18 19 18.50 185.0 148.5
1 18 19 19.5 19.25 192.5 156.0
1 19 19.4 20 19.70 197.0 160.5 7.63 31.57
1 20 20 20.5 20.25 202.5 166.0
1 21 20.4 21 20.70 207.0 170.5
1 22 21 21.5 21.25 212.5 176.0
1 23 21.6 22 21.80 218.0 181.5
1 24 22.2 22.5 22.35 223.5 187.0
1 25 23 23 23.00 230.0 193.5
1 26 24 23.5 23.75 237.5 201.0
1 27 24.5 24 24.25 242.5 206.0
1 28 24.5
1 29 25
1 30 25.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 96 +200 L 3.48 M Y : 029 7294 X : 047 1092 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 2 0 0 0.0
1 1 4 8 6.00 60.0 60.0
1 2 6 11.2 8.60 86.0 26.0
1 3 9 14.5 11.75 117.5 57.5 18.33 10.37
1 4 10.8 17 13.90 139.0 79.0
1 5 12 19 15.50 155.0 95.0
1 6 13.5 20.5 17.00 170.0 110.0
1 7 14 21.5 17.75 177.5 117.5
1 8 15 23.5 19.25 192.5 132.5
1 9 17 25 21.00 210.0 150.0
1 10 18.1 27 22.55 225.5 165.5 17.14 11.29
1 11 19.5 29.5 24.50 245.0 185.0
1 12 21 31.5 26.25 262.5 202.5
1 13 22.5 33.5 28.00 280.0 220.0
1 14 24.5 35.5 30.00 300.0 240.0
1 15 27.2 37.5 32.35 323.5 263.5
1 16 30 39 34.50 345.0 285.0
1 17 32.5 40.5 36.50 365.0 305.0 18.63 10.16
1 18 35.5 42 38.75 387.5 327.5
1 19 37.5 44 40.75 407.5 347.5
1 20 40.5 46 43.25 432.5 372.5
1 21 45.2 49.5 47.35 473.5 413.5
1 22 50.5 53 51.75 517.5 457.5
1 23 53 55 54.00 540.0 480.0
1 24 54 56 55.00 550.0 490.0
1 25 55.5 58.5 57.00 570.0 510.0 21.17 8.64
1 26 56.2 62.5 59.35 593.5 533.5
1 27 57.5 65 61.25 612.5 552.5
1 28 58.5 67.5 63.00 630.0 570.0
1 29 60 73 66.50 665.0 605.0
1 30 61 78 69.50 695.0 635.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 96 +300 L 3.27 M Y : 029 7292 X : 047 1000 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 3 0 0 0.0
1 1 5 8 6.50 65.0 65.0
1 2 6.5 10 8.25 82.5 17.5
1 3 8.5 12 10.25 102.5 37.5
1 4 10.5 14.1 12.30 123.0 58.0 14.64 13.79
1 5 11.5 16 13.75 137.5 72.5
1 6 13 17.5 15.25 152.5 87.5
1 7 14.5 19 16.75 167.5 102.5
1 8 16 20.5 18.25 182.5 117.5
1 9 18.5 23 20.75 207.5 142.5
1 10 20 26 23.00 230.0 165.0
1 11 20.5 29.5 25.00 250.0 185.0
1 12 21 34.5 27.75 277.5 212.5 17.94 10.66
1 13 22 38.5 30.25 302.5 237.5
1 14 23 40.5 31.75 317.5 252.5
1 15 24.2 42.5 33.35 333.5 268.5
1 16 26 44.4 35.20 352.0 287.0
1 17 29 48.1 38.55 385.5 320.5
1 18 31 53.5 42.25 422.5 357.5
1 19 33 56 44.50 445.0 380.0
1 20 34 58 46.00 460.0 395.0
1 21 36 61.5 48.75 487.5 422.5
1 22 38.2 65.5 51.85 518.5 453.5 27.41 6.22
1 23 41 70 55.50 555.0 490.0
1 24 44.5 77 60.75 607.5 542.5
1 25 47.5 84 65.75 657.5 592.5
1 26 58 90 74.00 740.0 675.0
1 27 61 100 80.50 805.0 740.0
1 28 63.5
1 29 67.5
1 30 70.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 96 +400 R 3.47 M Y : 029 7236 X : 047 0866 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 0 0 0 0.0
1 1 4.5 2 3.25 32.5 32.5
1 2 6 3 4.50 45.0 12.5
1 3 7 5 6.00 60.0 27.5
1 4 8 6 7.00 70.0 37.5
1 5 9 8 8.50 85.0 52.5 11.39 18.98
1 6 9.5 9 9.25 92.5 60.0
1 7 10.5 10.5 10.50 105.0 72.5
1 8 11.5 12 11.75 117.5 85.0
1 9 12 15 13.50 135.0 102.5
1 10 14 17 15.50 155.0 122.5
1 11 15 18.2 16.60 166.0 133.5
1 12 16 19 17.50 175.0 142.5
1 13 17 20 18.50 185.0 152.5 12.50 16.86
1 14 18 21 19.50 195.0 162.5
1 15 19.5 22.5 21.00 210.0 177.5
1 16 21.5 25 23.25 232.5 200.0
1 17 23.5 27.5 25.50 255.0 222.5
1 18 25.5 29.5 27.50 275.0 242.5
1 19 27.5 31 29.25 292.5 260.0
1 20 31.5 31.5 31.50 315.0 282.5
1 21 35 32.5 33.75 337.5 305.0
1 22 40 35 37.50 375.0 342.5 17.17 11.27
1 23 45 38.5 41.75 417.5 385.0
1 24 48 40 44.00 440.0 407.5
1 25 50 40.5 45.25 452.5 420.0
1 26 52.5 41 46.75 467.5 435.0
1 27 57 42 49.50 495.0 462.5
1 28 61 42.5 51.75 517.5 485.0
1 29 65.1 43 54.05 540.5 508.0
1 30 66 43.5 54.75 547.5 515.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 96 +500 L 3.49 M Y : 029 7327 X : 047 0837 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 3.5 3.4 3.45 34.5 34.5
1 2 5 4.5 4.75 47.5 13.0
1 3 6 5.5 5.75 57.5 23.0
1 4 7 6.4 6.70 67.0 32.5
1 5 8 7 7.50 75.0 40.5
1 6 9 8.2 8.60 86.0 51.5 8.88 26.05
1 7 10 9 9.50 95.0 60.5
1 8 11 10 10.50 105.0 70.5
1 9 12.2 10.5 11.35 113.5 79.0
1 10 13.2 11.2 12.20 122.0 87.5
1 11 14.3 12.1 13.20 132.0 97.5
1 12 15.2 13 14.10 141.0 106.5
1 13 16.3 14 15.15 151.5 117.0
1 14 17.3 15 16.15 161.5 127.0
1 15 18.3 16.1 17.20 172.0 137.5
1 16 19.5 17.2 18.35 183.5 149.0
1 17 20.4 18.3 19.35 193.5 159.0 9.57 23.68
1 18 21.4 20 20.70 207.0 172.5
1 19 22.3 20.5 21.40 214.0 179.5
1 20 23.2 21.5 22.35 223.5 189.0
1 21 24 22.5 23.25 232.5 198.0
1 22 25 24 24.50 245.0 210.5
1 23 26 25 25.50 255.0 220.5
1 24 27 26 26.50 265.0 230.5
1 25 28 27.2 27.60 276.0 241.5
1 26 29.4 28.3 28.85 288.5 254.0 9.85 22.82
1 27 30.5 29.5 30.00 300.0 265.5
1 28 31.5 30.5 31.00 310.0 275.5
1 29 32.5 32 32.25 322.5 288.0
1 30 33 33 33.00 330.0 295.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 96 +600 R 3.60 M Y : 029 7427 X : 047 0843 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 2 0 0 0.0
1 1 6 6.5 6.25 62.5 62.5
1 2 11.5 10 10.75 107.5 45.0
2 18 15 16.50 165.0 102.5
1 3 24 21.5 22.75 227.5 165.0
1 4 30 27 28.50 285.0 222.5 43.61 3.45
1 5 34 33.2 33.60 336.0 273.5
1 6 37 40 38.50 385.0 322.5
1 7 38 46 42.00 420.0 357.5
1 8 38.5 50 44.25 442.5 380.0
1 9 39 52 45.50 455.0 392.5
1 10 39.5 55.5 47.50 475.0 412.5
1 11 40.1 60 50.05 500.5 438.0
1 12 40.9 63 51.95 519.5 457.0 35.54 4.47
1 13 41.3 67 54.15 541.5 479.0
1 14 42 70 56.00 560.0 497.5
1 15 42.5 73 57.75 577.5 515.0
1 16 43 75 59.00 590.0 527.5
1 17 43.5 76.5 60.00 600.0 537.5
1 18 44 79 61.50 615.0 552.5 29.28 5.72
1 19 45 84 64.50 645.0 582.5
1 20 45.5 89 67.25 672.5 610.0
1 21 46 94 70.00 700.0 637.5
1 22 46.5 96 71.25 712.5 650.0
1 23 47.2 100 73.60 736.0 673.5
1 24 48
1 25 49
1 26 49.6
1 27 50.4
1 28 51.1
1 29 52
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 96 +700 L. 4.00 M Y : 029 7488 X : 047 0915 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 4.6 4.5 4.55 45.5 45.5
1 2 7 6.5 6.75 67.5 22.0
1 3 8.5 8 8.25 82.5 37.0 14.57 13.88
1 4 10.2 9.5 9.85 98.5 53.0
1 5 12 10.5 11.25 112.5 67.0
1 6 14 11.8 12.90 129.0 83.5
1 7 16.5 13 14.75 147.5 102.0
1 8 19.7 14.4 17.05 170.5 125.0
1 9 22.8 15 18.90 189.0 143.5
1 10 25 16 20.50 205.0 159.5
1 11 26.5 17 21.75 217.5 172.0
1 12 28 18 23.00 230.0 184.5 16.08 12.24
1 13 29.5 19 24.25 242.5 197.0
1 14 32 20.7 26.35 263.5 218.0
1 15 34.2 23.5 28.85 288.5 243.0
1 16 35.2 26 30.60 306.0 260.5
1 17 36.6 27.5 32.05 320.5 275.0
1 18 37.5 29.5 33.50 335.0 289.5
1 19 39 31.5 35.25 352.5 307.0
1 20 40.5 33.5 37.00 370.0 324.5
1 21 41.5 34 37.75 377.5 332.0
1 22 42.5 35 38.75 387.5 342.0
1 23 43.5 36 39.75 397.5 352.0
1 24 44.2 37 40.60 406.0 360.5 14.73 13.69
1 25 45 38 41.50 415.0 369.5
1 26 47.2 38.5 42.85 428.5 383.0
1 27 49.5 39 44.25 442.5 397.0
1 28 52 39.5 45.75 457.5 412.0
1 29 54.5 40 47.25 472.5 427.0
1 30 57 40.5 48.75 487.5 442.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 96 +800 R. Y : 029 7499 X : 047 0864 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)

