Download as pdf
Download as pdf
You are on page 1of 1
/—VERTIGAL FENDER COPE LEVEL GRANITE FACIN STONE +60 ELEVATION rs Fa Apigranests ove a (COPE LEVEL + COPE LINE UBER FENDERS suse sr ns —/ PLAN ws 0 os ad fre ute ls OPTIONS FOR RUBBER FENDERS cH NOTES, ‘1. ALL DIMENSIONS ARE IN MILLIMETRES. 2 ALL LEVELS REFER TO PRINCIPAL DATUM(PO) AND ARE IN MILLIMETRES. % OPTIONS FOR RUBBEA FENDERS MAY INCLUDE D, ARCH OR TURTLE FENDERS WITH SECTION HEIGHTS 150 TO 00mm, DEPENDING ON VESSEL TYPES. SPACING BETWEEN VERTICAL FENDERS : 900 TO 1500mm, DEPENDING ON VESSEL TYPES. THE HORIZONTAL SPACING OF VERTICAL FENDERS SHALL BE ADJUSTED TO AVOID CENTRE OF FIXING BOLTS TO LIE WITHIN 260mm OF CONCRETE EDGE. 7 ROE 7 WO DRG TLE MNES [orga ogd [TE & FOR DETAILS OF RUBBER STEP UNITS, REFER TO D [HANDRAL PLNTHS ON COPING: DRAWING Cso0a/4. REMOVED AND GRANITE FACING STONE |Griginal Signed |10.2004 BOLTS, STUDS AND NUTS SHALL BE OF STAINLESS oparmanaes 2 . eats ‘STEEL GRADE M4-¢0. WASHERS SHALL BE &_ [Wife OF DEPARTMENT AEWEED. _[O fine Sort GRADE TAO} STAINLESS STEEL 0 [RL evaGN OF FOC logy st [ate & FOR OTHER DETAILS OF LANDING, REFER TO (A [MINOR AMENDMENTS TO GENERAL |Criginal Bignad | 01.1080 DRAWINGS Cacoga AND Ca00g/4. [DETALE OF LANDING TEVISTOH [EOUATUNE [BATE oS _ CIVIL ENGINEERING AND oa SEAWALL EDD DEVELOPMENT DEPARTMENT LANDIN SCALE AS SHOWN | DRAWING NO. (SHEET 2 OF §) DATE _ JAN 1991 C3009 /2E XRLE BRS Wa Engineer Hong Kong's Development

You might also like