Saudi Aramco Inspection Checklist: SAIC-L-1003 29-Jun-17

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

SAUDI ARAMCO ID/PIEU - 29-Jun-2017 - REV. 2017.02.00 (Standards Cutoff - February 28, 2017) Rev. 2017.02.

00 28-Feb-17
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Pipe Lowering Inspection SAIC-L-1003 29-Jun-17 CIVIL -
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

The bottom of the trench shall be free of rocks and other materials that SAEL-L-450
A1
can damage the pipe or pipe coating. Sec. 14.8.2

Slings for lifting pipe shall be nylon or similar material to prevent damage SAES-L-450
A2
to the pipe surfaces. Wire rope slings shall not be used. Sec. 8.5

SAES-L-450
A3 Pipe shall not be rolled or dropped off of trucks.
Sec. 8.6

Internally coated pipe shall be handled from the outside diameter (O.D.) SAES-L-450
A4
only. Sec. 8.7

Pipe strings or portions thereof shall not be moved until all joints have SAES-L-450
A5
been fully welded and inspected. Sec. 11.3

Open ends of pipe strings shall be capped to prevent entry of debris or SAES-L-450
A6
animals and birds. Sec. 11.4

SAES-L-450
A7 Each string of the pipeline shall be cleaned to remove all debris.
Sec. 11.5

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-L-450 -- Construction of On-Land and Near Shore Pipelines, 12 October 2015

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED