QUOTATION FOR GROUND BEAM TO STIFFING AN EXISTING

FENCE

S/N DESCRIPTION UNIT QTY RATE MATERIAL LABOUR


A Excavation for ground beam 7,200
B Breaking of existing/affected 7,000
block wall/fence of 10m
C BLINDING
(i) Cement No 8 2800 22,400
(ii) Sharp Sand Ton 1 4000 4,000
(iii) Granite Ton 2 7000 14,000
(iv) Casting M3 1.26 5000 6,300
REINFORCED CONCRETE
(i) Cement No 275 2800 770,000
(ii) Sharp Sand Ton 30 4000 120,000
(iii) Granite Ton 60 7000 420,000
(iv) REINFORCEMENT
a. Y16 No 30 2800 84,000
b. Y10 No 134 1,600 214,400
c. Binding Wire No 2 9000 18,000
d. Iron Bender Ton 2 20000 40,000
(v) Casting M3 39.6 5000 198,000
(vi) Formwork M2 244,000 36,000
BLOCK WALL
(i) Cement No 10 2800 28,000
(ii) Sharp Sand Ton 5 4,000 20,000
(iii) Masonary M2 45 700 31,500
(iv) 9” Block No 500 200 100,000
PLASTERING
(i) Cement No
(ii) Plaster Sand Ton 5 4000 20,000
(iii) Masonary M2 700 70,000
Sub Total 396,000
Profit and Overhead 160,000
2,078,800 556,000
TOTAL N2,634,800