HARD SOIL

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 96 +900 R. 3.40 M Y : 029 7490 X : 047 0792 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 1 0 0 0.0
1 1 6 5.2 5.60 56.0 56.0
1 2 8.6 7 7.80 78.0 22.0
1 3 11.5 10.9 11.20 112.0 56.0 21.80 8.32
1 4 14 13.5 13.75 137.5 81.5
1 5 16.8 16.2 16.50 165.0 109.0
1 6 18 18 18.00 180.0 124.0
1 7 19.2 19 19.10 191.0 135.0
1 8 20.5 20.3 20.40 204.0 148.0
1 9 21.5 22 21.75 217.5 161.5 16.08 12.25
1 10 23 23 23.00 230.0 174.0
1 11 24 24.1 24.05 240.5 184.5
1 12 25.5 25 25.25 252.5 196.5
1 13 27 26 26.50 265.0 209.0
1 14 28.5 28 28.25 282.5 226.5
1 15 30.5 30.2 30.35 303.5 247.5
1 16 33 32.4 32.70 327.0 271.0
1 17 35.2 35.2 35.20 352.0 296.0 19.00 9.91
1 18 38 38 38.00 380.0 324.0
1 19 41 40 40.50 405.0 349.0
1 20 44 42.2 43.10 431.0 375.0
1 21 46 45 45.50 455.0 399.0
1 22 48 47.5 47.75 477.5 421.5
1 23 49.5 51 50.25 502.5 446.5
1 24 50.5 53.5 52.00 520.0 464.0
1 25 51.5 57 54.25 542.5 486.5 21.05 8.70
1 26 52.5 61 56.75 567.5 511.5
1 27 54.4 63.2 58.80 588.0 532.0
1 28 58 72.2 65.10 651.0 595.0
1 29 61 73 67.00 670.0 614.0
1 30 64 73.5 68.75 687.5 631.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 97 +000 R. 3.42 M Y : 029 7508 X : 047 0772 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 0 0 0 0.0
1 1 2.8 3 2.90 29.0 29.0
1 2 5 5 5.00 50.0 21.0
1 3 6.8 6.1 6.45 64.5 35.5
1 4 8 7.8 7.90 79.0 50.0 13.63 15.11
1 5 9.5 9 9.25 92.5 63.5
1 6 11.2 10.5 10.85 108.5 79.5
1 7 12.5 12.2 12.35 123.5 94.5
1 8 13.6 14 13.80 138.0 109.0
1 9 14.8 15.5 15.15 151.5 122.5
1 10 16.2 17.5 16.85 168.5 139.5
1 11 17.5 18.5 18.00 180.0 151.0
1 12 18.8 20 19.40 194.0 165.0
1 13 20.4 21.3 20.85 208.5 179.5
1 14 22 22.5 22.25 222.5 193.5
1 15 23.6 24.5 24.05 240.5 211.5
1 16 25.6 26.4 26.00 260.0 231.0 15.50 12.83
1 17 27.8 28.5 28.15 281.5 252.5
1 18 29.8 30.5 30.15 301.5 272.5
1 19 31.8 32.6 32.20 322.0 293.0
1 20 33.4 34.4 33.90 339.0 310.0
1 21 35.6 36 35.80 358.0 329.0
1 22 37 37.5 37.25 372.5 343.5
1 23 38.1 39 38.55 385.5 356.5
1 24 39.5 40.1 39.80 398.0 369.0
1 25 41 41 41.00 410.0 381.0
1 26 42 42 42.00 420.0 391.0
1 27 43 43.2 43.10 431.0 402.0 14.62 13.82
1 28 44.8 44.7 44.75 447.5 418.5
1 29 44.5 46.2 45.35 453.5 424.5
1 30 45.5 48 46.75 467.5 438.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 97 +100 R. 3.36M Y : 029 7575 X : 047 0744 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1.5 3 0 0 0.0
1 1 4.5 5 4.75 47.5 47.5
1 2 7 6.2 6.60 66.0 18.5 9.25 24.72
1 3 8.5
1 4 10
1 5 11.2
1 6 12.5
1 7 14
1 8 16
1 9 18.1
1 10 20
1 11 21.5
1 12 22.8
1 13 23.4
1 14 24

