1/11 Engine Model: 4He1-X: Ass'y No.: 107492-1112
1/11 Engine Model: 4He1-X: Ass'y No.: 107492-1112
Nozzle & Nozzle Holder Ass'y: 105780-8250 (Bosch Type No. 1 688 901 101 )
Nozzle opening pressure: 20.7 MPa { 211 kgf/cm2 } Transfer pump pressure: 255 kPa { 2.6 kgf/cm2 }
Overflow valve opening pressure: 255 34 kPa { 2.6 0.35 kgf/cm2 } Selector switch No. 00 (For C/U 407910-303*)
Digi switch No. 11 (For C/U 407980-224*)
2. Injection timing
Pre-stroke: No.1 Plunger 4.0 0.03mm
Injection order: 1 3, 1 4, 1 2
90 15' 180 15' 270 15'
Tappet clearance Manually rotate the camshaft 2 3 times and confirm that it rotates smoothly.
3 6 5
3.43 a1 + tolerance
a
3.17 a2 -tolerance
2.85 b1 + tolerance
b
2.65 b2 -tolerance
Advice
If measuring device (P/N 105782-6420) is removed, the output voltage (a1, a2) should be
remeasured.
4. Governor adjustment
4-1. Governor adjustment
Full load adjustment
Advice
Loosen timing cam and lock screw.
Fully tighten the adjusting nut.
R1(13.5)
14.0 • •0.1
R2 [R1-1.4]
10.3 • •1.0
0
250-40 (700) 1000 (1400) 1630
(1560) 1775
Idling adjustment
7.8
6.6 • •0.1
3.9 • •0.3
0
240 400 500 880
400 475
(1) Select a push rod so C = 37.5• •0.5 at full boost pressure. (C is the distance from the
end face of the housing to top of the lever.)
(2) Adjust the boost compensator stroke using screw A.
(0 boost pressure position adjustment)
Adjust the beginning of boost compensator operation by adjusting the notch adjusting
nut B.
C Top of lever
Pushrod
A Boost compensator
stroke adjusting screw
B Notch adjusting nut
Boost compensator spring
N = 500 r/min
Rack position ( mm )
R2 [R1-1.4]
R2-0.8
0
Approx. 24.7 {Approx. 185}
13.3 • •1.3 {100 • •10}
3.43 a1 + tolerance
a
3.17 a2 -tolerance
2.85 b1 + tolerance
b
2.65 b2 -tolerance
2.65 (b2)
2.85 (b1) b (confirmation point)
3.17 (a2)
a (adjusting point)
3.43 (a1)
5. Injection quantity
Max.
Rack Pump
Adjusting Injection q'ty variation Pre-stroke
position speed Fixed Remarks
point ( cm3 /100 strokes ) between at adjustment
( mm ) ( r/min )
cylinders
Cylinder variation
- 13.5 1,000 87 ± 1.6 ±4 Rack a1• •a2(v) Basic
adjustment standard
Cylinder variation
Z 8.5±0.5 500 19 ± 1.5 ± 14 Rack c(v) adjustment standard
6. FICD Adjustment
1+1 mm
• •
Tightening torque
• • 5 • •7 N.m {0.5 • •0.7 kgf.m}
107492-1112 9/11
Stroke
D
Rack position (mm)
Idling
Normal Stop
29•
• •
3••
30• •
• •5 Full-speed
•• • Hole(R41.3)
(1) Before removing rack position measuring device, apply at least 38.0 kPa
{at least 285 mmHg} boost pressure and confirm rack position is R1 = 13.5 mm and
fuel injection quantity is 87 • •1 mm3/st at N = 1,000 r/min.
(2) Remove rack position measuring device.
(3) Attach rack sensor core to control rack.
At this time, hold control rack using a spanner (to prevent the rack from bending).
Specified torque : 3.4 • ••4.9 N.m {0.35 • ••0.5 kgf.m}
(4) While pulling stop lever, install rack sensor to rack sensor core.
(5) Tighten two flange fixing screws.
Specified torque : 6.9 • ••8.8 N.m {0.7 • ••0.9 kgf.m}
(6) Connect rack sensor wire harness to constant voltage power supply and digital voltmeter.
(7) Turn constant voltage power supply power switch ON and set it to DC 5 • •0.01V.
(8) Apply at least 38.0 kPa {at least 285 mmHg} boost pressure, set pump speed at
N= 1,000 r/min, and hold speed control lever against the full speed stopper bolt.
(9) Confirm the rack sensor output voltage from the digital voltmeter. (Vist = 2.25 • •0.28)
(10) Confirm that the voltage changes when the speed control lever is moved to the idle and
full sides.
Sensor output voltage (V)
Rack position (mm)
A
R1
Vist
R1
N
Pump speed (r/min) Rack position (mm)
107492-1112 11/11
•
28 • •
••••
••••
Gear side
Check hole