Download as pdf
Download as pdf
You are on page 1of 1
‘SMB 10 Installation of Pump Control House & | 1.01/Stuctural Constucton lat 100 ie 102 Becical Woks i 100 BE ||| 20 ___[aalaon of Pover Supply and Gareraor % 201/Becric Power and Service Drop Wire hstlaton lt 100 b 202 Serie Poverine in 9000 J g : 30 Installation of HypoChlorination Facility (Metering Type) ze | 100] Metering Pump and Acessories lt 1.00 ; F || 40 Installation of Pump and Accessories a 401] Submersible Water Pump and Accessories lat ‘0 *% 402)Ppes, Fitings and Valves lot 4.00 50 |EarthworkPPipelaying g 501] Trenching/ Excavation 7” 3986 a 502) Backéiling and Compaction (Natve Materials) mm 16 g 2 60 Installation of Transmission Pipeline 38 600)Phoes and Fitings Im 1/8000 8 10 Installation of Distribution Pipeline With Pipe Support and Trust Blocks z 101/Ppes Im 3540.0 702] Fitings lot 10 80 [Demolition and Restoration of Pavements (Road Crossing) 801| Demolition Im 120 802 Restoration Im 120 3 90 Installation of Control Valves & Valve BoxesiCasings 8.00/On he Line 63 mm & 50 mm unit 70 100 (Construction of Tapstand 1001] Hardware unit 110 > : ‘02|Poes and Fitings nit 110 z el] 10 Installation of Blow-off (DrainValves and Air Rlease Valve F ‘1 Ore Line 68 mm 8.50 mm # 70 120 (Construction of CHB Partition with concrete flooring/Door Installation ‘1201 Hardware lat 10 1202 DoorInstlaton units 30 || 189 [Painting Works (Painting of well, Elevated Water tank and Stand) 2 ‘100|Paining Works (Paining of well, Elevated Water ank and Stand) lot 4.0 Pipeline Hydro Testing/Sytem Disinfection and Test Run *400/On the ne 50mm (112°) & 63mm (2°) im 35400 Project Signboard 1500) Fabrication and Instalaton set 10

You might also like