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 97 +200 L. 6.32 M Y : 029 7659 X : 047 0685 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 2.5 3 2.75 27.5 27.5
1 2 5 5.5 5.25 52.5 25.0
1 3 8.5 8 8.25 82.5 55.0
1 4 11.5 9 10.25 102.5 75.0
1 5 14.6 11.5 13.05 130.5 103.0
1 6 16 14.5 15.25 152.5 125.0 16.25 12.08
1 7 19 16 17.50 175.0 147.5
1 8 20.5 17 18.75 187.5 160.0
1 9 21.5 17.5 19.50 195.0 167.5
1 10 22 18.5 20.25 202.5 175.0
1 11 23 19.2 21.10 211.0 183.5
1 12 24.5 20 22.25 222.5 195.0
1 13 26 21 23.50 235.0 207.5
1 14 27.5 23 25.25 252.5 225.0
1 15 29 24.4 26.70 267.0 239.5
1 16 30 25 27.50 275.0 247.5
1 17 30.5 26.2 28.35 283.5 256.0 13.81 14.86
1 18 31 27.1 29.05 290.5 263.0
1 19 31.5 28.1 29.80 298.0 270.5
1 20 32 29.5 30.75 307.5 280.0
1 21 32.5 31 31.75 317.5 290.0
1 22 33 33.1 33.05 330.5 303.0
1 23 33.5 34.8 34.15 341.5 314.0
1 24 34 37 35.50 355.0 327.5
1 25 34.6 38.4 36.50 365.0 337.5 13.08 15.91
1 26 36 40.1 38.05 380.5 353.0
1 27 37.2 41.5 39.35 393.5 366.0
1 28 38.7 42 40.35 403.5 376.0
1 29 39 43 41.00 410.0 382.5
1 30 40 44 42.00 420.0 392.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 100 +100 R. 3.64 M Y : 029 8538 X : 046 9704 Date : November 23, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0 0.0
1 1 8 8 8.00 80.0 80.0
1 2 11 13.5 12.25 122.5 42.5
1 3 13 14 13.50 135.0 55.0 16.43 11.92
1 4 15 15 15.00 150.0 70.0
1 5 16 16.5 16.25 162.5 82.5
1 6 18 17.5 17.75 177.5 97.5
1 7 20 19 19.50 195.0 115.0
1 8 21.1 19.5 20.30 203.0 123.0
1 9 23 20.5 21.75 217.5 137.5
1 10 25 21.5 23.25 232.5 152.5
1 11 26.2 22.5 24.35 243.5 163.5 20.50 9.00
1 12 30.5 24 27.25 272.5 192.5
1 13 34 25.6 29.80 298.0 218.0
1 14 39 29 34.00 340.0 260.0
1 15 43.5 34 38.75 387.5 307.5
1 16 46.5 37 41.75 417.5 337.5
1 17 50.5 40.1 45.30 453.0 373.0
1 18 54 45.1 49.55 495.5 415.5 27.02 6.33
1 19 56.5 49.5 53.00 530.0 450.0
1 20 58.5 55.1 56.80 568.0 488.0
1 21 70 59.5 64.75 647.5 567.5
1 22 73 63.5 68.25 682.5 602.5
1 23 75.5 70 72.75 727.5 647.5
1 24 79 76 77.50 775.0 695.0
1 25 84 80 82.00 820.0 740.0
1 26 89 85 87.00 870.0 790.0 14.00 14.60
1 27 93 90 91.50 915.0 835.0
1 28 96 95 95.50 955.0 875.0
1 29 100 98 99.00 990.0 910.0
1 30 100 50.00 500.0 420.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 100 +125 R. 3.64 M Y : 029 8596 X : 046 9687 Date : November 23, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 0 0 0 0.0
1 1 4 3 3.50 35.0 35.0
1 2 7 6 6.50 65.0 30.0
1 3 10 7.5 8.75 87.5 52.5
1 4 11 9 10.00 100.0 65.0
1 5 12 10 11.00 110.0 75.0 11.67 18.41
1 6 13 10.5 11.75 117.5 82.5
1 7 14 11 12.50 125.0 90.0
1 8 15 11.5 13.25 132.5 97.5
1 9 16 12 14.00 140.0 105.0
1 10 16.5 12.5 14.50 145.0 110.0
1 11 17 13 15.00 150.0 115.0
1 12 18 13.5 15.75 157.5 122.5
1 13 19 14 16.50 165.0 130.0
1 14 20 14.5 17.25 172.5 137.5
1 15 21.5 15 18.25 182.5 147.5
1 16 22 15.5 18.75 187.5 152.5 9.52 23.82
1 17 24 16 20.00 200.0 165.0
1 18 25 16.5 20.75 207.5 172.5
1 19 26.5 17 21.75 217.5 182.5
1 20 27 17.5 22.25 222.5 187.5
1 21 29 18 23.50 235.0 200.0
1 22 31 18.5 24.75 247.5 212.5
1 23 33 19.5 26.25 262.5 227.5
1 24 35 20 27.50 275.0 240.0
1 25 36.1 20.5 28.30 283.0 248.0 9.67 23.37
1 26 37.2 21 29.10 291.0 256.0
1 27 38 22 30.00 300.0 265.0
1 28 39 23 31.00 310.0 275.0
1 29 39.5 24 31.75 317.5 282.5
1 30 40 25 32.50 325.0 290.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
ENGINEER
REPUBLIC OF INDONESIA MINISTRY OF YACHIO ENGINEERING Co. Ltd
PUBLIC WORKS DIRECTORATE GENERAL
of HIGHWAYS CONTRACTOR
NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
TESTED DYNAMIX CONE PENETRATION
L R
DCP
DCP Point
Point

STA : 104 +825 L. 3.64 M Y : 029 9182 X : 046 8560 Date : November 23, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 4 11 7.50 75.0 75.0
1 2 6 14 10.00 100.0 25.0
1 3 8 16 12.00 120.0 45.0
1 4 9 18 13.50 135.0 60.0
1 5 9.5 19.5 14.50 145.0 70.0 12.22 17.35
1 6 10 21 15.50 155.0 80.0
1 7 11 22 16.50 165.0 90.0
1 8 11.5 23 17.25 172.5 97.5
1 9 12 25 18.50 185.0 110.0
1 10 15 27.3 21.15 211.5 136.5
1 11 20 28.6 24.30 243.0 168.0
1 12 21 29.6 25.30 253.0 178.0
1 13 22 30.2 26.10 261.0 186.0
1 14 22.5 31 26.75 267.5 192.5
1 15 23 32 27.50 275.0 200.0
1 16 24.5 32.5 28.50 285.0 210.0
1 17 26 33 29.50 295.0 220.0 12.00 17.76
1 18 28 34 31.00 310.0 235.0
1 19 30 35 32.50 325.0 250.0
1 20 31 36 33.50 335.0 260.0
1 21 31.5 37 34.25 342.5 267.5
1 22 32 38 35.00 350.0 275.0
1 23 32.4 39.1 35.75 357.5 282.5
1 24 33 40 36.50 365.0 290.0
1 25 34 41 37.50 375.0 300.0
1 26 35 42 38.50 385.0 310.0
1 27 35.5 43 39.25 392.5 317.5
1 28 37 44 40.50 405.0 330.0 11.68 18.37
1 29 38 45 41.50 415.0 340.0
1 30 39.1 46 42.55 425.5 350.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) ( SUNARTOMO) ( MARWAN )


NIP.19770223 200812 1 001 Quality Engineer Quality Control Engineer
REPUBLIC OF INDONESIA ENGINEER
YACHIO ENGINEERING Co. Ltd
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL of CONTRACTOR
HIGHWAYS NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013

