10 Installation of Pump Control House
a 101 Structural Construction lot 1.00
H 11 Electrical Works Tot 1.00
B) [20 Installation of Power Supply and Generator
201 [Electric Power and Service Drop Wire Installation lot 1.00
202 Service Powerine Im 50.00
30 Installation of HypoChlorination Facility (Metering Type)
a 1.0] Metering Pump and Accessories lot 1.00
8} | a0 Installation of Pump Outlet Assembly
se "0 [Ppes, Figs and Valves ia 100
a Be [30 EarthworkPipelaying
ais 501] Trenching/Excavaton nm 191.25
Ee 512 | Backiling and Compacton (Nave Materials) m7 604 |
3) [80 Installation of Transmission Pipeline
olf Sat Pipes and Flings im F000
2 E| [70 Installation of Distribution Pipeline With Pipe Support and Trust Blocks
3 7H'/Pipes ih 2,160.00
32 722] Fitings it 1.00
g 2 80 Construction of Overhead Ferrocement Water Tank (16.0 cu. m)
z 8.01 |Structural Excavation (Common Materials) cum 10.00
z 02 |Stuctural Backfill cum 8.00
5.08 Gravel Bedding cum. 500
= 8.0 Structural Concrete cum, 9.03
3 50 Valves & Meters lk 100
E |e 808 Ppes 8 Fitings it 100
E ie 807 |Extemal& intemal Ladders let 4.00
a 3] [90 Demolition and Restoration of Pavements (Road Crossing)
"E 82 /Demelion in 1800
E 8 Restoraion Tm 718.00
100 Installation of Control Valves & Valve BoxesiCasings
| 1090 On the Line 63 mm@ nit 4.00
& EH 110 Construction of Tapstand
3 [5 710 [Hardware ut 5.00
‘11.02 Pipes and Fitings ‘nit 6.00
120 Installation of Blow-off /DrainValves and Air Rlease Valve
1200 On the Line 63 mm@ st 7.00
130 Construction of CHB Partition with concrete flooring/Door Installation
1301 Hardware ‘ot 1.00
1822 Door Installation units 300
rT} Painting Works (Painting of well, Elevated Water tank and Stand)
42 Paining Works (Painting of wel, Elevated Water tank and Stand) ick 100
10 Pipeline Hydro Testing/Sytem Disinfection and Test Run
1500 [On he line 63mm (2') 0 im 2,160.00
i] | 160 Project Signboard
1800] Fabrication and Installation set 1.00