Night shift Reinstatement Test Pa

Sr No. Package No Drawing No, Joint No. QC C

VB--376140-301-01B, FW-8, PMI Report Component Description wrong, PMI-F-170


VB-376140-301-01B, FW-S8 PMI Report Component Description wrong, QCS-PMI-0
1 VB-376140-301, SW-09 PMI Report Component Description wrong, PMI-S-P9
VB-376140-301, FW-07 PMI Report Component

PMI-F-1266,
PMI-F-1267,
2 PMI-F-1704,
Given PMI Rep
QCS-PMI-0048

TP-PB03B-BD-001- VB-376140-301, FW-11


3 0011 VB-376140-303, SW-31RW PMI Re

4 VB-376140-301-00, FW-05,06,07,08 Wrong Dia is M

5 PWHT-F-30346 PID S

VB-376140-301, FW-01, 16
6 VB-376140-302, FW-17, 21, 25 HT Re
VB-376140-303, SW-31, 33, 34

PMI-S-P91-1285,
7 VB-376140-303, SW-33RW Remove
atement Test Packages Review Progress Sheet
QC Comment Current Status PKG Reviwed By

nt Description wrong, PMI-F-1704,


nt Description wrong, QCS-PMI-0048 Handed over to BILAL ASGHAR
ent Description wrong, PMI-S-P91-0816 Construction
PMI Report Component Description wrong, PMI-F-2027

Given PMI Reports QC Sign Missing Handed over to BILAL ASGHAR


Construction

Handed over to
PMI Report is Missing Construction BILAL ASGHAR

Wrong Dia is Mentioned, HT-F-3219 Handed over to BILAL ASGHAR


Construction

PID Sign Missing Handed over to BILAL ASGHAR


Construction

HT Report Missing Handed over to BILAL ASGHAR


Construction

Remove from the report


PKG Reviwed By Remarks

BILAL ASGHAR

BILAL ASGHAR

BILAL ASGHAR

BILAL ASGHAR

BILAL ASGHAR

BILAL ASGHAR
Night shift Reinstatement Test Pa
Sr No. Package No Drawing No, Joint No. QC C

PWHT-F-30321, PWHT-F-30419, PWHT-F-


30378, PWHT-F-30335, PWHT-F-30273,
1 PWHT-F-30348, PWHT-F-30142, PWHT-F- All PWHT Re
30471, PWHT-F-030314, PWHT-F-030299

PMI-F-2041
VB-376143-301, FW-01 PMI-F-1292
VB-376143-302, FW-15
2 VB-376143-303, FW-27 PMI-F-2030
VB-376143-303, FW-28 PMI-F-2029
TP-PB03B-BD-001- Mentioned Joints component desc
00013
QCS-PMI-0048,
3 PMI-F-2504 Given PMI Repo

4 VB-376143-302, FW-19 Wrong Dia is

5 VB-376143-301, SW-02, 04 These joints should be updated


atement Test Packages Review Progress Sheet
QC Comment Current Status PKG Reviwed By

All PWHT Reports Need PID Sign Handed over to TABRAIZ


Construction

Handed over to
Construction TABRAIZ
All
Mentioned Joints component description is wrong in the given PMI Reports.

Handed over to
Given PMI Reports need QC Signature Construction TABRAIZ

Handed over to
Wrong Dia is written, PMI-S-1173 Construction TABRAIZ

Handed over to
These joints should be updated in Weld Summery as per PID Comments Construction TABRAIZ

Handed over to TABRAIZ


Construction
PKG Reviwed By Remarks

TABRAIZ

TABRAIZ

TABRAIZ

TABRAIZ

TABRAIZ

TABRAIZ
Night shift Reinstatement Test Pa
Sr No. Package No Drawing No, Joint No. QC

1 VB-433969-301, SEPCO-GJ-49 Golden jo

2 PWHT-F-030387 Need

3 PWHT-S-0233 Attach This PWH

4 PT-19-45726 Attach This PT

5 RTFI-0622 Need

VB-433969-302, FW-34, PMI-F-2761,


PMI-F-2709,
6 VB-433969-302, FW-S32, PMI-F-2567
VB-433969-302, FW-25 All Mentioned Joints Dia I

TP-PB03B-HRH-
000-0004
All Mentioned joints Component discription is written w
As per Drawing Should be:
FW-32 Nipple/Valve
FW-28 CAP/SOCKOLET,
FW-29 SOCKOLET/NIPPLE,
FW-25 FLANGE/INSTRUMENT,
7 VB-433969-302 NIPPLE/ELBOW,
ELBOW/NIPPLE,
SW-23 PIPE/TEE,
SW-12 PIPE/ELBOW,
SW-27 PIPE/CAP,
24 TEE/FLANGE,
26 PIPE/T
atement Test Packages Review Progress Sheet
QC Comment Current Status PKG Reviwed By

Golden joint DWR Balance Handed over to Qaiser Bajwa


Construction

Handed over to
Need PID Signature Construction Qaiser Bajwa

Handed over to
Attach This PWHT Report with Package Construction Qaiser Bajwa

Attach This PT Report with Package Handed over to Qaiser Bajwa


Construction

Handed over to
Need OID Signature Construction Qaiser Bajwa

Handed over to
Construction Qaiser Bajwa
All Mentioned Joints Dia Is Wrong in the given PMI Reports

omponent discription is written wrong in the given PMI Reports


ld be:

,
NIPPLE,
UMENT, FW-30 Handed over to
FW-31 Qaiser Bajwa
Construction

SW-
SW-
26 PIPE/TEE
PKG Reviwed By Remarks

Qaiser Bajwa

Qaiser Bajwa

Qaiser Bajwa

Qaiser Bajwa

Qaiser Bajwa

Qaiser Bajwa

Qaiser Bajwa
Night shift Reinstatement Test P
Sr No. Package No Drawing No, Joint No.

1 VB-034510-301, FW-10 Attach PT Rep

VB-034491-306, FW52CC1 VB-


433936, FW-01BEC1
VB-034507-301, FW-12EC1
VB-034494-302, FW-18CC1
VB-058396-303, FW-28CC1
2 VB-058396-303, FW-29CC1 All Mentio
VB-034493-301-01C, FW-14CC1
VB-034493-302, FW-18RW
TP-PB03B-LPS-001- VB-034493-302, FW-21CC1 VB-
0025 034510-301, FW-10RW1 VB-
034495-301, SW-01RW1

3 VB-034507-301, FW-05EC1 Need

VB-433936-302, FW-18EC1
VB-406335-301, FW-05CC1, 06CC1
4 VB-406335-302, FW-15CC1, 16CC1
All Mentio
VB-034501-301, FW-03CC1, 06CC1

10
11

12

13

14

15
tement Test Packages Review Progress Sheet
QC Comment Current Status PKG Reviwed By

Handed over to
Attach PT Report with Package, PT-45610 Construction SYED JAVAID

All Mentioned Joints NEED BEVEL PT Handed over to SYED JAVAID


Construction

Handed over to
Need BEVEL and Final PT Construction SYED JAVAID

All Mentioned Joints Need Final PT Handed over to SYED JAVAID


Construction
PKG Reviwed By Remarks

SYED JAVAID

SYED JAVAID

SYED JAVAID

SYED JAVAID
Night shift Reinstatement Test P
Sr No. Package No Drawing No, Joint No.

VB-046499-303, FW-37 PMI-096,


VB-046499-303, FW-43, 44 PMI-F-5676,
VB-046499-301, FW-63, 64, 65 PMI-096,
VB-555492-302, FW-01 F-3724,
VB-555506-301, FW-08 0116,
VB-555507-302, FW-09, 10, 12, 14, 19 VB- 100,
046490-302, FW-93 VB- 567,
1 046490-302, FW-99 0116,
VB-046490-302, FW-101, 102, 103 096,
VB-046490-301, FW-84 3381,
VB-555494-301, FW-01 096,
VB-555500-301, FW-73, 76,
VB-555498-301, FW-01
VB-555498-302, FW-09, 10, 13, 14,
19, 20, 23, 24 component descriptio

PMI-096
TP-PB03B-CRH-001- VB-555507-302, FW-20 100
2 VB-555507-302, FW-21, 22, 24 Mentioned joints component description is wrong
0008
HT

VB-046499-303, FW-81, 49, 51, 56


3 VB-555507-301, FW-03 HT
VB-555507-302, FW-26

4 VB-046490-302, FW-95, 97RW1 Given Jo

5 VB-555494-301, FW-08 PM

Updated Weld
Updated Weld
tement Test Packages Review Progress Sheet
QC Comment Current Status PKG Reviwed By

PMI-
PMI-
PMI-
PMI-
PMI- Handed over to
PMI- SYED JAVAID
PMI- Construction
PMI-
PMI-096,
PMI-096,
PMI-096
All Mentioned joints
component description is wrong in the given PMI Reports

PMI-
All Handed over to
mponent description is wrong in the given PMI Reports Also Construction SYED JAVAID
HT REPORT Missing

Handed over to
HT REPORT MISSING Construction SYED JAVAID

Handed over to
Given Joints HT and PMI Missing Construction SYED JAVAID

PMI REPORT MISSING Handed over to SYED JAVAID


Construction

Handed over to
Updated Weld Summery should be provided Construction SYED JAVAID
Handed over to
Updated Weld Summery should be provided Construction SYED JAVAID
PKG Reviwed By Remarks

SYED JAVAID

SYED JAVAID

SYED JAVAID

SYED JAVAID

SYED JAVAID

SYED JAVAID
SYED JAVAID
Night shift Reinstatement Test P
Sr No. Package No Drawing No, Joint No.

PMI-F-2350,
VB-433982-301, FW-33, 36 F-2352,
1 VB-433982-301, FW-37
2553
VB-433982-301, FW-38, 39 Mentioned Joints component

VB-439982-303, SW-03, 04, 06, 08, 09, 10 VB-


2 433982-302-01A, SW-12, FW-S11 VB-433982- PM
301-01A, FW-21A, 21B, 31, 32, 34, 35, 41B, S39

3 PT-55898 NEED QC S

SEPCO-A-PWHT-F-30485,
SEPCO-A-PWHT-F-030259,
4 SEPCO-A-PWHT-F-30670, Given PWHT R
TP-PB03B-HRH-000- SEPCO-A-PWHT-F-30424,
0005 SEPCO-A-PWHT-F-030387

PT-45582,
PT Date Before Welding Date
5 VB-433982-301, FW-27
Welding Date:19-12-2019
P

6 VB-4339982-301, FW-S31 Update the W

PT-46533,
PT Date Before Welding Date
7 VB--528713-301, FW-01 Welding Date:15-09-2019

VB-433982-303, SW-03, 04, 06, 08, 09, 10 VB-


8 433982-302, SW-11, 12 FW-16 VB- HT
433982-301, FW-22B
tement Test Packages Review Progress Sheet
QC Comment Current Status PKG Reviwed By

PMI-
PMI-F- Handed over to BILAL ASGHAR
All Construction
Mentioned Joints component description is wrong in the given PMI Reports

Handed over to
PMI REPORT MISSING Construction BILAL ASGHAR

NEED QC SIGN ON GIVEN PT REPORT Handed over to BILAL ASGHAR


Construction

Handed over to
Given PWHT Reports Need PID and QC Sign Construction BILAL ASGHAR

ng Date Handed over to BILAL ASGHAR


:19-12-2019 Construction
PT DATE: 08-12-2019

Update the Welding Date in Pkg Summery Handed over to BILAL ASGHAR
Construction

ing Date Handed over to


te:15-09-2019 Construction BILAL ASGHAR
PT DATE: 14-09-2019

HT REPORT MISSING Handed over to BILAL ASGHAR


Construction
PKG Reviwed By Remarks

BILAL ASGHAR

BILAL ASGHAR

BILAL ASGHAR

BILAL ASGHAR

BILAL ASGHAR

BILAL ASGHAR

BILAL ASGHAR

BILAL ASGHAR
Night shift Reinstatement Test P
Sr No. Package No Drawing No, Joint No.