SUMMARY LOCATION WIDENING FOR TESTED DCP / CBR


AREA TESTING DCP COORDINATE CBR
MIN
NO STA (%) STATUS DATE REMARKS
L CL R Y X (%)
1 65+000 L 3.30 M 0287684 0490104 8.35 6 PASSED November 9, 2013
2 65+100 R . 3.5 M 0287759 049033 10.86 6 PASSED November 9, 2013
3 65+200 L. 3.50 M 0287856 0489995 19.28 6 PASSED November 10, 2013
4 65+300 R. 3.47 M 0287848 0489929 6.20 6 PASSED November 10, 2013
5 65+400 L. 3.48 M 0287843 0489840 3.36 6 FAILED November 10, 2013
6 65+500 R. 3.49 M 0287778 048763 11.3 6 PASSED November 10, 2013
7 65+600 L. 3.45 M 0287799 0489673 10.04 6 PASSED November 10, 2013
8 65+700 R. 3.50 M 0287868 0489604 14.23 6 PASSED November 10, 2013
9 65+800 R. 3.50 M 0287954 0489552 16.86 6 PASSED November 10, 2013
10 65+900 R. 3.65 M 0287944 0489453 15.19 6 PASSED November 10, 2013
11 66+000 CL 0287899 0489364 13.38 6 PASSED November 10, 2013
12 66+100 CL 0287847 0489282 6.99 6 PASSED November 10, 2013
13 66+200 L. 3.12 M 0287866 0489186 17.53 6 PASSED November 10, 2013
14 66+300 R. 3,61 M 0287941 0489143 10.0 6 PASSED November 10, 2013
15 66+400 R. 3.80 M 0288020 0489113 10.25 6 PASSED November 10, 2013
16 66+500 R. 3.70 M 0288045 0489015 9.19 6 PASSED November 10, 2013
17 66+600 R. 3.35 M 0288096 0488919 2.67 6 FAILED November 10, 2013
18 66+700 L. 3.50 M 0288010 0488828 4.40 6 FAILED November 10, 2013
19 66+800 R. 3.50 M 0288012 0488733 2.21 6 FAILED November 10, 2013
20 66+900 R. 3.50 M 0288012 0488733 2.87 6 FAILED November 10, 2013
21 67+000 R. 3. 50 M 0288128 0488592 4.85 6 FAILED November 10, 2013
22 67+100 L. 3.60 M 0288191 0488676 11.49 6 PASSED November 10, 2013
23 67+200 R. 3.60 M 0288772 0488670 25.37 6 PASSED November 10, 2013
24 67+300 L . 3.40 M 0288359 0488615 3.62 6 FAILED November 10, 2013
25 67+400 R. 3. 60 M 0288413 0488548 11.85 6 PASSED November 10, 2013
26 67+500 R. 3.28 M 0288429 0488460 15.54 6 PASSED November 10, 2013
27 67+600 L. 3.66 M 0288529 0488466 6.37 6 PASSED November 10, 2013
28 67+700 R. 3.52 M 0288550 0488418 5.23 6 FAILED November 10, 2013
29 67+800 L. 3.36 M 0288577 0488325 7.3 6 PASSED November 10, 2013
30 67+900 R. 3.51 M 0288627 0488741 8.94 6 PASSED November 10, 2013
31 68+000 R. 3.26 M 0288645 0488154 8.47 6 PASSED November 10, 2013
32 68+100 L. 3.94 M 0288619 0488064 5.20 6 FAILED November 10, 2013
33 68+200 R. 3.54 M 0288643 0487978 1.71 6 FAILED November 10, 2013
34 68+300 R. 3.25 M 0288696 0487944 4.63 6 FAILED November 10, 2013
35 68+400 L. 5.05 M 0288805 0487946 4.66 6 FAILED November 10, 2013
36 68+500 R. 2.76 M 0288850 0487883 14.83 6 PASSED November 10, 2013
37 68+600 L. 3.49 M 0288943 0487863 6.20 6 PASSED November 10, 2013
38 68+700 R. 3.32 M 0289039 0487841 6.29 6 PASSED November 10, 2013
39 68+800 L. 3.49 M 0289072 0487769 5.13 6 FAILED November 10, 2013
40 68+900 R. 3.85 M 0289149 0487692 4.62 6 FAILED November 10, 2013
41 69+000 L. 3.34 M 0289240 0487659 4.02 6 FAILED November 10, 2013
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) SUNARTOMO MARWAN


NIP.197202082012121001 Quality Engineer Quality Control Engineer
REPUBLIC OF INDONESIA ENGINEER
YACHIO ENGINEERING Co. Ltd
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL of CONTRACTOR
HIGHWAYS NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013

SUMMARY LOCATION WIDENING, FOR TESTED DCP / CBR


AREA TESTING DCP COORDINATE CBR
MIN
NO STA (%) STATUS DATE REMARKS
L CL R Y X (%)
42 69+100 R. 3.55 M 0289321 0487597 13.83 6 PASSED November 10, 2013
43 69+200 R. 3.45 M 0288772 0488670 14.38 6 PASSED November 11, 2013
44 69+300 L. 3.48 M 0289488 0487638 9.01 6 PASSED November 11, 2013
45 69+400 R. 3.42 M 0289490 0487637 18.32 6 PASSED November 11, 2013
46 69+500 L. 3.49 M 0289652 0487560 4.95 6 FAILED November 11, 2013
47 69+600 R. 3.39 M 0289743 0487549 11.70 6 PASSED November 11, 2013
48 69+700 L. 3.44 M 0289840 0487549 3.28 6 FAILED November 11, 2013
49 69+800 R. 3.46 M 0289933 0487497 23.63 6 PASSED November 11, 2013
50 69+900 L. 3.54 M 0290028 0487523 13.24 6 PASSED November 11, 2013
51 70+000 R. 3.55 M 0290111 0487570 12.70 6 PASSED November 11, 2013
52 70+100 L. 3.45 M 0290201 0487609 10.25 6 PASSED November 11, 2013
53 70+200 R. 3.50 M 0290288 0487671 7.85 6 PASSED November 11, 2013
54 70+300 L. 3.43 M 0290367 0487720 2.37 6 FAILED November 11, 2013
55 70+400 R. 3.39 M 0290545 0487636 8.43 6 PASSED November 11, 2013
56 70+500 L. 3.55 M 0290560 0487747 6.73 6 PASSED November 11, 2013
57 70+600 R. 3.49 M 0290655 0487723 4.67 6 FAILED November 11, 2013
58 70+700 L. 3.48 M 0290703 0487802 6.70 6 PASSED November 11, 2013
59 70+800 R. 3.51 M 0290740 0487895 6.85 6 PASSED November 11, 2013
60 70+900 L. 3.43 M 0290762 0487836 4.43 6 FAILED November 11, 2013
61 71+000 R. 3.32 M 0290764 0487738 27.01 6 PASSED November 11, 2013
62 71+100 L. 3.53 M 0290788 0487645 4.02 6 FAILED November 11, 2013
63 71+200 R. 5.00 M 0291143 0486750 25.96 6 PASSED November 11, 2013
64 71+300 L. 5.40 M 0290808 0487447 9.45 6 PASSED November 11, 2013
65 71+400 R. 4.20 M 0290754 0487367 2.44 6 FAILED November 11, 2013
66 71+500 L. 4.00 M 0290804 0487304 10.11 6 PASSED November 11, 2013
67 71+600 R. 3.40 M 0290897 0487265 13.77 6 PASSED November 11, 2013
68 71+700 R. 2.40 M 0290468 0487001 6.05 6 PASSED November 11, 2013
69 71+775 Cutting
70 71+800 Cutting
71 71+900 Cutting
72 72+000 R. 3.46 M 0291031 0486919 7.77 6 PASSED November 11, 2013
73 72+100 R. 3.42 M 0291025 0486919 1.29 6 FAILED November 11, 2013
74 72+200 R. 3.48 M 0291143 0486750 4.31 6 FAILED November 11, 2013
75 72+300 R. 3.66 M 0291207 0486672 6.21 6 PASSED November 11, 2013
76 72+400 L. 4.59 M 0291239 0486585 6.74 6 PASSED November 11, 2013
77 72+500 R. 5.72 M 0291224 0486487 2.08 6 FAILED November 12, 2013
78 72+600 - - - - - - Bridge
79 72+650 L. 2.30 M 0291293 0486371 13.76 6 PASSED November 12, 2013
80 72+700 L. 3.56 M 0291340 0486334 21.56 6 PASSED November 12, 2013
81 72+800 R. 4.20 M 0291401 0486263 18.26 6 PASSED November 12, 2013
82 72+900 L. 3.50 M 0291488 0486222 4.48 6 FAILED November 12, 2013
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) SUNARTOMO MARWAN


