/—VERTIGAL FENDER
COPE LEVEL
GRANITE FACIN
STONE
+60
ELEVATION
rs
Fa Apigranests ove a
(COPE LEVEL
+
COPE LINE
UBER FENDERS
suse sr ns —/
PLAN
ws
0 os ad fre ute ls
OPTIONS FOR RUBBER FENDERS
cH
NOTES,
‘1. ALL DIMENSIONS ARE IN MILLIMETRES.
2 ALL LEVELS REFER TO PRINCIPAL DATUM(PO) AND ARE IN MILLIMETRES.
% OPTIONS FOR RUBBEA FENDERS MAY INCLUDE D, ARCH OR TURTLE FENDERS WITH SECTION HEIGHTS
150 TO 00mm, DEPENDING ON VESSEL TYPES.
SPACING BETWEEN VERTICAL FENDERS : 900 TO 1500mm, DEPENDING ON VESSEL TYPES.
THE HORIZONTAL SPACING OF VERTICAL FENDERS
SHALL BE ADJUSTED TO AVOID CENTRE OF FIXING
BOLTS TO LIE WITHIN 260mm OF CONCRETE EDGE.
7 ROE 7 WO DRG TLE MNES [orga ogd [TE
& FOR DETAILS OF RUBBER STEP UNITS, REFER TO D [HANDRAL PLNTHS ON COPING:
DRAWING Cso0a/4. REMOVED AND GRANITE FACING STONE |Griginal Signed |10.2004
BOLTS, STUDS AND NUTS SHALL BE OF STAINLESS oparmanaes
2 . eats
‘STEEL GRADE M4-¢0. WASHERS SHALL BE &_ [Wife OF DEPARTMENT AEWEED. _[O fine Sort
GRADE TAO} STAINLESS STEEL 0 [RL evaGN OF FOC logy st [ate
& FOR OTHER DETAILS OF LANDING, REFER TO (A [MINOR AMENDMENTS TO GENERAL |Criginal Bignad | 01.1080
DRAWINGS Cacoga AND Ca00g/4. [DETALE OF LANDING
TEVISTOH [EOUATUNE [BATE
oS _ CIVIL ENGINEERING AND
oa SEAWALL EDD DEVELOPMENT DEPARTMENT
LANDIN SCALE AS SHOWN | DRAWING NO.
(SHEET 2 OF §) DATE _ JAN 1991 C3009 /2E
XRLE BRS Wa Engineer Hong Kong's Development