VB-358550-301, FW-01, 02, 03, 04, 05, 06, 07, 08,


1 09 VB- PWH
358550-302, FW-13B, 14, S12

VB-045354-301, FW-01CC1
2 VB-045357-301, FW-01CC1 Need BEV

3 VB-045346-307, FW-99R1 BEVE

4 VB-045346-307, FW-93 HT Re

5 VB-058400-301, FW-09, 11, 14 PM


TP-PB03B-HPS-001-
0003

PMI-F-0762
6 VB-045346-307, FW-90 Given Joint Component Di

7 HT/5312 Need QC
tement Test Packages Review Progress Sheet
QC Comment Current Status PKG Reviwed By

PWHT REPORT MISSING Handed over to TBARAIZ AHAMAD


Construction

Need BEVEL PT of the given Joints Handed over to TBARAIZ AHAMAD


Construction

BEVEL PT to be Provided Handed over to TBARAIZ AHAMAD


Construction

Handed over to
HT Report to be Provided Construction TBARAIZ AHAMAD

PMI Report IS Missing Handed over to TBARAIZ AHAMAD


Construction

Handed over to
Given Joint Component Discription is wrong in the given PMI Report Construction TBARAIZ AHAMAD

Need QC Signature on HT report Handed over to TBARAIZ AHAMAD


Construction
PKG Reviwed By Remarks

TBARAIZ AHAMAD

TBARAIZ AHAMAD

TBARAIZ AHAMAD

TBARAIZ AHAMAD

TBARAIZ AHAMAD

TBARAIZ AHAMAD

TBARAIZ AHAMAD
Night shift Reinstatement Test P
Sr No. Package No Drawing No, Joint No.

1 VB-046523-301, FW-01

VB-046523-303, FW-25ARW2 BEVEL PT to be Provided, 14-01-2020


2 VB-406314-301, FW-01CC1 Bevel PT to

3 RTFI-765, RTFI-0632, RTFI-0667 NEE

VB-046523-303, SW-06, 07
4 VB-046523-302, FW-19BEA1 HT Re

5 TP-PB03B-VPS-000- VB-406314-301, FW-01 PMI an


0003

PMI-S-P91-0687
VB-046523-303, SW-37
6 VB-046523-301, FW-38
PMI-F-2412
All Mentioned joints Com

PMI-F-2538
7 VB-046523-302, FW-33, 34
Mentioned Joints Siz
tement Test Packages Review Progress Sheet
QC Comment Current Status PKG Reviwed By

DWR BALANCE Handed over to QAISER BAJWA


Construction

ded, 14-01-2020 Handed over to QAISER BAJWA


Bevel PT to be Provided, 29-02-2020 Construction

NEED OID SIGNATURE Handed over to QAISER BAJWA


Construction

Handed over to
HT Report to be Provided Construction QAISER BAJWA

PMI and HT Report is Missing Handed over to QAISER BAJWA


Construction

412 Handed over to QAISER BAJWA


All Mentioned joints Component Description is wrong in the given PMI Reports Construction

Handed over to QAISER BAJWA


Mentioned Joints Size is wrong in the given PMI Report. Construction
PKG Reviwed By Remarks

QAISER BAJWA

QAISER BAJWA

QAISER BAJWA

QAISER BAJWA

QAISER BAJWA

QAISER BAJWA

QAISER BAJWA
Night shift Reinstatement Test Pa
Sr No. Package No Drawing No, Joint No. QC
atement Test Packages Review Progress Sheet
QC Comment Current Status PKG Reviwed By
PKG Reviwed By Remarks