NIP.197202082012121001 Quality Engineer Quality Control Engineer
REPUBLIC OF INDONESIA ENGINEER
YACHIO ENGINEERING Co. Ltd
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL of CONTRACTOR
HIGHWAYS NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013

SUMMARY LOCATION WIDENING, FOR TESTED DCP / CBR


AREA TESTING DCP COORDINATE CBR
MIN
NO STA (%) STATUS DATE REMARKS
L CL R Y X (%)
83 73+000 R. 4.50 M 0291462 0486154 9.28 6 PASSED November 12, 2013
87 73+100 L. 3.47 M 0291377 0486141 2.88 6 FAILED November 12, 2013
91 73+200 L. 3 37 M 0291289 0486102 9.00 6 PASSED November 12, 2013
95 73+300 L. 3.45 M 0291279 0486003 15.89 6 PASSED November 12, 2013
96 73+400 L. 3.06 M 0291329 0486019 5.74 6 FAILED November 12, 2013
97 73+500 R. 4.21 M 0291389 0485987 8.47 6 PASSED November 12, 2013
98 73+600 L. 3.00 M 0291413 0485888 10.08 6 PASSED November 12, 2013
99 73+700 R. 3.04 M 0291401 0485790 14.82 6 PASSED November 12, 2013
100 73+800 L. 2.76 M 0291442 0485699 18.46 6 PASSED November 12, 2013
101 73+900 - - - - Cutting
102 73+950 R. 2.45 M 0291469 0485572 15.45 PASSED November 13, 2013
103 74+000 L3.49 M 0291451 0485521 16.82 6 PASSED November 13, 2013
104 74+100 L. 4.73 M 0291445 0485426 3.52 6 FAILED November 13, 2013
105 74+200 L. 3.79 M 0291414 0485330 6.80 6 PASSED November 13, 2013
106 74+300 R. 6.10 M 0291395 0485236 3.26 6 FAILED November 13, 2013
107 74+400 R. 3.20 M 0291383 0485131 4.20 6 FAILED November 13, 2013
108 74+500 L. 2.60 M 0291394 0485034 6.85 6 PASSED November 13, 2013
109 74+600 L. 4.60 M 0291374 0484901 3.91 6 FAILED November 13, 2013
110 74+700 L. 2.00 M 0291402 0484850 4.56 6 FAILED November 13, 2013
111 74+800 R. 4.10 M 0291489 0484797 5.09 6 FAILED November 13, 2013
112 74+900 L. 3.90 M 0291515 0484711 3.45 6 FAILED November 13, 2013
113 75+000 R. 5.20 M 0291513 0484708 8.67 6 PASSED November 13, 2013
114 75+100 L. 2.30 M 0291587 0484645 8.39 6 PASSED November 13, 2013
115 75+200 R. 3.42 M 0484516 0291728 4.05 6 FAILED November 13, 2013
116 75+300 L. 3.55 M 0291783 0484435 3.63 6 FAILED November 13, 2013
117 75+400 R. 3.25 M 0291855 0484372 22.39 6 PASSED November 13, 2013
118 75+500 L. 3.44 M 0291866 0484280 3.53 6 FAILED November 13, 2013
119 75+600 L. 3.36 M 0291821 0484190 11.30 6 PASSED November 13, 2013
120 75+700 R. 3.50 M 0291774 0484105 4.19 6 FAILED November 13, 2013
121 75+800 L. 3.30 M 0291776 0484002 2.54 6 FAILED November 13, 2013
122 75+900 R. 3.50 M 0291765 0483904 15.78 6 PASSED November 13, 2013
123 76+000 Relocation I
124 76+100
125 76+200 L3.49 M 0291942 0483669 6 6 FAILED November 13, 2013
126 76+300 L. 4.12 M 0291971 0483572 5.72 6 FAILED November 13, 2013
127 76+400 R. 3.80 M 0291933 0483483 15.84 6 PASSED November 13, 2013
128 76+500 L. 4.20 M 0291923 0483390 12.76 6 PASSED November 13, 2013
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) SUNARTOMO MARWAN


NIP.197202082012121001 Quality Engineer Quality Control Engineer
REPUBLIC OF INDONESIA ENGINEER
YACHIO ENGINEERING Co. Ltd
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL of CONTRACTOR
HIGHWAYS NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
AREA TESTING DCP COORDINATE CBR
MIN
NO STA (%) STATUS DATE REMARKS
L CL R Y X (%)
129 76+600 R. 5.20 M 0291975 0483324 5.53 6 FAILED November 13, 2013
130 76+700 L. 6.50 M 0292076 0483328 5.04 6 FAILED November 13, 2013
131 76+800 R. 6.50 M 0292075 0483250 9.86 6 PASSED November 13, 2013
132 76+900 L. 3.30 M 0292008 0483171 2.99 6 FAILED November 13, 2013
133 77+000 L. 5.90 M 0291958 0483103 4.72 6 FAILED November 13, 2013
134 77+100 L. 3.42 M 0292006 0483019 8.43 6 PASSED November 13, 2013
135 77+200 R. 5.22 M 0291938 0482936 2.11 6 FAILED November 13, 2013
136 77+300 L. 4.80 M 0291933 0482865 5.74 6 FAILED November 13, 2013
137 77+400 L. 4.90 M 0291962 0482776 7.26 6 PASSED November 13, 2013
138 77+500 R. 4.85 M 0291953 0482678 6.09 6 PASSED November 13, 2013
139 77+600 L. 4.30 M 0291920 0482595 15.74 6 PASSED November 13, 2013
140 77+700 R. 5.05 M 0291871 0482490 16.65 6 PASSED November 13, 2013
141 77+800 CL 0291888 0482399 7.27 6 PASSED November 13, 2013
142 77+900 R. 4.02 M 0291942 0482324 5.05 6 FAILED November 13, 2013
143 78+000 L. 5.00 M 0292019 0482251 3.35 6 FAILED November 13, 2013
144 78+100 L. 3.62 M 0292076 0482212 2.38 6 FAILED November 13, 2013
145 78+200 R. 4.65 M 0292057 0482116 2.68 6 FAILED November 13, 2013
146 78+300 L. 4.21 M 0292101 0482109 2.49 6 FAILED November 13, 2013
147 78+400 L. 4.41 M 0292160 0482178 1.62 6 FAILED November 13, 2013
148 78+500 L. 4.80 M 0292336 0482125 3.31 6 FAILED November 13, 2013
149 78+600 R. 4.62 M 0292326 0482133 2.00 6 FAILED November 13, 2013 60
150 78+700 L. 3.92 M 0292404 0482186 7.10 6 PASSED November 13, 2013 60
151 78+800 R. 3.25 M 0292444 0482218 9.82 6 PASSED November 13, 2013
152 78+900 L. 4.10 M 0292468 0482118 6.11 6 PASSED November 13, 2013
153 79+000 R. 6.40 M 0292426 0482028 8.30 6 PASSED November 13, 2013
154 79+100 R. 3.33 M 0292492 0481951 11.5 6 PASSED November 13, 2013
155 79+200 L. 4.41 M 0292573 0481995 5.5 6 FAILED November 13, 2013 15
156 79+300 L. 390 M 0292667 0481859 4.03 6 FAILED November 13, 2013 15
157 79+400 R. 4.70 M 0292761 0481843 17.04 6 PASSED November 13, 2013
158 79+500 L. 4.23 M 0292825 0481810 5.74 6 FAILED November 13, 2013 15
159 79+600 R. 3.55 M 0292881 0481742 29.85 6 PASSED November 13, 2013
160 79+700 Cutting
161 79+800 R. 3.22 M 0291587 0484645 18.75 6 PASSED November 13, 2013
162 79+900 R. 3.65 M 0292933 0481492 12.81 6 PASSED November 13, 2013
163 80+000 L. 3.90 M 0292879 0481492 5.10 6 FAILED November 13, 2013 15
164 80+100 R. 3.32 M 0292870 0481396 22.39 6 PASSED November 13, 2013
165 80+200 L. 4.05 0292909 0481305 6.00 6 PASSED November 13, 2013
166 80+300 R. 5.30 M 0292898 0481206 16.86 6 PASSED November 13, 2013
167 80+400 L.2.90 M 0292952 0481123 6.63 6 PASSED November 13, 2013
168 80+500 R. 4.87 M 0292965 0481023 9.28 6 PASSED November 13, 2013
171 80+600 L. 3.44 M 0292992 0480934 3.28 6 FAILED November 13, 2013 30
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) SUNARTOMO MARWAN


