23/08/2019

To:
The Chairman
Apapa Local Government Council
37, Burma Road,
Apapa – Lagos.

Dear Sir,

QUOTATION FOR CHANGING THE WALL PAPER ON DIVIDER OFFICE


AND CLEAN ALUMINUM

1. The all divider Sqm is =120.00m / 5.00m= 25rolls X 10,000 = 250,000.00

2. Topbond Gum for the wallpaper = 6gallons X 7,000 = 42,000.00

3. Clean the aluminum chemical = 20litres X 3,000 = 60,000.00

Total = 352,000.00

4. Plus 11% = 12,473.00

5. Workmanship = 180,000.00
_________
GRAND TOTAL = 544,473.00

………………………….
Mr. Abolarinwa
Project Manager
22/08/2019

To:
The Chairman
Apapa Local Government Council
37, Burma Road,
Apapa – Lagos.

Dear Sir,

QUOTATION FOR CHANGING THE WALL PAPER ON DIVIDER OFFICE


AND CLEAN ALUMINUM

1. Sqm2 form divider is 140.45m / 5.00m = 28.09 X 11,500 = 323.035

2. Gum for wallpaper (Topbond) = 8gallons X 7,500 = 60,000

3. Clean aluminum chemical = 25litres X 4,000 = 100,000

= 483,035

4. Plus 11% = 18,973

5. Workmanship = 200,000
_______
GRAND TOTAL = 701,972

………………………….
Project Manager
22/08/2019

To:
The Chairman
Apapa Local Government Council
37, Burma Road,
Apapa – Lagos.

Dear Sir,

QUOTATION FOR CHANGING THE WALL PAPER ON DIVIDER OFFICE


AND CLEAN ALUMINUM

1. Sqm2 all divider 148.85m / 5.00m = 29.77 X 12,000 = 357,240.00

2. Gum for wallpaper = 10gallons X 8,000 = 80,000.00

3. Clean the aluminum = 30litres X 4,500 = 135,000.00

Total = 572,240.00

4. Plus 11% = 24,747.00

5. Workmanship = 250,000.00
_________
GRAND TOTAL = 846,987.00

………………………….
Project Manager