NIP.197202082012121001 Quality Engineer Quality Control Engineer
REPUBLIC OF INDONESIA ENGINEER
YACHIO ENGINEERING Co. Ltd
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL of CONTRACTOR
HIGHWAYS NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
AREA TESTING DCP COORDINATE CBR
MIN
NO STA (%) STATUS DATE REMARKS
L CL R Y X (%)
172 80+700 L. 3. 40 M 0293064 0480900 3.53 6 FAILED November 13, 2013 30
173 80+800 L. 5.80 M 0293174 0480890 6.37 6 PASSED November 13, 2013
174 80+900 R. 4.40 M 0293185 0480804 5.30 6 FAILED November 13, 2013 15
175 81+000 L.3.80 M 0293159 0480707 19.46 6 PASSED November 14, 2013
176 81+100 L. 4.00 M 0293156 0480605 2.01 6 FAILED November 14, 2013 30
177 81+200 R. 3.76 M 0293227 0480570 17.96 6 PASSED November 14, 2013
178 81+300 L . 3.00 M 0293324 0480579 5.18 6 FAILED November 14, 2013 15
179 81+400 R . 4.60 M 0293370 0480502 18.39 6 PASSED November 14, 2013
180 81+500 L. 5.20 M 0293385 0480399 4.45 6 FAILED November 14, 2013 15
181 81+600 R. 4.70 M 0293416 0480308 6.92 6 PASSED November 14, 2013
182 81+700 L. 4.80 M 0293515 0480265 1.24 6 FAILED November 14, 2013 60
183 81+800 R. 5.81 M 0293483 0480117 2.91 6 FAILED November 14, 2013 30
184 81+900 L. 2.04 M 0293570 0480062 4.79 6 FAILED November 14, 2013 15
185 82+000 L. 4.50 M 0293667 0480039 8.40 6 PASSED November 14, 2013
186 82+100 R . 3.47 M 0293758 0480071 9.66 6 PASSED November 14, 2013
187 82+200 L. 3.47 M 0293761 0480013 9.00 6 PASSED November 14, 2013
188 82+300 R. 4.21 M 0293851 0480022 3.91 6 FAILED November 14, 2013 15
189 82+400 R. 5.32 M 0293936 0489968 7.53 6 PASSED November 14, 2013
190 82+500 L. 3.80 M 0293984 0489880 2.55 6 FAILED November 14, 2013 15
191 82+600 R. 1. 60 M 0293969 0489787 7.46 6 PASSED November 14, 2013
192 82+700 R. 3.90 M 0293961 0489681 5.82 6 FAILED November 14, 2013 15
193 82+800 R. 2.70 M 0293938 0489590 4.56 6 FAILED November 14, 2013 15
194 82+900 L. 5.80 M 0293871 0489520 4.25 6 FAILED November 14, 2013 15
195 83+000 R. 3.26 M 0293389 0489460 12.25 6 PASSED November 14, 2013
196 83+100 R. 3.40 M 0293718 0489391 1.64 6 FAILED November 14, 2013 60
197 83+200 L. 3.00 M 0293644 0489322 4.88 6 FAILED November 14, 2013 15
198 83+300 R. 3.26 M 0293599 0489238 13.38 6 PASSED November 14, 2013
199 83+400 L. 5.80 M 0293572 0479137 2.36 6 FAILED November 14, 2013 60
200 83+500 R. 4.56 M 0293527 0489051 21.70 6 PASSED November 14, 2013
201 83+600 L. 3.60 M 0293572 0488993 11.27 6 PASSED November 14, 2013
202 83+700 R. 2.90 M 0293657 0478920 10.82 6 PASSED November 14, 2013
203 83+800 R. 3.00 M 0293717 0478880 3.68 6 FAILED November 14, 2013 15
204 83+900 R.3.31 M 0293755 0478877 5.18 6 FAILED November 14, 2013 15
205 84+000 L. 2.82 M 0293830 0478840 12.49 6 PASSED November 18, 2013
206 84+100 R.3.50 M 0293925 047886 1.73 6 FAILED November 18, 2013 60
207 84+200 R. 4.05 M 0294033 0478853 3.67 6 FAILED November 18, 2013 15
208 84+300 L. 4.71 M 0294116 0478829 7.87 6 PASSED November 18, 2013
209 84+400 R. 3.50 M 0294187 0478756 3.77 6 FAILED November 18, 2013 15
210 84+500 L. 3.50 M 0294217 0478666 7.77 6 PASSED November 18, 2013
211 84+600 L. 4.90 M 0294224 0478569 3.71 6 FAILED November 18, 2013 15
212 84+700 R. 2.61 M 0294244 0478470 5.38 6 FAILED November 18, 2013
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) SUNARTOMO MARWAN


NIP.197202082012121001 Quality Engineer Quality Control Engineer
REPUBLIC OF INDONESIA ENGINEER
YACHIO ENGINEERING Co. Ltd
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL of CONTRACTOR
HIGHWAYS NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
AREA TESTING DCP COORDINATE CBR
MIN
NO STA (%) STATUS DATE REMARKS
L CL R Y X (%)
213 84+800 R. 5.20 M 0294252 0478381 7.24 6 PASSED November 18, 2013
214 84+900 L. 3.93 M 0294276 0478284 5.10 6 FAILED November 18, 2013 15
215 85+000 R. 4.80 M 0294229 0478197 7.36 6 PASSED November 18, 2013
216 85+100 R.3.40 M 0294228 0478099 6.26 6 PASSED November 18, 2013
217 85+200 R. 3.47 M 0294159 0478051 6.26 6 PASSED November 18, 2013
218 85+300 L. 4.95 M 0294081 0477991 2.82 6 FAILED November 18, 2013
219 85+400 L. 3.07 M 0294044 0477913 5.52 6 FAILED November 18, 2013
220 85+500 L. 3.27 M 0294010 0477829 4.37 6 FAILED November 18, 2013
221 85+600 L. 3.31 M 0293898 0477782 3.15 6 FAILED November 20, 2013
222 85+700 R. 3.26 M 0293897 0477686 4.59 6 FAILED November 20, 2013
223 85+800 L. 4.12 M 0293821 0477626 4.58 6 FAILED November 20, 2013
224 85+900 R. 2.95 M 0293836 0477522 4.18 6 FAILED November 20, 2013
225 86+000 L. 2.40 M 0293863 0477838 8.84 6 PASSED November 20, 2013
226 86+100 L. 3.48 M 0293872 0477335 4.40 6 FAILED November 20, 2013
227 86+200 L. 3.50 M 0293807 0477284 4.80 6 FAILED November 20, 2013
228 86+300 Cutting
229 86+400 Cutting
230 86+500 Cutting
231 86+600 L. 5.21 M 0293824 0476960 3.04 6 FAILED November 20, 2013
869 86+700 R. 3.33 M 0293783 0476877 7.40 6 PASSED November 20, 2013
873 86+800 L. 3.50 M 0293746 0476776 1.79 6 FAILED November 20, 2013
877 86+900 R. 3.49 M 0293798 0476693 2.36 6 FAILED November 20, 2013
881 87+000 L. 3.28 M 029 3858 047 6610 14.94 6 PASSED November 20, 2013
885 87+100 R. 3.48 M 029 3904 047 6531 6.0 6 PASSED November 20, 2013
889 87+200 R. 3.50 M 029 3994 047 6478 3.49 6 FAILED November 20, 2013
893 87+300 L. 3.49 M 029 4068 047 6425 3.91 6 FAILED November 20, 2013
897 87+400 R. 3.90 M 029 4088 047 6360 7.59 6 PASSED November 20, 2013
901 87+500 L. 3.49 M 029 4090 047 6361 12.97 6 PASSED November 20, 2013
905 87+600 R. 3.52 M 029 4140 047 6251 3.28 6 FAILED November 20, 2013
909 87+700 L.3.50 M 029 4105 047 6193 2.51 6 FAILED November 20, 2013
913 87+800 L. 3.49 M 029 4146 047 6194 3.36 6 FAILED November 20, 2013
917 87+900 R. 4.62 M 029 4246 047 6185 5.35 6 FAILED November 20, 2013
921 88+000 L.2.90 M 029 4311 047 6227 3.09 6 FAILED November 20, 2013
925 88+100 R. 5.21 M 029 4413 047 6233 3.99 6 FAILED November 20, 2013
929 88+200 L. 3.26 M 029 4499 047 6288 15.68 6 PASSED November 20, 2013
933 88+300 R. 3.91 M 029 4557 047 6231 4.63 6 FAILED November 20, 2013
937 88+400 L. 3.72 M 029 4584 047 6142 0.66 6 FAILED November 20, 2013
941 88+500 R. 4.14 M 029 4650 047 6069 8.05 6 PASSED November 20, 2013
942 88+600 L. 3.32 M 029 4653 047 5959 6.05 6 PASSED November 20, 2013
943 88+700 R. 6.10 M 029 4650 047 5874 4.73 6 FAILED November 20, 2013
944 88+800 L. 3.26 M 029 4726 047 5824 10.13 6 PASSED November 20, 2013
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) SUNARTOMO MARWAN


NIP.197202082012121001 Quality Engineer Quality Control Engineer
REPUBLIC OF INDONESIA ENGINEER
YACHIO ENGINEERING Co. Ltd
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL of CONTRACTOR
HIGHWAYS NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
AREA TESTING DCP COORDINATE CBR
MIN
NO STA (%) STATUS DATE REMARKS
L CL R Y X (%)
945 88+900 R. 3.51 M 029 4820 047 5850 3.02 6 FAILED November 20, 2013
946 89+000 R. 4.49 M 029 4861 047 5833 4.29 6 FAILED November 20, 2013
947 89+100 L. 1.90 M 029 4889 047 5754 7.31 6 PASSED November 20, 2013
948 89+200 R. 3.40 M 029 4941 047 5679 4.92 6 FAILED November 20, 2013
949 89+300 L. 3.26 M 029 5037 047 5684 6.70 6 PASSED November 20, 2013
950 89+400 L. 3.40 M 029 5132 047 5695 3.30 6 FAILED November 20, 2013
951 89+500 R. 5.12 M 029 5097 047 5605 3.25 6 FAILED November 20, 2013
952 89+600 L . 3.42 M 029 5095 047 5517 3.12 6 FAILED November 20, 2013
953 89+700 R.3.62 M 029 5178 047 5423 13.52 6 PASSED November 20, 2013
954 89+800 R .3.29 M 029 5137 047 5330 4.10 6 FAILED November 20, 2013
955 89+900 R. 3.00 M 029 5144 047 5225 8.81 6 PASSED November 20, 2013
956 90+000 L. 3.00 M 029 5217 047 5175 3.04 6 FAILED November 20, 2013
957 90+100 R. 4.16 M 029 5280 047 5127 15.06 6 PASSED November 20, 2013
958 90+200 R. 3.28 M 029 5327 047 5027 8.67 6 PASSED November 21, 2013
959 90+300 R. 5.05 M 0295385 0474955 6.00 6 PASSED November 21, 2013
960 90+400 L. 2.49 M 0295446 0474869 3.56 6 FAILED November 21, 2013
961 90+500 R. 4.80 M 0295543 0474871 9.28 6 PASSED November 21, 2013
962 90+600 L. 3.27 M 0295545 0474816 2.36 6 FAILED November 21, 2013
963 90+700 R. 4.49 M 0295470 0474749 6.64 6 PASSED November 21, 2013
964 90+800 R. 3.41 M 0295511 0474668 5.36 6 FAILED November 21, 2013
965 90+900 R. 3.50 M 0295494 0474560 4.61 6 FAILED November 21, 2013
966 91+000 L. 3.48 M 0295539 0474473 5.67 6 FAILED November 21, 2013
967 91+100 R. 3.51 M 0295542 0474375 2.70 6 FAILED November 21, 2013
968 91+200 L. 3.49 M 0295610 0474322 6.33 6 PASSED November 21, 2013
969 91+300 L. 3.51 M 0295619 0474237 7.43 6 PASSED November 21, 2013
970 91+400 R. 2.20 M 0295641 0474149 11.00 6 PASSED November 21, 2013
971 91+500 R. 2.90 M 0295693 0474063 12.61 6 PASSED November 21, 2013
972 91+600 R. 3.00 M 0295727 0473979 13.24 6 PASSED November 21, 2013
973 91+700 R. 3.62 M 0295738 0473894 7.16 6 PASSED November 21, 2013
974 91+800 L. 3.34 M 0295735 0473802 13.38 6 PASSED November 21, 2013
975 91+900 L. 3.31 M 0295684 0473728 10.78 6 PASSED November 21, 2013
976 92 + 025 R. 3.44 M 0295751 0473626 5.18 6 FAILED November 21, 2013
977 92+100 R. 2.92 M 0295770 0473549 4.18 6 FAILED November 21, 2013
978 92+200 L. 3.32 M 029 5749 047 3453 6.28 6 PASSED November 21, 2013
979 92+300 R. 5.10 M 029 5696 047 3363 2.59 6 FAILED November 21, 2013
980 92+400 L. 3.25 M 029 5727 047 3271 18.41 6 PASSED November 21, 2013
981 92+500 R. 3.25 M 029 5806 047 3248 9.28 6 PASSED November 21, 2013
982 92+600 L. 3.24 M 029 5884 047 3299 13.70 6 PASSED November 21, 2013
983 92+700 R. 3.62 M 029 5939 047 3220 9.63 6 PASSED November 21, 2013
984 92+800
985 92 + 850 R. 4.68 M 029 6060 047 3130 11.34 6 PASSED November 21, 2013
986 92+900 R. 6.15 M 029 6086 047 3114 17.35 6 PASSED November 21, 2013
987 93+000 L. 3.12 M 029 6165 047 3036 4.38 6 FAILED November 21, 2013
988 93+100 L. 3.41 M 029 6232 047 2972 3.87 6 FAILED November 21, 2013
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) SUNARTOMO MARWAN


REPUBLIC OF INDONESIA ENGINEER
YACHIO ENGINEERING Co. Ltd
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL of CONTRACTOR
HIGHWAYS NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
NIP.197202082012121001 Quality Engineer Quality Control Engineer
REPUBLIC OF INDONESIA ENGINEER
YACHIO ENGINEERING Co. Ltd
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL of CONTRACTOR
HIGHWAYS NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
AREA TESTING DCP COORDINATE CBR
MIN
NO STA (%) STATUS DATE REMARKS
L CL R Y X (%)
989 93+200 L. 3.62 M 029 6210 047 2877 4.78 6 FAILED November 21, 2013
990 93+300 R. 3.29 M 029 6207 047 2775 12.61 6 PASSED November 21, 2013
991 93+400 R. 3.64 M 029 6213 047 2879 6.00 6 PASSED November 21, 2013
992 93+500 L. 3.47 M 029 6339 047 2620 12.91 6 PASSED November 21, 2013
993 93+600 R. 4.16 M 029 6403 047 2588 7.73 6 PASSED November 21, 2013
994 93+700 L. 3.32 M 029 6428 047 2506 16.55 6 PASSED November 21, 2013
995 93+800 R. 3.66 M 029 6502 047 2538 5.03 6 FAILED November 21, 2013
996 93+900 L. 3.48 M 029 6553 047 2475 9.95 6 PASSED November 21, 2013
997 94+000 R. 4.21 M 029 6583 047 2379 14.38 6 PASSED November 21, 2013
998 94+100 L. 3.76 M 029 6645 047 2315 7.61 6 PASSED November 22, 2013
999 94+200 L. 2.97 M 029 6663 047 2230 14.49 6 PASSED November 22, 2013
1000 94+300 R. 4.10 M 029 6709 047 2129 3.11 6 FAILED November 22, 2013
1001 94+400 L. 3.21 M 029 6692 047 2052 15.01 6 PASSED November 22, 2013
1002 94+500 R. 3.53 M 029 6674 047 1965 21.56 6 PASSED November 22, 2013
1003 94+600 R. 5.14 M 029 6727 047 1934 4.85 6 FAILED November 22, 2013
1004 94+700 L. 3.76 M 0296910 0471907 6 6 PASSED November 22, 2013
1005 94+800 R. 3.71 M 029 6810 047 1806 10.19 6 PASSED November 22, 2013
1006 94+900 L. 3.49 M 029 6786 048 1720 22.25 6 PASSED November 22, 2013
1007 95+000 R. 3.00 M 029 6725 047 1639 11.92 6 PASSED November 22, 2013
1008 95+100 L. 3.21 M 029 6782 047 1630 14.24 6 PASSED November 22, 2013
1009 95+200 R. 3.61 M 029 6941 047 1680 9.40 6 PASSED November 22, 2013
1010 95+300 R. 5.21 M 029 6910 047 1751 1.0 6 FAILED November 22, 2013
1011 95+400 R. 3.26 M 029 6966 047 1683 5.79 6 FAILED November 22, 2013
1012 95+500 L. 3.58 M 029 7018 047 1595 20.73 6 PASSED November 22, 2013
1013 95+600 R. 3.51 M 029 7071 047 1515 16.76 6 PASSED November 22, 2013
1014 95+700 L. 3.31 M 029 7168 047 1502 26.02 6 PASSED November 22, 2013
1015 95+800 R. 3.50 M 029 7249 047 1474 15.54 6 PASSED November 22, 2013
1016 95+900 R. 3.42 M 029 7322 047 1291 19.58 6 PASSED November 22, 2013
1017 96+000 L. 3.36 M 029 7337 047 1292 34.32 6 PASSED November 22, 2013
1018 96+100 R 3.50 M 029 7303 047 1202 23.47 6 PASSED November 22, 2013
1019 96+200 L 3.48 M 029 7294 047 1092 8.64 6 PASSED November 22, 2013
1020 96+300 L 3.27 M 029 7292 047 1000 6.22 6 PASSED November 22, 2013
1021 96+400 R 3.47 M 029 7236 047 0866 11.27 6 PASSED November 22, 2013
1022 96+500 L 3.49 M 029 7327 047 0837 22.82 6 PASSED November 22, 2013
1023 96+600 R 3.60 M 029 7427 047 0843 3.45 6 FAILED November 22, 2013
1024 96+700 L. 4.00 M 029 7488 047 0915 12.24 6 PASSED November 22, 2013
1025 96+800 R. 029 7499 047 0864 Hard Soil
1026 96+900 R. 3.40 M 029 7490 047 0792 8.32 6 PASSED November 22, 2013
1027 97+000 R. 3.42 M 029 7508 047 0772 12.83 6 PASSED November 22, 2013
1028 97+100 R. 3.36M 029 7575 047 0744 24.72 6 PASSED November 22, 2013
1029 97+200 L. 6.32 M 029 7659 047 0685 12.08 6 PASSED November 22, 2013
1058 100+100 R. 3.64 M 029 8538 046 9704 6.33 6 PASSED November 23, 2013
1059 100+125 R. 3.64 M 029 8596 046 9687 18.41 6 PASSED November 23, 2013
1033 104 +825 L. 3.64 M 029 9182 046 8560 17.35 6 PASSED November 23, 2013
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) SUNARTOMO MARWAN


REPUBLIC OF INDONESIA ENGINEER
YACHIO ENGINEERING Co. Ltd
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL of CONTRACTOR
HIGHWAYS NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
NIP.197202082012121001 Quality Engineer Quality Control Engineer
REPUBLIC OF INDONESIA ENGINEER
YACHIO ENGINEERING Co. Ltd
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL of CONTRACTOR
HIGHWAYS NINDYA - LAMPIRI. JO.

Project : Aceh Reconstruction Project (IP-545) Road Sub Project


Package : Package No. 1 Section Sp. Kraft - Batas Aceh Tengah
Source of Fund : JICA Loan IP - 545
No. Contract : KU.08.08/CTR.Br.A2/01/JICA/2013
Date of Contract : January 31th, 2013
AREA TESTING DCP COORDINATE CBR
MIN
NO STA (%) STATUS DATE REMARKS
L CL R Y X (%)
1 86 + 300 R. 3.25 M 0298646 0469459 7.26 6 PASSED December 19, 2013
2 86 + 400 L. 3.25 M 0293824 0467148 3.30 6 FAILED December 19, 2013
3 86 + 475 CL 0293830 0477075 3.47 6 FAILED December 19, 2013

Acknowledge by: Checked and Approved by: Submitted by:


Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.

( TEUKU FADRIAL MAHFUD. ST ) SUNARTOMO MARWAN


NIP.197202082012121001 Quality Engineer Quality Control Engineer
GOVERNMENT OF REPUBLIC INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS
ACEH RECONSTRUCTION PROJECT (IP-545)
PACKAGE No. 1 SECTION SP. KRAFT - BATAS ACEH TENGAH

LEGALIZATION SHEET

TESTED DINAMIX CONE PENETRATION


(DCP)

NAME SIGNATURE
Nr. DESCRIPTION
OCCUPATION AND OFFICE STAMP

1 Acknowledge by, Dedy Heriadi, ST. MT.


NIP. 197700502 200502 1 001

Employer
Sub Project Manager (PPK) 7A

2 Checked & Approved by, Akihiko Kitayama


Resident Engineer

Engineer
YACHIYO Engineering Co. Ltd.

3 Submitted by, Eko Setyo Koncoro


General Superintendent

Contractor
NINDYA - LAMPIRI, JO.

Remarks:

Package : 1 (ONE) Section Sp. Kraft - Batas Aceh Tengah

Contractor : NINDYA - LAMPIRI, JO.

Engineer : YACHIYO ENGINEERING Co, Ltd.


REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS

ACEH RECONTRUCTION PROJECT (IP- 545)


ROAD SUB PROJECT

PACKAGE NAME : 1 (ONE) Section Sp. Kraft - Batas Aceh Tengah


CONTRACT NUMBER : KU.08.08/CTR.Br.A2/01/JICA/2013

CONTRACT DATE : January 31th, 2013


PROVINCE : ACEH

TESTED DYNAMIC CONE PENETRATION


(DCP)

Package : 1 (ONE) Section Sp. Kraft - Batas Aceh Tengah

Contractor : NINDYA - LAMPIRI, JO.

Engineer : YACHIYO ENGINEERING Co, Ltd.


DCP Reading
Cumulative CBR (%)
Blow Cumulative Point 1 Point 2 Average DCP
Penetration
No Blow mm (mm/Blow)
(h) =10^(2.8135-
cm cm cm
(1.313*Log(h)))

0 0 0 1 0 0 0 -
1 1 3 6 4.5 45 45
1 2 6 9 7.5 75 30
1 3 8.5 10.5 9.5 95 50
15.00 13.4
1 4 10.5 11.5 11 110 65
1 5 12.5 12 12.25 123 78
1 6 14.5 12.5 13.5 135 90
1 7 16 13.5 14.75 148 103
1 8 17 14 15.5 155 110
1 9 17.5 14.5 16 160 115
1 10 18 15 16.5 165 120 10.38 21.43
1 11 18.5 15.5 17 170 125
1 12 19 16 17.5 175 130
1 13 19.5 16.5 18 180 135

You might also like